Subproject Database as of December 02, 2024

Download CSV
Count No. ID Subproject Location Name of Subproject Type of Subproject Unit of Measurement Quantity (Unit) Cost in Pesos Beneficiaries Stage Status Contractor
Cluster Region Province District Municipality Loan Proceeds Government of the Philippines Local Goverment Unit Equity European Union Grant Total No. of Households Population
Male Female Total
1 PRDP-IB-RCAR-KAL-005-000-000-2015 Luzon A CAR Kalinga Lone Pinukpuk Improvement of Catabbogan-Wagud Farm to Market Road Farm to Market Road (FMR) Kilometer 13.500 173,820,771.70 21,727,596.46 21,727,596.46 0.00 217,275,964.62 1,631 4,432 4,230 8,662 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE Omengan Construction & Development Corporation
2 PRDP-IB-RCAR-BEN-001-000-000-2015 Luzon A CAR Benguet Lone Atok Improvement Along Jose-Mencio Farm to Market Road Farm to Market Road (FMR) Kilometer 11.910 161,869,447.94 20,233,680.99 20,233,680.99 0.00 202,336,809.92 2,561 6,117 5,672 11,789 Completed (100%) 100.00% physical progress as of Aug. 14, 2020 » VIEW S-CURVE NORTHERN BUILDERS/JOMARCANN GENERAL CONSTRUCTION (JOINT VENTURE)
3 PRDP-IB-RCAR-KAL-004-000-000-2015 Luzon A CAR Kalinga Lone Tabuk City Improvement of Bado Dangwa-Guilayon Farm to Market Road Farm to Market Road (FMR) Kilometer 10.410 184,520,410.40 23,065,051.30 23,065,051.30 0.00 230,650,513.00 1,015 2,650 2,446 5,096 Completed (100%) 100.00% physical progress as of Sep. 06, 2020 » VIEW S-CURVE Omengan Construction and Development Corporation & Royal Sea Bees Construction (JV)
4 PRDP-IB-RCAR-BEN-013-LAT-001-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Puguis Others Square Meter 661.000 8,806,490.63 1,100,811.33 1,100,811.33 0.00 11,008,113.29 1,624 3,360 3,336 6,696 Completed (100%) 100.00% physical progress as of Jun. 29, 2020 » VIEW S-CURVE Kalahan General Construction and Supplies
5 PRDP-IB-RCAR-APA-003-000-000-2016 Luzon A CAR Apayao Lone Pudtol Construction of Warehouse at Barangay Suan, Pudtol, Apayao Others Square Meter 720.000 8,697,285.44 1,087,160.68 1,087,160.68 0.00 10,871,606.80 1,137 6,878 6,427 13,305 Completed (100%) 100.00% physical progress as of Nov. 20, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
6 PRDP-IB-RCAR-APA-004-000-000-2016 Luzon A CAR Apayao Lone Kabugao Construction of Warehouse (Kalyat, Lenneng, Kabugao, Apayao) Others Square Meter 720.000 9,091,754.55 1,136,469.32 1,136,469.32 0.00 11,364,693.19 3,281 8,308 7,593 15,901 Completed (100%) 100.00% physical progress as of Nov. 20, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
7 PRDP-IB-RCAR-APA-006-000-000-2016 Luzon A CAR Apayao Lone Luna Construction of Warehouse (San Gregorio, Luna, Apayao) Others Square Meter 720.000 8,149,108.81 1,018,638.60 1,018,638.60 0.00 10,186,386.01 116 321 260 581 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
8 PRDP-IB-RCAR-APA-007-000-000-2016 Luzon A CAR Apayao Lone Santa Marcela Construction of Warehouse (Panay, Sta. Marcela, Apayao) Others Square Meter 720.000 8,594,280.13 1,074,285.02 1,074,285.02 0.00 10,742,850.17 763 6,070 5,940 12,010 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
9 PRDP-IB-RCAR-APA-008-000-000-2016 Luzon A CAR Apayao Lone Conner Construction of Warehouse at Barangay Calafug, Conner, Apayao Others Square Meter 720.000 7,883,121.83 985,390.23 985,390.23 0.00 9,853,902.29 5,193 13,621 11,928 25,549 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
10 PRDP-IB-RCAR-IFU-019-BAN-010-2017 Luzon A CAR Ifugao Lone Banaue Construction of Dalipe Communal Irrigation System Communal Irrigation System (CIS) Hectare 10.600 6,041,540.59 755,192.57 755,192.57 0.00 7,551,925.73 29 97 81 178 Completed (100%) 100.00% physical progress as of Jun. 01, 2019 » VIEW S-CURVE Wangjo Construction
11 PRDP-IB-RCAR-BEN-017-BOK-002-2018 Luzon A CAR Benguet Lone Bokod Construction of Wakal Tramline Others Square Meter 450.000 3,776,227.18 472,028.40 472,028.40 0.00 4,720,283.98 39 98 97 195 Completed (100%) 100.00% physical progress as of Aug. 04, 2019 » VIEW S-CURVE Summerlin Construction & Development Corporation
12 PRDP-IB-RCAR-MOP-003-000-000-2014 Luzon A CAR Mountain Province Lone Paracelis Improvement of Poblacion-Bantay Farm to Market Road Farm to Market Road (FMR) Kilometer 3.200 32,861,558.62 4,107,694.83 4,107,694.83 0.00 41,076,948.28 2,845 7,255 6,972 14,227 Completed (100%) 100.00% physical progress as of Mar. 28, 2019 » VIEW S-CURVE Edison Development and Construction/Upland Construction and Engineering Services (JV)
13 PRDP-IB-RCAR-MOP-002-000-000-2014 Luzon A CAR Mountain Province Lone Bauko Improvement of Banata-Sumey-Ang-Sadsadan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.580 57,027,239.41 7,128,404.93 7,128,404.93 0.00 71,284,049.27 828 2,422 2,236 4,658 Completed (100%) 100.00% physical progress as of Oct. 19, 2021 » VIEW S-CURVE 3K ROCK ENGINEERING
14 PRDP-IB-RCAR-KAL-001-000-000-2014 Luzon A CAR Kalinga Lone Tanudan Improvement of Banneng-Gombowoy Farm to Market Road Farm to Market Road (FMR) Kilometer 13.000 104,520,722.46 13,065,090.31 13,065,090.31 0.00 130,650,903.08 673 2,126 1,892 4,018 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE Royal Sea Bees Construction
15 PRDP-IB-RCAR-KAL-002-000-000-2014 Luzon A CAR Kalinga Lone Tabuk City Improvement of Bulanao - Amlao Farm to Market Road Farm to Market Road (FMR) Kilometer 15.800 170,440,912.15 21,305,114.02 21,305,114.02 0.00 213,051,140.19 1,225 3,296 3,120 6,416 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Omengan Construction and Development Corporation
16 PRDP-IB-RCAR-MOP-001-000-000-2014 Luzon A CAR Mountain Province Lone Besao Improvement of Besao-Nacawang and Tadian-Mabalite Farm to Market Road Farm to Market Road (FMR) Kilometer 13.630 155,833,309.85 19,479,163.73 19,479,163.73 0.00 194,791,637.31 4,270 10,972 10,542 21,514 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE Upland Construction and Engineering Services
17 PRDP-IB-RCAR-IFU-001-000-000-2015 Luzon A CAR Ifugao Lone Asipulo Improvement of Pula - Cawayan-Camandag Farm to Market Road with Bridge FMR with Bridge Kilometer 9.060 176,160,505.20 22,020,063.15 22,020,063.15 0.00 220,200,631.50 1,327 3,932 3,674 7,606 Less than fifty percent progress 24.18% physical progress as of Sep. 23, 2019 » VIEW S-CURVE LSD Construction and supplies
18 PRDP-IB-RCAR-BEN-002-000-000-2015 Luzon A CAR Benguet Lone Kabayan Improvement of KM 49 - Ambakian Farm to Market Road Farm to Market Road (FMR) Kilometer 10.790 220,064,060.27 27,508,007.53 27,508,007.53 0.00 275,080,075.33 1,263 3,194 3,158 6,352 Completed (100%) 99.99% physical progress as of Dec. 31, 2022 » VIEW S-CURVE 3K Rock Engineering
19 PRDP-IB-RCAR-MOP-004-000-000-2015 Luzon A CAR Mountain Province Lone Bauko Mt. Province Arabica Coffee Enterprise-Civil Works Others Square Meter 526.000 6,017,500.11 752,187.51 752,187.51 0.00 7,521,875.13 2,803 1,177 1,626 2,803 Completed (100%) 100.00% physical progress as of Nov. 27, 2019 » VIEW S-CURVE DYANGGO CONSTRUCTION
20 PRDP-IB-RCAR-BEN-005-000-000-2015 Luzon A CAR Benguet Lone Kibungan Benguet Arabica Coffee Enterprise-Civil Works Others Square Meter 145.520 3,299,451.54 412,431.44 412,431.44 0.00 4,124,314.42 1,367 544 472 1,016 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ICO CONSTRUCTION AND SERVICES
21 PRDP-IB-RCAR-KAL-011-000-000-2015 Luzon A CAR Kalinga Lone Tanudan Improvement of Banneng-Darulog-Bawac Farm to Market Road Farm to Market Road (FMR) Kilometer 6.160 116,845,672.88 14,605,709.11 14,605,709.11 0.00 146,057,091.10 497 1,502 1,369 2,871 Completed (100%) 99.98% physical progress as of Mar. 15, 2024 » VIEW S-CURVE Omengan Construction and Development Corporation
22 PRDP-IB-RCAR-BEN-006-KAB-001-2016 Luzon A CAR Benguet Lone Kabayan Improvement of Balang-Bocao FMR with Vehicular Bridge FMR with Bridge Kilometer 2.340 73,205,530.90 9,150,691.36 9,150,691.36 0.00 91,506,913.62 175 435 417 852 Fifty percent and above progress 52.84% physical progress as of Nov. 15, 2024 » VIEW S-CURVE BALINTUGAN CONSTRUCTION
23 PRDP-IB-RCAR-KAL-003-000-000-2015 Luzon A CAR Kalinga Lone Tanudan Establishment of Coffee Trading Post - Civil Works Others Square Meter 649.000 1,919,562.58 239,945.32 239,945.32 0.00 2,399,453.22 649 346 303 649 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE ROYAL SEA BEES CONSTRUCTION
24 PRDP-IB-RCAR-APA-001-000-000-2015 Luzon A CAR Apayao Lone Flora Improvement of Sta.Maria - Mallig - Upper Atok Farm to Market Road Farm to Market Road (FMR) Kilometer 11.800 172,407,497.77 21,550,937.22 21,550,937.22 0.00 215,509,372.21 298 958 828 1,786 Completed (100%) 100.00% physical progress as of Jun. 30, 2022 » VIEW S-CURVE
25 PRDP-IB-RCAR-BEN-009-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Beckel, La Trinidad Others Square Meter 1590.280 5,510,023.40 688,752.93 688,752.93 0.00 6,887,529.26 766 1,628 1,553 3,181 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE APB CONSTRUCTION
26 PRDP-IB-RCAR-BEN-010-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Alno, La Trinidad, Benguet Others Square Meter 209.650 1,400,463.06 175,057.88 175,057.88 0.00 1,750,578.82 488 1,184 1,128 2,312 Completed (100%) 100.00% physical progress as of Jun. 30, 2018 » VIEW S-CURVE ROCKY 5G BUILDERS
27 PRDP-IB-RCAR-BEN-011-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Alapang, La Trinidad, Benguet Others Square Meter 531.250 3,260,116.15 407,514.52 407,514.52 0.00 4,075,145.19 400 1,892 1,843 3,735 Completed (100%) 100.00% physical progress as of Oct. 15, 2017 » VIEW S-CURVE ROCKY 5G BUILDERS
28 PRDP-IB-RCAR-BEN-012-000-000-2016 Luzon A CAR Benguet Lone Bakun Construction of Slope Protection in Brgy. Bagu, Bakun, Benguet Others Square Meter 2997.000 12,375,445.11 1,546,930.64 1,546,930.64 0.00 15,469,306.39 216 562 518 1,080 Completed (100%) 100.00% physical progress as of Feb. 23, 2018 » VIEW S-CURVE FB Bantales Engineering Construction
29 PRDP-IB-RCAR-ABR-008-VIL-001-2016 Luzon A CAR Abra Lone Villaviciosa Construction of Slope Protection at Villaviciosa, Abra Others Square Meter 1731.750 23,998,509.05 2,999,813.63 2,999,813.63 0.00 29,998,136.31 564 1,446 1,468 2,914 Completed (100%) 100.00% physical progress as of Oct. 03, 2019 » VIEW S-CURVE Legacy Construction Corporation
30 PRDP-IB-RCAR-APA-009-000-000-2016 Luzon A CAR Apayao Lone Flora Construction of Warehouse (Poblacion East, Flora, Apayao) Others Square Meter 720.000 8,777,088.26 1,097,136.03 1,097,136.03 0.00 10,971,360.32 403 1,588 855 2,443 Completed (100%) 100.00% physical progress as of Dec. 07, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
31 PRDP-IB-RCAR-APA-010-000-000-2016 Luzon A CAR Apayao Lone Calanasan Construction of Warehouse at Tanglagan, Calanasan, Apayao Others Square Meter 720.000 8,515,215.02 1,064,401.88 1,064,401.88 0.00 10,644,018.78 449 1,203 802 2,005 Completed (100%) 100.00% physical progress as of Nov. 25, 2021 » VIEW S-CURVE CAMIA Construction Development Corporation
32 PRDP-IB-RCAR-IFU-005-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Bangaan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 144.000 3,550,619.59 443,827.45 443,827.45 0.00 4,438,274.49 206 639 618 1,257 Completed (100%) 100.00% physical progress as of Oct. 18, 2022 » VIEW S-CURVE
33 PRDP-IB-RCAR-IFU-006-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Ducligan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 217.000 2,431,077.29 303,884.66 303,884.66 0.00 3,038,846.61 217 537 479 1,016 Completed (100%) 99.99% physical progress as of Aug. 15, 2022 » VIEW S-CURVE
34 PRDP-IB-RCAR-IFU-007-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Uhaj Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 673.000 1,984,657.04 248,082.13 248,082.13 0.00 2,480,821.30 673 2,126 1,892 4,018 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE Marcia-Joi Construction
35 PRDP-IB-RCAR-IFU-008-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Cambulo Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 206.000 2,976,195.68 372,024.46 372,024.46 0.00 3,720,244.60 206 639 618 1,257 Completed (100%) 100.00% physical progress as of Mar. 15, 2022 » VIEW S-CURVE
36 PRDP-IB-RCAR-IFU-009-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Poitan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 330.000 2,513,984.70 314,248.09 314,248.09 0.00 3,142,480.88 330 845 850 1,695 Completed (100%) 99.99% physical progress as of Feb. 11, 2022 » VIEW S-CURVE
37 PRDP-IB-RCAR-BEN-014-000-000-2016 Luzon A CAR Benguet Lone Bakun Construction of Consolidation Facility, Ampusongan, Bakun, Benguet Others Square Meter 86.400 2,574,069.34 321,758.67 321,758.67 0.00 3,217,586.68 594 888 1,033 1,921 Completed (100%) 100.00% physical progress as of Feb. 20, 2019 » VIEW S-CURVE REASONS CONSTRUCTION
38 PRDP-IB-RCAR-IFU-010-BAN-001-2017 Luzon A CAR Ifugao Lone Banaue Construction of Amchu-uy – Bae CIS Communal Irrigation System (CIS) Hectare 6.000 1,151,127.46 143,890.93 143,890.93 0.00 1,438,909.32 372 910 844 1,754 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE
39 PRDP-IB-RCAR-IFU-012-BAN-003-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Aparnga-o – Ligligan CIS Communal Irrigation System (CIS) Hectare 40.000 5,949,478.00 743,684.75 743,684.75 0.00 7,436,847.50 242 674 627 1,301 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE Alfalfa Construction
40 PRDP-IB-RCAR-IFU-013-BAN-004-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Bongbongna – Poitan CIS Communal Irrigation System (CIS) Hectare 36.220 5,864,325.41 733,040.68 733,040.68 0.00 7,330,406.77 291 845 850 1,695 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE Alfalfa Construction
41 PRDP-IB-RCAR-IFU-014-BAN-005-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Luutan – Imbangnge – Bayungon CIS Communal Irrigation System (CIS) Hectare 19.750 5,823,591.34 727,948.92 727,948.92 0.00 7,279,489.18 330 767 773 1,540 Completed (100%) 100.00% physical progress as of Jul. 15, 2019 » VIEW S-CURVE Alfalfa Construction
42 PRDP-IB-RCAR-IFU-011-BAN-002-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Aparnga-o – Ki-iyang CIS Communal Irrigation System (CIS) Hectare 51.200 5,414,421.80 676,802.73 676,802.73 0.00 6,768,027.26 699 1,766 1,652 3,418 Completed (100%) 99.97% physical progress as of Oct. 15, 2019 » VIEW S-CURVE Alfalfa Construction
43 PRDP-IB-RCAR-MOP-006-BON-001-2017 Luzon A CAR Mountain Province Lone Bontoc Construction of Talubin Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 366.000 4,495,511.08 561,938.89 561,938.89 0.00 5,619,388.86 366 918 840 1,758 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE BONTOC BUILDERS
44 PRDP-IB-RCAR-MOP-007-BON-002-2017 Luzon A CAR Mountain Province Lone Bontoc Improvement of Mainit Chorngowan PWS Potable Water Supply (PWS) Level 2 Number of Households 249.000 5,596,181.70 699,522.71 699,522.71 0.00 6,995,227.12 308 559 480 1,039 Completed (100%) 100.00% physical progress as of Aug. 06, 2020 » VIEW S-CURVE BONTOC BUILDERS
45 PRDP-IB-RCAR-IFU-015-BAN-006-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Viewpoint - San Fernando Farm to Market Road Farm to Market Road (FMR) Kilometer 4.600 108,489,239.46 13,561,154.93 13,561,154.93 0.00 135,611,549.32 362 965 876 1,841 Completed (100%) 100.00% physical progress as of Feb. 24, 2022 » VIEW S-CURVE Wangjo Construction
46 PRDP-IB-RCAR-IFU-016-BAN-007-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Epeheng Communal Irrigation System Communal Irrigation System (CIS) Hectare 20.550 6,000,179.62 750,022.45 750,022.45 0.00 7,500,224.52 330 767 773 1,540 Completed (100%) 100.00% physical progress as of Aug. 15, 2021 » VIEW S-CURVE Wangjo Construction
47 PRDP-IB-RCAR-IFU-017-BAN-008-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Nabalit Communal Irrigation System Communal Irrigation System (CIS) Hectare 10.270 3,920,006.79 490,000.85 490,000.85 0.00 4,900,008.49 72 187 173 360 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE Wangjo Construction
48 PRDP-IB-RCAR-IFU-018-BAN-009-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Bong-bongna - Dalican Communal Irrigation System Communal Irrigation System (CIS) Hectare 17.000 4,126,195.54 515,774.44 515,774.44 0.00 5,157,744.42 85 183 157 340 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE Wangjo Construction
49 PRDP-IB-RCAR-BEN-016-BOK-001-2018 Luzon A CAR Benguet Lone Bokod Construction of Surek-Salat Tramline Others Square Meter 360.000 3,498,087.92 437,260.99 437,260.99 0.00 4,372,609.90 53 69 40 109 Completed (100%) 100.00% physical progress as of Apr. 14, 2020 » VIEW S-CURVE BLDY Engineering and Construction
50 PRDP-IB-RCAR-IFU-020-000-000-2018 Luzon A CAR Ifugao Lone Mayoyao Junction-Alimit-Nattum Farm to Market Road Improvement Farm to Market Road (FMR) Kilometer 4.960 112,422,423.90 14,052,802.99 14,052,802.99 0.00 140,528,029.88 296 977 839 1,816 Completed (100%) 100.00% physical progress as of May. 28, 2022 » VIEW S-CURVE ALFALFA CONSTRUCTION
51 PRDP-IB-RCAR-IFU-021-BAN-011-2018 Luzon A CAR Ifugao Lone Banaue Construction of Anaba-Ducligan-Banao Farm to Market Road FMR with Bridge Kilometer 8.000 196,508,934.63 24,563,616.83 24,563,616.83 0.00 245,636,168.29 275 641 614 1,255 Completed (100%) 100.00% physical progress as of May. 02, 2022 » VIEW S-CURVE ALFALFA CONSTRUCTION
52 PRDP-IB-RCAR-MOP-021-BAR-021-2021 Luzon A CAR Mountain Province Lone Barlig Construction of Lias PWS Level II Potable Water Supply (PWS) Level 2 Number of Households 365.000 5,486,387.16 685,798.40 685,798.40 0.00 6,857,983.96 365 525 444 969 Completed (100%) 100.00% physical progress as of Feb. 19, 2024 » VIEW S-CURVE CNL Construction
53 PRDP-IB-RCAR-IFU-036-AGU-001-2020 Luzon A CAR Ifugao Aguinaldo Improvement of Ubao - Manaot FMR Farm to Market Road (FMR) Kilometer 8.400 173,325,417.49 21,665,677.19 21,665,677.19 0.00 216,656,771.87 446 995 878 1,873 Fifty percent and above progress 80.79% physical progress as of Nov. 15, 2024 » VIEW S-CURVE 3W BUILDERS INC.
54 PRDP-IB-R001-LAU-001-000-000-2014 Luzon A Region 1 La Union 2nd Naguilian Rehabilitation of Balecbec-Basca Farm to Market Road and Balecbec Bridge FMR with Bridge Kilometer 7.920 103,116,636.74 12,889,579.59 12,889,579.59 0.00 128,895,795.92 957 2,267 2,326 4,593 Completed (100%) 100.00% physical progress as of Jan. 15, 2019 » VIEW S-CURVE Goldrich Construction and Trading
55 PRDP-IB-R001-ILS-001-000-000-2014 Luzon A Region 1 Ilocos Sur 1st Sinait Rehabilitation of Tubigay-Baracbac-Nagcullooban Farm to Market Road Farm to Market Road (FMR) Kilometer 6.170 61,223,775.11 7,652,971.89 7,652,971.89 0.00 76,529,718.89 356 824 841 1,665 Completed (100%) 100.00% physical progress as of Nov. 15, 2019 » VIEW S-CURVE Firm Builders Inc.
56 PRDP-IB-R001-PAN-003-MAN-002-2015 Luzon A Region 1 Pangasinan 4th Manaoag Construction of Oraan Bridge with Approaches Bridge Linear Meter 21.000 16,460,028.86 2,057,503.61 2,057,503.61 0.00 20,575,036.08 815 750 661 1,411 Completed (100%) 100.00% physical progress as of Oct. 26, 2018 » VIEW S-CURVE BET Construction and Supply
57 PRDP-IB-R001-LAU-005-000-000-2015 Luzon A Region 1 La Union 2nd Rosario Construction of Malicnao Bridge Bridge Linear Meter 56.100 31,157,813.78 3,894,726.72 3,894,726.72 0.00 38,947,267.22 1,353 3,444 3,320 6,764 Completed (100%) 100.00% physical progress as of Dec. 05, 2020 » VIEW S-CURVE R.G. Benito Construction and Supply Corporation
58 PRDP-IB-R001-ILN-012-CUR-001-2015 Luzon A Region 1 Ilocos Norte 2nd Currimao Rehabilitation of Tapao Tigue-Poblacion 2-Sta. Cruz-Lang-ayan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.900 42,027,432.49 5,253,429.06 5,253,429.06 0.00 52,534,290.61 225 623 448 1,071 Completed (100%) 100.00% physical progress as of Jul. 26, 2019 » VIEW S-CURVE Badoc Builders and Supply, Inc.
59 PRDP-IB-R001-ILN-006-PAO-001-2015 Luzon A Region 1 Ilocos Norte 2nd Paoay Rehabilitation of Nalasin-Sungadan-Langiden Farm to Market Road Farm to Market Road (FMR) Kilometer 4.930 53,864,271.19 6,733,033.90 6,733,033.90 0.00 67,330,338.99 301 1,292 1,304 2,596 Completed (100%) 100.00% physical progress as of Aug. 30, 2019 » VIEW S-CURVE Viking Construction and Supplies
60 PRDP-IB-R001-ILN-001-000-000-2014 Luzon A Region 1 Ilocos Norte 2nd Batac City Rehabilitation of Billoca-San Juan Farm to Market Road and Eight (8) Bridges FMR with Bridge Kilometer 12.240 149,122,888.92 18,640,361.12 18,640,361.12 0.00 186,403,611.16 1,254 2,515 3,764 6,279 Completed (100%) 100.00% physical progress as of Sep. 24, 2020 » VIEW S-CURVE AJ Taylan Construction Corporation
61 PRDP-IB-R001-ILS-004-000-000-2015 Luzon A Region 1 Ilocos Sur 1st Cabugao Construction of Cabugao Mango Packaging Center Others Square Meter 234.000 3,862,584.55 482,823.07 482,823.07 0.00 4,828,230.69 45 39 6 45 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE Vigan Fortune Construction
62 PRDP-IB-R001-ILS-005-CER-001-2016 Luzon A Region 1 Ilocos Sur 2nd Cervantes Construction of Namita Agricultural Tramline System Others Square Meter 1590.000 3,749,639.57 468,704.95 468,704.95 0.00 4,687,049.47 101 259 358 617 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE Remnant Builders
63 PRDP-IB-R001-ILS-006-SAO-001-2016 Luzon A Region 1 Ilocos Sur 1st Santo Domingo Construction of Sto. Domingo Municipal Warehouse with Multi-Purpose Drying Pavement Others Square Meter 1000.000 7,470,531.93 933,816.49 933,816.49 0.00 9,338,164.91 2,296 4,679 1,294 5,973 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE JENBA Construction
64 PRDP-IB-R001-PAN-004-MAN-003-2016 Luzon A Region 1 Pangasinan 4th Manaoag Construction of Municipal Warehouse with Multi-Purpose Drying Pavement Others Square Meter 477.500 8,335,702.29 1,041,962.79 1,041,962.79 0.00 10,419,627.87 754 2,192 827 3,019 Completed (100%) 100.00% physical progress as of Jul. 14, 2018 » VIEW S-CURVE JG Garcia Construction and Supply
65 PRDP-IB-R001-ILN-014-NUE-001-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Uguis Solar Dryer Others Square Meter 1020.000 1,834,681.28 229,335.16 229,335.16 0.00 2,293,351.60 38 573 530 1,103 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
66 PRDP-IB-R001-ILN-015-NUE-002-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Garnaden Solar Dryer Others Square Meter 480.000 884,576.31 110,572.04 110,572.04 0.00 1,105,720.39 121 335 300 635 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
67 PRDP-IB-R001-ILN-016-NUE-003-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Naguilian Solar Dryer Others Square Meter 594.000 1,052,009.54 131,501.19 131,501.19 0.00 1,315,011.92 148 410 386 796 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
68 PRDP-IB-R001-ILN-018-ADA-001-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Sinidangan Solar Dryer Others Square Meter 420.000 810,323.03 101,290.38 101,290.38 0.00 1,012,903.79 36 78 57 135 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
69 PRDP-IB-R001-ILN-019-ADA-002-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Maligligay Solar Dryer Others Square Meter 420.000 1,118,383.75 139,797.97 139,797.97 0.00 1,397,979.69 23 54 26 80 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
70 PRDP-IB-R001-ILN-020-ADA-003-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Malaggao Solar Dryer Others Square Meter 420.000 1,071,418.41 133,927.30 133,927.30 0.00 1,339,273.01 131 151 135 286 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
71 PRDP-IB-R001-ILN-017-NUE-004-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Acnam Solar Dryer Others Square Meter 420.000 854,847.41 106,855.93 106,855.93 0.00 1,068,559.27 130 335 300 635 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
72 PRDP-IB-R001-ILN-021-000-000-2016 Luzon A Region 1 Ilocos Norte 1st Vintar Construction of Mabanbanag Solar Dryer Others Square Meter 420.000 1,098,415.39 137,301.92 137,301.92 0.00 1,373,019.23 20 346 340 686 Completed (100%) 100.00% physical progress as of Jul. 07, 2017 » VIEW S-CURVE Remar Construction
73 PRDP-IB-R001-ILN-022-000-000-2016 Luzon A Region 1 Ilocos Norte 1st Vintar Construction of Salsalamagui Solar Dryer Others Square Meter 420.000 921,727.47 115,215.93 115,215.93 0.00 1,152,159.33 26 609 589 1,198 Completed (100%) 100.00% physical progress as of Jun. 15, 2017 » VIEW S-CURVE Remar Construction
74 PRDP-IB-R001-ILN-024-PAO-002-2017 Luzon A Region 1 Ilocos Norte 2nd Paoay Rehabilitation of Paoay Communal Irrigation System Communal Irrigation System (CIS) Hectare 538.670 109,255,764.64 13,656,970.58 13,656,970.58 0.00 136,569,705.80 1,086 2,700 2,728 5,428 Completed (100%) 100.00% physical progress as of Dec. 13, 2021 » VIEW S-CURVE N.A. Ibarra Construction
75 PRDP-IB-R001-PAN-001-000-000-2014 Luzon A Region 1 Pangasinan 6th Umingan Rehabilitation of Gonzales-San Juan Farm to Market Road Farm to Market Road (FMR) Kilometer 10.630 95,416,491.82 11,927,061.48 11,927,061.48 0.00 119,270,614.78 2,872 7,142 6,052 13,194 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE Joint Venture - Alcel Construction and BET Construction and Supply
76 PRDP-IB-R001-LAU-006-000-000-2015 Luzon A Region 1 La Union 2nd Rosario Rehabilitation of Parasapas Farm to Market Road and Parasapas Bridge FMR with Bridge Kilometer 2.980 62,425,373.84 7,803,171.73 7,803,171.73 0.00 78,031,717.30 294 698 672 1,370 Completed (100%) 100.00% physical progress as of May. 20, 2021 » VIEW S-CURVE Goldrich Construction and Trading
77 PRDP-IB-R001-ILS-002-000-000-2015 Luzon A Region 1 Ilocos Sur 1st Cabugao Rehabilitation of Pug-Os-Nagcullooban Farm to Market Road Farm to Market Road (FMR) Kilometer 15.480 165,078,000.37 20,634,750.05 20,634,750.05 0.00 206,347,500.47 1,843 4,629 4,260 8,889 Completed (100%) 100.00% physical progress as of Dec. 06, 2022 » VIEW S-CURVE BMK Construction Corporation
78 PRDP-IB-R001-ILN-023-VIN-001-2017 Luzon A Region 1 Ilocos Norte 1st Vintar Rehabilitation of San Jose Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 124.000 3,191,540.81 398,942.60 398,942.60 0.00 3,989,426.01 124 232 215 447 Completed (100%) 100.00% physical progress as of Nov. 12, 2019 » VIEW S-CURVE JB Felipe Construction
79 PRDP-IB-R001-PAN-006-BAY-001-2018 Luzon A Region 1 Pangasinan 3rd Bayambang Improvement of San Gabriel II Farm To Market Road with Bridge FMR with Bridge Kilometer 1.870 2,801,867.90 350,233.49 350,233.49 0.00 3,502,334.88 2,017 4,375 4,337 8,712 Completed (100%) 99.99% physical progress as of Jun. 28, 2024 » VIEW S-CURVE CHRISTIAN IAN CONSTRUCTION CORPORATION
80 PRDP-IB-R001-LAU-008-BAU-001-2017 Luzon A Region 1 La Union 2nd Bauang Rehabilitation and Road Opening of Cabalayangan-Sta. Monica Farm to Market Road Farm to Market Road (FMR) Kilometer 4.750 80,405,982.10 10,050,747.76 10,050,747.76 0.00 100,507,477.62 3,168 1,590 578 2,168 Fifty percent and above progress 72.66% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Tarlac 3-G Construction and Development Corporation
81 PRDP-IB-R001-ILS-009-SAM-001-2020 Luzon A Region 1 Ilocos Sur 2nd Santa Maria Construction of Cabaroan-Silag-Pacang (CASIPA) Bridge with Approaches Bridge Linear Meter 120.900 82,273,541.30 10,284,192.66 10,284,192.66 0.00 102,841,926.62 1,162 2,559 2,502 5,061 Fifty percent and above progress 86.86% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Viking Construction
82 PRDP-IB-R002-ISA-001-000-000-2014 Luzon A Region 2 Isabela 1st Cabagan Rehabilitation/Improvement of Magassi-Union-Camasi Farm to Market Road Farm to Market Road (FMR) Kilometer 4.930 34,654,673.76 4,331,834.22 4,331,834.22 0.00 43,318,342.20 1,139 2,827 2,711 5,538 Completed (100%) 100.00% physical progress as of Sep. 15, 2016 » VIEW S-CURVE RRC Construction
83 PRDP-IB-R002-ISA-002-000-000-2014 Luzon A Region 2 Isabela 2nd Mallig Rehabilitation/Construction of Olango-Siempre Viva-Trinidad-Manano Farm to Market Road Farm to Market Road (FMR) Kilometer 9.170 53,193,981.59 6,649,247.70 6,649,247.70 0.00 66,492,476.99 1,898 4,277 4,240 8,517 Completed (100%) 100.00% physical progress as of Jun. 30, 2016 » VIEW S-CURVE A. De Guia Construction
84 PRDP-IB-R002-ISA-005-000-000-2014 Luzon A Region 2 Isabela 2nd Roxas Rehabilitation/Concreting of San Placido-Muñoz West-Sinamar Farm to Market Road Farm to Market Road (FMR) Kilometer 8.150 71,882,388.34 8,985,298.54 8,985,298.54 0.00 89,852,985.42 2,029 4,735 4,459 9,194 Completed (100%) 100.00% physical progress as of Feb. 19, 2019 » VIEW S-CURVE C.R Domingo Const./Alfalfa Const. (JV)
85 PRDP-IB-R002-ISA-007-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Rehabilitation/Improvement of Virgoneza-Salay-Sinaoangan-Palacian Farm to Market Road with Bridge FMR with Bridge Kilometer 14.030 154,275,806.41 19,284,475.80 19,284,475.80 0.00 192,844,758.01 885 1,843 1,816 3,659 Approved by RPAB For endorsement to NPCO
86 PRDP-IB-R002-ISA-006-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Rehabilitation/Improvement of Virgoneza-Quimalabasa-San Antonio-Sto Niño-Dabubu Grande Farm to Market Road Farm to Market Road (FMR) Kilometer 8.010 54,691,455.82 6,836,431.98 6,836,431.98 0.00 68,364,319.78 1,331 2,797 2,559 5,356 Completed (100%) 100.00% physical progress as of Jul. 08, 2020 » VIEW S-CURVE BHM Construction
87 PRDP-IB-R002-QUI-002-000-000-2014 Luzon A Region 2 Quirino Lone Aglipay Rehabilitation of NRJ-Palacian-Ramos Farm to Market Road Farm to Market Road (FMR) Kilometer 11.790 107,848,941.87 13,481,117.73 13,481,117.73 0.00 134,811,177.33 983 2,182 2,081 4,263 Completed (100%) 100.00% physical progress as of Nov. 30, 2017 » VIEW S-CURVE RDI Jr. Construction
88 PRDP-IB-R002-QUI-001-000-000-2014 Luzon A Region 2 Quirino Lone Saguday Improvement / Rehabilitation of NRJ-Gamis-Banuar-Dumabel-Cabugao-Eden-Burgos-PRJ Burgos-Gomez-Calaocan Farm to Market Road Farm to Market Road (FMR) Kilometer 19.380 124,024,766.44 15,503,095.81 15,503,095.81 0.00 155,030,958.06 1,338 3,159 2,868 6,027 Completed (100%) 100.00% physical progress as of Dec. 14, 2019 » VIEW S-CURVE APD CONSTRUCTION
89 PRDP-IB-R002-QUI-006-000-000-2014 Luzon A Region 2 Quirino Lone Aglipay Rehabilitation of National Road Junction- Ligaya-Villa Pagaduan Farm to Market Road Farm to Market Road (FMR) Kilometer 5.300 41,109,415.63 5,138,676.95 5,138,676.95 0.00 51,386,769.53 892 2,037 1,943 3,980 Completed (100%) 100.00% physical progress as of Dec. 05, 2017 » VIEW S-CURVE RDI Jr. Construction
90 PRDP-IB-R002-QUI-007-000-000-2015 Luzon A Region 2 Quirino Lone Diffun Rehabilitation of National Road Junction- Ricarte Sur-Magsaysay Farm to Market Road Farm to Market Road (FMR) Kilometer 8.070 118,666,165.39 14,833,270.67 14,833,270.67 0.00 148,332,706.73 729 1,680 1,549 3,229 Completed (100%) 100.00% physical progress as of Jul. 06, 2021 » VIEW S-CURVE APD CONSTRUCTION
91 PRDP-IB-R002-QUI-008-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of Lusod-Sto Niño Farm to Market Road Farm to Market Road (FMR) Kilometer 3.890 44,793,425.26 5,599,178.16 5,599,178.16 0.00 55,991,781.58 873 2,065 2,013 4,078 Completed (100%) 100.00% physical progress as of Dec. 13, 2021 » VIEW S-CURVE Ocean Construction Services
92 PRDP-IB-R002-CAG-004-000-000-2014 Luzon A Region 2 Cagayan 3rd Amulung Rehabilitation of Iraga-Bayabat Farm to Market Road and Bridges FMR with Bridge Kilometer 20.250 162,555,785.31 20,319,473.16 20,319,473.16 0.00 203,194,731.63 5,654 13,409 13,302 26,711 Completed (100%) 100.00% physical progress as of Jun. 17, 2019 » VIEW S-CURVE RDI JR CONSTRUCTION/CREST CONSTRUCTION (JV)
93 PRDP-IB-R002-CAG-002-000-000-2014 Luzon A Region 2 Cagayan 3rd Tuguegarao City Cagayan Dairy Enterprise - Infra Others Square Meter 1019.780 7,775,525.84 971,940.73 971,940.73 0.00 9,719,407.30 64 171 83 254 Completed (100%) 100.00% physical progress as of Jul. 25, 2019 » VIEW S-CURVE M.G. JACINTO CONSTRUCTION
94 PRDP-IB-R002-CAG-005-000-000-2014 Luzon A Region 2 Cagayan 1st Alcala Alcala Dairy Production and Marketing Enterprise - Infra Others Square Meter 902.800 7,523,782.40 940,472.80 940,472.80 0.00 9,404,728.00 169 137 69 206 Completed (100%) 100.00% physical progress as of Dec. 20, 2018 » VIEW S-CURVE Pacific Star Erectors
95 PRDP-IB-R002-CAG-001-000-000-2014 Luzon A Region 2 Cagayan 3rd Tuguegarao City Construction/Rehabilitation of Namabbalan Norte-Baliuag-Bical-Cabbo Farm to Market Road with bridges FMR with Bridge Kilometer 17.420 160,489,574.43 20,061,196.80 20,061,196.80 0.00 200,611,968.03 894 2,257 2,275 4,532 Completed (100%) 100.00% physical progress as of Oct. 15, 2019 » VIEW S-CURVE R.D. Interior Jr. Construction
96 PRDP-IB-R002-ISA-003-000-000-2014 Luzon A Region 2 Isabela 2nd Mallig Isabela Dairy Enterprise - Infra (Construction of Dairy Processing Plant) Others Square Meter 240.000 4,081,144.13 510,143.02 510,143.02 0.00 5,101,430.17 1,152 1,369 1,111 2,480 Completed (100%) 100.00% physical progress as of Aug. 17, 2017 » VIEW S-CURVE _______________________
97 PRDP-IB-R002-ISA-008-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Dairy Carabao Enterprise of Isabela - Infra (Construction of Milking Barn with Water System and Electrical Facilities) Others Square Meter 202.500 2,754,680.41 344,335.05 344,335.05 0.00 3,443,350.51 78 55 23 78 Completed (100%) 100.00% physical progress as of Aug. 03, 2018 » VIEW S-CURVE A.F Manuel Construction
98 PRDP-IB-R002-QUI-003-000-000-2014 Luzon A Region 2 Quirino Lone Maddela Quirino Coffee Enterprise - Infra Others Square Meter 120.000 1,901,979.46 237,747.43 237,747.43 0.00 2,377,474.32 245 734 369 1,103 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE GB Carlos Construction
99 PRDP-IB-R002-ISA-004-000-000-2014 Luzon A Region 2 Isabela 2nd San Manuel Rehabilitation/Construction of Barangay District III-Barangay Sta. Cruz Farm to Market Road Farm to Market Road (FMR) Kilometer 6.590 51,399,826.94 6,424,978.37 6,424,978.37 0.00 64,249,783.68 472 728 770 1,498 Completed (100%) 100.00% physical progress as of Jun. 02, 2018 » VIEW S-CURVE Danysons Construction/ Marcphil Construction (Joint Venture)
100 PRDP-IB-R002-QUI-005-000-000-2014 Luzon A Region 2 Quirino Lone Cabarroguis Rehabilitation of PRJ-Dibibi-Dingasan Farm to Market Road Farm to Market Road (FMR) Kilometer 3.900 32,610,715.90 4,076,339.49 4,076,339.49 0.00 40,763,394.88 406 1,003 846 1,849 Completed (100%) 100.00% physical progress as of May. 11, 2017 » VIEW S-CURVE RDI Jr. Construction
101 PRDP-IB-R002-QUI-004-000-000-2014 Luzon A Region 2 Quirino Lone Diffun Rehabilitation of National Road Junction- Maria Clara-Gabriela Silang Farm to Market Road Farm to Market Road (FMR) Kilometer 4.700 43,751,929.30 5,468,991.16 5,468,991.16 0.00 54,689,911.62 589 1,173 1,212 2,385 Completed (100%) 100.00% physical progress as of Jan. 23, 2018 » VIEW S-CURVE RDI Jr. Construction
102 PRDP-IB-R002-QUI-012-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Quirino Banana Enterprise - Infra Others Square Meter 120.000 1,757,537.96 219,692.25 219,692.25 0.00 2,196,922.46 26 14 104 118 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE GB Carlos Construction
103 PRDP-IB-R002-NUV-003-000-000-2015 Luzon A Region 2 Nueva Vizcaya Lone Solano Mandarin Production and Marketing Enterprise - Infra (Construction of Malabing Valley Trading Center) Others Square Meter 200.000 3,612,398.18 451,549.77 451,549.77 0.00 4,515,497.72 560 336 224 560 Completed (100%) 100.00% physical progress as of Oct. 23, 2018 » VIEW S-CURVE DENISSE-JOHN CONSTRUCTION & SUPPLIES
104 PRDP-IB-R002-ISA-022-000-000-2016 Luzon A Region 2 Isabela 2nd Roxas Construction of Warehouse with Solar Dryer (at Barangay Doña Concha, Roxas) Others Square Meter 1112.000 10,029,600.00 1,253,700.00 1,253,700.00 0.00 12,537,000.00 233 700 466 1,166 Completed (100%) 100.00% physical progress as of Sep. 02, 2020 » VIEW S-CURVE COLBY Construction
105 PRDP-IB-R002-ISA-023-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Warehouse with Solar Dryer (at Barangay Alinam, Cauayan City) Others Square Meter 1112.000 9,294,651.83 1,161,831.48 1,161,831.48 0.00 11,618,314.79 239 670 523 1,193 Completed (100%) 100.00% physical progress as of Sep. 12, 2019 » VIEW S-CURVE Limestone Construction and Development Corporation
106 PRDP-IB-R002-ISA-024-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Cauayan City Warehouse, Barangay San Pablo, Cauayan City, Isabela Others Square Meter 584.400 10,744,006.53 1,343,000.82 1,343,000.82 0.00 13,430,008.17 539 945 925 1,870 Approved by RPAB For Issuance of NOL 1
107 PRDP-IB-R002-ISA-025-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Warehouse with Solar Dryer (at Barangay Buyon, Cauayan city) Others Square Meter 1112.000 9,236,800.00 1,154,600.00 1,154,600.00 0.00 11,546,000.00 239 630 605 1,235 Approved by RPAB For Issuance of NOL 1
108 PRDP-IB-R002-ISA-026-000-000-2016 Luzon A Region 2 Isabela 1st Cabagan Construction of Cansan Warehouse with Solar Dryer, Barangay Cansan, Cabagan, Isabela Others Square Meter 540.000 10,460,725.21 1,307,590.65 1,307,590.65 0.00 13,075,906.51 959 2,598 2,451 5,049 Approved by RPAB For Issuance of NOL 1
109 PRDP-IB-R002-ISA-027-000-000-2016 Luzon A Region 2 Isabela 4th Echague Construction of Warehouse with Solar Dryer (at Barangay San Fabian, Echague) Others Square Meter 1112.000 9,766,624.80 1,220,828.10 1,220,828.10 0.00 12,208,281.00 175 137 38 175 Completed (100%) 100.00% physical progress as of Jun. 01, 2020 » VIEW S-CURVE AHB Construction and Supply
110 PRDP-IB-R002-ISA-012-000-000-2016 Luzon A Region 2 Isabela 1st Tumauini Construction of Namnama Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 60.000 8,408,286.01 1,051,035.75 1,051,035.75 0.00 10,510,357.51 331 797 770 1,567 Completed (100%) 100.00% physical progress as of Mar. 29, 2019 » VIEW S-CURVE EGB Construction
111 PRDP-IB-R002-ISA-013-000-000-2016 Luzon A Region 2 Isabela 2nd Naguilian Construction of Aguinaldo Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 25.000 2,778,719.46 347,339.93 347,339.93 0.00 3,473,399.32 92 201 200 401 Completed (100%) 100.00% physical progress as of Mar. 29, 2019 » VIEW S-CURVE EGB CONSTRUCTION
112 PRDP-IB-R002-ISA-014-000-000-2016 Luzon A Region 2 Isabela 2nd Naguilian Construction of Lapu-Lapu Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 45.000 8,853,856.36 1,106,732.05 1,106,732.05 0.00 11,067,320.46 82 188 160 348 Completed (100%) 100.00% physical progress as of Sep. 25, 2019 » VIEW S-CURVE E.G.B CONSTRUCTION
113 PRDP-IB-R002-ISA-015-000-000-2016 Luzon A Region 2 Isabela 2nd Quirino Construction of Timpuyog Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 40.000 10,143,269.58 1,267,908.70 1,267,908.70 0.00 12,679,086.98 749 1,447 1,355 2,802 Completed (100%) 100.00% physical progress as of Jan. 21, 2020 » VIEW S-CURVE EGB Construction
114 PRDP-IB-R002-ISA-016-000-000-2016 Luzon A Region 2 Isabela 2nd Quezon Construction of Santos Small Water Impounding Project II (SWIP) Communal Irrigation System (CIS) Hectare 35.000 6,114,395.88 764,299.49 764,299.49 0.00 7,642,994.86 761 1,723 1,645 3,368 Completed (100%) 100.00% physical progress as of Jun. 29, 2019 » VIEW S-CURVE EGB Construction
115 PRDP-IB-R002-ISA-017-000-000-2016 Luzon A Region 2 Isabela 2nd Quezon Construction of Dummon Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 30.000 2,644,523.33 330,565.42 330,565.42 0.00 3,305,654.17 139 224 225 449 Completed (100%) 100.00% physical progress as of Aug. 29, 2018 » VIEW S-CURVE EGB Construction
116 PRDP-IB-R002-ISA-018-000-000-2016 Luzon A Region 2 Isabela 2nd Roxas Construction of Kabigaan Small Water Impounding Project II (SWIP) Communal Irrigation System (CIS) Hectare 40.000 9,680,000.00 1,210,000.00 1,210,000.00 0.00 12,100,000.00 829 1,807 1,774 3,581 Completed (100%) 100.00% physical progress as of Mar. 24, 2019 » VIEW S-CURVE Gacutan Construction
117 PRDP-IB-R002-ISA-019-000-000-2016 Luzon A Region 2 Isabela 4th Jones Construction of San Jose Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 35.000 7,775,088.87 971,886.11 971,886.11 0.00 9,718,861.09 111 278 254 532 Completed (100%) 100.00% physical progress as of Apr. 22, 2020 » VIEW S-CURVE C.R DOMINGO CONSTRUCTION
118 PRDP-IB-R002-ISA-020-000-000-2016 Luzon A Region 2 Isabela 4th Cordon Construction of Capirpiriwan Diversion Dam (DD) Communal Irrigation System (CIS) Hectare 36.000 4,535,319.05 566,914.88 566,914.88 0.00 5,669,148.81 865 1,924 1,944 3,868 Completed (100%) 100.00% physical progress as of Nov. 17, 2018 » VIEW S-CURVE AHB Construction and Supply
119 PRDP-IB-R002-CAG-009-BAG-001-2016 Luzon A Region 2 Cagayan 1st Baggao Rehabilitation of Bitag-Pequeño Communal Irrigation System Communal Irrigation System (CIS) Hectare 260.000 10,687,406.92 1,335,925.87 1,335,925.87 0.00 13,359,258.66 400 743 1,180 1,923 Completed (100%) 100.00% physical progress as of May. 18, 2021 » VIEW S-CURVE Four M Builders
120 PRDP-IB-R002-ISA-031-000-000-2016 Luzon A Region 2 Isabela 3rd Angadanan Construction of Sinalugan Communal Pump Irrigation Project Communal Irrigation System (CIS) Hectare 300.000 21,200,000.00 2,650,000.00 2,650,000.00 0.00 26,500,000.00 630 1,313 1,262 2,575 Approved by RPAB For Issuance of NOL 1
121 PRDP-IB-R002-ISA-033-RAM-001-2017 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of Oscariz - Nagbacalan Farm to Market Road Farm to Market Road (FMR) Kilometer 6.800 101,560,000.00 12,695,000.00 12,695,000.00 0.00 126,950,000.00 3,157 6,674 6,459 13,133 Completed (100%) 100.00% physical progress as of Jan. 27, 2021 » VIEW S-CURVE C. R. Domingo Construction and POwer Development, Inc.
122 PRDP-IB-R002-BTN-001-000-000-2017 Luzon A Region 2 Batanes Lone Sabtang Construction of Sinakan Agricultural Tramline System Others Square Meter 1.500 9,423,161.88 1,177,895.24 1,177,895.24 0.00 11,778,952.36 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
123 PRDP-IB-R002-ISA-037-000-000-2018 Luzon A Region 2 Isabela 3rd Cabatuan Rehabilitation / Improvement of La Paz - Canan FMR Farm to Market Road (FMR) Kilometer 5.900 56,640,000.00 7,080,000.00 7,080,000.00 0.00 70,800,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
124 PRDP-IB-R002-ISA-038-000-000-2018 Luzon A Region 2 Isabela 3rd Angadanan Rehabilitation/Improvement of Lourdes - Duroc-Malasin-Dipaluda FMR (Aromatic/Pigmented Rice) Farm to Market Road (FMR) Kilometer 9.800 110,042,240.00 13,755,280.00 13,755,280.00 0.00 137,552,800.00 738 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
125 PRDP-IB-R002-ISA-000-000-000-2016 Luzon A Region 2 Isabela 2nd Gamu Construction of Warehouse with Solar Dryer (at Barangay District 3, Gamu) Others Square Meter 1112.000 9,811,370.60 1,226,421.33 1,226,421.33 0.00 12,264,213.26 280 216 64 280 Completed (100%) 100.00% physical progress as of Aug. 23, 2020 » VIEW S-CURVE Isabela EBC Builders Construction, Inc.
126 PRDP-IB-R002-CAG-010-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Construction of Dalaya-Sta. Maria FMR Farm to Market Road (FMR) Kilometer 6.000 86,134,799.46 10,766,849.93 10,766,849.93 0.00 107,668,499.32 920 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
127 PRDP-IB-R002-QUI-013-000-000-2019 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of San Pedro-Villa Agullana-Villa Yllana-San Martin FMR Farm to Market Road (FMR) Kilometer 10.170 122,012,352.00 15,251,544.00 15,251,544.00 0.00 152,515,440.00 778 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
128 PRDP-IB-R002-CAG-011-000-000-2019 Luzon A Region 2 Cagayan 1st Aparri Rehabilitation/Construction of Bukig-Caagaman-Navagan FMR and Bridge FMR with Bridge Kilometer 8.910 126,772,800.00 15,846,600.00 15,846,600.00 0.00 158,466,000.00 647 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
129 PRDP-IB-R002-ISA-044-000-000-2019 Luzon A Region 2 Isabela 1st San Pablo Construction of Annanuman Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 195.000 9,486,400.00 1,185,800.00 1,185,800.00 0.00 11,858,000.00 195 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
130 PRDP-IB-R002-ISA-045-000-000-2019 Luzon A Region 2 Isabela 1st San Pablo Construction of Limbauan Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 300.000 12,073,600.00 1,509,200.00 1,509,200.00 0.00 15,092,000.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
131 PRDP-IB-R002-ISA-046-000-000-2019 Luzon A Region 2 Isabela 1st Delfin Albano Construction of Bayabo Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 272.000 3,753,164.80 469,145.60 469,145.60 0.00 4,691,456.00 272 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
132 PRDP-IB-R002-ISA-047-000-000-2019 Luzon A Region 2 Isabela 1st Delfin Albano Construction of San Antonio Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 117.000 1,614,412.80 201,801.60 201,801.60 0.00 2,018,016.00 117 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
133 PRDP-IB-R002-CAG-013-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Rehabilitation of Bicud Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 195.000 2,354,352.00 294,294.00 294,294.00 0.00 2,942,940.00 195 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
134 PRDP-IB-R002-CAG-014-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Rehabilitation of Dalaya Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 300.000 3,622,080.00 452,760.00 452,760.00 0.00 4,527,600.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
135 PRDP-IB-R002-ISA-048-000-000-2019 Luzon A Region 2 Isabela 4th San Agustin Construction of Dairy Microbiological Facility Others Square Meter 110.000 5,492,485.92 686,560.74 686,560.74 0.00 6,865,607.40 3,049 1,810 1,239 3,049 Completed (100%) 100.00% physical progress as of May. 21, 2021 » VIEW S-CURVE A.T DUMLAO CONSTRUCTION INC.
136 PRDP-IB-R002-ISA-055-SAI-001-2020 Luzon A Region 2 Isabela 4th San Isidro Concreting of Rizal West - Ramos West - Ramos East Farm to Market Road Farm to Market Road (FMR) Kilometer 7.020 125,357,042.78 15,669,630.35 15,669,630.35 0.00 156,696,303.48 1,070 2,260 2,167 4,427 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
137 PRDP-IB-R002-ISA-056-SAI-002-2020 Luzon A Region 2 Isabela 4th San Isidro Concreting of Villaflor-Nagbukel-Gud Farm to Market Road Farm to Market Road (FMR) Kilometer 7.450 83,440,000.00 10,430,000.00 10,430,000.00 0.00 104,300,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
138 PRDP-IB-R002-ISA-057-000-000-2020 Luzon A Region 2 Isabela 2nd Burgos Construction of MARIIS Burgos SPC Warehouse with Solar Dryer, Barangay Caliguian, Burgos, Isabela Others Square Meter 576.000 11,808,065.65 1,476,008.21 1,476,008.21 0.00 14,760,082.07 1,570 3,281 3,152 6,433 Approved by RPAB For endorsement to NPCO
139 PRDP-IB-R002-ISA-058-000-000-2020 Luzon A Region 2 Isabela Construction of Warehouse (Naguilian, Isabela) Others Square Meter 612.000 8,800,000.00 1,100,000.00 1,100,000.00 0.00 11,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
140 PRDP-IB-R002-ISA-060-000-000-2020 Luzon A Region 2 Isabela 3rd San Guillermo Construction of San Guillermo Warehouse with Solar Dryer, Barangay Nakar, San Guillermo, Isabela Others Square Meter 584.000 12,179,211.98 1,522,401.50 1,522,401.50 0.00 15,224,014.98 4,524 10,706 9,484 20,190 Approved by RPAB For endorsement to NPCO
141 PRDP-IB-R002-ISA-061-000-000-2020 Luzon A Region 2 Isabela 4th San Isidro Construction of San Isidro Warehouse with Solar Dryer, Barangay Gomez, San Isidro, Isabela Others Square Meter 584.000 13,453,853.07 1,681,731.63 1,681,731.63 0.00 16,817,316.33 5,831 12,689 12,172 24,861 Approved by RPAB For endorsement to NPCO
142 PRDP-IB-R002-ISA-062-000-000-2021 Luzon A Region 2 Isabela 3rd Cauayan City Construction of NMI Agri Coop Warehouse, Barangay Nungnungan II, Cauayan City, Isabela Others Square Meter 1080.000 17,621,541.46 2,202,692.68 2,202,692.68 0.00 22,026,926.82 6,488 5,948 2,701 8,649 Approved by RPAB For endorsement to NPCO
143 PRDP-IB-R002-ISA-063-000-000-2020 Luzon A Region 2 Isabela 4th Cordon Rehabilitation/Improvement of Rizaluna - Camarao Farm to Market Road Farm to Market Road (FMR) Kilometer 4.600 75,573,570.83 9,446,696.35 9,446,696.35 0.00 94,466,963.53 1,161 1,959 2,232 4,191 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
144 PRDP-IB-R002-ISA-009-000-000-2015 Luzon A Region 2 Isabela 2nd Quezon Rehabilitation / Improvement of San Juan - Barucboc - Estrada - Dummon Farm To Market Road Farm to Market Road (FMR) Kilometer 12.420 111,933,152.19 13,991,644.02 13,991,644.02 0.00 139,916,440.23 1,698 3,469 3,283 6,752 Fifty percent and above progress 98.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ Construction
145 PRDP-IB-R002-QUI-009-000-000-2015 Luzon A Region 2 Quirino Lone Cabarroguis Rehabilitation of Gundaway-Doña Imelda Farm to Market Road Farm to Market Road (FMR) Kilometer 3.840 50,974,754.71 6,371,844.34 6,371,844.34 0.00 63,718,443.39 377 847 787 1,634 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE APD Construction
146 PRDP-IB-R002-QUI-010-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of NRJ-Dungo-San Salvador-Divisoria Sur Farm to Market Road Farm to Market Road (FMR) Kilometer 10.480 93,303,809.33 11,662,976.17 11,662,976.17 0.00 116,629,761.67 473 989 896 1,885 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE APD Construction
147 PRDP-IB-R002-ISA-010-SAO-001-2015 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Calaocan-Batal Farm-to-Market Road Farm to Market Road (FMR) Kilometer 11.190 105,608,463.22 13,201,057.90 13,201,057.90 0.00 132,010,579.02 5,331 12,140 11,469 23,609 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE NTL Builders and Developer
148 PRDP-IB-R002-ISA-011-SAO-002-2015 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Baluarte-Sinili Farm to Market Road Farm to Market Road (FMR) Kilometer 7.370 72,304,112.00 9,038,014.00 9,038,014.00 0.00 90,380,140.00 761 1,446 1,599 3,045 Completed (100%) 99.99% physical progress as of Oct. 17, 2021 » VIEW S-CURVE NTL Builders and Developer
149 PRDP-IB-R002-CAG-003-000-000-2014 Luzon A Region 2 Cagayan 1st Alcala Rehabilitation of Alcala East Farm to Market Road with Bridges FMR with Bridge Kilometer 13.100 160,019,998.73 20,002,499.84 20,002,499.84 0.00 200,024,998.41 1,898 4,458 4,792 9,250 Completed (100%) 100.00% physical progress as of Jul. 15, 2021 » VIEW S-CURVE A.M. Oreta & Co., Inc./Camia Construction Dev't. Corp. (JV)
150 PRDP-IB-R002-ISA-028-000-000-2016 Luzon A Region 2 Isabela 2nd Mallig Construction of Warehouse with Solar Dryer (at Barangay Centro 2, Mallig) Others Square Meter 1112.000 10,051,200.00 1,256,400.00 1,256,400.00 0.00 12,564,000.00 1,992 1,740 252 1,992 Completed (100%) 100.00% physical progress as of May. 22, 2021 » VIEW S-CURVE COLBY CONSTRUCTION
151 PRDP-IB-R002-ISA-034-SAO-003-2017 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Rizal-Abra Farm to Market Road Farm to Market Road (FMR) Kilometer 7.710 51,841,600.00 6,480,200.00 6,480,200.00 0.00 64,802,000.00 3,997 8,813 8,619 17,432 Approved by RPAB For Issuance of NOL 1
152 PRDP-IB-R002-NUV-004-AMB-001-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Tiblac – Duli Farm To Market Road Farm to Market Road (FMR) Kilometer 7.850 111,220,546.98 13,902,568.37 13,902,568.37 0.00 139,025,683.72 1,121 2,351 2,163 4,514 Completed (100%) 100.00% physical progress as of Jun. 27, 2022 » VIEW S-CURVE Christian Ian Construction Corp./Edfrobon Construction & Services Inc. - JV
153 PRDP-IB-R002-ISA-035-SAO-004-2018 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of the Sinsayon - Cabulay Farm To Market Road Farm to Market Road (FMR) Kilometer 6.030 95,527,949.62 11,940,993.70 11,940,993.70 0.00 119,409,937.02 370 842 789 1,631 Approved by RPAB For Issuance of NOL 1
154 PRDP-IB-R002-ISA-039-000-000-2018 Luzon A Region 2 Isabela 2nd Gamu Rehabilitation / Improvement of Union - Barcolan Farm To Market Road Farm to Market Road (FMR) Kilometer 6.130 86,900,556.95 10,862,569.62 10,862,569.62 0.00 108,625,696.19 566 902 1,103 2,005 Approved by RPAB For Issuance of NOL 1
155 PRDP-IB-R002-NUV-005-KAS-001-2018 Luzon A Region 2 Nueva Vizcaya Lone Kasibu Rehabilitation of Malabing Valley Farm to Market Roads Farm to Market Road (FMR) Kilometer 12.070 154,816,529.00 19,352,066.13 19,352,066.13 0.00 193,520,661.26 165 388 349 737 Fifty percent and above progress 99.01% physical progress as of Oct. 15, 2024 » VIEW S-CURVE OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION
156 PRDP-IB-R002-NUV-006-AMB-002-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Ammoweg-Camandag Farm to Market Road Farm to Market Road (FMR) Kilometer 10.060 163,041,981.13 20,380,247.64 20,380,247.64 0.00 203,802,476.41 796 1,777 1,609 3,386 Fifty percent and above progress 86.98% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ CONSTRUCTION
157 PRDP-IB-R002-ISA-041-RAM-003-2019 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of General Aguinaldo-Planas Farm to Market Road Farm to Market Road (FMR) Kilometer 8.060 96,077,573.42 12,009,696.68 12,009,696.68 0.00 120,096,966.78 2,895 6,119 5,648 11,767 Completed (100%) 100.00% physical progress as of Oct. 15, 2023 » VIEW S-CURVE Christian Ian Construction Corporation
158 PRDP-IB-R002-ISA-042-NAG-001-2018 Luzon A Region 2 Isabela 2nd Naguilian Rehabilitation of Quinalabasa - Sta. Victoria - Bagong Sikat Farm - to - Market Road Farm to Market Road (FMR) Kilometer 7.240 83,380,729.09 10,422,591.14 10,422,591.14 0.00 104,225,911.37 635 990 971 1,961 Completed (100%) 100.00% physical progress as of Oct. 15, 2023 » VIEW S-CURVE Christian Ian Construction Corporation
159 PRDP-IB-R002-NUV-007-AMB-003-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Poblacion-Labang Farm to Market Road Farm to Market Road (FMR) Kilometer 3.430 69,089,980.40 8,636,247.55 8,636,247.55 0.00 86,362,475.50 414 888 811 1,699 Approved by RPAB For Issuance of NOL 1
160 PRDP-IB-R002-ISA-043-DIN-001-2019 Luzon A Region 2 Isabela 4th Dinapigue Rehabilitation/Construction of Digumased-Ayod Farm to Market Road (FMR) with Bridge FMR with Bridge Kilometer 8.300 185,725,919.34 23,215,739.92 23,215,739.92 0.00 232,157,399.18 1,010 2,330 2,164 4,494 Fifty percent and above progress 95.55% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Christian Ian Construction Corporation
161 PRDP-IB-R002-ISA-049-DIV-001-2020 Luzon A Region 2 Isabela 1st Divilacan Rehabilitation / Concreting of Dimapula - Dilakit Farm to Market Road with Bridges FMR with Bridge Kilometer 5.660 196,354,400.00 24,544,300.00 24,544,300.00 0.00 245,443,000.00 452 929 848 1,777 Approved by RPAB For endorsement to NPCO
162 PRDP-IB-R002-ISA-050-RAM-004-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Ambatali, Ramon, Isabela Others Square Meter 612.000 33,323,411.24 4,165,426.41 4,165,426.41 0.00 41,654,264.06 2,290 4,545 4,533 9,078 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A Construction
163 PRDP-IB-R002-ISA-051-RAM-005-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Bugallon Proper, Ramon, Isabela Others Square Meter 1224.000 35,292,172.46 4,411,521.56 4,411,521.56 0.00 44,115,215.58 3,691 7,500 7,373 14,873 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE A.I.A Construction
164 PRDP-IB-R002-ISA-052-RAM-006-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Burgos, Ramon, Isabela Others Square Meter 612.000 13,792,878.38 1,724,109.80 1,724,109.80 0.00 17,241,097.98 526 1,097 1,117 2,214 Completed (100%) 99.99% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A. CONSTRUCTION
165 PRDP-IB-R002-ISA-053-RAM-007-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, San Miguel, Ramon, Isabela Others Square Meter 612.000 25,137,277.41 3,142,159.68 3,142,159.68 0.00 31,421,596.77 887 1,878 1,809 3,687 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A Construction
166 PRDP-IB-R002-ISA-054-RAM-008-2020 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of Bugallon Proper- Villa Carmen- San Antonio FMR Farm to Market Road (FMR) Kilometer 11.790 122,185,942.01 15,273,242.75 15,273,242.75 0.00 152,732,427.51 2,843 11,464 11,292 22,756 Approved by RPAB For endorsement to NPCO
167 PRDP-IB-R002-ISA-059-QUI-001-2019 Luzon A Region 2 Isabela 2nd Quirino Rehabilitation of Sta. Lucia - Sta. Catalina Farm to Market Road with Bridge FMR with Bridge Kilometer 13.640 181,579,924.64 22,697,490.58 22,697,490.58 0.00 226,974,905.80 1,547 3,144 3,019 6,163 Approved by RPAB For endorsement to NPCO
168 PRDP-IB-R002-CAG-015-CAM-001-2020 Luzon A Region 2 Cagayan 1st Camalaniugan Rehabilitation/Construction of Agusi Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.630 47,855,200.00 5,981,900.00 5,981,900.00 0.00 59,819,000.00 1,045 2,166 2,075 4,241 Approved by RPAB For endorsement to NPCO
169 PRDP-IB-R002-CAG-016-GON-001-2020 Luzon A Region 2 Cagayan 1st Gonzaga Rehabilitation of the Pateng-Callao Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.640 27,421,600.00 3,427,700.00 3,427,700.00 0.00 34,277,000.00 664 715 345 1,060 Approved by RPAB For endorsement to NPCO
170 PRDP-IB-R002-NUV-008-KAY-001-2020 Luzon A Region 2 Nueva Vizcaya Lone Kayapa Upgrading of Pangawan-Banao Farm to Market Road Farm to Market Road (FMR) Kilometer 10.440 242,909,360.00 30,363,670.00 30,363,670.00 0.00 303,636,700.00 385 878 777 1,655 Approved by RPAB For endorsement to NPCO
171 PRDP-IB-R002-CAG-017-RIZ-001-2020 Luzon A Region 2 Cagayan 2nd Rizal Rehabilitation/Construction of Nanauatan-Lattut Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.880 184,317,600.00 23,039,700.00 23,039,700.00 0.00 230,397,000.00 708 1,585 1,430 3,015 Approved by RPAB For endorsement to NPCO
172 PRDP-IB-R002-QUI-014-000-000-2018 Luzon A Region 2 Quirino Lone Nagtipunan Rehabilitation of NRJ-Sangbay- Anak Farm to Market Road (with Anak-Dibunglin Spur Road) Farm to Market Road (FMR) Kilometer 10.370 277,927,334.10 34,740,916.76 34,740,916.76 0.00 347,409,167.62 - - - - Under Validation No validation date
173 PRDP-IB-R003-BUL-001-000-000-2014 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Bubulong Malake-Bulusukan-Bubulong Munti-Bohol na Manga Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.810 85,519,074.91 10,689,884.36 10,689,884.36 0.00 106,898,843.63 1,617 3,595 3,583 7,178 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE A.R. LUSTRE JR. CONSTRUCTION /A.R.L. CONSTRUCTION (JV)
174 PRDP-IB-R003-AUR-001-000-000-2014 Luzon A Region 3 Aurora Lone Maria Aurora Construction and Improvement of San Joaquin - Cadayakan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.300 20,031,836.00 2,503,979.50 2,503,979.50 0.00 25,039,795.00 719 1,624 1,562 3,186 Completed (100%) 100.00% physical progress as of Aug. 20, 2017 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC./TRIBU DESIGN CONSTRUCTION-JOINT VENTURE
175 PRDP-IB-R003-NUE-001-000-000-2014 Luzon A Region 3 Nueva Ecija 2nd San Jose City Improvement of San Juan-Villa Joson- Porais Farm to Market Road Farm to Market Road (FMR) Kilometer 5.170 40,171,921.00 5,021,490.13 5,021,490.13 0.00 50,214,901.26 1,432 3,435 3,301 6,736 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE Wizard Trading and Construction
176 PRDP-IB-R003-NUE-004-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Talavera Improvement of Basang Hamog-Pantoc-Bulac-Bulac Farm to Market Road Farm to Market Road (FMR) Kilometer 2.950 19,417,482.51 2,427,185.31 2,427,185.31 0.00 24,271,853.13 974 2,181 2,069 4,250 Completed (100%) 100.00% physical progress as of Jun. 30, 2017 » VIEW S-CURVE JRS CONSTRUCTION & XP BUILDERS
177 PRDP-IB-R003-TAR-001-000-000-2015 Luzon A Region 3 Tarlac 1st Moncada Improvement of Capaoayan- Banaoang- Ablang Sapang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 14.640 118,481,823.30 14,810,227.91 14,810,227.91 0.00 148,102,279.12 2,119 4,521 4,219 8,740 Completed (100%) 100.00% physical progress as of Feb. 04, 2019 » VIEW S-CURVE R.R. RICAFORT CONSTRUCTION & SUPLLIES/ RM MALLARI BUILDERS & ENTERPRISE JOINT VENTURE
178 PRDP-IB-R003-AUR-005-000-000-2015 Luzon A Region 3 Aurora Lone Baler Improvement of Pingit Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.610 22,214,938.80 2,776,867.35 2,776,867.35 0.00 27,768,673.50 1,168 700 660 1,360 Completed (100%) 100.00% physical progress as of Jan. 15, 2019 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
179 PRDP-IB-R003-AUR-004-000-000-2015 Luzon A Region 3 Aurora Lone San Luis Improvement of Nonong Sr.-L.Pimentel Farm to Market Road Farm to Market Road (FMR) Kilometer 5.850 46,687,182.30 5,835,897.79 5,835,897.79 0.00 58,358,977.88 1,019 2,458 2,513 4,971 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE ZF CONSTRUCTION
180 PRDP-IB-R003-BAT-001-000-000-2014 Luzon A Region 3 Bataan 2nd Bagac New Construction of San Antonio - Parang - Saysain Farm to Market Road Farm to Market Road (FMR) Kilometer 14.970 138,299,892.82 17,287,486.60 17,287,486.60 0.00 172,874,866.02 2,403 4,973 4,778 9,751 Completed (100%) 100.00% physical progress as of Jan. 09, 2020 » VIEW S-CURVE 4B Construction Corporation
181 PRDP-IB-R003-NUE-007-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Llanera Improvement of San Felipe- San Nicolas via A. Bonifacio Norte Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.210 44,674,341.82 5,584,292.73 5,584,292.73 0.00 55,842,927.28 1,132 2,663 2,575 5,238 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE JRS and XP BUILDERS JOINT VENTURES
182 PRDP-IB-R003-TAR-005-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Improvement of Sta. Barbara - Cruz Balayang - Palacpalac Farm to Market Road Farm to Market Road (FMR) Kilometer 10.580 115,443,807.61 14,430,475.95 14,430,475.95 0.00 144,304,759.51 2,752 6,316 6,070 12,386 Approved by RPAB For Issuance of NOL 1
183 PRDP-IB-R003-AUR-002-000-000-2014 Luzon A Region 3 Aurora Lone Maria Aurora Establishment of Processing Facilities for Coco Coir and Coir By-Products-Civil Works Others Square Meter 309.000 6,005,879.28 750,734.91 750,734.91 0.00 7,507,349.10 1,878 375 1,001 1,376 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
184 PRDP-IB-R003-NUE-005-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Onion Hanger Type Storage Others Square Meter 132.000 2,564,435.34 320,554.42 320,554.42 0.00 3,205,544.18 153 125 28 153 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
185 PRDP-IB-R003-NUE-002-000-000-2014 Luzon A Region 3 Nueva Ecija 2nd San Jose City Construction of Ampalaya Packing Building with Ground Improvement Others Square Meter 110.000 2,300,171.88 287,521.49 287,521.49 0.00 2,875,214.86 121 73 48 121 Completed (100%) 100.00% physical progress as of Oct. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
186 PRDP-IB-R003-NUE-006-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Farm Machinery Shed Others Square Meter 126.000 988,599.26 123,574.91 123,574.91 0.00 1,235,749.08 1,265 545 720 1,265 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
187 PRDP-IB-R003-TAR-003-000-000-2015 Luzon A Region 3 Tarlac 1st Camiling Construction of Sitio Pantul, Carael-Ablang Sapang Farm to Market Road Farm to Market Road (FMR) Kilometer 7.700 61,600,000.00 7,700,000.00 7,700,000.00 0.00 77,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
188 PRDP-IB-R003-TAR-004-000-000-2015 Luzon A Region 3 Tarlac 3rd Capas Improvement of Sto. Rosario-Cutcut Farm to Market Road with Bridge FMR with Bridge Kilometer 17.400 163,200,000.00 20,400,000.00 20,400,000.00 0.00 204,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
189 PRDP-IB-R003-BUL-005-000-000-2015 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Sumandig - Bubulong Malaki Farm to Market Road Farm to Market Road (FMR) Kilometer 2.930 40,118,403.20 5,014,800.40 5,014,800.40 0.00 50,148,004.00 1,615 3,532 3,414 6,946 Completed (100%) 100.00% physical progress as of Mar. 22, 2021 » VIEW S-CURVE NORTHERN BUILDERS
190 PRDP-IB-R003-TAR-006-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Improvement of Lalapac Farm to Market Road Farm to Market Road (FMR) Kilometer 4.000 32,000,000.00 4,000,000.00 4,000,000.00 0.00 40,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
191 PRDP-IB-R003-TAR-007-000-000-2015 Luzon A Region 3 Tarlac 1st Mayantoc Improvement of Melicio Manganaan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.000 32,000,000.00 4,000,000.00 4,000,000.00 0.00 40,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
192 PRDP-IB-R003-BAT-002-000-000-2014 Luzon A Region 3 Bataan 2nd Mariveles Establishment of Iceplant and Cold Storage Building Others Square Meter 200.400 7,020,963.98 877,620.50 877,620.50 0.00 8,776,204.98 146 44 102 146 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE POLYMER-VIC CONSTRUCTION
193 PRDP-IB-R003-BUL-002-000-000-2014 Luzon A Region 3 Bulacan 3rd San Ildefonso Construction of Ampalaya Production and Processing Building at Bulusukan, San Ildefonso, Bulacan Others Square Meter 187.600 2,885,595.47 360,699.43 360,699.43 0.00 3,606,994.33 284 372 60 432 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE Chanbar Builders Corportion
194 PRDP-IB-R003-ZAM-005-000-000-2015 Luzon A Region 3 Zambales 1st Subic Improvement of Batiawan Farm to Market Road Farm to Market Road (FMR) Kilometer 8.500 68,000,000.00 8,500,000.00 8,500,000.00 0.00 85,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
195 PRDP-IB-R003-TAR-002-000-000-2014 Luzon A Region 3 Tarlac 1st Moncada Construction of Processing Center and Storage Facilities with Solar Dryer Others Square Meter 512.000 9,798,346.97 1,224,793.37 1,224,793.37 0.00 12,247,933.71 165 124 55 179 Completed (100%) 100.00% physical progress as of Dec. 15, 2017 » VIEW S-CURVE RM MALLARI BUILDERS & ENTERPRISE
196 PRDP-IB-R003-ZAM-001-000-000-2014 Luzon A Region 3 Zambales 2nd Iba Trading and Consolidation Building- Amungan, Iba, Zambales Others Square Meter 255.250 2,819,533.82 352,441.73 352,441.73 0.00 3,524,417.28 45 27 28 55 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE MONTEONE CONSTRUCTION CORP.
197 PRDP-IB-R003-ZAM-003-000-000-2014 Luzon A Region 3 Zambales 2nd Santa Cruz Trading and Consolidation Building- Sta. Cruz, Zambales Others Square Meter 255.250 2,788,570.64 348,571.33 348,571.33 0.00 3,485,713.30 32 15 22 37 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY
198 PRDP-IB-R003-NUE-009-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Carranglan Improvement of R.A. Padilla - Bunga Farm to Market Road Farm to Market Road (FMR) Kilometer 5.680 57,532,562.34 7,191,570.29 7,191,570.29 0.00 71,915,702.92 1,337 3,028 2,911 5,939 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE ALCEL CONSTRUCTION
199 PRDP-IB-R003-NUE-011-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Cuyapo Improvement of Bonifacio - San Juan Farm - to - Market Road Farm to Market Road (FMR) Kilometer 4.400 29,760,172.97 3,720,021.62 3,720,021.62 0.00 37,200,216.21 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
200 PRDP-IB-R003-NUE-010-000-000-2014 Luzon A Region 3 Nueva Ecija 4th Peñaranda Improvement of Partida Road (Las Pinas - Sinasajan - San Mariano Farm - to Market Road) Farm to Market Road (FMR) Kilometer 5.600 65,688,000.00 8,211,000.00 8,211,000.00 0.00 82,110,000.00 1,837 4,247 4,204 8,451 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
201 PRDP-IB-R003-NUE-013-CAR-002-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,325,187.12 790,648.39 790,648.39 0.00 7,906,483.90 33 32 1 33 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
202 PRDP-IB-R003-NUE-014-CAR-003-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,379,249.74 797,406.22 797,406.22 0.00 7,974,062.18 29 29 1 30 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
203 PRDP-IB-R003-NUE-015-CAR-004-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,112,755.30 514,094.41 514,094.41 0.00 5,140,944.12 27 26 4 30 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE RAQ RIVERA TRADING, DESIGN AND CONSTRUCTION
204 PRDP-IB-R003-NUE-016-CAR-005-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,088,054.96 511,006.87 511,006.87 0.00 5,110,068.70 100 100 - 100 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE Vyragus Construction
205 PRDP-IB-R003-NUE-017-CAR-006-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Barangay San Agustin Communal Irrigation System (Tabon Mayor SWIP), Carranglan Nueva Ecija Communal Irrigation System (CIS) Hectare 949.000 45,126,264.06 5,640,783.01 5,640,783.01 0.00 56,407,830.08 2,569 6,400 6,446 12,846 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE Vyragus Construction
206 PRDP-IB-R003-AUR-006-000-000-2016 Luzon A Region 3 Aurora Lone Casiguran Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,827,900.40 853,487.55 853,487.55 0.00 8,534,875.50 146 292 290 582 Completed (100%) 100.00% physical progress as of Nov. 15, 2018 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
207 PRDP-IB-R003-AUR-007-000-000-2016 Luzon A Region 3 Aurora Lone Dilasag Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,395,381.04 549,422.63 549,422.63 0.00 5,494,226.30 463 1,118 1,075 2,193 Completed (100%) 100.00% physical progress as of May. 17, 2018 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
208 PRDP-IB-R003-NUE-018-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,324,681.74 790,585.22 790,585.22 0.00 7,905,852.18 1,850 847 1,020 1,867 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE Ayana Construction and Trading
209 PRDP-IB-R003-NUE-019-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,380,986.14 797,623.27 797,623.27 0.00 7,976,232.68 36 29 11 40 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Adroit Construction
210 PRDP-IB-R003-NUE-020-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-Purpose Drying Pavement Others Square Meter 300.000 4,116,731.07 514,591.38 514,591.38 0.00 5,145,913.83 45 38 12 50 Completed (100%) 100.00% physical progress as of Nov. 15, 2018 » VIEW S-CURVE R.D. Talens Construction and Trading
211 PRDP-IB-R003-BUL-008-000-000-2017 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Gabihan-Basuit-Sapang Putik Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.180 62,364,061.43 7,795,507.68 7,795,507.68 0.00 77,955,076.79 2,188 4,783 4,624 9,407 Approved by RPAB For Issuance of NOL 1
212 PRDP-IB-R003-PAM-003-000-000-2018 Luzon A Region 3 Pampanga 3rd Arayat Construction of Tilapia Hatchery Others Square Meter 15141.000 129,360,000.00 16,170,000.00 16,170,000.00 0.00 161,700,000.00 800 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
213 PRDP-IB-R003-PAM-004-000-000-2019 Luzon A Region 3 Pampanga 2nd Floridablanca Proposed Nabuclod PWS Potable Water Supply (PWS) Level 2 Number of Households 600.000 10,348,800.00 1,293,600.00 1,293,600.00 0.00 12,936,000.00 350 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
214 PRDP-IB-R003-PAM-005-000-000-2019 Luzon A Region 3 Pampanga 2nd Porac Proposed Villa Maria PWS Potable Water Supply (PWS) Level 2 Number of Households 300.000 6,899,200.00 862,400.00 862,400.00 0.00 8,624,000.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
215 PRDP-IB-R003-BUL-010-000-000-2017 Luzon A Region 3 Bulacan 3rd San Miguel Improvement of Lambakin -Malibay Farm to Market Road Farm to Market Road (FMR) Kilometer 5.000 68,992,000.00 8,624,000.00 8,624,000.00 0.00 86,240,000.00 1,020 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
216 PRDP-IB-R003-NUE-023-000-000-2019 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Cold Storage Others Square Meter 1895.000 86,240,000.00 10,780,000.00 10,780,000.00 0.00 107,800,000.00 1,350 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
217 PRDP-IB-R003-AUR-009-000-000-2019 Luzon A Region 3 Aurora Lone Dinalungan Construction of Warehouse with Multi Purpose Drying Pavement, Brgy. Paleg Dinalungan Others Square Meter 420.000 30,638,496.00 3,829,812.00 3,829,812.00 0.00 38,298,120.00 296 654 624 1,278 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
218 PRDP-IB-R003-NUE-028-TAL-024-2019 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Cold Storage Others Square Meter 12452.000 164,934,564.62 20,616,820.58 20,616,820.58 0.00 206,168,205.78 8,241 20,838 20,203 41,041 Approved by RPAB For endorsement to NPCO
219 PRDP-IB-R003-PAM-006-000-000-2020 Luzon A Region 3 Pampanga 3rd Santa Ana Construction of Consolidation & Trading Area for Tilapia & other commodity Others Square Meter 400.000 12,503,998.70 1,562,999.84 1,562,999.84 0.00 15,629,998.38 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
220 PRDP-IB-R003-PAM-007-000-000-2020 Luzon A Region 3 Pampanga 4th Minalin Construction of Feed Mill Plant for Tilapia Others Square Meter 0.000 80,000,000.00 10,000,000.00 10,000,000.00 0.00 100,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
221 PRDP-IB-R003-PAM-008-MIN-001-2020 Luzon A Region 3 Pampanga 4th Minalin Construction of Aqua Feed Mill Others Square Meter 3364.000 227,823,813.67 28,477,976.71 28,477,976.71 0.00 284,779,767.09 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
222 PRDP-IB-R003-NUE-003-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Improvement of Hulo-Malaya-Dolores Farm-to-Market Road with Two (2) Lane Bridge FMR with Bridge Kilometer 3.180 67,119,779.95 8,389,972.49 8,389,972.49 0.00 83,899,724.93 1,642 3,275 3,412 6,687 Completed (100%) 100.00% physical progress as of Nov. 15, 2022 » VIEW S-CURVE TJ Velasco
223 PRDP-IB-R003-NUE-008-TAL-001-2015 Luzon A Region 3 Nueva Ecija 1st Talavera Improvement of Poblacion Sur, La Torre, Bantug - Mamandil Farm to Market Road Farm to Market Road (FMR) Kilometer 3.760 30,264,265.26 3,783,033.16 3,783,033.16 0.00 37,830,331.58 2,862 6,511 6,429 12,940 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE SPJ Construction
224 PRDP-IB-R003-PAM-001-000-000-2014 Luzon A Region 3 Pampanga 2nd Floridablanca Improvement of Calantas - Planas - San Jose Farm to Market Road Farm to Market Road (FMR) Kilometer 5.860 47,835,574.81 5,979,446.85 5,979,446.85 0.00 59,794,468.51 3,986 9,313 8,887 18,200 Completed (100%) 100.00% physical progress as of Jun. 15, 2022 » VIEW S-CURVE POWER K CONSTRUCTION SUPPLY & SERVICES
225 PRDP-IB-R003-BAT-004-000-000-2015 Luzon A Region 3 Bataan 1st Hermosa Improvement of Sitio Nazareno - Culis Farm to Market Road Farm to Market Road (FMR) Kilometer 5.720 72,251,528.50 9,031,441.06 9,031,441.06 0.00 90,314,410.62 211 513 475 988 Fifty percent and above progress 51.55% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Viking Construction and Supplies
226 PRDP-IB-R003-ZAM-004-000-000-2015 Luzon A Region 3 Zambales 2nd Iba Improvement of Dirita - San Agustin Farm to Market Road Farm to Market Road (FMR) Kilometer 10.220 84,248,327.78 10,531,040.97 10,531,040.97 0.00 105,310,409.72 1,267 2,479 2,291 4,770 Completed (100%) 100.00% physical progress as of Jan. 15, 2022 » VIEW S-CURVE TJ Velaco Construction and Supply
227 PRDP-IB-R003-PAM-003-000-000-2015 Luzon A Region 3 Pampanga 4th Macabebe Improvement of San Jose - Castuli Farm to Market Road Farm to Market Road (FMR) Kilometer 2.680 37,880,451.31 4,735,056.41 4,735,056.41 0.00 47,350,564.13 14,287 2,524 2,372 4,896 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE ORANI BUILDERS SUPPLY
228 PRDP-IB-R003-NUE-012-CAR-001-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,379,249.74 797,406.22 797,406.22 0.00 7,974,062.18 25 - 25 25 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
229 PRDP-IB-R003-NUE-021-PAL-001-2017 Luzon A Region 3 Nueva Ecija 3rd Palayan City Construction of Cold Storage Others Square Meter 2225.200 152,640,613.96 19,080,076.75 19,080,076.75 0.00 190,800,767.46 3,760 605 147 752 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ARN BUILDERS
230 PRDP-IB-R003-BAT-006-000-000-2017 Luzon A Region 3 Bataan 2nd Orion Construction of Multi Commodity Solar Tunnel Dryer Others Square Meter 340.000 7,960,146.98 995,018.37 995,018.37 0.00 9,950,183.72 420 45 108 153 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE RZ TIGAS Construction and Trading
231 PRDP-IB-R003-BAT-008-000-000-2019 Luzon A Region 3 Bataan 1st Orani Construction of Fish Landing and Trading Facility Others Square Meter 3385.680 147,140,853.43 18,392,606.68 18,392,606.68 0.00 183,926,066.79 - 4,824 4,788 9,612 Fifty percent and above progress 83.28% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ CONSTRUCTION
232 PRDP-IB-R003-NUE-024-BON-023-2019 Luzon A Region 3 Nueva Ecija 3rd Bongabon Construction of Cold Storage Others Square Meter 2500.000 169,467,085.58 21,183,385.70 21,183,385.70 0.00 211,833,856.98 14,990 32,475 31,698 64,173 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE ARN BUIILDERS INC.
233 PRDP-IB-R003-ZAM-006-MAS-001-2019 Luzon A Region 3 Zambales 2nd Masinloc Improvement of Baloganon - Sitio Coto, Taltal Farm-to-Market Road and Construction of Two Lane Bridges FMR with Bridge Kilometer 26.190 593,600,000.00 74,200,000.00 74,200,000.00 0.00 742,000,000.00 3,953 6,693 7,816 14,509 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
234 PRDP-IB-R003-NUE-031-000-000-2020 Luzon A Region 3 Nueva Ecija 2nd Muñoz City Construction of Nueva Ecija Onion Cold Storage Facility Others Square Meter 2500.000 167,964,000.00 20,995,500.00 20,995,500.00 0.00 209,955,000.00 8,241 20,203 41,041 61,244 Fifty percent and above progress 93.96% physical progress as of Nov. 15, 2024 » VIEW S-CURVE ARN BUIILDERS INC.
235 PRDP-IB-R003-ZAM-006-PAL-006-2023 Luzon A Region 3 Zambales 2nd Palauig Improvement of Pangolingan Farm to Market Road Farm to Market Road (FMR) Kilometer 6.820 98,912,800.00 12,364,100.00 12,364,100.00 0.00 123,641,000.00 1,267 2,479 2,291 4,770 Under Validation No validation date
236 PRDP-IB-R003-AUR-009-000-000-2023 Luzon A Region 3 Aurora Improvement of Agues-Cozo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.800 144,000,000.00 18,000,000.00 18,000,000.00 0.00 180,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
237 PRDP-IB-R003-AUR-008-000-000-2023 Luzon A Region 3 Aurora Improvement of Salay – Kadayakan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.500 79,200,000.00 9,900,000.00 9,900,000.00 0.00 99,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
238 PRDP-IB-R04A-QUE-003-GUI-001-2014 Luzon B Region 4A Quezon 4th Guinayangan Concreting of Manggagawa - Capuluan Central FMR Farm to Market Road (FMR) Kilometer 15.740 94,500,646.17 11,812,580.77 11,812,580.77 0.00 118,125,807.71 2,877 6,549 6,234 12,783 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE C. B. Garay Philwide Construction/Bomel Construction(JV)
239 PRDP-IB-R04A-QUE-012-SAN-001-2014 Luzon B Region 4A Quezon 2nd San Antonio Concreting of San Jose - Del Valle FMR Farm to Market Road (FMR) Kilometer 9.630 78,741,665.20 9,842,708.15 9,842,708.15 0.00 98,427,081.50 2,276 5,366 6,831 12,197 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE NDM Sanchez Builders Corporation
240 PRDP-IB-R04A-QUE-010-SAA-001-2014 Luzon B Region 4A Quezon 3rd San Andres Concreting of Camflora FMR Project Farm to Market Road (FMR) Kilometer 6.710 59,891,205.12 7,486,400.64 7,486,400.64 0.00 74,864,006.40 1,354 3,898 4,224 8,122 Completed (100%) 100.00% physical progress as of Aug. 15, 2021 » VIEW S-CURVE DUMDUMA CONSTRUCTION AND TRADING CORPORATION
241 PRDP-IB-R04A-QUE-038-PIT-001-2015 Luzon B Region 4A Quezon 3rd Pitogo Construction of Brgy. Pina - Cabulihan FMR Farm to Market Road (FMR) Kilometer 8.560 63,688,752.00 7,961,094.00 7,961,094.00 0.00 79,610,940.00 - 1,129 968 2,097 Approved by RPAB For endorsement to NPCO
242 PRDP-IB-R04A-QUE-036-GUI-002-2015 Luzon B Region 4A Quezon 4th Guinayangan Concreting of Sta. Cruz-Magallanes Farm to Market Road Farm to Market Road (FMR) Kilometer 21.190 130,215,337.63 16,276,917.20 16,276,917.20 0.00 162,769,172.03 1,522 3,422 3,230 6,652 Approved by RPAB For endorsement to NPCO
243 PRDP-IB-R04A-QUE-029-INF-002-2015 Luzon B Region 4A Quezon 1st Infanta Concreting of Tongohin FMR Farm to Market Road (FMR) Kilometer 2.130 17,547,792.91 2,193,474.11 2,193,474.11 0.00 21,934,741.13 2,360 5,740 5,618 11,358 Approved by RPAB For endorsement to NPCO
244 PRDP-IB-R04A-QUE-013-SAF-001-2014 Luzon B Region 4A Quezon 3rd San Francisco Concreting of Barangay Huyon- Uyon - Pagsangahan and Huyon-Uyon - Sto. Niño FMR Farm to Market Road (FMR) Kilometer 12.200 199,101,562.40 24,887,695.30 24,887,695.30 0.00 248,876,953.00 2,587 8,137 7,386 15,523 Approved by RPAB For endorsement to NPCO
245 PRDP-IB-R04A-QUE-002-CAN-001-2014 Luzon B Region 4A Quezon 2nd Candelaria Improvement of Sta. Catalina Norte-San Isidro-Kinatihan I -Kinatihan II-Pahinga Norte FMR Farm to Market Road (FMR) Kilometer 12.480 74,572,784.14 9,321,598.02 9,321,598.02 0.00 93,215,980.18 3,334 10,069 9,936 20,005 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE R.V. LABORTE BUILDER
246 PRDP-IB-R04A-QUE-009-SAM-001-2014 Luzon B Region 4A Quezon 1st Sampaloc Construction of Mamala - Taquico - Caldong FMR Farm to Market Road (FMR) Kilometer 10.380 127,526,882.22 15,940,860.28 15,940,860.28 0.00 159,408,602.78 94 189 155 344 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE DQT BUILDERS
247 PRDP-IB-R04A-QUE-006-LUE-002-2014 Luzon B Region 4A Quezon 2nd Lucena City Rehabilitation of Purok Baybayin-Ibabang Dupay-Purok Centro Itaas-Ilayang Dupay FMR Farm to Market Road (FMR) Kilometer 1.920 12,553,117.28 1,569,139.66 1,569,139.66 0.00 15,691,396.60 1,565 4,642 4,749 9,391 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE Jemak Construction
248 PRDP-IB-R04A-QUE-042-000-000-2018 Luzon B Region 4A Quezon 4th Lopez Rehabilitation/Concreting of Circumferential FMR Brgy. Jongo-Cogorin Ibaba Farm to Market Road (FMR) Kilometer 15.740 206,383,731.58 25,797,966.45 25,797,966.45 0.00 257,979,664.48 1,354 3,463 3,307 6,770 Approved by RPAB For endorsement to NPCO
249 PRDP-IB-R04A-BTG-003-000-000-2018 Luzon B Region 4A Batangas 4th San Juan Concreting of Sapangan-Libato FMR Farm to Market Road (FMR) Kilometer 7.320 86,058,400.00 10,757,300.00 10,757,300.00 0.00 107,573,000.00 2,289 5,202 5,100 10,302 Approved by RPAB For endorsement to NPCO
250 PRDP-IB-R04A-BTG-004-000-000-2018 Luzon B Region 4A Batangas 4th Taysan Concreting and Improvement of San Isidro-Pinagbayanan-Guinhawa Farm-to-Market Road Taysan, Batangas Farm to Market Road (FMR) Kilometer 17.000 224,150,230.42 28,018,778.80 28,018,778.80 0.00 280,187,788.02 1,371 3,289 3,207 6,496 Approved by RPAB For endorsement to NPCO
251 PRDP-IB-R04A-QUE-043-000-000-2018 Luzon B Region 4A Quezon 3rd Unisan Concreting of Mairok Ibaba-cIlaya-Burgos-Bulo Ilaya-Kalilayan Ilaya FMR Farm to Market Road (FMR) Kilometer 10.000 130,076,914.38 16,259,614.30 16,259,614.30 0.00 162,596,142.98 647 1,366 1,578 2,944 Approved by RPAB For endorsement to NPCO
252 PRDP-IB-R04A-QUE-041-REA-036-2018 Luzon B Region 4A Quezon 1st Real Construction of Pandan-Masikap FMR Farm to Market Road (FMR) Kilometer 13.110 199,804,713.51 24,975,589.19 24,975,589.19 0.00 249,755,891.89 350 822 750 1,572 Approved by RPAB For endorsement to NPCO
253 PRDP-IB-R04A-QUE-044-000-000-2018 Luzon B Region 4A Quezon 4th Atimonan Road Opening/Construction of Farm-to-Market Road in Barangay San Rafael-San Jose Balatok-Manggalayan Bundok Farm to Market Road (FMR) Kilometer 12.000 119,694,341.22 14,961,792.65 14,961,792.65 0.00 149,617,926.52 574 1,202 1,040 2,242 Approved by RPAB For endorsement to NPCO
254 PRDP-IB-R04A-QUE-045-000-000-2018 Luzon B Region 4A Quezon 4th Alabat Construction/Concreting of Villa Jesus Este-Pantay Sabang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.180 59,794,250.66 7,474,281.33 7,474,281.33 0.00 74,742,813.32 91 349 - 349 Approved by RPAB For endorsement to NPCO
255 PRDP-IB-R04A-BTG-008-IBA-007-2019 Luzon B Region 4A Batangas 4th Ibaan Poultry/Breeder Farm Others Square Meter 1666.670 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 30 20 10 30 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
256 PRDP-IB-R04A-BTG-010-IBA-009-2019 Luzon B Region 4A Batangas 4th Ibaan Culled Dressing & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 30 80 90 170 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
257 PRDP-IB-R04A-BTG-011-ROS-010-2019 Luzon B Region 4A Batangas 4th Rosario Poultry/Swine Breeder Farm Others Square Meter 1666.670 43,120,000.00 5,390,000.00 5,390,000.00 0.00 53,900,000.00 50 120 100 220 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
258 PRDP-IB-R04A-BTG-009-PAD-008-2019 Luzon B Region 4A Batangas 4th Padre Garcia Slaughter House & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
259 PRDP-IB-R04A-BTG-013-SAN-011-2019 Luzon B Region 4A Batangas 4th San Jose Culled Dressing & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
260 PRDP-IB-R04A-BTG-014-SAN-012-2019 Luzon B Region 4A Batangas 4th San Jose Powdered Egg Processing Others Square Meter 666.670 17,248,000.00 2,156,000.00 2,156,000.00 0.00 21,560,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
261 PRDP-IB-R04A-BTG-015-000-000-2019 Luzon B Region 4A Batangas Shared Facility for the processing of Banana, Rootcrops, Cacao and Coffee Others Square Meter 300.000 7,761,600.00 970,200.00 970,200.00 0.00 9,702,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
262 PRDP-IB-R04A-BTG-016-000-000-2019 Luzon B Region 4A Batangas Dairy Processing Facility (Carabao) Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
263 PRDP-IB-R04A-LAG-006-000-000-2019 Luzon B Region 4A Laguna Coco Water Processing Center Others Square Meter 1000.000 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
264 PRDP-IB-R04A-LAG-007-CAA-007-2019 Luzon B Region 4A Laguna 3rd Calauan Rehab. Of Dairy Processing Facility Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 70 80 150 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
265 PRDP-IB-R04A-LAG-008-SAA-008-2019 Luzon B Region 4A Laguna 4th Santa Maria Establishment of Coffee Shop Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 70 90 160 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
266 PRDP-IB-R04A-QUE-031-REA-029-2019 Luzon B Region 4A Quezon 1st Real Fish Landing & Cold Storage Others Square Meter 1342.280 43,120,000.00 5,390,000.00 5,390,000.00 0.00 53,900,000.00 50 120 80 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
267 PRDP-IB-R04A-QUE-033-SAR-031-2019 Luzon B Region 4A Quezon 3rd San Narciso Coconut Sap Sugar Processing Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 60 80 140 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
268 PRDP-IB-R04A-QUE-034-UNI-032-2019 Luzon B Region 4A Quezon 3rd Unisan Geonet/Twine Rope Project Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
269 PRDP-IB-R04A-QUE-035-MAU-033-2019 Luzon B Region 4A Quezon 1st Mauban Geonet/Twine Rope Project Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
270 PRDP-IB-R04A-QUE-036-SAI-034-2019 Luzon B Region 4A Quezon 2nd Sariaya Cold Storage Facility Others Square Meter 134.230 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
271 PRDP-IB-R04A-QUE-037-ATI-035-2019 Luzon B Region 4A Quezon 4th Atimonan Processing of Dried Cacao Beans Others Square Meter 200.000 5,174,400.00 646,800.00 646,800.00 0.00 6,468,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
272 PRDP-IB-R04A-CAV-002-GER-002-2019 Luzon B Region 4A Cavite 6th General Trias Dairy Processing Facility (Carabao) Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
273 PRDP-IB-R04A-CAV-003-SIL-003-2019 Luzon B Region 4A Cavite 5th Silang Pineapple Processing Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 80 80 160 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
274 PRDP-IB-R04A-BTG-012-BAT-001-2019 Luzon B Region 4A Batangas 2nd Batangas City Grain Storage Facility Others Square Meter 2166.670 20,000,000.00 2,500,000.00 2,500,000.00 0.00 25,000,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
275 PRDP-IB-R04A-QUE-030-LUE-002-2019 Luzon B Region 4A Quezon 2nd Lucena City Cold Storage Facility Others Square Meter 268.460 8,624,000.00 1,078,000.00 1,078,000.00 0.00 10,780,000.00 40 102 80 182 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
276 PRDP-IB-R04A-QUE-032-GEE-030-2019 Luzon B Region 4A Quezon 1st General Nakar Poultry Farm Facility Others Square Meter 100.000 2,587,200.00 323,400.00 323,400.00 0.00 3,234,000.00 30 90 80 170 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
277 PRDP-IB-R04A-CAV-001-MAR-001-2019 Luzon B Region 4A Cavite 7th Maragondon Slaughter House Facility Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
278 PRDP-IB-R04A-RIZ-001-MOR-001-2019 Luzon B Region 4A Rizal 2nd Morong Sitio Pugala to Yapak, Lagundi, Morong, Rizal Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.400 76,948,777.88 9,618,597.24 9,618,597.24 0.00 96,185,972.36 - - - - Approved by RPAB For endorsement to NPCO
279 PRDP-IB-R04A-LAG-005-CAV-002-2018 Luzon B Region 4A Laguna 4th Cavinti Construction of Level II Potable Water System in Brgy. Cansuso and Paowin, Cavinti, Laguna Potable Water Supply (PWS) Level 2 Number of Households 0.000 46,068,135.54 5,758,516.94 5,758,516.94 0.00 57,585,169.42 506 1,209 1,135 2,344 Approved by RPAB For endorsement to NPCO
280 PRDP-IB-R04A-QUE-029-MAU-001-2018 Luzon B Region 4A Quezon 1st Mauban Upgrade, Rehabilitate and Expansion of Mauban Batok-Toro Potable Water System Level II Subproject Potable Water Supply (PWS) Level 2 Number of Households 0.000 72,494,577.15 9,061,822.14 9,061,822.14 0.00 90,618,221.43 4,582 10,344 10,000 20,344 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
281 PRDP-IB-R04A-LAG-010-SAA-010-2021 Luzon B Region 4A Laguna 4th Santa Maria Construction of Bagumbayan-Pao-o – Parang ng Buho Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.490 79,209,913.67 9,901,239.21 9,901,239.21 0.00 99,012,392.09 3,295 4,828 4,452 9,280 Approved by RPAB For endorsement to NPCO
282 PRDP-IB-R04A-LAG-011-CAV-011-2020 Luzon B Region 4A Laguna 4th Cavinti Rehabilitation/Concreting of Poblacion – Sisilimin - Bukal- Cansuso- Paowin Farm-to-Market Road with Bridge Component FMR with Bridge Kilometer 10.850 197,221,799.12 24,652,724.89 24,652,724.89 0.00 246,527,248.90 1,136 2,413 2,363 4,776 Approved by RPAB For endorsement to NPCO
283 PRDP-IB-R04A-QUE-038-PAD-036-2021 Luzon B Region 4A Quezon 3rd Padre Burgos Construction/Concreting of Cabuyao Norte - Walay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.220 93,655,186.42 11,706,898.30 11,706,898.30 0.00 117,068,983.02 555 1,403 1,310 2,713 Approved by RPAB For endorsement to NPCO
284 PRDP-IB-R04A-QUE-039-CAT-037-2020 Luzon B Region 4A Quezon 3rd Catanauan Construction of Brgy. San Roque-San Antonio Magcopa-San Pablo Suha-Doongan Ilaya Farm to Market Road w/ Bridge Component FMR with Bridge Kilometer 11.000 191,690,211.82 23,961,276.48 23,961,276.48 0.00 239,612,764.78 2,367 5,576 5,427 11,003 Approved by RPAB For endorsement to NPCO
285 PRDP-IB-R04A-LAG-001-CAV-001-2014 Luzon B Region 4A Laguna 4th Cavinti Construction of Level II Cavinti Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 2624.000 21,159,598.00 2,644,949.75 2,644,949.75 0.00 26,449,497.50 2,624 5,405 5,091 10,496 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE ARDC Construction & Supplies
286 PRDP-IB-R04A-QUE-026-POL-001-2015 Luzon B Region 4A Quezon 1st Polillo Construction of Atulayan - Bislian - Pamatdan FMR Farm to Market Road (FMR) Kilometer 11.860 125,001,357.66 15,625,169.71 15,625,169.71 0.00 156,251,697.08 979 2,321 2,174 4,495 Less than fifty percent progress 25.86% physical progress as of Nov. 15, 2022 » VIEW S-CURVE LSD Construction and Supplies
287 PRDP-IB-R04A-QUE-001-MUL-001-2014 Luzon B Region 4A Quezon 3rd Mulanay Concreting of Brgy. San Isidro-Canuyep-F. Nañadiego-Matataja-Patabog Farm-to-Market Road with Bridge Component FMR with Bridge Kilometer 8.180 112,740,179.05 14,092,522.38 14,092,522.38 0.00 140,925,223.81 2,250 6,304 5,870 12,174 Completed (100%) 101.86% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Dumduma Construction and Trading Corporation
288 PRDP-IB-R04A-QUE-008-BUE-001-2014 Luzon B Region 4A Quezon 3rd Buenavista Improvement/ Concreting of Cadlit-Manlana-Mabutag-Cawa FMR Farm to Market Road (FMR) Kilometer 12.080 96,501,568.58 12,062,696.07 12,062,696.07 0.00 120,626,960.72 1,812 4,521 4,095 8,616 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Edison Development And Construction
289 PRDP-IB-R04A-QUE-040-GEN-001-2015 Luzon B Region 4A Quezon 3rd General Luna Concreting of San Vicente-Malaya, Quezon Farm to Market Road Farm to Market Road (FMR) Kilometer 15.400 138,259,200.00 17,282,400.00 17,282,400.00 0.00 172,824,000.00 1,562 6,747 6,314 13,061 Fifty percent and above progress 88.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Linear Construction Corporation
290 PRDP-IB-R04A-QUE-039-PAN-001-2015 Luzon B Region 4A Quezon 1st Panukulan Concreting of Poblacion - Pinag-agan Farm to Market Road Farm to Market Road (FMR) Kilometer 8.140 105,211,560.26 13,151,445.03 13,151,445.03 0.00 131,514,450.32 698 1,721 1,779 3,500 Fifty percent and above progress 97.64% physical progress as of Oct. 30, 2024 » VIEW S-CURVE C. B. Garay Philwide Builders
291 PRDP-IB-R04A-QUE-031-PER-001-2015 Luzon B Region 4A Quezon 4th Perez Concreting of Mainit Sur - Mainit Norte - Pambuhan FMR Project Farm to Market Road (FMR) Kilometer 5.120 46,330,450.02 5,791,306.25 5,791,306.25 0.00 57,913,062.52 1,211 2,922 2,848 5,770 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE RAM Builders
292 PRDP-IB-R04A-QUE-032-TAG-002-2015 Luzon B Region 4A Quezon 4th Tagkawayan Concreting of Sta. Monica – Sto. Niño – Manato Station FMR Farm to Market Road (FMR) Kilometer 10.040 115,564,615.70 14,445,576.96 14,445,576.96 0.00 144,455,769.62 885 2,004 2,046 4,050 Fifty percent and above progress 85.04% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Hi-Tri Development Corporation
293 PRDP-IB-R04A-QUE-018-MAC-001-2015 Luzon B Region 4A Quezon 3rd Macalelon Concreting of San Nicolas-Malabahay FMR Farm to Market Road (FMR) Kilometer 6.060 20,111,685.52 2,513,960.69 2,513,960.69 0.00 25,139,606.90 923 2,592 1,785 4,377 Completed (100%) 100.00% physical progress as of Sep. 15, 2018 » VIEW S-CURVE Edison Development and Construction / Lead Tek Construction
294 PRDP-IB-R04A-QUE-014-SAR-001-2014 Luzon B Region 4A Quezon 3rd San Narciso Concreting of Barangay Binay, Busok Busokan, San Vicente FMR Farm to Market Road (FMR) Kilometer 9.050 71,652,914.24 8,956,614.28 8,956,614.28 0.00 89,566,142.80 8,862 22,434 21,878 44,312 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE Edison Development Corporation
295 PRDP-IB-R04A-QUE-004-LUC-001-2014 Luzon B Region 4A Quezon 1st Lucban Concreting of Nalunao-Kalangay-Mahabang Parang-Aliliw-Kabatete-Piis FMR Farm to Market Road (FMR) Kilometer 15.480 60,574,627.99 7,571,828.50 7,571,828.50 0.00 75,718,284.99 419 890 653 1,543 Completed (100%) 103.37% physical progress as of Dec. 15, 2022 » VIEW S-CURVE R.A. Mendiola Construction & Developer
296 PRDP-IB-R04A-BTG-001-LOB-001-2015 Luzon B Region 4A Batangas 2nd Lobo Concreting of Farm to Market Road, Barangay Olo-olo, Mabilog na Bundok and Nagtaluntong (Phase I) Farm to Market Road (FMR) Kilometer 8.060 103,082,243.54 12,885,280.44 12,885,280.44 0.00 128,852,804.42 1,796 4,631 4,349 8,980 Completed (100%) 100.00% physical progress as of Mar. 15, 2019 » VIEW S-CURVE Pacific Concrete Products
297 PRDP-IB-R04A-LAG-002-LUI-001-2015 Luzon B Region 4A Laguna 4th Luisiana Construction of Luisiana Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 4735.000 58,968,765.33 7,371,095.67 7,371,095.67 0.00 73,710,956.67 4,735 12,790 10,885 23,675 Less than fifty percent progress 45.26% physical progress as of Oct. 15, 2018 » VIEW S-CURVE ILG Enterprises and C.T. Leoncio Construction and Trading (Joint Venture)
298 PRDP-IB-R04A-BTG-002-TAN-001-2016 Luzon B Region 4A Batangas 3rd Tanauan City Construction of Brgy. Pantay Matanda, Pagaspas, Trapiche, Sambat, Natatas, Bagumbayan, Tinurik, BanJo West, and Banjo East, Farm to Market Road FMR with Bridge Kilometer 7.800 164,800,000.00 20,600,000.00 20,600,000.00 0.00 206,000,000.00 8,533 - - - Approved by RPAB For Issuance of NOL 1
299 PRDP-IB-R04A-QUE-041-CAT-001-2017 Luzon B Region 4A Quezon 3rd Catanauan Construction of San Isidro – Bolo – San Vicente Kanluran- San Vicente Silangan-Sta. Maria DAO FMR Farm to Market Road (FMR) Kilometer 12.360 136,854,038.85 17,106,754.86 17,106,754.86 0.00 171,067,548.57 3,073 6,898 6,875 13,773 Completed (100%) 100.00% physical progress as of Nov. 15, 2021 » VIEW S-CURVE DQT Builders Corporation
300 PRDP-IB-R04A-QUE-042-SAI-001-2017 Luzon B Region 4A Quezon 2nd Sariaya Rehabilitation and Concreting of Concepcion Palasan to Manggalang Kiling Farm-To-Market-Road with Line Canal Farm to Market Road (FMR) Kilometer 13.900 149,918,002.43 18,739,750.30 18,739,750.30 0.00 187,397,503.03 8,862 20,634 19,960 40,594 Completed (100%) 100.00% physical progress as of Jan. 15, 2022 » VIEW S-CURVE L.A. Clamor Construction
301 PRDP-IB-R04A-BTG-005-000-000-2018 Luzon B Region 4A Batangas 4th Rosario Concreting and Improvement of Rosario FMR (Phase 1) Farm to Market Road (FMR) Kilometer 4.440 58,939,932.94 7,367,491.62 7,367,491.62 0.00 73,674,916.18 3,151 12,310 11,688 23,998 Fifty percent and above progress 71.01% physical progress as of Oct. 15, 2024 » VIEW S-CURVE M.V. Caldo Construction and Supply Corporation
302 PRDP-IB-R04A-BTG-006-TAY-005-2018 Luzon B Region 4A Batangas 4th Taysan Improvement of Brgy. Sto. Niño to Brgy. Piña Farm-to-Market Road with Bridge FMR with Bridge Kilometer 4.300 81,535,372.86 10,191,921.61 10,191,921.61 0.00 101,919,216.08 887 2,245 2,213 4,458 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE N.D.M. Sanchez Builders Development Corporation
303 PRDP-IB-R04A-BTG-007-SAL-001-2018 Luzon B Region 4A Batangas 2nd San Luis Rehabilitation of Farm-to-Market Road of Calumpang East and Calumpang West Farm to Market Road (FMR) Kilometer 1.590 16,914,363.02 2,114,295.38 2,114,295.38 0.00 21,142,953.78 750 1,339 1,285 2,624 Completed (100%) 100.00% physical progress as of Nov. 15, 2020 » VIEW S-CURVE V.R Patron Builders & Developers Corporation
304 PRDP-IB-R04A-LAG-003-SAA-001-2018 Luzon B Region 4A Laguna 4th Santa Maria Concreting of Kayhakat-Bubucal-Inayapan-Calangay-Coralan-Bagumbayan-Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.170 84,869,860.74 10,608,732.59 10,608,732.59 0.00 106,087,325.92 2,261 5,568 5,330 10,898 Completed (100%) 100.00% physical progress as of May. 15, 2022 » VIEW S-CURVE DUMDUMA CONSTRUCTION AND TRADING CORPORATION
305 PRDP-IB-R04A-LAG-009-MAJ-001-2018 Luzon B Region 4A Laguna 4th Majayjay Rehabilitation and Improvement of Level II Potable Water System in Majayjay, Laguna Potable Water Supply (PWS) Level 2 Number of Households 0.000 72,505,817.78 9,063,227.22 9,063,227.22 0.00 90,632,272.22 960 1,994 1,912 3,906 Approved by RPAB For endorsement to NPCO
306 PRDP-IB-R04A-LAG-009-RIZ-009-2020 Luzon B Region 4A Laguna 3rd Rizal Concreting of Brgy. Tala-Antipolo Farm To Market Road Farm to Market Road (FMR) Kilometer 2.470 38,603,356.47 4,825,419.56 4,825,419.56 0.00 48,254,195.59 1,515 2,677 3,216 5,893 Fifty percent and above progress 81.09% physical progress as of Oct. 15, 2024 » VIEW S-CURVE N.D.M. Sanchez Builders and Development Corporation
307 PRDP-IB-R04A-BTG-017-AGO-015-2020 Luzon B Region 4A Batangas 3rd Agoncillo Concreting of Barigon-Bilibinwang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 4.640 71,286,499.38 8,910,812.42 8,910,812.42 0.00 89,108,124.22 1,978 5,005 4,685 9,690 Fifty percent and above progress 61.61% physical progress as of Oct. 15, 2024 » VIEW S-CURVE T Solomon Construction and Development Corporation
308 PRDP-IB-R04A-QUE-040-GEE-038-2021 Luzon B Region 4A Quezon 1st General Nakar Concreting of Anoling - Magsikap Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.960 116,844,147.17 14,605,518.40 14,605,518.40 0.00 146,055,183.97 1,572 3,643 3,389 7,032 Approved by RPAB For endorsement to NPCO
309 PRDP-IB-R04A-QUE-042-BUE-040-2022 Luzon B Region 4A Quezon 3rd Buenavista Concreting of Brgy. Lilukin to Villa Magsaysay Farm To Market Road Farm to Market Road (FMR) Kilometer 8.980 186,323,231.23 23,290,403.90 23,290,403.90 0.00 232,904,039.03 - - - - Approved by RPAB For endorsement to NPCO
310 PRDP-IB-R04A-QUE-041-SAI-039-2022 Luzon B Region 4A Quezon 2nd Sariaya Concreting and Rehabilitation of Farm-to-Market Road of Castañas-Limbon-Canda-Janagdong 2-Janagdong 1-Tumbaga 2-Sampaloc 2 with Line Canal and Bridge FMR with Bridge Kilometer 13.270 173,895,147.58 21,736,893.45 21,736,893.45 0.00 217,368,934.48 720 1,484 677 2,161 Fifty percent and above progress 81.32% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Jemak Construction & Supply
311 PRDP-IB-R04A-QUE-044-SAM-042-2021 Luzon B Region 4A Quezon 1st Sampaloc Construction of Ilayang Owain - Bataan FMR Farm to Market Road (FMR) Kilometer 6.980 126,195,728.35 15,774,466.04 15,774,466.04 0.00 157,744,660.43 - - - - Approved by RPAB For endorsement to NPCO
312 PRDP-IB-R04B-ORM-003-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Baco Rehabilitation/Upgrading of Dulangan I - Dulangan II FMR Farm to Market Road (FMR) Kilometer 5.310 41,769,043.88 5,221,130.49 5,221,130.49 0.00 52,211,304.86 2,155 5,314 4,912 10,226 Completed (100%) 100.00% physical progress as of Nov. 10, 2016 » VIEW S-CURVE R.D. Interior Junior Construction
313 PRDP-IB-R04B-ORM-001-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Victoria Concreting of Bagong Silang - Macatoc FMR Farm to Market Road (FMR) Kilometer 2.790 19,333,164.47 2,416,645.56 2,416,645.56 0.00 24,166,455.59 1,570 3,768 3,451 7,219 Completed (100%) 100.00% physical progress as of Sep. 30, 2016 » VIEW S-CURVE Monolithic Construction & Concrete Products, Inc.
314 PRDP-IB-R04B-ORM-002-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Victoria Construction of Calamansi Trading Center and Buying Station Others Square Meter 210.000 1,844,289.60 230,536.20 230,536.20 0.00 2,305,362.00 2,802 371 61 432 Completed (100%) 100.00% physical progress as of Oct. 15, 2016 » VIEW S-CURVE F.S. Sugay Construction & Supplies
315 PRDP-IB-R04B-MAR-002-000-000-2016 Luzon B Region 4B Marinduque Lone Santa Cruz Improvement/Upgrading of Pantayin-Jolo-Napo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.520 38,173,812.46 4,771,726.56 4,771,726.56 0.00 47,717,265.58 410 1,244 1,194 2,438 Completed (100%) 100.00% physical progress as of Dec. 19, 2020 » VIEW S-CURVE DQT Builders Corporation
316 PRDP-IB-R04B-PAL-012-ROX-001-2014 Luzon B Region 4B Palawan 1st Roxas Construction and Upgrading of Nicanor Zabala - San Miguel -Jolo FMR Farm to Market Road (FMR) Kilometer 11.710 93,950,387.65 11,743,798.46 11,743,798.46 0.00 117,437,984.57 845 2,200 2,025 4,225 Completed (100%) 100.00% physical progress as of Jun. 15, 2020 » VIEW S-CURVE BCT Trading and Construction/ Tagusao Construction and Trading (JV)
317 PRDP-IB-R04B-MAR-003-000-000-2015 Luzon B Region 4B Marinduque Lone Boac Construction of Warehouse with office area, Weaving Shed, Soaking Pond, Multi-Purpose Pavement and Winnowing Shed Others Square Meter 347.500 1,760,480.62 220,060.08 220,060.08 0.00 2,200,600.78 821 243 577 820 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE DQT Builders Corporation
318 PRDP-IB-R04B-OCM-002-000-000-2016 Luzon B Region 4B Occidental Mindoro Lone Sablayan Expansion and Development of Fish Landing Others Square Meter 648.000 15,810,882.01 1,976,360.25 1,976,360.25 0.00 19,763,602.51 3,039 2,735 304 3,039 Completed (100%) 100.00% physical progress as of Jan. 07, 2019 » VIEW S-CURVE C.T Leoncio Construction & Trading
319 PRDP-IB-R04B-PAL-013-ROX-002-2014 Luzon B Region 4B Palawan 1st Roxas Construction of Palawan Cashew Processing Center, Warehouse, Store, and Solar Drier Others Square Meter 535.950 6,083,649.04 760,456.13 760,456.13 0.00 7,604,561.30 116 66 50 116 Completed (100%) 100.00% physical progress as of Jul. 07, 2018 » VIEW S-CURVE A. P. Consebido Construction & Trading
320 PRDP-IB-R04B-PAL-014-ROX-003-2016 Luzon B Region 4B Palawan 1st Roxas Construction & Upgrading of Antonino - Taradungan FMR with 30 L.M. RCDG Bridge FMR with Bridge Kilometer 10.400 125,600,000.00 15,700,000.00 15,700,000.00 0.00 157,000,000.00 587 1,301 1,184 2,485 Approved by RPAB For Issuance of NOL 1
321 PRDP-IB-R04B-ORM-007-BON-007-2019 Luzon B Region 4B Oriental Mindoro 2nd Bongabong Concreting of Centro - Panluan - Balite, Hagan Farm to Market Road Farm to Market Road (FMR) Kilometer 10.000 109,703,130.70 13,712,891.34 13,712,891.34 0.00 137,128,913.38 787 1,850 1,977 3,827 Approved by RPAB For Issuance of NOL 1
322 PRDP-IB-R04B-ORM-008-000-000-2019 Luzon B Region 4B Oriental Mindoro Concreting of Barangay Merit - Concepcion, Victoria - Barangay Ma. Concepcion - Happy Valley - Bugtong na Tuog, Socorro Farm to Market Road with Bridge FMR with Bridge Kilometer 10.730 132,447,376.08 16,555,922.01 16,555,922.01 0.00 165,559,220.10 935 2,158 1,999 4,157 Approved by RPAB For Issuance of NOL 1
323 PRDP-IB-R04B-ORM-009-000-000-2019 Luzon B Region 4B Oriental Mindoro Rehabilitation/ Construction/ Concreting of Rosacara FMR with Bridges FMR with Bridge Kilometer 8.280 124,523,515.62 15,565,439.45 15,565,439.45 0.00 155,654,394.52 516 - - - Approved by RPAB For Issuance of NOL 1
324 PRDP-IB-R04B-PAL-010-000-000-2019 Luzon B Region 4B Palawan Construction and Upgrading of Aramaywan to Cacarigan Farm to Market Road FMR with Bridge Kilometer 12.280 181,964,224.01 22,745,528.00 22,745,528.00 0.00 227,455,280.01 1,399 2,666 2,928 5,594 Approved by RPAB For Issuance of NOL 1
325 PRDP-IB-R04B-PAL-011-000-000-2019 Luzon B Region 4B Palawan Rehabilitation/Improvement of Sandoval-Silanga Farm to Market Road Farm to Market Road (FMR) Kilometer 7.640 117,336,800.00 14,667,100.00 14,667,100.00 0.00 146,671,000.00 900 2,349 2,124 4,473 Approved by RPAB For Issuance of NOL 1
326 PRDP-IB-R04B-MAR-006-000-000-2020 Luzon B Region 4B Marinduque Establishment/ Construction of AAA Slaughterhouse Others Square Meter 15000.000 226,626,476.98 28,328,309.62 28,328,309.62 0.00 283,283,096.22 8,326 12,704 29,228 41,932 Approved by RPAB For Issuance of NOL 1
327 PRDP-IB-R04B-OCM-005-000-000-2018 Luzon B Region 4B Occidental Mindoro Construction of Surong Bridge and Upgrading of Brgy. Aguas Farm to Market Road FMR with Bridge Kilometer 4.700 179,997,600.00 22,499,700.00 22,499,700.00 0.00 224,997,000.00 662 1,255 1,273 2,528 Approved by RPAB For endorsement to NPCO
328 PRDP-IB-R04B-ORM-015-PIN-002-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Road Concreting and Upgrading of Brgy. Del Razon - Brgy. Malaya Farm To Market Road with Bridge FMR with Bridge Kilometer 5.480 125,485,115.37 15,685,639.42 15,685,639.42 0.00 156,856,394.21 2,176 5,669 3,778 9,447 Approved by RPAB For Issuance of NOL 1
329 PRDP-IB-R04B-OCM-001-000-000-2015 Luzon B Region 4B Occidental Mindoro Lone Magsaysay Upgrading/Concreting of Brgy. Poblacion Farm-To-Market Road Farm to Market Road (FMR) Kilometer 5.000 76,504,410.57 9,563,051.32 9,563,051.32 0.00 95,630,513.21 1,672 4,200 4,161 8,361 Completed (100%) 100.00% physical progress as of Jun. 04, 2021 » VIEW S-CURVE F.A Torres Construction
330 PRDP-IB-R04B-ROM-001-000-000-2015 Luzon B Region 4B Romblon Lone Odiongan Construction of Brgy. Pato-o Proper- Sitio Aurora, Odiongan, Romblon Farm to Market Road with Two Bridges FMR with Bridge Kilometer 5.800 139,795,925.45 17,474,490.68 17,474,490.68 0.00 174,744,906.81 4,702 3,610 14,437 18,047 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE RCDG Construction Corporation
331 PRDP-IB-R04B-PAL-005-000-000-2014 Luzon B Region 4B Palawan 1st Dumaran Construction and Upgrading of Junction Salban-Culasian-Magsaysay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 17.170 157,767,307.99 19,720,913.50 19,720,913.50 0.00 197,209,134.99 1,488 2,379 2,163 4,542 Completed (100%) 100.00% physical progress as of Jun. 17, 2022 » VIEW S-CURVE Ivy Michelle Trading and Construction
332 PRDP-IB-R04B-PAL-007-PUE-002-2014 Luzon B Region 4B Palawan 3rd Puerto Princesa City Construction and Concreting of Bual Bualan FMR Farm to Market Road (FMR) Kilometer 3.000 25,595,571.02 3,199,446.38 3,199,446.38 0.00 31,994,463.78 297 600 589 1,189 Completed (100%) 100.00% physical progress as of Apr. 30, 2019 » VIEW S-CURVE BCT Trading and Construction
333 PRDP-IB-R04B-PAL-009-PUE-003-2015 Luzon B Region 4B Palawan 3rd Puerto Princesa City Construction of Maruyugon to Buenavista Farm to Market Road Farm to Market Road (FMR) Kilometer 6.500 94,396,325.50 11,799,540.69 11,799,540.69 0.00 117,995,406.88 1,305 2,863 2,809 5,672 Completed (100%) 100.00% physical progress as of Dec. 06, 2020 » VIEW S-CURVE BCT Trading and Construction
334 PRDP-IB-R04B-PAL-002-PUE-001-2014 Luzon B Region 4B Palawan 3rd Puerto Princesa City Concreting of Bukang Liwayway - Makandring FMR Farm to Market Road (FMR) Kilometer 8.000 62,140,215.06 7,767,526.88 7,767,526.88 0.00 77,675,268.82 528 1,165 946 2,111 Completed (100%) 100.00% physical progress as of Jun. 15, 2017 » VIEW S-CURVE BCT Trading and Construction
335 PRDP-IB-R04B-ORM-011-SAN-011-2018 Luzon B Region 4B Oriental Mindoro 1st San Teodoro Concreting of Barangay Bigaan - Saclag, Caagutayan Farm To Market Road with Bridge FMR with Bridge Kilometer 5.250 76,043,621.40 9,505,452.68 9,505,452.68 0.00 95,054,526.76 999 2,478 2,186 4,664 Completed (100%) 100.00% physical progress as of Dec. 19, 2023 » VIEW S-CURVE Framecon Builders
336 PRDP-IB-R04B-MAR-003-000-000-2020 Luzon B Region 4B Marinduque Lone Boac Improvement/ Upgrading of Caganhao - Amoingon - Maybo Farm To Market Road Farm to Market Road (FMR) Kilometer 5.140 83,068,398.38 10,383,549.80 10,383,549.80 0.00 103,835,497.98 814 1,586 1,585 3,171 Fifty percent and above progress 92.09% physical progress as of Nov. 11, 2024 » VIEW S-CURVE DQT Builders Corporation
337 PRDP-IB-R04B-MAR-004-BOA-004-2019 Luzon B Region 4B Marinduque Lone Boac Concreting of Cawit - Tugos Farm To Market Road Farm to Market Road (FMR) Kilometer 2.890 68,696,865.89 8,587,108.24 8,587,108.24 0.00 85,871,082.37 2,771 6,000 5,897 11,897 Fifty percent and above progress 83.84% physical progress as of Nov. 17, 2024 » VIEW S-CURVE ARKY Construction & Supply
338 PRDP-IB-R04B-MAR-008-000-000-2020 Luzon B Region 4B Marinduque Lone Santa Cruz Rehabilitation/Improvement of Brgy. Kaganhao - Banogbog Farm To Market Road Farm to Market Road (FMR) Kilometer 3.370 71,375,399.15 8,921,924.89 8,921,924.89 0.00 89,219,248.93 1,217 3,022 2,413 5,435 Fifty percent and above progress 90.30% physical progress as of Nov. 05, 2024 » VIEW S-CURVE DQT Builders Corporation
339 PRDP-IB-R04B-ORM-012-000-000-2021 Luzon B Region 4B Oriental Mindoro 1st Victoria Construction of Oriental Mindoro Trading and Consolidation Facility Others Square Meter 966.750 26,808,513.59 3,351,064.20 3,351,064.20 0.00 33,510,641.99 103 211 193 404 Completed (100%) 100.00% physical progress as of Aug. 05, 2024 » VIEW S-CURVE MADSAM ENTERPRISES
340 PRDP-IB-R04B-ORM-013-MAN-001-2021 Luzon B Region 4B Oriental Mindoro 2nd Mansalay Concreting of Brgy. Teresita to Brgy. Waygan to Brgy. Balugo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.540 99,977,978.21 12,497,247.28 12,497,247.28 0.00 124,972,472.77 2,342 4,773 4,596 9,369 Fifty percent and above progress 81.11% physical progress as of Oct. 31, 2024 » VIEW S-CURVE LUMEL GLENN CONSTRUCTION
341 PRDP-IB-R04B-OCM-006-RIZ-001-2018 Luzon B Region 4B Occidental Mindoro Lone Rizal Upgrading of Brgy. Manoot Farm to Market Road and Construction of Manoot Bridge II FMR with Bridge Kilometer 3.720 179,995,668.63 22,499,458.58 22,499,458.58 0.00 224,994,585.79 483 995 236 1,231 Approved by RPAB For Issuance of NOL 1
342 PRDP-IB-R04B-ORM-014-PIN-001-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Concreting and Opening of Sta. Isabel Farm To Market Road Farm to Market Road (FMR) Kilometer 2.500 39,829,621.65 4,978,702.71 4,978,702.71 0.00 49,787,027.07 2,176 3,468 3,778 7,246 Completed (100%) 100.00% physical progress as of Oct. 03, 2023 » VIEW S-CURVE Sixteen Enterprises
343 PRDP-IB-R04B-ORM-016-PIN-003-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Construction of Pinamalayan Slaughterhouse AA Others Square Meter 676.000 39,804,654.26 4,975,581.78 4,975,581.78 0.00 49,755,817.82 19,551 55,333 35,050 90,383 Completed (100%) 100.00% physical progress as of Dec. 27, 2023 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
344 PRDP-IB-R04B-ORM-017-MAN-002-2021 Luzon B Region 4B Oriental Mindoro 2nd Mansalay Construction of Mansalay Slaughterhouse AA Others Square Meter 676.000 39,995,586.66 4,999,448.33 4,999,448.33 0.00 49,994,483.32 650 8,205 5,005 13,210 Completed (100%) 100.00% physical progress as of Nov. 24, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
345 PRDP-IB-R04B-OCM-007-000-000-2023 Luzon B Region 4B Occidental Mindoro Upgrading/ concreting of JNR Kabangkalan - So. Guitong, Brgy. Ilvita - Brgy. Claudio Salgado Farm to Market Road Farm to Market Road (FMR) Kilometer 9.270 157,813,600.00 19,726,700.00 19,726,700.00 0.00 197,267,000.00 2,141 4,442 4,249 8,691 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
346 PRDP-IB-R04B-OCM-008-000-000-2023 Luzon B Region 4B Occidental Mindoro Upgrading/ concreting of JNR Bubog - Artemia - (D6) Brgy. San Agustin farm to Market Road with Two (2) Bridges San Jose, Occidental Mindoro FMR with Bridge Kilometer 8.100 200,021,600.00 25,002,700.00 25,002,700.00 0.00 250,027,000.00 4,303 9,014 8,269 17,283 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
347 PRDP-IB-R04B-ORM-018-ROX-001-2023 Luzon B Region 4B Oriental Mindoro 2nd Roxas Establishment of Roxas Abattoir Others Square Meter 367.130 44,800,000.00 5,600,000.00 5,600,000.00 0.00 56,000,000.00 13,564 29,796 29,019 58,815 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
348 PRDP-IB-R04B-ORM-019-GLO-001-2023 Luzon B Region 4B Oriental Mindoro 2nd Gloria Establishment of Gloria Abattoir Others Square Meter 367.130 44,800,000.00 5,600,000.00 5,600,000.00 0.00 56,000,000.00 4,300 3,785 1,262 5,047 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
349 PRDP-IB-R005-CAS-002-000-000-2014 Luzon B Region 5 Camarines Sur 2nd Libmanan Rehabilitation of San Isidro - Pag Oring Nuevo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.000 35,428,922.13 4,428,615.27 4,428,615.27 0.00 44,286,152.67 1,514 3,749 3,538 7,287 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE MARCBILT CONSTRUCTION
350 PRDP-IB-R005-CAN-001-000-000-2014 Luzon B Region 5 Camarines Norte 2nd Basud Construction/Rehabilitation of Pinagwarasan - Lanot FMR in (Basud & Mercedes) Farm to Market Road (FMR) Kilometer 8.500 89,246,073.45 11,155,759.18 11,155,759.18 0.00 111,557,591.81 4,629 10,007 9,298 19,305 Completed (100%) 100.00% physical progress as of Oct. 20, 2020 » VIEW S-CURVE J.D. LEGASPI CONSTRUCTION / JB ROS CONSTRUCTION CORPORATION JOINT VENTURE
351 PRDP-IB-R005-CAN-007-000-000-2015 Luzon B Region 5 Camarines Norte 2nd Basud Concreting of Angas - Lidong FMR in Basud Farm to Market Road (FMR) Kilometer 5.770 39,109,851.18 4,888,731.40 4,888,731.40 0.00 48,887,313.98 457 1,185 1,102 2,287 Completed (100%) 100.00% physical progress as of Aug. 12, 2019 » VIEW S-CURVE Hi-Tone Construction and Development Corporation/JCO Construction and Supply (JV)
352 PRDP-IB-R005-CAS-003-000-000-2014 Luzon B Region 5 Camarines Sur 2nd Pasacao Upgrading of Cuco - Bagong Silang Farm to Market Road Farm to Market Road (FMR) Kilometer 8.500 61,739,925.79 7,717,490.72 7,717,490.72 0.00 77,174,907.23 546 1,265 1,095 2,360 Completed (100%) 100.00% physical progress as of Jun. 30, 2020 » VIEW S-CURVE MARCBILT CONSTRUCTION, INC.
353 PRDP-IB-R005-CAS-006-000-000-2015 Luzon B Region 5 Camarines Sur 2nd Pamplona Road Opening and concreting of Batang - San Gabriel FMR Farm to Market Road (FMR) Kilometer 6.160 60,665,502.42 7,583,187.80 7,583,187.80 0.00 75,831,878.02 542 1,409 1,301 2,710 Completed (100%) 100.00% physical progress as of Feb. 20, 2021 » VIEW S-CURVE GCI. CONSTRUCTION AND DEVELOPMENT CORP.
354 PRDP-IB-R005-MAS-002-ESP-001-2015 Luzon B Region 5 Masbate 3rd Esperanza Concreting of (Segment A) Domorog- Tawad & (Segment B) San Roque - Baras FMR Project Farm to Market Road (FMR) Kilometer 10.390 83,496,759.65 10,437,094.96 10,437,094.96 0.00 104,370,949.57 1,764 4,030 3,813 7,843 Completed (100%) 100.00% physical progress as of Dec. 12, 2019 » VIEW S-CURVE ARKY CONSTRUCTION AND SUPPLY
355 PRDP-IB-R005-MAS-001-PLA-001-2015 Luzon B Region 5 Masbate 3rd Placer Concreting of Aguada - Locso-an FMR Project Farm to Market Road (FMR) Kilometer 9.500 96,703,806.45 12,087,975.81 12,087,975.81 0.00 120,879,758.07 1,087 2,904 2,942 5,846 Completed (100%) 100.00% physical progress as of Apr. 30, 2019 » VIEW S-CURVE ALGIMAR Construction
356 PRDP-IB-R005-CAN-006-000-000-2015 Luzon B Region 5 Camarines Norte 1st Santa Elena Concreting of Poblacion to Pulongguit-guit FMR Farm to Market Road (FMR) Kilometer 3.440 56,419,281.99 7,052,410.25 7,052,410.25 0.00 70,524,102.49 2,088 5,324 5,115 10,439 Completed (100%) 100.00% physical progress as of Oct. 15, 2020 » VIEW S-CURVE EUS Construction (Efren U. Sale)
357 PRDP-IB-R005-CAN-003-000-000-2014 Luzon B Region 5 Camarines Norte 1st Santa Elena Coco Geonet Production and Coco Peat Processing Project Others Square Meter 150.000 3,077,697.20 384,712.15 384,712.15 0.00 3,847,121.50 1,053 604 449 1,053 Completed (100%) 100.00% physical progress as of Mar. 17, 2018 » VIEW S-CURVE OMNICON BUILDERS
358 PRDP-IB-R005-ALB-002-000-000-2014 Luzon B Region 5 Albay 3rd Libon Construction of 150 sq.m. Warehouse for coco Geonets Others Square Meter 150.000 1,502,670.86 187,833.86 187,833.86 0.00 1,878,338.58 106 59 47 106 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE ALXM Construction
359 PRDP-IB-R005-CAN-011-000-000-2015 Luzon B Region 5 Camarines Norte 1st Labo Camarines Norte Pineapple Trading and Processing Project Others Square Meter 324.000 6,158,036.28 769,754.54 769,754.54 0.00 7,697,545.36 9,140 1,854 7,286 9,140 Completed (100%) 100.00% physical progress as of Jun. 29, 2018 » VIEW S-CURVE JCO CONSTRUCTION AND SUPPLY
360 PRDP-IB-R005-CAS-004-000-000-2014 Luzon B Region 5 Camarines Sur 5th Baao Camarines Sur Coco Sap Sugar Processing Others Square Meter 141.000 2,491,958.49 311,494.81 311,494.81 0.00 3,114,948.11 230 75 155 230 Completed (100%) 100.00% physical progress as of Oct. 30, 2018 » VIEW S-CURVE Beltran SB Aga General Merchandise and Construction
361 PRDP-IB-R005-CAT-002-000-000-2015 Luzon B Region 5 Catanduanes Lone Bato Construction of Main and Satellite Warehouse Building Others Square Meter 392.000 4,762,497.50 595,312.19 595,312.19 0.00 5,953,121.88 3,483 1,051 2,432 3,483 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE JR CONTRACTOR
362 PRDP-IB-R005-ALB-001-000-000-2014 Luzon B Region 5 Albay 3rd Oas Rehabilitation Improvement of Pistola Tablon Road with 3 units bridges FMR with Bridge Kilometer 15.030 164,136,396.06 20,517,049.51 20,517,049.51 0.00 205,170,495.08 1,943 5,112 4,608 9,720 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE WCS Construction
363 PRDP-IB-R005-CAT-009-000-000-2017 Luzon B Region 5 Catanduanes Lone Caramoran Concreting of Junction Sabangan-Datag East FMR, Caramoran Farm to Market Road (FMR) Kilometer 7.370 101,591,367.00 12,698,920.88 12,698,920.88 0.00 126,989,208.76 811 2,142 1,916 4,058 Completed (100%) 100.00% physical progress as of Oct. 27, 2020 » VIEW S-CURVE Honeyville Construction
364 PRDP-IB-R005-CAN-010-JOS-010-2017 Luzon B Region 5 Camarines Norte 1st Jose Panganiban Upgrading of Nakalaya to Sta. Elena Farm to Market Road Farm to Market Road (FMR) Kilometer 4.430 67,635,536.90 8,454,442.11 8,454,442.11 0.00 84,544,421.12 769 1,652 1,658 3,310 Approved by RPAB For Issuance of NOL 1
365 PRDP-IB-R005-SOR-004-000-000-2017 Luzon B Region 5 Sorsogon 1st Castilla Concreting of Cumadcad-Canjela Farm to Market Road Farm to Market Road (FMR) Kilometer 5.210 63,464,800.00 7,933,100.00 7,933,100.00 0.00 79,331,000.00 1,442 3,857 3,704 7,561 Approved by RPAB For Issuance of NOL 1
366 PRDP-IB-R005-MAS-003-ARO-001-2017 Luzon B Region 5 Masbate 2nd Aroroy Concreting of San Agustin -Tigbao Farm to Market Road Farm to Market Road (FMR) Kilometer 15.000 194,044,946.87 24,255,618.36 24,255,618.36 0.00 242,556,183.59 2,231 5,968 5,573 11,541 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ARKY Construction and Supply
367 PRDP-IB-R005-ALB-004-MAN-001-2018 Luzon B Region 5 Albay 2nd Manito Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 1476.000 28,480,578.29 3,560,072.29 3,560,072.29 0.00 35,600,722.87 1,476 3,794 3,586 7,380 Approved by RPAB For Issuance of NOL 1
368 PRDP-IB-R005-MAS-006-CAW-001-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Junction Pulot to RM Magbalon Farm to Market Road Farm to Market Road (FMR) Kilometer 5.740 98,554,368.00 12,319,296.00 12,319,296.00 0.00 123,192,960.00 309 1,114 742 1,856 Approved by RPAB For endorsement to NPCO
369 PRDP-IB-R005-MAS-008-CAW-003-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Junction Recodo to Begia Farm to Market Road Farm to Market Road (FMR) Kilometer 4.160 53,805,702.40 6,725,712.80 6,725,712.80 0.00 67,257,128.00 1,241 3,000 2,776 5,776 Approved by RPAB For endorsement to NPCO
370 PRDP-IB-R005-MAS-010-PLA-003-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Matagangtang to Manlut-od Farm to Market Road with Bridge FMR with Bridge Kilometer 4.080 112,000,000.00 14,000,000.00 14,000,000.00 0.00 140,000,000.00 600 1,512 1,490 3,002 Approved by RPAB For endorsement to NPCO
371 PRDP-IB-R005-MAS-011-USO-001-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Buenasuerte to Centro Farm to Market Roads Farm to Market Road (FMR) Kilometer 9.100 199,887,139.20 24,985,892.40 24,985,892.40 0.00 249,858,924.00 - - - - Approved by RPAB For endorsement to NPCO
372 PRDP-IB-R005-MAS-012-BAT-001-2019 Luzon B Region 5 Masbate 2nd Balud Concreting of Junction Dao to San Antonio Farm to Market Road Farm to Market Road (FMR) Kilometer 6.000 84,000,000.00 10,500,000.00 10,500,000.00 0.00 105,000,000.00 851 - - - Approved by RPAB For endorsement to NPCO
373 PRDP-IB-R005-CAS-009-PAM-001-2019 Luzon B Region 5 Camarines Sur 2nd Pamplona Concreting of Barangay Tambo to San Vicente Farm to Market Road Farm to Market Road (FMR) Kilometer 4.200 63,360,000.00 7,920,000.00 7,920,000.00 0.00 79,200,000.00 1,773 4,405 4,069 8,474 Approved by RPAB For endorsement to NPCO
374 PRDP-IB-R005-CAT-002-CAR-001-2019 Luzon B Region 5 Catanduanes Lone Caramoran Construction of Barangay Tubli to Maysuram Farm to Market Road Farm to Market Road (FMR) Kilometer 6.360 182,345,600.00 22,793,200.00 22,793,200.00 0.00 227,932,000.00 1,478 3,855 3,534 7,389 Approved by RPAB For endorsement to NPCO
375 PRDP-IB-R005-CAS-008-LUP-002-2019 Luzon B Region 5 Camarines Sur 1st Lupi Construction of Slaughter House Others Square Meter 0.000 40,000,000.00 5,000,000.00 5,000,000.00 0.00 50,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
376 PRDP-IB-R005-CAT-011-000-000-2020 Luzon B Region 5 Catanduanes Lone Pandan Concreting of Junction Libod to Panuto Farm to Market Road Farm to Market Road (FMR) Kilometer 4.960 140,382,877.94 17,547,859.74 17,547,859.74 0.00 175,478,597.42 676 1,802 1,694 3,496 Approved by RPAB For endorsement to NPCO
377 PRDP-IB-R005-CAT-014-PAN-001-2020 Luzon B Region 5 Catanduanes Lone Pandan Concreting of San Andres to Balangonan to Farm to Market Road Farm to Market Road (FMR) Kilometer 2.500 61,600,000.00 7,700,000.00 7,700,000.00 0.00 77,000,000.00 506 844 748 1,592 Approved by RPAB For endorsement to NPCO
378 PRDP-IB-R005-MAS-023-000-000-2020 Luzon B Region 5 Masbate 1st San Jacinto Concreting of Bagahanglad to Danao Farm to Market Road FMR with Bridge Kilometer 9.040 168,000,000.00 21,000,000.00 21,000,000.00 0.00 210,000,000.00 2,337 8,413 5,608 14,021 Approved by RPAB For Issuance of NOL 1
379 PRDP-IB-R005-MAS-009-000-000-2020 Luzon B Region 5 Masbate 3rd Uson Concreting of Marcella to Madao FMR with bridge FMR with Bridge Kilometer 8.120 160,000,000.00 20,000,000.00 20,000,000.00 0.00 200,000,000.00 898 3,233 2,155 5,388 Approved by RPAB For endorsement to NPCO
380 PRDP-IB-R005-MAS-010-000-000-2020 Luzon B Region 5 Masbate 2nd Balud Concreting of San Andres to San Antonio FMR with bridge FMR with Bridge Kilometer 8.180 176,000,000.00 22,000,000.00 22,000,000.00 0.00 220,000,000.00 596 2,145 1,431 3,576 Approved by RPAB For endorsement to NPCO
381 PRDP-IB-R005-SOR-002-SAN-001-2020 Luzon B Region 5 Sorsogon 2nd Santa Magdalena Concreting of San Antontio to La Esperanza Farm to Market Farm to Market Road (FMR) Kilometer 5.600 79,998,400.00 9,999,800.00 9,999,800.00 0.00 99,998,000.00 420 1,120 1,077 2,197 Approved by RPAB For endorsement to NPCO
382 PRDP-IB-R005-MAS-022-000-000-2020 Luzon B Region 5 Masbate 1st San Jacinto Concreting of Burgos to Bagacay Farm to Market Road Farm to Market Road (FMR) Kilometer 11.460 199,200,000.00 24,900,000.00 24,900,000.00 0.00 249,000,000.00 3,195 11,503 7,668 19,171 Approved by RPAB For Issuance of NOL 1
383 PRDP-IB-R005-MAS-033-MIL-001-2020 Luzon B Region 5 Masbate 2nd Milagros Concreting of Magsalangui FMR Farm to Market Road (FMR) Kilometer 6.520 128,000,000.00 16,000,000.00 16,000,000.00 0.00 160,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
384 PRDP-IB-R005-MAS-017-ARO-004-2020 Luzon B Region 5 Masbate 2nd Aroroy Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 7545.000 199,884,000.00 24,985,500.00 24,985,500.00 0.00 249,855,000.00 7,545 27,161 18,107 45,268 Approved by RPAB For endorsement to NPCO
385 PRDP-IB-R005-CAN-013-SAV-001-2020 Luzon B Region 5 Camarines Norte 2nd San Vicente Construction of AA Slaughter House Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 1,209 - - - Approved by RPAB For endorsement to NPCO
386 PRDP-IB-R005-MAS-027-PLA-004-2020 Luzon B Region 5 Masbate 3rd Placer Construction of 'AA" Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
387 PRDP-IB-R005-CAS-018-IRI-001-2020 Luzon B Region 5 Camarines Sur 5th Iriga City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 35,200,000.00 4,400,000.00 4,400,000.00 0.00 44,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
388 PRDP-IB-R005-CAS-018-MIL-001-2020 Luzon B Region 5 Camarines Sur 2nd Milaor Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
389 PRDP-IB-R005-ALB-013-LEG-001-2020 Luzon B Region 5 Albay 2nd Legazpi City Improvement / Rehabilitation of AA Slaughterhouse Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
390 PRDP-IB-R005-CAN-014-CAP-002-2020 Luzon B Region 5 Camarines Norte 1st Capalonga Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
391 PRDP-IB-R005-CAN-015-JOS-002-2020 Luzon B Region 5 Camarines Norte 1st Jose Panganiban Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
392 PRDP-IB-R005-CAN-016-DAE-001-2020 Luzon B Region 5 Camarines Norte 2nd Daet Construction of AA Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
393 PRDP-IB-R005-CAN-017-VIN-001-2020 Luzon B Region 5 Camarines Norte 2nd Vinzons Construction of AA Slaughter House Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
394 PRDP-IB-R005-CAS-020-NAG-001-2020 Luzon B Region 5 Camarines Sur 3rd Naga City Improvement / Rehabilitation of AA Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
395 PRDP-IB-R005-CAS-022-OCA-001-2020 Luzon B Region 5 Camarines Sur 3rd Ocampo Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
396 PRDP-IB-R005-ALB-014-MAL-001-2020 Luzon B Region 5 Albay 1st Malilipot Construction of AA Slaughter House Others Square Meter 1500.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
397 PRDP-IB-R005-ALB-015-LIG-001-2020 Luzon B Region 5 Albay 3rd Ligao City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 35,200,000.00 4,400,000.00 4,400,000.00 0.00 44,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
398 PRDP-IB-R005-CAT-012-BAT-001-2020 Luzon B Region 5 Catanduanes Lone Bato Construction of AA Slaughter House Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
399 PRDP-IB-R005-CAS-027-DEL-001-2020 Luzon B Region 5 Camarines Sur 1st Del Gallego Construction of AA Slaughter house Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
400 PRDP-IB-R005-CAS-028-BAT-001-2020 Luzon B Region 5 Camarines Sur 5th Bato Construction of AA Slaughterhouse Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
401 PRDP-IB-R005-CAS-029-SAG-001-2020 Luzon B Region 5 Camarines Sur 4th Sagnay Construction of AA Slaughter house Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
402 PRDP-IB-R005-SOR-007-SOR-001-2020 Luzon B Region 5 Sorsogon 1st Sorsogon City Improvement / Rehabilitation of AA Slaughterhouse Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
403 PRDP-IB-R005-SOR-008-JUB-001-2020 Luzon B Region 5 Sorsogon 2nd Juban Construction of AA Slaughter house Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
404 PRDP-IB-R005-SOR-010-SAN-002-2020 Luzon B Region 5 Sorsogon 2nd Santa Magdalena Construction of AA Slaughterhouse Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
405 PRDP-IB-R005-MAS-027-000-000-2021 Luzon B Region 5 Masbate 2nd Baleno Concreting of Población to Ubongan Dacu Farm to Market Road with Bridge FMR with Bridge Kilometer 10.900 283,404,800.00 35,425,600.00 35,425,600.00 0.00 354,256,000.00 1,253 4,511 3,007 7,518 Approved by RPAB For endorsement to NPCO
406 PRDP-IB-R005-CAN-005-000-000-2015 Luzon B Region 5 Camarines Norte 2nd San Vicente Concreting of Sto. Domingo - Fabrica FMR Farm to Market Road (FMR) Kilometer 8.610 70,483,093.89 8,810,386.74 8,810,386.74 0.00 88,103,867.37 1,173 4,375 4,197 8,572 Fifty percent and above progress 71.15% physical progress as of Apr. 15, 2021 » VIEW S-CURVE HEXAMINDZ CORPORATION
407 PRDP-IB-R005-CAS-001-000-000-2014 Luzon B Region 5 Camarines Sur 1st Sipocot Upgrading of Manangle - Caima Farm to Market Road Farm to Market Road (FMR) Kilometer 19.150 104,829,662.14 13,103,707.77 13,103,707.77 0.00 131,037,077.68 1,437 3,385 3,306 6,691 Less than fifty percent progress 49.25% physical progress as of Jun. 30, 2021 » VIEW S-CURVE Marc Built Construction
408 PRDP-IB-R005-ALB-006-TAB-001-2017 Luzon B Region 5 Albay 1st Tabaco City Rehabilitation / Improvement of Hacienda-Rawis FMR Farm to Market Road (FMR) Kilometer 8.300 154,190,593.77 19,273,824.22 19,273,824.22 0.00 192,738,242.21 3,007 7,689 7,157 14,846 Completed (100%) 100.00% physical progress as of May. 05, 2022 » VIEW S-CURVE Legazpi Premuim & Development Corporation/3RB Construction & Supply (Joint Venture)
409 PRDP-IB-R005-ALB-009-PIO-001-2019 Luzon B Region 5 Albay 3rd Pio Duran Rehabilitation/Concreting of Barangay Caratagan to Buyo Farm to Market Road Farm to Market Road (FMR) Kilometer 13.500 160,733,134.96 20,091,641.87 20,091,641.87 0.00 200,916,418.70 1,739 3,647 3,544 7,191 Completed (100%) 100.00% physical progress as of Oct. 01, 2024 » VIEW S-CURVE HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
410 PRDP-IB-R005-MAS-001-000-000-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Del Carmen to Malatawan Farm to Market Road Farm to Market Road (FMR) Kilometer 14.140 199,135,566.89 24,891,945.86 24,891,945.86 0.00 248,919,458.61 1,226 3,822 3,526 7,348 Completed (100%) 100.00% physical progress as of Aug. 28, 2024 » VIEW S-CURVE MGB CONSTRUCTION & TRADING
411 PRDP-IB-R005-MAS-002-000-000-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Cabangcalan to Malatawan Farm to Market Road with Bridge FMR with Bridge Kilometer 12.120 199,199,505.98 24,899,938.25 24,899,938.25 0.00 248,999,382.48 994 3,283 2,190 5,473 Fifty percent and above progress 80.90% physical progress as of Nov. 15, 2024 » VIEW S-CURVE NFH CONSTRUCTION & SUPPLY
412 PRDP-IB-R005-MAS-003-000-000-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Del Carmen to San Ramon Farm to Market Road with Bridge FMR with Bridge Kilometer 10.260 198,949,231.40 24,868,653.93 24,868,653.93 0.00 248,686,539.26 1,464 5,271 3,514 8,785 Fifty percent and above progress 99.66% physical progress as of Oct. 15, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
413 PRDP-IB-R005-ALB-008-POL-001-2019 Luzon B Region 5 Albay 3rd Polangui Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 4342.000 155,588,393.22 19,448,549.15 19,448,549.15 0.00 194,485,491.52 4,342 11,064 11,029 22,093 Fifty percent and above progress 98.96% physical progress as of Nov. 15, 2024 » VIEW S-CURVE CB Garay Philwide Builders
414 PRDP-IB-R005-MAS-004-000-000-2019 Luzon B Region 5 Masbate 2nd Milagros Concreting of San Antonio to San Carlos Farm to Market Road with Bridge FMR with Bridge Kilometer 9.060 195,673,010.80 24,459,126.35 24,459,126.35 0.00 244,591,263.50 662 2,318 1,588 3,906 Fifty percent and above progress 94.57% physical progress as of Nov. 15, 2024 » VIEW S-CURVE NFH CONSTRUCTION & SUPPLY
415 PRDP-IB-R005-MAS-005-000-000-2019 Luzon B Region 5 Masbate 2nd Milagros Concreting of San Carlos to Magsalangui Farm to Market Road Farm to Market Road (FMR) Kilometer 8.100 155,292,653.64 19,411,581.71 19,411,581.71 0.00 194,115,817.06 791 2,233 1,490 3,723 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE HGG BUILDERS & SUPPLY
416 PRDP-IB-R005-MAS-007-CAW-002-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Segment( A) Palobandera to Dalipe and Segment (B) Calumpang to Iraya Farm to Market Road Farm to Market Road (FMR) Kilometer 15.080 198,378,576.00 24,797,322.00 24,797,322.00 0.00 247,973,220.00 775 2,791 1,861 4,652 Completed (100%) 100.00% physical progress as of Feb. 21, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
417 PRDP-IB-R005-ALB-011-TIW-001-2019 Luzon B Region 5 Albay 1st Tiwi Construction of Tiwi Level II Water System Potable Water Supply (PWS) Level 2 Number of Households 5301.000 161,535,142.58 20,191,892.82 20,191,892.82 0.00 201,918,928.22 5,331 12,084 12,089 24,173 Fifty percent and above progress 99.05% physical progress as of Oct. 15, 2024 » VIEW S-CURVE VERZONTAL INFRASTRUCTURE CORPORATION
418 PRDP-IB-R005-CAS-007-LUP-001-2019 Luzon B Region 5 Camarines Sur 1st Lupi Construction/Improvement of Bulawan Jr. to Bangon Farm to Market Road Farm to Market Road (FMR) Kilometer 4.700 66,527,703.46 8,315,962.93 8,315,962.93 0.00 83,159,629.32 411 1,069 987 2,056 Fifty percent and above progress 97.05% physical progress as of Nov. 15, 2024 » VIEW S-CURVE PRECIOUS CONSTRUCTION
419 PRDP-IB-R005-MAS-009-PLA-002-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Puro to Camayabsan FMR Farm to Market Road (FMR) Kilometer 6.460 94,957,495.38 11,869,686.92 11,869,686.92 0.00 118,696,869.22 787 1,901 1,881 3,782 Completed (100%) 100.00% physical progress as of Feb. 29, 2024 » VIEW S-CURVE ARKY CONSTRUCTION AND SUPPLY
420 PRDP-IB-R005-ALB-011-TIW-002-2019 Luzon B Region 5 Albay 1st Tiwi Construction of Slaughterhouse Others Square Meter 0.000 40,000,000.00 5,000,000.00 5,000,000.00 0.00 50,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
421 PRDP-IB-R005-MAS-014-MOB-001-2019 Luzon B Region 5 Masbate 2nd Mobo Concreting of Sta. Maria to Pinamalatican Farm-to-Market Road with Bridge Farm to Market Road (FMR) Kilometer 12.000 200,000,000.00 25,000,000.00 25,000,000.00 0.00 250,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
422 PRDP-IB-R005-CAT-010-000-000-2020 Luzon B Region 5 Catanduanes Lone Viga Concreting of Junction Ogbong to Mabini Farm to Market Road Farm to Market Road (FMR) Kilometer 5.500 141,577,107.87 17,697,138.48 17,697,138.48 0.00 176,971,384.83 619 1,614 1,479 3,093 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Legaspi Premium Development Corporation
423 PRDP-IB-R005-MAS-015-ARO-002-2020 Luzon B Region 5 Masbate 2nd Aroroy Concreting of Tigbao to Mataba Farm to Market Road FMR with Bridge Kilometer 12.100 199,124,000.00 24,890,500.00 24,890,500.00 0.00 248,905,000.00 1,481 5,333 3,555 8,888 Approved by RPAB For endorsement to NPCO
424 PRDP-IB-R005-MAS-016-ARO-003-2020 Luzon B Region 5 Masbate 2nd Aroroy Concreting of San Agustin to Macabug Farm to Market Road with Bridge Farm to Market Road (FMR) Kilometer 9.460 199,349,850.02 24,918,731.25 24,918,731.25 0.00 249,187,312.52 1,033 3,718 2,478 6,196 Completed (100%) 100.00% physical progress as of Sep. 15, 2023 » VIEW S-CURVE ARKY Construction and Supply
425 PRDP-IB-R005-MAS-007-000-000-2020 Luzon B Region 5 Masbate 2nd Balud Concreting of Dao to Bungcanaway FMR with bridge FMR with Bridge Kilometer 11.160 197,891,414.62 24,736,426.83 24,736,426.83 0.00 247,364,268.28 1,657 5,966 3,977 9,943 Fifty percent and above progress 66.23% physical progress as of Nov. 15, 2024 » VIEW S-CURVE ARKY CONSTRUCTION & SUPPLY
426 PRDP-IB-R005-MAS-008-000-000-2020 Luzon B Region 5 Masbate 3rd Placer Concreting of Manlut-od to Guindawahan FMR Farm to Market Road (FMR) Kilometer 11.860 197,628,897.47 24,703,612.18 24,703,612.18 0.00 247,036,121.83 1,542 5,549 3,699 9,248 Completed (100%) 100.00% physical progress as of May. 15, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
427 PRDP-IB-R005-MAS-011-000-000-2020 Luzon B Region 5 Masbate 2nd Masbate City Concreting of Mapiña to Batuhan FMR Farm to Market Road (FMR) Kilometer 6.330 103,441,468.21 12,930,183.53 12,930,183.53 0.00 129,301,835.27 2,577 9,277 6,184 15,461 Completed (100%) 100.00% physical progress as of Oct. 31, 2024 » VIEW S-CURVE CL CARANDANG
428 PRDP-IB-R005-MAS-020-000-000-2020 Luzon B Region 5 Masbate 1st Claveria Concreting of Junction Gaway-Gaway to Pasig FMR Farm to Market Road (FMR) Kilometer 10.160 199,156,968.80 24,894,621.10 24,894,621.10 0.00 248,946,211.00 1,630 5,867 3,912 9,779 Completed (100%) 100.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY & DEVELOPMENT CORPORATION
429 PRDP-IB-R005-MAS-021-000-000-2020 Luzon B Region 5 Masbate 1st Claveria Concreting of Calpi to Cawayan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.780 103,205,173.73 12,900,646.72 12,900,646.72 0.00 129,006,467.17 510 1,834 1,223 3,057 Completed (100%) 100.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE A3 CONSTRUCTION & SUPPLY
430 PRDP-IB-R005-MAS-025-000-000-2020 Luzon B Region 5 Masbate 1st San Pascual Concreting of San Pedro to Malaking Ilog FMR Farm to Market Road (FMR) Kilometer 11.060 198,844,928.82 24,855,616.10 24,855,616.10 0.00 248,556,161.02 2,698 5,476 3,651 9,127 Fifty percent and above progress 96.28% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY AND DEVELOPMENT CORP.
431 PRDP-IB-R005-MAS-026-000-000-2020 Luzon B Region 5 Masbate 1st San Pascual Concreting of Mabuhay to Sta. Cruz FMR Farm to Market Road (FMR) Kilometer 7.040 135,302,785.69 16,912,848.21 16,912,848.21 0.00 169,128,482.11 587 2,113 1,409 3,522 Fifty percent and above progress 96.03% physical progress as of Nov. 15, 2024 » VIEW S-CURVE HI-TONE CONSTRUCTION AND DEVELOPMENT CORPORATION
432 PRDP-IB-R005-MAS-032-DIM-001-2020 Luzon B Region 5 Masbate 3rd Dimasalang Concreting of Gregorio Aliño to Cabanoyoan FMR Farm to Market Road (FMR) Kilometer 16.240 172,264,145.01 21,533,018.13 21,533,018.13 0.00 215,330,181.27 2,024 7,284 6,915 14,199 Fifty percent and above progress 95.03% physical progress as of Nov. 15, 2024 » VIEW S-CURVE V.R. PATRON BUILDERS & DEVELOPERS CORP.
433 PRDP-IB-R005-MAS-034-PAL-001-2020 Luzon B Region 5 Masbate 3rd Palanas Concreting of Malibas to San Isidro Farm to Market Road Farm to Market Road (FMR) Kilometer 11.650 198,213,105.30 24,776,638.16 24,776,638.16 0.00 247,766,381.62 637 1,411 1,402 2,813 Fifty percent and above progress 94.71% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY AND DEVELOPMENT CORPORATION
434 PRDP-IB-R005-ALB-012-DAR-001-2020 Luzon B Region 5 Albay 2nd Daraga Construction of AA Slaughterhouse Others Square Meter 2000.000 37,999,990.54 4,749,998.82 4,749,998.82 0.00 47,499,988.18 - - - - With NOL 2 For awarding of contract
435 PRDP-IB-R005-CAS-017-BUL-001-2020 Luzon B Region 5 Camarines Sur 5th Bula Construction of AA Slaughter House Others Square Meter 2000.000 26,394,964.99 3,299,370.62 3,299,370.62 0.00 32,993,706.23 13,362 34,021 35,409 69,430 Fifty percent and above progress 94.33% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
436 PRDP-IB-R005-SOR-005-BAR-001-2020 Luzon B Region 5 Sorsogon 2nd Barcelona Construction of AA Slaughter House Others Square Meter 2100.000 17,599,076.62 2,199,884.58 2,199,884.58 0.00 21,998,845.78 5,250 11,653 11,346 22,999 Fifty percent and above progress 95.12% physical progress as of Nov. 15, 2024 » VIEW S-CURVE System Processor and Construction Corporation
437 PRDP-IB-R005-CAS-019-CAL-001-2020 Luzon B Region 5 Camarines Sur 3rd Calabanga Construction of AA Slaughter House Others Square Meter 2000.000 34,456,799.67 4,307,099.96 4,307,099.96 0.00 43,070,999.59 17,211 42,526 40,507 83,033 Less than fifty percent progress 38.17% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
438 PRDP-IB-R005-CAS-021-BUH-001-2020 Luzon B Region 5 Camarines Sur 1st Buhi Construction of AA Slaughterhouse Others Square Meter 2000.000 35,172,587.94 4,396,573.49 4,396,573.49 0.00 43,965,734.92 16,541 39,241 37,902 77,143 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
439 PRDP-IB-R005-CAS-025-RAG-002-2020 Luzon B Region 5 Camarines Sur 1st Ragay Construction of AA Slaughter House Others Square Meter 2000.000 22,348,644.92 2,793,580.62 2,793,580.62 0.00 27,935,806.16 12,333 26,187 24,613 50,800 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE SYSTEM PROCESSOR AND CONSTRUCTION CORPORATION
440 PRDP-IB-R005-CAT-013-VIR-001-2020 Luzon B Region 5 Catanduanes Lone Virac Construction of AA Slaughter House Others Square Meter 2000.000 35,199,514.69 4,399,939.34 4,399,939.34 0.00 43,999,393.37 - - - - Fifty percent and above progress 79.32% physical progress as of Nov. 15, 2024 » VIEW S-CURVE SYSTEM PROCESSOR AND CONSTRUCTION CORPORATION
441 PRDP-IB-R005-ALB-016-TAB-002-2020 Luzon B Region 5 Albay 1st Tabaco City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 39,983,837.24 4,997,979.66 4,997,979.66 0.00 49,979,796.56 32,039 71,838 69,528 141,366 Fifty percent and above progress 82.45% physical progress as of Nov. 15, 2024 » VIEW S-CURVE CEBU 7H TECHNOCHEM INDUSTRIES, INC.
442 PRDP-IB-R005-SOR-009-GUB-001-2020 Luzon B Region 5 Sorsogon 2nd Gubat Construction of AA Slaughter House Others Square Meter 3630.000 31,344,193.05 3,918,024.13 3,918,024.13 0.00 39,180,241.31 13,471 29,912 29,622 59,534 Fifty percent and above progress 99.83% physical progress as of Nov. 15, 2024 » VIEW S-CURVE VERZONTAL INFRASTRUCTURE CORPORATION
443 PRDP-IB-R005-MAS-028-000-000-2021 Luzon B Region 5 Masbate 2nd Mobo Concreting of Baang to Barag FMR with bridges FMR with Bridge Kilometer 8.760 240,000,000.00 30,000,000.00 30,000,000.00 0.00 300,000,000.00 2,577 2,567 1,317 3,884 Approved by RPAB For endorsement to NPCO
444 PRDP-IB-R005-CAS-030-PIL-001-2023 Luzon B Region 5 Camarines Sur 3rd Pili Establishment of Pili Abattoir Others Square Meter 0.000 39,480,859.14 4,935,107.39 4,935,107.39 0.00 49,351,073.92 21,266 50,160 48,571 98,731 Approved by RPAB For endorsement to NPCO
445 PRDP-IB-R006-NOC-010-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Construction of 40 l.m. Dalayapan Bridge along Rehabilitation of Brgy. Caduha-an to Sitio Aluyan FMR Bridge Linear Meter 40.000 18,757,129.96 2,344,641.25 2,344,641.25 0.00 23,446,412.46 1,819 1,656 1,509 3,165 Completed (100%) 100.00% physical progress as of Aug. 15, 2019 » VIEW S-CURVE WILKINSON CONSTRUCTION
446 PRDP-IB-R006-NOC-002-000-000-2014 Visayas Region 6 Negros Occidental 2nd Cadiz City Rehabilitation of Brgy. Caduha-an to Sitio Aluyan Farm to Market Road Farm to Market Road (FMR) Kilometer 12.460 117,231,591.60 14,653,948.95 14,653,948.95 0.00 146,539,489.50 633 1,656 1,509 3,165 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Dynamic Builders and Construction Company, (Phil.) Inc.
447 PRDP-IB-R006-NOC-011-000-000-2015 Visayas Region 6 Negros Occidental 1st Toboso Construction of 75 l.m. Himoga-an Bridge along Rehabilitation of Sitio Magtu-od to Sitio Vergara FMR Bridge Linear Meter 75.000 31,689,709.18 3,961,213.65 3,961,213.65 0.00 39,612,136.48 1,173 2,346 5,320 7,666 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Dynamic Builders and Construction Company, (Phil.) Inc.
448 PRDP-IB-R006-AKL-001-000-000-2014 Visayas Region 6 Aklan Lone Banga Rehab/Improvement of Banga Libacao FMR with Bridge FMR with Bridge Kilometer 14.280 132,308,619.26 16,538,577.41 16,538,577.41 0.00 165,385,774.08 2,756 6,794 6,156 12,950 Completed (100%) 100.00% physical progress as of Feb. 15, 2021 » VIEW S-CURVE BSP & Company Inc.
449 PRDP-IB-R006-AKL-003-000-000-2015 Visayas Region 6 Aklan Lone Batan Rehabilitation and Improvement of Lalab-Bay-ang-Magpag-ong FMR Farm to Market Road (FMR) Kilometer 4.200 62,357,120.66 7,794,640.08 7,794,640.08 0.00 77,946,400.82 1,375 3,377 3,353 6,730 Completed (100%) 100.00% physical progress as of Oct. 21, 2021 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
450 PRDP-IB-R006-ANT-001-000-000-2014 Visayas Region 6 Antique Lone Laua-an Rehabilitation/Concreting of Liya-Liya-Casit-an FMR Farm to Market Road (FMR) Kilometer 1.380 17,437,616.14 2,179,702.02 2,179,702.02 0.00 21,797,020.18 383 878 891 1,769 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE FLT Enterprise
451 PRDP-IB-R006-CAP-001-000-000-2014 Visayas Region 6 Capiz 1st Ma-ayon Concreting and Improvement of Hipona-Canapian-Quinabonglan FMR with Bridge FMR with Bridge Kilometer 18.120 157,430,408.62 19,678,801.08 19,678,801.08 0.00 196,788,010.78 6,766 14,501 20,431 34,932 Completed (100%) 100.00% physical progress as of Jan. 07, 2022 » VIEW S-CURVE J.E. TICO Conctruction Co.,Inc. & F. Gurrea Construction Inc.
452 PRDP-IB-R006-ILO-002-000-000-2015 Visayas Region 6 Iloilo 1st Tigbauan Rehabilitation of Parara - Jamog Farm to Market Road Farm to Market Road (FMR) Kilometer 7.890 69,952,110.94 8,744,013.87 8,744,013.87 0.00 87,440,138.68 4,663 10,176 10,090 20,266 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE UY CONDEV CORP./G.UY CONSTRUCTION JOINT VENTURE
453 PRDP-IB-R006-ILO-001-000-000-2014 Visayas Region 6 Iloilo 4th Passi City Rehabilitation of Imbang Grande-Tagubong-Gemumua Agahon-Agtabo FMR Farm to Market Road (FMR) Kilometer 28.000 219,874,581.28 27,484,322.66 27,484,322.66 0.00 274,843,226.60 4,080 9,983 9,204 19,187 Completed (100%) 100.00% physical progress as of Jun. 15, 2020 » VIEW S-CURVE International Builders Corporation
454 PRDP-IB-R006-ILO-007-000-000-2015 Visayas Region 6 Iloilo 2nd Leon Concreting of Poblacion to Tacuyong Norte Farm to Market Road Farm to Market Road (FMR) Kilometer 10.470 96,684,933.54 12,085,616.69 12,085,616.69 0.00 120,856,166.92 2,930 7,107 7,183 14,290 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE INTERNATIONA BUILDERS CORPORATION
455 PRDP-IB-R006-NOC-004-000-000-2015 Visayas Region 6 Negros Occidental 3rd Enrique B. Magalona Rehabilitation of Hinicayan - Violeta FMR with Napilas Bridge FMR with Bridge Kilometer 10.110 130,055,448.99 16,256,931.12 16,256,931.12 0.00 162,569,311.23 974 2,188 2,130 4,318 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Dynamic Builders and Construction Company Incorporated/Wilkinson Construction Joint Venture
456 PRDP-IB-R006-NOC-005-000-000-2015 Visayas Region 6 Negros Occidental 4th Pontevedra Rehabilitation of Brgy. Gomez - Brgy. Zamora Farm to Market Road Farm to Market Road (FMR) Kilometer 3.230 38,736,322.14 4,842,040.27 4,842,040.27 0.00 48,420,402.68 435 1,054 978 2,032 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE SILVER DRAGON CONSTRUCTION LUMBER & GLASS SUPPLY
457 PRDP-IB-R006-NOC-009-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Construction of 75 l.m. Sicaba Bridge along Rehabilitation of Brgy. Caduha-an to Sitio Aluyan FMR Bridge Linear Meter 75.000 29,550,364.22 3,693,795.53 3,693,795.53 0.00 36,937,955.28 1,819 4,960 4,325 9,285 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE Wilkinson Construction
458 PRDP-IB-R006-NOC-008-000-000-2015 Visayas Region 6 Negros Occidental 2nd Manapla Rehabilitation of Brgy. 1-A to Brgy. Punta Salong FMR Farm to Market Road (FMR) Kilometer 3.100 38,799,531.67 4,849,941.46 4,849,941.46 0.00 48,499,414.59 992 2,475 2,285 4,760 Completed (100%) 100.00% physical progress as of May. 15, 2021 » VIEW S-CURVE Silver Dragon Construction, Lumber, and Glass Supply, Inc.
459 PRDP-IB-R006-NOC-001-000-000-2013 Visayas Region 6 Negros Occidental 1st Toboso Rehabilitation of Brgy Bug-ang - Sitio Magtu-od - Sitio Vergara FMR Farm to Market Road (FMR) Kilometer 4.200 49,333,316.30 6,166,664.54 6,166,664.54 0.00 61,666,645.38 448 949 1,341 2,290 Completed (100%) 100.00% physical progress as of Jan. 15, 2018 » VIEW S-CURVE Silver Dragon Construction Lumber abd Glass Supply
460 PRDP-IB-R006-GUI-002-000-000-2014 Visayas Region 6 Guimaras Lone Jordan Improvement / Rehabiltation of Bugnay-Sapal-Maabay Farm to Market Road Farm to Market Road (FMR) Kilometer 10.870 112,748,236.65 14,093,529.58 14,093,529.58 0.00 140,935,295.81 2,068 4,838 4,484 9,322 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE J.E.TICO CONSTRUCTION CO., INC.
461 PRDP-IB-R006-AKL-002-LIB-001-2015 Visayas Region 6 Aklan Lone Libacao Concreting of Brgy. Pampango-Rosal-Loctuga-Manika FMR with Four (4) Bridges FMR with Bridge Kilometer 4.900 138,922,858.59 17,365,357.32 17,365,357.32 0.00 173,653,573.23 1,411 4,421 4,623 9,044 Completed (100%) 100.00% physical progress as of Nov. 15, 2022 » VIEW S-CURVE BSP & Co., Inc.
462 PRDP-IB-R006-ILO-005-000-000-2015 Visayas Region 6 Iloilo 4th Dingle Rehabilitation /Concreting of Tinocuan-Maribuyong Farm to Market Road Farm to Market Road (FMR) Kilometer 9.750 83,600,588.02 10,450,073.50 10,450,073.50 0.00 104,500,735.02 1,281 2,915 2,830 5,745 Completed (100%) 100.00% physical progress as of Mar. 16, 2020 » VIEW S-CURVE Uy Condev Corporation / G. Uy Construction (Joint Venture)
463 PRDP-IB-R006-ILO-006-000-000-2015 Visayas Region 6 Iloilo 3rd Cabatuan Rehabilitation/Concreting of Bongol-Tambal-Quipot FMR with Two Bridges FMR with Bridge Kilometer 14.460 172,430,300.93 21,553,787.62 21,553,787.62 0.00 215,537,876.17 2,026 7,790 7,005 14,795 Completed (100%) 100.00% physical progress as of Dec. 27, 2022 » VIEW S-CURVE BSP & Company Inc.
464 PRDP-IB-R006-NOC-012-000-000-2015 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of 120 L.M. Himoga-an Bridge Bridge Linear Meter 120.000 61,037,062.46 7,629,632.81 7,629,632.81 0.00 76,296,328.08 1,951 4,264 4,096 8,360 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE ESJ and Sons Construction and Construction Supply, Inc
465 PRDP-IB-R006-AKL-004-000-000-2014 Visayas Region 6 Aklan Lone Altavas Rehabilitation of Coconut Mini Oil Mill for the Production of Small Scale Coco-Based Crude Oil and Copra Cakes Others Square Meter 185.420 3,456,640.00 432,080.00 432,080.00 0.00 4,320,800.00 237 108 129 237 Completed (100%) 100.00% physical progress as of Aug. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
466 PRDP-IB-R006-NOC-016-000-000-2016 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of Sagay Feeder Port/ Fish Landing Others Square Meter 280.000 122,813,318.00 15,351,664.75 15,351,664.75 0.00 153,516,647.50 3,648 6,753 5,768 12,521 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE BSP and Company, Inc.
467 PRDP-IB-R006-GUI-003-000-000-2016 Visayas Region 6 Guimaras Lone Sibunag Construction of Ten (10) Units Seaweeds Dryer cum Storage Others Square Meter 200.000 8,662,407.35 1,082,800.92 1,082,800.92 0.00 10,828,009.19 130 11 119 130 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE J.E. TICO CONSTRUCTION COMPANY, INC.
468 PRDP-IB-R006-AKL-005-000-000-2018 Visayas Region 6 Aklan Lone Batan Construction of Magpag-ong Fishport Others Square Meter 147.800 10,206,019.81 1,275,752.48 1,275,752.48 0.00 12,757,524.77 3,840 - - - Completed (100%) 100.00% physical progress as of Jul. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
469 PRDP-IB-R006-ILO-008-000-000-2018 Visayas Region 6 Iloilo 2nd Alimodian Proposed Construction of Sixty (60) L.M. Pre-Stressed Concrete Girder Cabacanan Bridge Bridge Linear Meter 60.000 36,595,200.00 4,574,400.00 4,574,400.00 0.00 45,744,000.00 495 1,492 1,431 2,923 Fifty percent and above progress 75.14% physical progress as of Oct. 15, 2024 » VIEW S-CURVE F. Gurrea Construction Inc.
470 PRDP-IB-R006-AKL-006-000-000-2018 Visayas Region 6 Aklan Lone Altavas Rehabilitation and Improvement of Cabangila-Angas-Palay-Camanci Road Farm to Market Road (FMR) Kilometer 4.610 64,695,200.00 8,086,900.00 8,086,900.00 0.00 80,869,000.00 2,750 4,939 4,904 9,843 Less than fifty percent progress 36.31% physical progress as of Nov. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
471 PRDP-IB-R006-AKL-008-LIB-001-2019 Visayas Region 6 Aklan Lone Libacao Construction/Concreting of Manika-Oyang Farm to Market Road Farm to Market Road (FMR) Kilometer 9.740 209,040,191.17 26,130,023.90 26,130,023.90 0.00 261,300,238.97 851 1,709 1,691 3,400 Less than fifty percent progress 0.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE KHAN KON CHI CONSTRUCTION AND DEVELOPMENT CORP.
472 PRDP-IB-R006-NOC-012-000-000-2019 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of 90-ln. m. Himogaan (Brgy. Puey) Bridge III Bridge Linear Meter 90.000 50,244,765.15 6,280,595.64 6,280,595.64 0.00 62,805,956.43 1,107 2,089 1,811 3,900 Fifty percent and above progress 94.20% physical progress as of Oct. 15, 2024 » VIEW S-CURVE ESJ and Sons Construction and Construction Supply, Inc
473 PRDP-IB-R006-ILO-010-000-000-2020 Visayas Region 6 Iloilo 1st Oton Establishment of Oton Abattoir Others Square Meter 1231.340 38,525,502.12 4,815,687.77 4,815,687.77 0.00 48,156,877.66 22,471 49,956 49,512 99,468 Fifty percent and above progress 94.40% physical progress as of Nov. 15, 2024 » VIEW S-CURVE F. Gurrea Construction, Inc.
474 PRDP-IB-R006-ILO-011-000-000-2021 Visayas Region 6 Iloilo Establishment of Concepcion Abattoir Others Square Meter 534.000 23,960,000.00 2,995,000.00 2,995,000.00 0.00 29,950,000.00 9,218 22,362 20,797 43,159 Fifty percent and above progress 51.18% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GC & S Construction Supply
475 PRDP-IB-R006-NOC-015-000-000-2021 Visayas Region 6 Negros Occidental Establishment of Hinobaan Municipal Abattoir Others Square Meter 3895.800 39,737,600.00 4,967,200.00 4,967,200.00 0.00 49,672,000.00 13,830 31,291 29,574 60,865 Fifty percent and above progress 87.98% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Jaime B Ching Enterprises
476 PRDP-IB-R006-NOC-013-000-000-2021 Visayas Region 6 Negros Occidental Establishment of Binalbagan Municipal Abattoir Others Square Meter 2341.900 39,056,000.00 4,882,000.00 4,882,000.00 0.00 48,820,000.00 15,495 34,733 34,456 69,189 Fifty percent and above progress 73.30% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Silver Dragon Construction & Lumber & Glass Supply, Inc.
477 PRDP-IB-R006-NOC-014-000-000-2021 Visayas Region 6 Negros Occidental 6th Cauayan Establishment of Cauayan Municipal Abattoir Others Square Meter 2842.060 2,634,725.02 329,340.63 329,340.63 0.00 3,293,406.28 22,858 53,220 49,418 102,638 Fifty percent and above progress 82.67% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Almana Construction and Development Corporation
478 PRDP-IB-R006-NOC-016-000-000-2021 Visayas Region 6 Negros Occidental 3rd Murcia Establishment of Murcia Municipal Abattoir Others Square Meter 4311.080 37,884,800.00 4,735,600.00 4,735,600.00 0.00 47,356,000.00 1,822 41,454 39,832 81,286 Fifty percent and above progress 80.88% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Almana Construction and Development Corporation
479 PRDP-IB-R006-GUI-008-NUE-001-2021 Visayas Region 6 Guimaras Lone Nueva Valencia Establishment of Nueva Valencia Municipal Abattoir Others Square Meter 534.000 29,501,599.26 3,687,699.91 3,687,699.91 0.00 36,876,999.08 8,525 20,479 19,297 39,776 Fifty percent and above progress 98.77% physical progress as of Sep. 15, 2024 » VIEW S-CURVE J.E. TICO CONSTRUCTION CO., INC.
480 PRDP-IB-R006-NOC-019-000-000-2021 Visayas Region 6 Negros Occidental 1st Toboso Establishment of Toboso Municipal Abattoir Others Square Meter 3895.080 37,468,800.00 4,683,600.00 4,683,600.00 0.00 46,836,000.00 9,745 21,661 20,453 42,114 Fifty percent and above progress 79.33% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Patrila Builders Incorporated
481 PRDP-IB-R006-NOC-018-000-000-2021 Visayas Region 6 Negros Occidental 1st San Carlos City Establishment of San Carlos Abattoir Others Square Meter 2443.180 39,913,182.93 4,989,147.87 4,989,147.87 0.00 49,891,478.67 32,220 67,054 67,566 134,620 Fifty percent and above progress 82.25% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Kenneth Construction and Development Corporation
482 PRDP-IB-R006-GUI-009-JOR-001-2021 Visayas Region 6 Guimaras Lone Jordan Establishment of Jordan Municipal Abattoir Others Square Meter 0.000 28,065,791.98 3,508,224.00 3,508,224.00 0.00 35,082,239.98 - - - - Fifty percent and above progress 78.15% physical progress as of Sep. 15, 2024 » VIEW S-CURVE GEMWEALTH CONSTRUCTION & TRADING
483 PRDP-IB-R006-ILO-016-000-000-2021 Visayas Region 6 Iloilo Danao-Danao Island Solar-Powered Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 213.000 10,275,946.26 1,284,493.28 1,284,493.28 0.00 12,844,932.82 213 453 401 854 Completed (100%) 100.00% physical progress as of Dec. 26, 2023 » VIEW S-CURVE NXTLVL WATER TECHNOLOGY INCORPORATED
484 PRDP-IB-R007-BOH-001-000-000-2014 Visayas Region 7 Bohol 2nd Sagbayan Rehabilitation of San Agustin-Canmaya Diot Farm to Market Road Farm to Market Road (FMR) Kilometer 5.980 38,551,612.41 4,818,951.55 4,818,951.55 0.00 48,189,515.51 1,183 1,887 1,828 3,715 Completed (100%) 100.00% physical progress as of Sep. 21, 2016 » VIEW S-CURVE YS Construction
485 PRDP-IB-R007-BOH-003-000-000-2014 Visayas Region 7 Bohol 1st Catigbian Rehabilitation of Baang-Mahayag Norte Farm to Market Road Farm to Market Road (FMR) Kilometer 3.530 23,886,256.17 2,985,782.02 2,985,782.02 0.00 29,857,820.21 595 1,507 1,588 3,095 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE WYNN Construction
486 PRDP-IB-R007-CEB-013-000-000-2015 Visayas Region 7 Cebu 2nd Santander Rehabilitation of Looc-Talisay Farm to Market Road Farm to Market Road (FMR) Kilometer 6.250 55,872,565.89 6,984,070.74 6,984,070.74 0.00 69,840,707.37 1,176 2,280 2,211 4,491 Completed (100%) 100.00% physical progress as of Sep. 14, 2020 » VIEW S-CURVE QM BUILDERS
487 PRDP-IB-R007-BOH-002-000-000-2014 Visayas Region 7 Bohol 1st Balilihan Rehabilitation of Del Carmen Weste via Tugbas Farm to Market Road Farm to Market Road (FMR) Kilometer 2.840 22,172,102.80 2,771,512.85 2,771,512.85 0.00 27,715,128.50 181 413 410 823 Completed (100%) 100.00% physical progress as of Mar. 16, 2019 » VIEW S-CURVE Contractor: CCM Construction
488 PRDP-IB-R007-CEB-005-000-000-2015 Visayas Region 7 Cebu 2nd Alegria Alegria Integrated Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 3187.000 81,568,550.57 10,196,068.82 10,196,068.82 0.00 101,960,688.21 3,187 8,594 8,271 16,865 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE REX E. MORALES CONSTRUCTION
489 PRDP-IB-R007-BOH-004-000-000-2014 Visayas Region 7 Bohol 3rd Loboc Rehabilitation of Alegria - Bugho Farm to Market Road Farm to Market Road (FMR) Kilometer 5.500 45,283,465.48 5,660,433.19 5,660,433.19 0.00 56,604,331.86 295 761 714 1,475 Completed (100%) 100.00% physical progress as of Aug. 15, 2022 » VIEW S-CURVE YU Construction
490 PRDP-IB-R007-CEB-001-000-000-2014 Visayas Region 7 Cebu 4th Bogo City Rehabilitation of Anonang Sur - Lambusan Farm to Market Road Farm to Market Road (FMR) Kilometer 5.820 45,595,541.32 5,699,442.67 5,699,442.67 0.00 56,994,426.66 1,052 2,665 2,996 5,661 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Duros Development Corporation
491 PRDP-IB-R007-CEB-003-000-000-2014 Visayas Region 7 Cebu 4th San Remigio Rehabilitation of Kinawahan - Canagahan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.710 23,756,370.26 2,969,546.28 2,969,546.28 0.00 29,695,462.82 725 1,428 1,417 2,845 Completed (100%) 100.00% physical progress as of Jun. 04, 2022 » VIEW S-CURVE J.A. ACHACOSO ENTERPRISES AND GENERAL SERVICES
492 PRDP-IB-R007-BOH-007-000-000-2014 Visayas Region 7 Bohol 1st Loon Rehabilitation of Pondol - Candaigan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.740 73,158,880.96 9,144,860.12 9,144,860.12 0.00 91,448,601.20 557 1,286 1,297 2,583 Fifty percent and above progress 87.27% physical progress as of Oct. 15, 2024 » VIEW S-CURVE BSP and Company, Inc.
493 PRDP-IB-R007-BOH-005-000-000-2014 Visayas Region 7 Bohol 2nd Inabanga Rehabilitation of Dagnawan - Dagohoy Farm-to-Market Road Farm to Market Road (FMR)