Subproject Database as of March 18, 2024

Download CSV
Count No. ID Subproject Location Name of Subproject Type of Subproject Unit of Measurement Quantity (Unit) Cost in Pesos Beneficiaries Stage Status
Cluster Region Province District Municipality By Business Undertaking By Financing Loan Proceeds Global Environmental Facility Government of the Philippines Local Goverment Unit Equity Total No. of Groups Members
Male Female Total
1 PRDP-IR-RCAR-ABR-002-VIL-002-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 46 1 47 Completed (100%) 100% physical progress
2 PRDP-IR-RCAR-ABR-003-VIL-003-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 62 0 62 Completed (100%) 100% physical progress
3 PRDP-IR-RCAR-ABR-004-VIL-004-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 53 2 55 Completed (100%) 100% physical progress
4 PRDP-IR-RCAR-ABR-005-VIL-005-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 79 0 79 Completed (100%) 100% physical progress
5 PRDP-IR-RCAR-ABR-006-VIL-006-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 59 1 60 Completed (100%) 100% physical progress
6 PRDP-IR-RCAR-ABR-007-VIL-007-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 91 2 93 Completed (100%) 100% physical progress
7 PRDP-IR-RCAR-ABR-008-VIL-008-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 57 1 58 Completed (100%) 100% physical progress
8 PRDP-IR-RCAR-BEN-002-000-000-2015 Luzon A CAR Benguet Lone Buguias Rehabilitation of Nursery and High Value Crop Protected Production Areas Damaged by Typhoon “Lando” Restoration / Rehabilitation Micro Enterprise Proponent Group 1 582,327.60 0.00 194,109.20 194,109.20 970,546.00 1 49 21 70 Completed (100%) 103% physical progress
9 PRDP-IR-RCAR-BEN-010-KAB-001-2015 Luzon A CAR Benguet Lone Kabayan BFCC Swine Raising for Typhoon Affected Members Restoration / Rehabilitation Micro Enterprise Proponent Group 1 420,420.00 0.00 140,140.00 140,140.00 700,700.00 1 0 20 20 Completed (100%) 100% physical progress
10 PRDP-IR-RCAR-BEN-011-KAB-002-2015 Luzon A CAR Benguet Lone Kabayan Hog Raising and "Kinuday" meat Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 595,770.00 0.00 198,590.00 198,590.00 992,950.00 1 39 36 75 Completed (100%) 101% physical progress
11 PRDP-IR-RCAR-BEN-015-KAB-003-2016 Luzon A CAR Benguet Lone Kabayan Vegetable Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 554,910.00 0.00 184,970.00 184,970.00 924,850.00 1 199 233 432 Completed (100%) 108% physical progress
12 PRDP-IR-RCAR-BEN-016-KAB-004-2016 Luzon A CAR Benguet Lone Kabayan Vegetable Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 543,732.90 0.00 181,244.30 181,244.30 906,221.50 1 90 30 120 Completed (100%) 110% physical progress
13 PRDP-IR-RCAR-BEN-018-LAT-001-2016 Luzon A CAR Benguet Lone La Trinidad Young Farmers Farm Mechanization and Service Provider Enterprise for a Sustainable Production of High Value Commercial Crops in La Trinidad, Benguet Restoration / Rehabilitation Micro Enterprise Proponent Group 1 592,674.00 0.00 197,558.00 197,558.00 987,790.00 1 28 2 30 Completed (100%) 101% physical progress
14 PRDP-IR-RCAR-BEN-019-LAT-002-2016 Luzon A CAR Benguet Lone La Trinidad Chrysanthemum Production using Greenhouse Conditon Restoration / Rehabilitation Micro Enterprise Proponent Group 1 578,400.00 0.00 192,800.00 192,800.00 964,000.00 1 19 51 70 Completed (100%) 104% physical progress
15 PRDP-IR-RCAR-BEN-020-LAT-003-2016 Luzon A CAR Benguet Lone La Trinidad Strawberry Production Under Tunnel Type Mini Greenhouse Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 361 203 564 Completed (100%) 100% physical progress
16 PRDP-IR-RCAR-MOP-002-000-000-2015 Luzon A CAR Mountain Province Lone Bauko Rehabilitation of Protected Areas for Organic Vegetable Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,760.00 0.00 199,920.00 199,920.00 999,600.00 1 138 49 187 Completed (100%) 100% physical progress
17 PRDP-IR-RCAR-MOP-003-000-000-2015 Luzon A CAR Mountain Province Lone Bauko Bagnen Swine Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,880.00 0.00 199,960.00 199,960.00 999,800.00 1 57 105 162 Completed (100%) 100% physical progress
18 PRDP-IR-RCAR-MOP-004-000-000-2015 Luzon A CAR Mountain Province Lone Bauko Farm Mechanization Service Provider for Highland Vegetable Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,280.00 0.00 199,760.00 199,760.00 998,800.00 1 90 137 227 Completed (100%) 100% physical progress
19 PRDP-IR-RCAR-MOP-005-000-000-2015 Luzon A CAR Mountain Province Lone Bontoc Swine Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 556,653.60 0.00 185,551.20 185,551.20 927,756.00 1 2 38 40 Completed (100%) 100% physical progress
20 PRDP-IR-RCAR-MOP-006-000-000-2015 Luzon A CAR Mountain Province Lone Bontoc Provision on Rain Shelter and Farm Inputs for leafy Vegetable Production under Protection Cultivation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,925.00 0.00 199,975.00 199,975.00 999,875.00 1 0 50 50 Completed (100%) 100% physical progress
21 PRDP-IR-RCAR-BEN-024-KAB-024-2021 Luzon A CAR Benguet Lone Kabayan Highland Vegetables Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,845,119.40 0.00 2,615,039.80 2,615,039.80 13,075,199.00 1 0 0 0 Business Plan Preparation Business Plan (w/ WFP, Proc. Plan, DED) for endorsement by the PPMIU to RPCO
22 PRDP-IR-RCAR-BEN-025-KAB-025-2021 Luzon A CAR Benguet Lone Kabayan Highland Vegetables Production, Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,800,000.00 0.00 1,600,000.00 1,600,000.00 8,000,000.00 1 0 0 0 Business Plan Preparation Business Plan (w/ WFP, Proc. Plan, DED) for endorsement by the PPMIU to RPCO
23 PRDP-IR-RCAR-MOP-012-SAG-012-2022 Luzon A CAR Mountain Province Lone Sagada Upgrading of Coffee Processing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 6,000,000.00 0.00 2,000,000.00 2,000,000.00 10,000,000.00 1 0 0 0 Business Plan Preparation Business Plan for Approval by the RPAB
24 PRDP-IR-RCAR-ABR-009-VIL-009-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 57 2 59 Completed (100%) 100% physical progress
25 PRDP-IR-RCAR-BEN-021-LAT-004-2016 Luzon A CAR Benguet Lone La Trinidad Fancy Lettuce Seedling Production Under Greenhouse Condition Restoration / Rehabilitation Micro Enterprise Proponent Group 1 585,600.00 0.00 195,200.00 195,200.00 976,000.00 1 23 8 31 Completed (100%) 102% physical progress
26 PRDP-IR-RCAR-MOP-011-BON-003-2021 Luzon A CAR Mountain Province Lone Bontoc Aliwes Arabica Coffee Consolidation, Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 5,321,159.20 0.00 1,773,719.73 1,773,719.73 8,868,598.66 1 17 43 60 Completed (100%) 100% physical progress
27 PRDP-IR-RCAR-BEN-022-000-000-2018 Luzon A CAR Benguet Lone Sablan Ubi Production and Marketing Enterprise Upgrading / Expansion Micro Enterprise Proponent Group 1 657,618.00 0.00 219,206.00 219,206.00 1,096,030.00 1 1 19 20 Completed (100%) 159% physical progress
28 PRDP-IR-RCAR-BEN-006-000-000-2015 Luzon A CAR Benguet Lone Kibungan Input Provision for Affected Vegetable Farmer Members Restoration / Rehabilitation Micro Enterprise Proponent Group 1 346,764.00 0.00 115,588.00 115,588.00 577,940.00 1 79 67 146 Completed (100%) 173% physical progress
29 PRDP-IR-RCAR-BEN-008-000-000-2015 Luzon A CAR Benguet Lone Mankayan Tomato Production under Greenhouse Condition Restoration / Rehabilitation Micro Enterprise Proponent Group 1 569,136.00 0.00 189,712.00 189,712.00 948,560.00 1 15 21 36 Completed (100%) 103% physical progress
30 PRDP-IR-RCAR-BEN-017-000-000-2016 Luzon A CAR Benguet Lone Kapangan Hog fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,666.40 0.00 196,888.80 196,888.80 984,444.00 1 28 41 69 Completed (100%) 101% physical progress
31 PRDP-IR-RCAR-BEN-001-000-000-2014 Luzon A CAR Benguet Lone Kibungan Benguet Arabica Coffee Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 10 3,645,336.00 0.00 1,215,112.00 1,215,112.00 6,075,560.00 10 607 595 1,202 Completed (100%) 102% physical progress
32 PRDP-IR-RCAR-BEN-005-000-000-2015 Luzon A CAR Benguet Lone Buguias Beekeeping Livelihood Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 546,279.00 0.00 182,093.00 182,093.00 910,465.00 1 24 9 33 Completed (100%) 100% physical progress
33 PRDP-IR-RCAR-BEN-009-000-000-2015 Luzon A CAR Benguet Lone Mankayan Potato Production under Greenhouse Condition Restoration / Rehabilitation Micro Enterprise Proponent Group 1 588,000.00 0.00 196,000.00 196,000.00 980,000.00 1 33 5 38 Completed (100%) 102% physical progress
34 PRDP-IR-RCAR-BEN-007-000-000-2015 Luzon A CAR Benguet Lone La Trinidad Greenhouse Rehabilitation and Production Support to Organic Vegetable Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 93 79 172 Completed (100%) 100% physical progress
35 PRDP-IR-RCAR-BEN-004-000-000-2015 Luzon A CAR Benguet Lone Buguias Community Based Upland Vegetable Seedling Production under Modern Greenhouse Structure for Continuous Vegetable Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 533,760.00 0.00 177,920.00 177,920.00 889,600.00 1 167 29 196 Completed (100%) 112% physical progress
36 PRDP-IR-RCAR-BEN-003-000-000-2015 Luzon A CAR Benguet Lone Buguias Lettuce Seedling Production Using Greenhouses to Shorten Production Period of Farmers in Recovering from Typhoon Damage Restoration / Rehabilitation Micro Enterprise Proponent Group 1 506,154.00 0.00 168,718.00 168,718.00 843,590.00 1 451 545 996 Completed (100%) 115% physical progress
37 PRDP-IR-RCAR-BEN-012-000-000-2016 Luzon A CAR Benguet Lone Atok Production of Alstromeria Flower Restoration / Rehabilitation Micro Enterprise Proponent Group 1 527,640.00 0.00 175,880.00 175,880.00 879,400.00 1 77 180 257 Completed (100%) 114% physical progress
38 PRDP-IR-RCAR-IFU-002-000-000-2016 Luzon A CAR Ifugao Lone Hungduan Livelihood Project on Swine Raising Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,250.00 0.00 198,750.00 198,750.00 993,750.00 1 7 43 50 Completed (100%) 101% physical progress
39 PRDP-IR-RCAR-IFU-003-000-000-2016 Luzon A CAR Ifugao Lone Lagawe Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 31 15 46 Completed (100%) 100% physical progress
40 PRDP-IR-RCAR-KAL-001-000-000-2014 Luzon A CAR Kalinga Lone Tanudan Kalinga Integrated Coffee Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Groups 6 3,955,046.96 0.00 1,318,348.99 1,318,348.99 6,591,744.94 6 326 275 601 Completed (100%) 111% physical progress
41 PRDP-IR-RCAR-KAL-002-000-000-2017 Luzon A CAR Kalinga Lone Tabuk City Consolidation, Processing, and Marketing of Kalinga Heirloom Rice Upgrading / Expansion Small Enterprise Proponent Group 1 2,596,932.56 0.00 865,644.19 865,644.19 4,328,220.94 1 22 136 158 Completed (100%) 105% physical progress
42 PRDP-IR-RCAR-MOP-001-000-000-2014 Luzon A CAR Mountain Province Lone Besao Mountain Province Arabica Coffee Enterprise Start-up Small Enterprise Proponent Groups 8 2,033,195.58 0.00 677,731.86 677,731.86 3,388,659.30 8 1,169 1,524 2,693 Completed (100%) 100% physical progress
43 PRDP-IR-RCAR-MOP-009-000-000-2018 Luzon A CAR Mountain Province Lone Sagada Sagada Coffee Processing with Cupping Laboratory Upgrading / Expansion Micro Enterprise Proponent Group 1 1,129,224.00 0.00 376,408.00 376,408.00 1,882,040.00 1 25 40 65 Completed (100%) 105% physical progress
44 PRDP-IR-RCAR-APA-002-000-000-2017 Luzon A CAR Apayao Lone Pudtol Banana Chips Processing and Marketing Upgrading / Expansion Micro Enterprise Proponent Group 1 577,939.20 0.00 192,646.40 192,646.40 963,232.00 1 77 107 184 Completed (100%) 104% physical progress
45 PRDP-IR-RCAR-APA-001-000-000-2016 Luzon A CAR Apayao Lone Flora Apayao Cardava Banana Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 6,376,051.42 0.00 2,125,350.47 2,125,350.47 10,626,752.36 1 28 20 48 Completed (100%) 101% physical progress
46 PRDP-IR-RCAR-APA-003-000-000-2018 Luzon A CAR Apayao Lone Calanasan Coffee Processing and Marketing Start-up Small Enterprise Proponent Group 1 2,028,927.54 0.00 676,309.18 676,309.18 3,381,545.90 1 59 17 76 Completed (100%) 104% physical progress
47 PRDP-IR-RCAR-APA-004-000-000-2018 Luzon A CAR Apayao Lone Conner Banana (Cardava) Production, Consolidation and Marketing of Conner, Apayao Start-up Small Enterprise Proponent Group 1 4,329,275.63 0.00 1,443,091.88 1,443,091.88 7,215,459.39 1 125 63 188 Completed (100%) 104% physical progress
48 PRDP-IR-RCAR-BEN-021-LAT-021-2019 Luzon A CAR Benguet Lone La Trinidad Potato Tuberlets Production and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 5,502,080.65 0.00 1,834,026.88 1,834,026.88 9,170,134.41 1 110 27 137 Completed (100%) 107% physical progress
49 PRDP-IR-RCAR-IFU-004-000-000-2017 Luzon A CAR Ifugao Lone Banaue Processing and Marketing of Export Quality Ifugao Heirloom Rice Upgrading / Expansion Small Enterprise Proponent Group 1 6,793,414.35 0.00 2,264,471.45 2,264,471.45 11,322,357.25 1 107 254 361 Completed (100%) 99% physical progress
50 PRDP-IR-RCAR-IFU-001-000-000-2015 Luzon A CAR Ifugao Lone Asipulo Ifugao Coffee Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 8,347,805.21 0.00 2,782,601.74 2,782,601.74 13,913,008.69 1 196 204 400 Completed (100%) 101% physical progress
51 PRDP-IR-RCAR-KAL-003-000-000-2018 Luzon A CAR Kalinga Lone Tabuk City Banana (Cardava) Consolidation and Marketing Start-up Small Enterprise Proponent Group 1 6,232,207.99 0.00 2,077,402.66 2,077,402.66 10,387,013.31 1 19 41 60 Completed (100%) 102% physical progress
52 PRDP-IR-RCAR-MOP-007-BAU-001-2017 Luzon A CAR Mountain Province Lone Bauko Potato Tubers Production and Marketing Start-up Small Enterprise Proponent Group 1 5,657,057.20 0.00 1,885,685.73 1,885,685.73 9,428,428.66 1 39 61 100 Completed (100%) 103% physical progress
53 PRDP-IR-RCAR-MOP-008-BAR-001-2017 Luzon A CAR Mountain Province Lone Barlig Mountain Province Heirloom Rice Consolidation Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 2,566,200.00 0.00 855,400.00 855,400.00 4,277,000.00 1 32 77 109 Completed (100%) 101% physical progress
54 PRDP-IR-RCAR-MOP-010-000-000-2019 Luzon A CAR Mountain Province Lone Sadanga Heirloom Rice Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 4,040,520.00 0.00 1,346,840.00 1,346,840.00 6,734,200.00 1 89 210 299 Completed (100%) 101% physical progress
55 PRDP-IR-RCAR-BEN-023-MAN-023-2021 Luzon A CAR Benguet Lone Mankayan Bosigan MPC's Highland Vegetable Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 8,109,326.66 0.00 2,703,108.89 2,703,108.89 13,515,544.44 1 52 51 103 Fifty percent and above progress 98.10% physical progress
56 PRDP-IR-RCAR-ABR-001-VIL-001-2015 Luzon A CAR Abra Lone Villaviciosa Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 46 36 82 Completed (100%) 100% physical progress
57 PRDP-IR-RCAR-ABR-011-000-000-2021 Luzon A CAR Abra Lone Bangued Carabao Mango Consolidation and Marketing Start-up Small Enterprise Proponent Group 1 4,080,520.00 0.00 1,360,173.33 1,360,173.33 6,800,866.66 1 78 29 107 Completed (100%) 100% physical progress
58 PRDP-IR-RCAR-ABR-011-000-000-2016 Luzon A CAR Abra Lone Tineg Cattle Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 23 7 30 Completed (100%) 100% physical progress
59 PRDP-IR-RCAR-BEN-022-KAB-022-2021 Luzon A CAR Benguet Lone Kabayan Highland Vegetables Hauling and Delivery Services Start-up Small Enterprise Proponent Group 1 3,749,661.60 0.00 1,249,887.20 1,249,887.20 6,249,436.00 1 28 50 78 Completed (100%) 103% physical progress
60 PRDP-IR-R001-PAN-050-000-000-2017 Luzon A Region 1 Pangasinan 1st Bani Salad Tomato Contract Farming and Support Service Facility Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 3,433,945.80 0.00 1,144,648.60 1,144,648.60 5,723,243.00 1 25 0 25 Completed (100%) 103% physical progress
61 PRDP-IR-R001-ILN-002-BAC-001-2015 Luzon A Region 1 Ilocos Norte 1st Bacarra Corn and Livestock Integration and Trading Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 254 126 380 Completed (100%) 100% physical progress
62 PRDP-IR-R001-ILN-003-BAA-001-2015 Luzon A Region 1 Ilocos Norte 2nd Banna Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 185 383 568 Completed (100%) 100% physical progress
63 PRDP-IR-R001-ILN-005-PID-001-2015 Luzon A Region 1 Ilocos Norte 1st Piddig Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 561,000.00 0.00 187,000.00 187,000.00 935,000.00 1 670 33 703 Completed (100%) 100% physical progress
64 PRDP-IR-R001-ILN-006-MAR-001-2016 Luzon A Region 1 Ilocos Norte 2nd Marcos Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 241 93 334 Completed (100%) 100% physical progress
65 PRDP-IR-R001-ILN-007-PID-002-2016 Luzon A Region 1 Ilocos Norte 1st Piddig Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 561,000.00 0.00 187,000.00 187,000.00 935,000.00 1 298 8 306 Completed (100%) 100% physical progress
66 PRDP-IR-R001-ILN-008-BUR-001-2016 Luzon A Region 1 Ilocos Norte 1st Burgos Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 88 20 108 Completed (100%) 100% physical progress
67 PRDP-IR-R001-ILN-009-PID-003-2016 Luzon A Region 1 Ilocos Norte 1st Piddig Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 561,000.00 0.00 187,000.00 187,000.00 935,000.00 1 193 77 270 Completed (100%) 100% physical progress
68 PRDP-IR-R001-ILN-010-BAC-002-2018 Luzon A Region 1 Ilocos Norte 1st Bacarra Commercialization of Ilocos Garlic: The White Gold Treasure of the North Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 11,108,979.19 0.00 3,702,993.06 3,702,993.06 18,514,965.31 1 61 4 65 Completed (100%) 100% physical progress
69 PRDP-IR-R001-ILS-003-SAO-001-2015 Luzon A Region 1 Ilocos Sur 1st Santo Domingo Production of Seed Planting Materials for Peanut and Farm Equipments/Implements Services Restoration / Rehabilitation Micro Enterprise Proponent Group 1 538,248.00 0.00 179,416.00 179,416.00 897,080.00 1 144 79 223 Completed (100%) 100% physical progress
70 PRDP-IR-R001-ILS-002-000-000-2015 Luzon A Region 1 Ilocos Sur 2nd Santa Lucia Integrated Quality Peanut Seed Production and Farm Service Enterprise Start-up Micro Enterprise Proponent Group 1 1,129,710.00 0.00 376,570.00 376,570.00 1,882,850.00 1 100 130 230 Completed (100%) 100% physical progress
71 PRDP-IR-R001-ILS-007-BUR-001-2016 Luzon A Region 1 Ilocos Sur 2nd Burgos Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 570,000.00 0.00 190,000.00 190,000.00 950,000.00 1 64 133 197 Completed (100%) 100% physical progress
72 PRDP-IR-R001-ILS-010-CAB-001-2016 Luzon A Region 1 Ilocos Sur 1st Cabugao Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,940.00 0.00 199,980.00 199,980.00 999,900.00 1 62 43 105 Completed (100%) 100% physical progress
73 PRDP-IR-R001-ILS-012-000-000-2016 Luzon A Region 1 Ilocos Sur 2nd Santa Maria Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 568,800.00 0.00 189,600.00 189,600.00 948,000.00 1 57 23 80 Completed (100%) 100% physical progress
74 PRDP-IR-R001-LAU-004-BAL-001-2015 Luzon A Region 1 La Union 1st Balaoan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 570,000.00 0.00 190,000.00 190,000.00 950,000.00 1 71 13 84 Completed (100%) 100% physical progress
75 PRDP-IR-R001-LAU-007-000-000-2016 Luzon A Region 1 La Union 1st Balaoan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 58 38 96 Completed (100%) 100% physical progress
76 PRDP-IR-R001-LAU-017-000-000-2016 Luzon A Region 1 La Union 1st Bangar Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 174 15 189 Completed (100%) 100% physical progress
77 PRDP-IR-R001-LAU-014-000-000-2016 Luzon A Region 1 La Union 2nd Caba Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 110 82 192 Completed (100%) 100% physical progress
78 PRDP-IR-R001-LAU-013-000-000-2016 Luzon A Region 1 La Union 2nd Rosario Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 160 28 188 Completed (100%) 100% physical progress
79 PRDP-IR-R001-LAU-008-000-000-2016 Luzon A Region 1 La Union 2nd Tubao Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 94 34 128 Completed (100%) 100% physical progress
80 PRDP-IR-R001-LAU-010-000-000-2016 Luzon A Region 1 La Union 1st Sudipen Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 116 27 143 Completed (100%) 100% physical progress
81 PRDP-IR-R001-LAU-009-000-000-2016 Luzon A Region 1 La Union 1st San Gabriel Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 86 44 130 Completed (100%) 100% physical progress
82 PRDP-IR-R001-PAN-004-000-000-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 241 38 279 Completed (100%) 100% physical progress
83 PRDP-IR-R001-PAN-005-000-000-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 380 180 560 Completed (100%) 100% physical progress
84 PRDP-IR-R001-PAN-006-000-000-2015 Luzon A Region 1 Pangasinan 3rd San Carlos City Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 588,000.00 0.00 196,000.00 196,000.00 980,000.00 1 90 95 185 Completed (100%) 100% physical progress
85 PRDP-IR-R001-PAN-007-000-000-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 83 32 115 Completed (100%) 100% physical progress
86 PRDP-IR-R001-PAN-008-000-000-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 98 43 141 Completed (100%) 100% physical progress
87 PRDP-IR-R001-PAN-011-SAF-005-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 110 30 140 Completed (100%) 100% physical progress
88 PRDP-IR-R001-PAN-012-SAF-006-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 184 19 203 Completed (100%) 100% physical progress
89 PRDP-IR-R001-PAN-013-SAF-007-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 290 49 339 Completed (100%) 100% physical progress
90 PRDP-IR-R001-PAN-014-SAF-008-2015 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 281 52 333 Completed (100%) 100% physical progress
91 PRDP-IR-R001-PAN-015-000-000-2015 Luzon A Region 1 Pangasinan 2nd Lingayen Production of Seed Planting Materials for Peanut and Farm Equipments/Implements Services Restoration / Rehabilitation Micro Enterprise Proponent Group 1 629,187.60 0.00 209,729.20 209,729.20 1,048,646.00 1 41 14 55 Completed (100%) 100% physical progress
92 PRDP-IR-R001-PAN-018-000-000-2015 Luzon A Region 1 Pangasinan 5th Pozzorubio Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 134 14 148 Completed (100%) 100% physical progress
93 PRDP-IR-R001-PAN-021-000-000-2016 Luzon A Region 1 Pangasinan 4th San Fabian Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 95 49 144 Completed (100%) 100% physical progress
94 PRDP-IR-R001-PAN-022-000-000-2016 Luzon A Region 1 Pangasinan 3rd Malasiqui Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 79 26 105 Completed (100%) 100% physical progress
95 PRDP-IR-R001-PAN-024-000-000-2016 Luzon A Region 1 Pangasinan 5th Villasis Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 80 25 105 Completed (100%) 100% physical progress
96 PRDP-IR-R001-PAN-025-000-000-2016 Luzon A Region 1 Pangasinan 5th Urdaneta City Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 31 14 45 Completed (100%) 100% physical progress
97 PRDP-IR-R001-PAN-026-000-000-2016 Luzon A Region 1 Pangasinan 1st Bolinao Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 146 25 171 Completed (100%) 100% physical progress
98 PRDP-IR-R001-PAN-027-000-000-2016 Luzon A Region 1 Pangasinan 1st Bani Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 139 105 244 Completed (100%) 100% physical progress
99 PRDP-IR-R001-PAN-039-000-000-2016 Luzon A Region 1 Pangasinan 6th Natividad Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 188 68 256 Completed (100%) 100% physical progress
100 PRDP-IR-R001-PAN-040-000-000-2016 Luzon A Region 1 Pangasinan 2nd Binmaley Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 389 191 580 Completed (100%) 100% physical progress
101 PRDP-IR-R001-PAN-043-000-000-2016 Luzon A Region 1 Pangasinan 5th Alcala Yellow Granex Production, Consolidation and Trading Enterprise Start-up Small Enterprise Proponent Group 1 3,406,398.02 0.00 1,135,466.01 1,135,466.01 5,677,330.04 1 57 7 64 Completed (100%) 100% physical progress
102 PRDP-IR-R001-PAN-044-000-000-2016 Luzon A Region 1 Pangasinan 6th Umingan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 32 16 48 Completed (100%) 100% physical progress
103 PRDP-IR-R001-PAN-048-000-000-2015 Luzon A Region 1 Pangasinan 2nd Basista Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 44 47 91 Completed (100%) 100% physical progress
104 PRDP-IR-R001-PAN-049-000-000-2016 Luzon A Region 1 Pangasinan 6th San Quintin Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 43 27 70 Completed (100%) 100% physical progress
105 PRDP-IR-R001-PAN-054-000-000-2017 Luzon A Region 1 Pangasinan 2nd Labrador Production and Marketing of Fingerlings and Marketable Size Bangus Enterprise Start-up Small Enterprise Proponent Group 1 2,052,933.96 0.00 684,311.32 684,311.32 3,421,556.60 1 185 15 200 Completed (100%) 100% physical progress
106 PRDP-IR-R001-PAN-028-000-000-2016 Luzon A Region 1 Pangasinan 1st Alaminos City Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 317 189 506 Completed (100%) 100% physical progress
107 PRDP-IR-R001-PAN-029-000-000-2016 Luzon A Region 1 Pangasinan 2nd Bugallon Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 69 39 108 Completed (100%) 100% physical progress
108 PRDP-IR-R001-PAN-030-000-000-2016 Luzon A Region 1 Pangasinan 3rd Mapandan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 236 65 301 Completed (100%) 100% physical progress
109 PRDP-IR-R001-PAN-031-000-000-2016 Luzon A Region 1 Pangasinan 4th Manaoag Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 77 51 128 Completed (100%) 100% physical progress
110 PRDP-IR-R001-PAN-032-000-000-2016 Luzon A Region 1 Pangasinan 6th Balungao Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 137 164 301 Completed (100%) 100% physical progress
111 PRDP-IR-R001-PAN-033-000-000-2016 Luzon A Region 1 Pangasinan 6th Umingan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 51 36 87 Completed (100%) 100% physical progress
112 PRDP-IR-R001-PAN-036-000-000-2016 Luzon A Region 1 Pangasinan 6th San Quintin Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,680.00 0.00 192,560.00 192,560.00 962,800.00 1 39 13 52 Completed (100%) 100% physical progress
113 PRDP-IR-R001-PAN-051-000-000-2017 Luzon A Region 1 Pangasinan 5th Urdaneta City Tomato Production, Consolidation and Trading Enterprise Start-up Small Enterprise Proponent Group 1 2,348,618.40 0.00 782,872.80 782,872.80 3,914,364.00 1 38 15 53 Completed (100%) 100% physical progress
114 PRDP-IR-R001-PAN-052-ALA-001-2017 Luzon A Region 1 Pangasinan 1st Alaminos City Salad Tomato Production, Consolidation and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 3,073,577.08 0.00 1,024,525.69 1,024,525.69 5,122,628.46 1 19 7 26 Completed (100%) 100% physical progress
115 PRDP-IR-R001-ILS-017-000-000-2017 Luzon A Region 1 Ilocos Sur 2nd Banayoyo Goat Multiplier Farm and Trading Post in Ilocos Sur Start-up Small Enterprise Proponent Group 1 8,840,968.80 0.00 2,946,989.60 2,946,989.60 14,734,948.00 1 678 226 904 Completed (100%) 100% physical progress
116 PRDP-IR-R001-LAU-001-000-000-2015 Luzon A Region 1 La Union 2nd Bauang Green Carabao Mango Production, Consolidation and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 7,391,703.66 0.00 2,463,901.22 2,463,901.22 12,319,506.10 1 62 88 150 Completed (100%) 100% physical progress
117 PRDP-IR-R001-LAU-019-000-000-2017 Luzon A Region 1 La Union 2nd Caba Production and Marketing of Mungbean Enterprise Start-up Small Enterprise Proponent Group 1 1,988,151.28 0.00 662,717.09 662,717.09 3,313,585.46 1 50 23 73 Completed (100%) 102% physical progress
118 PRDP-IR-R001-PAN-053-000-000-2017 Luzon A Region 1 Pangasinan 2nd Binmaley Production and Marketing of Processed Bangus Start-up Small Enterprise Proponent Group 1 4,356,662.04 0.00 1,452,220.68 1,452,220.68 7,261,103.40 1 87 97 184 Completed (100%) 101% physical progress
119 PRDP-IR-R001-ILS-018-000-000-2017 Luzon A Region 1 Ilocos Sur 1st Caoayan Multiplier Onion Seed Production and Trading Enterprise in Ilocos Sur Start-up Small Enterprise Proponent Group 1 3,299,788.20 0.00 1,099,929.40 1,099,929.40 5,499,647.00 1 127 99 226 Completed (100%) 100% physical progress
120 PRDP-IR-R001-ILS-008-SAO-002-2016 Luzon A Region 1 Ilocos Sur 1st Santo Domingo Corn and Squash Production and Trading Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,830.00 0.00 199,610.00 199,610.00 998,050.00 1 65 66 131 Completed (100%) 100% physical progress
121 PRDP-IR-R001-LAU-011-000-000-2016 Luzon A Region 1 La Union 1st Bacnotan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 95 59 154 Completed (100%) 100% physical progress
122 PRDP-IR-R001-LAU-018-000-000-2016 Luzon A Region 1 La Union 1st San Juan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 577,800.00 0.00 192,600.00 192,600.00 963,000.00 1 125 83 208 Completed (100%) 100% physical progress
123 PRDP-IR-R001-PAN-010-000-000-2015 Luzon A Region 1 Pangasinan 3rd Mapandan Farm Mechanization Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 84 114 198 Completed (100%) 100% physical progress
124 PRDP-IR-R001-ILS-001-000-000-2015 Luzon A Region 1 Ilocos Sur 1st Cabugao Production and Marketing of Fresh Carabao Mangoes Upgrading / Expansion Small Enterprise Proponent Group 1 3,733,639.32 0.00 1,244,546.44 1,244,546.44 6,222,732.20 1 39 6 45 Completed (100%) 100% physical progress
125 PRDP-IR-R001-ILN-001-000-000-2015 Luzon A Region 1 Ilocos Norte 1st Pasuquin Onion Production, Consolidation and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,382,700.00 0.00 460,900.00 460,900.00 2,304,500.00 1 210 32 242 Completed (100%) 100% physical progress
126 PRDP-IR-R001-PAN-037-000-000-2021 Luzon A Region 1 Pangasinan 1st Bolinao Peanut Production Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,195,864.42 0.00 2,398,621.47 2,398,621.47 11,993,107.36 1 194 64 258 Less than fifty percent progress 9.95% physical progress
127 PRDP-IR-R001-PAN-055-000-000-2022 Luzon A Region 1 Pangasinan 4th San Fabian Mungbean Production, Consolidation and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 6,533,724.00 0.00 2,177,908.00 2,177,908.00 10,889,540.00 1 95 7 102 Less than fifty percent progress 7.73% physical progress
128 PRDP-IR-R001-PAN-038-000-000-2021 Luzon A Region 1 Pangasinan 4th San Fabian Peanut Production Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,197,622.73 0.00 2,399,207.58 2,399,207.58 11,996,037.89 1 105 15 120 Less than fifty percent progress 9.95% physical progress
129 PRDP-IR-R001-ILS-019-000-000-2022 Luzon A Region 1 Ilocos Sur 1st Caoayan Establishment of Onion Cold Storage (Consolidation and Marketing) Upgrading / Expansion Medium Enterprise Proponent Group 1 53,686,256.16 0.00 17,895,418.72 17,895,418.72 89,477,093.60 1 175 45 220 Less than fifty percent progress 5.39% physical progress
130 PRDP-IR-R001-ILN-011-000-000-2022 Luzon A Region 1 Ilocos Norte 1st Sarrat Quality Tomato Production, Consolidation, Storage and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 21,415,896.00 0.00 7,138,632.00 7,138,632.00 35,693,160.00 1 41 9 50 Less than fifty percent progress 22.20% physical progress
131 PRDP-IR-R002-CAG-003-BAG-001-2015 Luzon A Region 2 Cagayan 1st Baggao Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 52 53 105 Completed (100%) 101% physical progress
132 PRDP-IR-R002-CAG-004-BAG-002-2015 Luzon A Region 2 Cagayan 1st Baggao Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 37 18 55 Completed (100%) 101% physical progress
133 PRDP-IR-R002-CAG-006-APA-002-2015 Luzon A Region 2 Cagayan 1st Aparri Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 589,500.00 0.00 196,500.00 196,500.00 982,500.00 1 278 32 310 Completed (100%) 102% physical progress
134 PRDP-IR-R002-CAG-007-LAL-001-2015 Luzon A Region 2 Cagayan 1st Lal-lo Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 297 424 721 Completed (100%) 100% physical progress
135 PRDP-IR-R002-CAG-008-SOL-001-2015 Luzon A Region 2 Cagayan 3rd Solana Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 94 7 101 Completed (100%) 101% physical progress
136 PRDP-IR-R002-CAG-009-SOL-002-2015 Luzon A Region 2 Cagayan 3rd Solana Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 0 113 113 Completed (100%) 101% physical progress
137 PRDP-IR-R002-CAG-010-SOL-003-2015 Luzon A Region 2 Cagayan 3rd Solana Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 26 16 42 Completed (100%) 101% physical progress
138 PRDP-IR-R002-CAG-011-SAE-001-2015 Luzon A Region 2 Cagayan 1st Santa Teresita Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 186 20 206 Completed (100%) 101% physical progress
139 PRDP-IR-R002-CAG-019-SAE-003-2015 Luzon A Region 2 Cagayan 1st Santa Teresita Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 150 25 175 Completed (100%) 101% physical progress
140 PRDP-IR-R002-CAG-020-AMU-001-2015 Luzon A Region 2 Cagayan 3rd Amulung Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 52 12 64 Completed (100%) 101% physical progress
141 PRDP-IR-R002-CAG-022-SOL-004-2015 Luzon A Region 2 Cagayan 3rd Solana Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 47 2 49 Completed (100%) 101% physical progress
142 PRDP-IR-R002-ISA-003-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Dairy Carabao Enterprise of Isabela Upgrading / Expansion Small Enterprise Proponent Group 1 2,950,536.00 0.00 983,512.00 983,512.00 4,917,560.00 1 55 23 78 Completed (100%) 105% physical progress
143 PRDP-IR-R002-ISA-004-CAA-001-2015 Luzon A Region 2 Isabela 3rd Cabatuan Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 59 11 70 Completed (100%) 100% physical progress
144 PRDP-IR-R002-ISA-005-CAU-001-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 127 27 154 Completed (100%) 100% physical progress
145 PRDP-IR-R002-ISA-011-CAU-007-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 45 83 128 Completed (100%) 101% physical progress
146 PRDP-IR-R002-ISA-014-RAM-001-2015 Luzon A Region 2 Isabela 4th Ramon Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 289 311 600 Completed (100%) 100% physical progress
147 PRDP-IR-R002-ISA-018-ROX-004-2015 Luzon A Region 2 Isabela 2nd Roxas Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 736 203 939 Completed (100%) 101% physical progress
148 PRDP-IR-R002-ISA-019-CAU-008-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 209 55 264 Completed (100%) 101% physical progress
149 PRDP-IR-R002-ISA-021-ROX-005-2015 Luzon A Region 2 Isabela 2nd Roxas Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 216 181 397 Completed (100%) 101% physical progress
150 PRDP-IR-R002-ISA-022-ROX-006-2015 Luzon A Region 2 Isabela 2nd Roxas Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 188 26 214 Completed (100%) 101% physical progress
151 PRDP-IR-R002-ISA-023-CAU-009-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 72 22 94 Completed (100%) 101% physical progress
152 PRDP-IR-R002-ISA-024-CAU-010-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 105 33 138 Completed (100%) 101% physical progress
153 PRDP-IR-R002-ISA-025-CAU-011-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 111 35 146 Completed (100%) 101% physical progress
154 PRDP-IR-R002-ISA-026-CAU-012-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 152 30 182 Completed (100%) 101% physical progress
155 PRDP-IR-R002-NUV-003-000-000-2018 Luzon A Region 2 Nueva Vizcaya Lone Aritao Aritao Tomato Processing and Marketing Enterprise Upgrading / Expansion Micro Enterprise Proponent Group 1 1,544,180.40 0.00 514,726.80 514,726.80 2,573,634.00 1 0 1,012 1,012 Completed (100%) 101% physical progress
156 PRDP-IR-R002-QUI-004-MAD-001-2015 Luzon A Region 2 Quirino Lone Maddela Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 115 119 234 Completed (100%) 101% physical progress
157 PRDP-IR-R002-QUI-005-DIF-001-2015 Luzon A Region 2 Quirino Lone Diffun Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,947.40 0.00 198,315.80 198,315.80 991,579.00 1 61 31 92 Completed (100%) 101% physical progress
158 PRDP-IR-R002-QUI-006-DIF-002-2015 Luzon A Region 2 Quirino Lone Diffun Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,947.40 0.00 198,315.80 198,315.80 991,579.00 1 206 211 417 Completed (100%) 101% physical progress
159 PRDP-IR-R002-ISA-029-SAO-001-2017 Luzon A Region 2 Isabela 4th Santiago City Peanut Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 8,924,075.18 0.00 2,974,691.73 2,974,691.73 14,873,458.64 1 90 420 510 Completed (100%) 101% physical progress
160 PRDP-IR-R002-ISA-027-000-000-2016 Luzon A Region 2 Isabela 3rd San Mateo Mung Bean Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 9,517,101.60 0.00 3,172,367.20 3,172,367.20 15,861,836.00 1 0 407 407 Completed (100%) 106% physical progress
161 PRDP-IR-R002-ISA-033-000-000-2017 Luzon A Region 2 Isabela 3rd Cabatuan Mungbean Seed Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 8,380,583.50 0.00 2,793,527.83 2,793,527.83 13,967,639.16 1 357 201 558 Completed (100%) 103% physical progress
162 PRDP-IR-R002-ISA-030-SAO-002-2017 Luzon A Region 2 Isabela 4th Santiago City Mungbean Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 8,671,351.75 0.00 2,890,450.58 2,890,450.58 14,452,252.91 1 1,141 228 1,369 Completed (100%) 101% physical progress
163 PRDP-IR-R002-ISA-031-SAO-003-2017 Luzon A Region 2 Isabela 4th Santiago City Mungbean Seed Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 8,837,539.51 0.00 2,945,846.50 2,945,846.50 14,729,232.51 1 1,008 467 1,475 Completed (100%) 101% physical progress
164 PRDP-IR-R002-QUI-001-000-000-2014 Luzon A Region 2 Quirino Lone Maddela Quirino Coffee Enterprise Start-up Small Enterprise Proponent Group 1 1,652,400.00 0.00 550,800.00 550,800.00 2,754,000.00 1 113 53 166 Completed (100%) 107% physical progress
165 PRDP-IR-R002-QUI-002-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Quirino Banana Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 1,457,999.99 0.00 486,000.00 486,000.00 2,429,999.99 1 3 23 26 Completed (100%) 101% physical progress
166 PRDP-IR-R002-ISA-032-000-000-2017 Luzon A Region 2 Isabela 4th Ramon Tilapia Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 8,620,786.22 0.00 2,873,595.41 2,873,595.41 14,367,977.04 1 81 77 158 Completed (100%) 100% physical progress
167 PRDP-IR-R002-ISA-034-SAO-004-2018 Luzon A Region 2 Isabela 4th Santiago City Beef Cattle Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,060,995.80 0.00 2,353,665.27 2,353,665.27 11,768,326.34 1 164 496 660 Completed (100%) 100% physical progress
168 PRDP-IR-R002-BTN-002-000-000-2018 Luzon A Region 2 Batanes Lone Basco Sweet Potato "WAKAY” Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,731,277.93 0.00 577,092.64 577,092.64 2,885,463.21 1 39 16 55 Completed (100%) 104% physical progress
169 PRDP-IR-R002-CAG-001-000-000-2014 Luzon A Region 2 Cagayan 3rd Tuguegarao City Cagayan Dairy Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 5 1,146,126.00 0.00 382,042.00 382,042.00 1,910,210.00 5 284 103 387 Completed (100%) 101% physical progress
170 PRDP-IR-R002-CAG-002-000-000-2015 Luzon A Region 2 Cagayan 1st Alcala Alcala Dairy Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 9 1,182,414.00 0.00 394,138.00 394,138.00 1,970,690.00 9 769 274 1,043 Completed (100%) 103% physical progress
171 PRDP-IR-R002-CAG-013-LAS-001-2015 Luzon A Region 2 Cagayan 2nd Lasam Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 18 15 33 Completed (100%) 101% physical progress
172 PRDP-IR-R002-CAG-023-SOL-005-2015 Luzon A Region 2 Cagayan 3rd Solana Palay Production Enterprise with emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,912.00 0.00 198,304.00 198,304.00 991,520.00 1 0 0 0 Completed (100%) 101% physical progress
173 PRDP-IR-R002-ISA-007-CAU-003-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 98 22 120 Completed (100%) 100% physical progress
174 PRDP-IR-R002-ISA-009-CAU-005-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 247 26 273 Completed (100%) 100% physical progress
175 PRDP-IR-R002-ISA-010-CAU-006-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 219 54 273 Completed (100%) 100% physical progress
176 PRDP-IR-R002-ISA-012-ROX-001-2015 Luzon A Region 2 Isabela 2nd Roxas Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 887 298 1,185 Completed (100%) 101% physical progress
177 PRDP-IR-R002-ISA-016-RAM-002-2015 Luzon A Region 2 Isabela 4th Ramon Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 551 147 698 Completed (100%) 100% physical progress
178 PRDP-IR-R002-QUI-003-SAG-001-2015 Luzon A Region 2 Quirino Lone Saguday Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,000.00 0.00 199,000.00 199,000.00 995,000.00 1 62 53 115 Completed (100%) 101% physical progress
179 PRDP-IR-R002-ISA-006-CAU-002-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 116 14 130 Completed (100%) 100% physical progress
180 PRDP-IR-R002-ISA-008-CAU-004-2015 Luzon A Region 2 Isabela 3rd Cauayan City Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 221 40 261 Completed (100%) 100% physical progress
181 PRDP-IR-R002-ISA-028-000-000-2017 Luzon A Region 2 Isabela 2nd Roxas Aromatic and Pigmented Rice Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 11,838,344.70 0.00 3,946,114.90 3,946,114.90 19,730,574.50 1 286 125 411 Completed (100%) 100% physical progress
182 PRDP-IR-R002-ISA-013-ROX-002-2015 Luzon A Region 2 Isabela 2nd Roxas Palay Production Enterprise with Emphasis on Land Preparation Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,931.20 0.00 198,310.40 198,310.40 991,552.00 1 127 64 191 Completed (100%) 101% physical progress
183 PRDP-IR-R002-NUV-002-000-000-2015 Luzon A Region 2 Nueva Vizcaya Lone Aritao Aritao Onion Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 3,163,800.12 0.00 1,054,600.04 1,054,600.04 5,273,000.20 1 688 239 927 Completed (100%) 106% physical progress
184 PRDP-IR-R002-NUV-004-000-000-2019 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Coffee Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 9,879,523.36 0.00 3,293,174.45 3,293,174.45 16,465,872.26 1 402 54 456 Completed (100%) 104% physical progress
185 PRDP-IR-R002-NUV-001-000-000-2015 Luzon A Region 2 Nueva Vizcaya Lone Solano Mandarin Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 2,212,980.01 0.00 737,660.00 737,660.00 3,688,300.01 1 336 224 560 Completed (100%) 102% physical progress
186 PRDP-IR-R002-ISA-001-000-000-2014 Luzon A Region 2 Isabela 2nd Mallig Isabela Dairy Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 4 7,116,000.00 0.00 2,372,000.00 2,372,000.00 11,860,000.00 4 1,351 1,104 2,455 Completed (100%) 100% physical progress
187 PRDP-IR-R002-ISA-036-000-000-2019 Luzon A Region 2 Isabela 4th Cordon Tilapia Fingerlings Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 10,821,691.30 0.00 3,607,230.43 3,607,230.43 18,036,152.16 1 735 1,141 1,876 Completed (100%) 104% physical progress
188 PRDP-IR-R002-ISA-038-SAO-005-2020 Luzon A Region 2 Isabela 4th Santiago City Tilapia Fingerlings Production and Marketing Enterprise Start-up Medium Enterprise Proponent Group 1 18,676,989.00 0.00 6,225,663.00 6,225,663.00 31,128,315.00 1 57 12 69 Fifty percent and above progress 93.79% physical progress
189 PRDP-IR-R002-ISA-037-ECH-001-2021 Luzon A Region 2 Isabela 4th Echague Pineapple Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 14,914,426.50 0.00 4,971,475.50 4,971,475.50 24,857,377.50 1 302 367 669 Fifty percent and above progress 66.72% physical progress
190 PRDP-IR-R002-CAG-024-SOL-006-2020 Luzon A Region 2 Cagayan 3rd Solana Aromatic and Pigmented Rice Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 11,129,947.52 0.00 3,709,982.51 3,709,982.51 18,549,912.54 1 26 0 26 Completed (100%) 126% physical progress
191 PRDP-IR-R003-BAT-002-000-000-2014 Luzon A Region 3 Bataan 2nd Mariveles Establishment of Ice Plant with Cold Storage Start-up Medium Enterprise Proponent Group 1 5,580,556.80 0.00 1,860,185.60 1,860,185.60 9,300,928.00 1 44 102 146 Completed (100%) 100% physical progress
192 PRDP-IR-R003-BAT-003-000-000-2015 Luzon A Region 3 Bataan 2nd Pilar Custom Service Facility Project in Bataan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 582,624.00 0.00 194,208.00 194,208.00 971,040.00 1 13 8 21 Completed (100%) 100% physical progress
193 PRDP-IR-R003-BAT-006-000-000-2016 Luzon A Region 3 Bataan 1st Orani Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 554,400.00 0.00 184,800.00 184,800.00 924,000.00 1 18 2 20 Completed (100%) 100% physical progress
194 PRDP-IR-R003-BUL-001-000-000-2014 Luzon A Region 3 Bulacan 3rd San Ildefonso Triple B Charantin Enterprise (Production, Processing and Marketing) Start-up Small Enterprise Proponent Groups 3 4,164,713.90 0.00 1,388,237.97 1,388,237.97 6,941,189.84 3 245 39 284 Completed (100%) 100% physical progress
195 PRDP-IR-R003-BUL-005-000-000-2016 Luzon A Region 3 Bulacan 1st Pulilan Farm Machinery Services in Pulilan Bulacan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,688.00 0.00 199,896.00 199,896.00 999,480.00 1 52 73 125 Completed (100%) 100% physical progress
196 PRDP-IR-R003-BUL-007-000-000-2016 Luzon A Region 3 Bulacan 2nd Plaridel Farm Machinery Services in Plaridel Bulacan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,688.00 0.00 199,896.00 199,896.00 999,480.00 1 89 32 121 Completed (100%) 100% physical progress
197 PRDP-IR-R003-BUL-008-000-000-2016 Luzon A Region 3 Bulacan 3rd San Rafael Farm Machinery Services in San Rafael Bulacan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,688.00 0.00 199,896.00 199,896.00 999,480.00 1 876 513 1,389 Completed (100%) 100% physical progress
198 PRDP-IR-R003-BUL-009-000-000-2016 Luzon A Region 3 Bulacan 1st Calumpit Farm Machinery Services in Calumpit, Bulacan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,688.00 0.00 199,896.00 199,896.00 999,480.00 1 28 34 62 Completed (100%) 100% physical progress
199 PRDP-IR-R003-NUE-001-000-000-2014 Luzon A Region 3 Nueva Ecija 2nd San Jose City SIKKAP San Jose Ampalaya Enterprise (Consolidation and Marketing of Ampalaya Project) Start-up Small Enterprise Proponent Groups 3 2,933,458.43 0.00 977,819.48 977,819.48 4,889,097.39 3 73 48 121 Completed (100%) 100% physical progress
200 PRDP-IR-R003-NUE-012-000-000-2015 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machineries for Onion Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,140.00 0.00 199,380.00 199,380.00 996,900.00 1 17 8 25 Completed (100%) 100% physical progress
201 PRDP-IR-R003-NUE-004-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Lupao Tomato Production Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,399.92 0.00 198,799.97 198,799.97 993,999.86 1 85 53 138 Completed (100%) 100% physical progress
202 PRDP-IR-R003-NUE-011-000-000-2015 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machineries for Onion Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,140.00 0.00 199,380.00 199,380.00 996,900.00 1 26 2 28 Completed (100%) 100% physical progress
203 PRDP-IR-R003-NUE-009-000-000-2015 Luzon A Region 3 Nueva Ecija 3rd Bongabon Irrigation Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 585,480.00 0.00 195,160.00 195,160.00 975,800.00 1 28 7 35 Completed (100%) 100% physical progress
204 PRDP-IR-R003-NUE-005-LUP-005-2015 Luzon A Region 3 Nueva Ecija 2nd Lupao Farm Machinery Service in Lupao, Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 507,000.00 0.00 169,000.00 169,000.00 845,000.00 1 58 60 118 Completed (100%) 100% physical progress
205 PRDP-IR-R003-NUE-007-000-000-2015 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machineries for Onion Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,140.00 0.00 199,380.00 199,380.00 996,900.00 1 176 120 296 Completed (100%) 100% physical progress
206 PRDP-IR-R003-NUE-013-000-000-2015 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machineries for Onion Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 628,800.00 0.00 209,600.00 209,600.00 1,048,000.00 1 25 23 48 Completed (100%) 100% physical progress
207 PRDP-IR-R003-NUE-015-BON-015-2016 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machinery Services in Calaanan, Bongabon Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,100.00 0.00 199,700.00 199,700.00 998,500.00 1 17 0 17 Completed (100%) 100% physical progress
208 PRDP-IR-R003-NUE-018-CAR-018-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Farm Machinery Services in Capintalan Carranglan Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 543,108.00 0.00 181,036.00 181,036.00 905,180.00 1 100 170 270 Completed (100%) 100% physical progress
209 PRDP-IR-R003-NUE-019-CAR-019-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Farm Machinery Services in DL Maglanoc Carranglan Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 540,000.00 0.00 180,000.00 180,000.00 900,000.00 1 34 0 34 Completed (100%) 100% physical progress
210 PRDP-IR-R003-NUE-020-CAR-020-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Hog Fattening Production in Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 610,305.00 0.00 203,435.00 203,435.00 1,017,175.00 1 23 2 25 Completed (100%) 100% physical progress
211 PRDP-IR-R003-NUE-021-GEE-021-2016 Luzon A Region 3 Nueva Ecija 3rd General Tinio Farm Machinery Services in Brgy Nazareth General Tinio Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 512,400.00 0.00 170,800.00 170,800.00 854,000.00 1 54 13 67 Completed (100%) 100% physical progress
212 PRDP-IR-R003-NUE-022-GEE-022-2016 Luzon A Region 3 Nueva Ecija 3rd General Tinio Farm Machinery Services in Brgy. Nazareth, General Tinio, Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 512,400.00 0.00 170,800.00 170,800.00 854,000.00 1 28 12 40 Completed (100%) 100% physical progress
213 PRDP-IR-R003-NUE-024-LAN-024-2016 Luzon A Region 3 Nueva Ecija 2nd Llanera Production and Marketing of Naturally Grown Rice in Llanera Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,417.00 0.00 197,139.00 197,139.00 985,695.00 1 19 0 19 Completed (100%) 100% physical progress
214 PRDP-IR-R003-NUE-026-LAN-026-2016 Luzon A Region 3 Nueva Ecija 2nd Llanera Farm Machinery Services in Bagumbayan, Llanera, Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 47 22 69 Completed (100%) 100% physical progress
215 PRDP-IR-R003-NUE-027-BON-027-2016 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machinery Services in Lusok Bongabon Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 543,060.00 0.00 181,020.00 181,020.00 905,100.00 1 37 11 48 Completed (100%) 100% physical progress
216 PRDP-IR-R003-NUE-028-LAN-028-2016 Luzon A Region 3 Nueva Ecija 2nd Llanera Farm Machinery Services in Bosque, Llanera, Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 21 16 37 Completed (100%) 100% physical progress
217 PRDP-IR-R003-NUE-029-CAR-029-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Turmeric and Ginger Production, Processing and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 0 30 30 Completed (100%) 100% physical progress
218 PRDP-IR-R003-NUE-031-GEE-031-2016 Luzon A Region 3 Nueva Ecija 3rd General Tinio Farm Machinery Services in Poblacion West General Tinio Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 565,200.00 0.00 188,400.00 188,400.00 942,000.00 1 21 13 34 Completed (100%) 100% physical progress
219 PRDP-IR-R003-NUE-032-GEE-032-2016 Luzon A Region 3 Nueva Ecija 3rd General Tinio Farm Machinery Services in Poblacion Central General Tinio Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 565,200.00 0.00 188,400.00 188,400.00 942,000.00 1 20 3 23 Completed (100%) 100% physical progress
220 PRDP-IR-R003-NUE-033-BON-033-2016 Luzon A Region 3 Nueva Ecija 3rd Bongabon Farm Machinery Services in Santor Bongabon Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,140.00 0.00 199,380.00 199,380.00 996,900.00 1 50 0 50 Completed (100%) 100% physical progress
221 PRDP-IR-R003-NUE-034-CAR-034-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Irrigation Facilities Support Project in Puncan Carranglan Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,624.00 0.00 199,208.00 199,208.00 996,040.00 1 23 9 32 Completed (100%) 100% physical progress
222 PRDP-IR-R003-NUE-035-CAR-035-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Irrigation Facilities Support Project in Puncan Carranglan Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,584.00 0.00 199,528.00 199,528.00 997,640.00 1 6 26 32 Completed (100%) 100% physical progress
223 PRDP-IR-R003-NUE-036-LAN-036-2016 Luzon A Region 3 Nueva Ecija 2nd Llanera Farm Machinery Services in Sta. Barbara, Llanera, Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 532,800.00 0.00 177,600.00 177,600.00 888,000.00 1 14 18 32 Completed (100%) 100% physical progress
224 PRDP-IR-R003-PAM-002-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 81 11 92 Completed (100%) 100% physical progress
225 PRDP-IR-R003-PAM-003-000-000-2015 Luzon A Region 3 Pampanga 3rd Arayat Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,940.00 0.00 199,980.00 199,980.00 999,900.00 1 37 7 44 Completed (100%) 100% physical progress
226 PRDP-IR-R003-PAM-004-000-000-2015 Luzon A Region 3 Pampanga 1st Magalang Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 497,520.00 0.00 165,840.00 165,840.00 829,200.00 1 39 1 40 Completed (100%) 100% physical progress
227 PRDP-IR-R003-PAM-005-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 37 25 62 Completed (100%) 100% physical progress
228 PRDP-IR-R003-PAM-006-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 44 6 50 Completed (100%) 100% physical progress
229 PRDP-IR-R003-PAM-007-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,680.00 0.00 199,560.00 199,560.00 997,800.00 1 22 13 35 Completed (100%) 100% physical progress
230 PRDP-IR-R003-PAM-008-000-000-2015 Luzon A Region 3 Pampanga 3rd Mexico Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 588,024.00 0.00 196,008.00 196,008.00 980,040.00 1 33 4 37 Completed (100%) 100% physical progress
231 PRDP-IR-R003-PAM-009-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 22 20 42 Completed (100%) 100% physical progress
232 PRDP-IR-R003-PAM-010-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 23 15 38 Completed (100%) 100% physical progress
233 PRDP-IR-R003-PAM-011-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 30 3 33 Completed (100%) 100% physical progress
234 PRDP-IR-R003-PAM-012-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 0 32 32 Completed (100%) 100% physical progress
235 PRDP-IR-R003-PAM-013-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility Project in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 593,100.00 0.00 197,700.00 197,700.00 988,500.00 1 39 3 42 Completed (100%) 100% physical progress
236 PRDP-IR-R003-PAM-015-000-000-2016 Luzon A Region 3 Pampanga 3rd Mexico Farm Machinery Services in Mexico Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,800.00 0.00 175,600.00 175,600.00 878,000.00 1 32 0 32 Completed (100%) 100% physical progress
237 PRDP-IR-R003-PAM-016-000-000-2016 Luzon A Region 3 Pampanga 4th Apalit Farm Machinery Services in Apalit Restoration / Rehabilitation Micro Enterprise Proponent Group 1 589,800.00 0.00 196,600.00 196,600.00 983,000.00 1 37 24 61 Completed (100%) 100% physical progress
238 PRDP-IR-R003-PAM-017-000-000-2016 Luzon A Region 3 Pampanga 1st Magalang Farm Machinery Services in Magalang Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 566,400.00 0.00 188,800.00 188,800.00 944,000.00 1 77 24 101 Completed (100%) 100% physical progress
239 PRDP-IR-R003-PAM-018-000-000-2016 Luzon A Region 3 Pampanga 2nd Floridablanca Farm Machinery Services in Dampe Floridablanca Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,400.00 0.00 196,800.00 196,800.00 984,000.00 1 83 0 83 Completed (100%) 100% physical progress
240 PRDP-IR-R003-PAM-019-000-000-2016 Luzon A Region 3 Pampanga 3rd Bacolor Farm Machinery Services in Concepcion Bacolor Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 537,600.00 0.00 179,200.00 179,200.00 896,000.00 1 35 0 35 Completed (100%) 100% physical progress
241 PRDP-IR-R003-PAM-020-000-000-2016 Luzon A Region 3 Pampanga 3rd Bacolor Farm Machinery Services in Maliwalu Bacolor Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 537,600.00 0.00 179,200.00 179,200.00 896,000.00 1 48 0 48 Completed (100%) 100% physical progress
242 PRDP-IR-R003-PAM-021-000-000-2016 Luzon A Region 3 Pampanga 4th Candaba Farm Machinery Services in Mandasig Candaba Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,600.00 0.00 197,200.00 197,200.00 986,000.00 1 22 0 22 Completed (100%) 100% physical progress
243 PRDP-IR-R003-PAM-022-000-000-2016 Luzon A Region 3 Pampanga 4th Candaba Farm Machinery Services in Bahay Pare Candaba Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,400.00 0.00 196,800.00 196,800.00 984,000.00 1 25 18 43 Completed (100%) 100% physical progress
244 PRDP-IR-R003-PAM-023-000-000-2016 Luzon A Region 3 Pampanga 2nd Guagua Farm Machinery Services in San Juan Nepomuceno Betis Guagua Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 595,200.00 0.00 198,400.00 198,400.00 992,000.00 1 30 6 36 Completed (100%) 100% physical progress
245 PRDP-IR-R003-PAM-024-000-000-2016 Luzon A Region 3 Pampanga 3rd Santa Ana Farm Machinery Services in Sta Ana Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,800.00 0.00 175,600.00 175,600.00 878,000.00 1 32 9 41 Completed (100%) 100% physical progress
246 PRDP-IR-R003-PAM-025-000-000-2016 Luzon A Region 3 Pampanga 4th San Luis Farm Machinery Services in Sto Tomas San Luis Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,800.00 0.00 175,600.00 175,600.00 878,000.00 1 21 6 27 Completed (100%) 100% physical progress
247 PRDP-IR-R003-PAM-026-000-000-2016 Luzon A Region 3 Pampanga 4th San Luis Farm Machinery Services in San Jose San Luis Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,800.00 0.00 175,600.00 175,600.00 878,000.00 1 32 7 39 Completed (100%) 100% physical progress
248 PRDP-IR-R003-PAM-027-000-000-2016 Luzon A Region 3 Pampanga 2nd Santa Rita Farm Machinery Services in Diladila Sta Rita Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 537,600.00 0.00 179,200.00 179,200.00 896,000.00 1 24 8 32 Completed (100%) 100% physical progress
249 PRDP-IR-R003-PAM-028-000-000-2016 Luzon A Region 3 Pampanga 4th Candaba Farm Machinery Services in Candaba, Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,600.00 0.00 197,200.00 197,200.00 986,000.00 1 45 18 63 Completed (100%) 100% physical progress
250 PRDP-IR-R003-PAM-029-000-000-2016 Luzon A Region 3 Pampanga 4th Candaba Irrigation Facilities Support Project in Vizal San Pablo Candaba Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 537,000.00 0.00 179,000.00 179,000.00 895,000.00 1 71 19 90 Completed (100%) 100% physical progress
251 PRDP-IR-R003-PAM-030-000-000-2016 Luzon A Region 3 Pampanga 3rd Arayat Farm Machinery Services in Lacmit Arayat Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 551,040.00 0.00 183,680.00 183,680.00 918,400.00 1 39 12 51 Completed (100%) 100% physical progress
252 PRDP-IR-R003-PAM-031-000-000-2016 Luzon A Region 3 Pampanga 4th Candaba Farm Machinery Services in Bahay Pare Candaba Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,600.00 0.00 197,200.00 197,200.00 986,000.00 1 279 20 299 Completed (100%) 100% physical progress
253 PRDP-IR-R003-PAM-032-000-000-2016 Luzon A Region 3 Pampanga 3rd Arayat Farm Machinery Services in Lapaz Turu Arayat Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 570,000.00 0.00 190,000.00 190,000.00 950,000.00 1 43 0 43 Completed (100%) 100% physical progress
254 PRDP-IR-R003-PAM-034-000-000-2016 Luzon A Region 3 Pampanga 3rd Arayat Farm Machinery Services in Palinlang Arayat Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,800.00 0.00 175,600.00 175,600.00 878,000.00 1 39 20 59 Completed (100%) 100% physical progress
255 PRDP-IR-R003-TAR-001-000-000-2014 Luzon A Region 3 Tarlac 1st Moncada Provision of Custom Service and Establishment of Processing Center and Storage Facility for Sweetpotato in the Province of Tarlac Upgrading / Expansion Medium Enterprise Proponent Group 1 11,189,985.00 0.00 3,729,995.00 3,729,995.00 18,649,975.00 1 124 55 179 Completed (100%) 100% physical progress
256 PRDP-IR-R003-TAR-009-000-000-2015 Luzon A Region 3 Tarlac 2nd Tarlac City Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 68 42 110 Completed (100%) 100% physical progress
257 PRDP-IR-R003-TAR-011-000-000-2015 Luzon A Region 3 Tarlac 2nd Gerona Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 28 12 40 Completed (100%) 100% physical progress
258 PRDP-IR-R003-TAR-024-000-000-2015 Luzon A Region 3 Tarlac 1st San Manuel Yellow Corn Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,900.00 0.00 199,300.00 199,300.00 996,500.00 1 59 32 91 Completed (100%) 100% physical progress
259 PRDP-IR-R003-TAR-026-000-000-2015 Luzon A Region 3 Tarlac 1st Santa Ignacia Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 130 122 252 Completed (100%) 100% physical progress
260 PRDP-IR-R003-TAR-033-000-000-2015 Luzon A Region 3 Tarlac 1st Mayantoc Production and Marketing of Sweet Potato Clean Planting Materials Restoration / Rehabilitation Micro Enterprise Proponent Group 1 435,000.00 0.00 145,000.00 145,000.00 725,000.00 1 35 6 41 Completed (100%) 100% physical progress
261 PRDP-IR-R003-TAR-032-000-000-2015 Luzon A Region 3 Tarlac 3rd Bamban Production and Marketing of Vegetables Restoration / Rehabilitation Micro Enterprise Proponent Group 1 589,013.90 0.00 196,337.97 196,337.97 981,689.84 1 46 5 51 Completed (100%) 100% physical progress
262 PRDP-IR-R003-TAR-035-000-000-2015 Luzon A Region 3 Tarlac 2nd San Jose Production of Farm Ready Lowland Vegetable Seedlings Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,615.85 0.00 199,538.62 199,538.62 997,693.09 1 15 11 26 Completed (100%) 100% physical progress
263 PRDP-IR-R003-TAR-036-000-000-2016 Luzon A Region 3 Tarlac 1st San Clemente Turmeric and Ginger Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,568.00 0.00 199,856.00 199,856.00 999,280.00 1 43 0 43 Completed (100%) 100% physical progress
264 PRDP-IR-R003-TAR-038-000-000-2016 Luzon A Region 3 Tarlac 2nd Tarlac City Farm Machinery Services in Balanti Tarlac City Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 26 49 75 Completed (100%) 100% physical progress
265 PRDP-IR-R003-TAR-039-000-000-2016 Luzon A Region 3 Tarlac 3rd Concepcion Farm Machinery Services in San Francisco Concepcion Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 592,800.00 0.00 197,600.00 197,600.00 988,000.00 1 26 49 75 Completed (100%) 100% physical progress
266 PRDP-IR-R003-TAR-040-000-000-2016 Luzon A Region 3 Tarlac 1st Mayantoc Farm Machinery Services in Mayantoc Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 163 4 167 Completed (100%) 100% physical progress
267 PRDP-IR-R003-TAR-041-000-000-2016 Luzon A Region 3 Tarlac 3rd Concepcion Farm Machinery Services in Talimundoc San Miguel Concepcion Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 587,100.00 0.00 195,700.00 195,700.00 978,500.00 1 38 15 53 Completed (100%) 100% physical progress
268 PRDP-IR-R003-TAR-042-000-000-2016 Luzon A Region 3 Tarlac 2nd San Jose Farm Machinery Services in San Jose Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,800.00 0.00 199,600.00 199,600.00 998,000.00 1 24 4 28 Completed (100%) 100% physical progress
269 PRDP-IR-R003-TAR-043-000-000-2016 Luzon A Region 3 Tarlac 2nd Victoria Farm Machinery Services in Victoria Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 20 2 22 Completed (100%) 100% physical progress
270 PRDP-IR-R003-TAR-044-000-000-2016 Luzon A Region 3 Tarlac 3rd Concepcion Farm Machinery Services in Talimundoc San Miguel Concepcion Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 39 4 43 Completed (100%) 100% physical progress
271 PRDP-IR-R003-TAR-045-000-000-2016 Luzon A Region 3 Tarlac 2nd Tarlac City Farm Machinery Services in Salapungan Tarlac City Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,100.00 0.00 199,700.00 199,700.00 998,500.00 1 5 15 20 Completed (100%) 100% physical progress
272 PRDP-IR-R003-TAR-046-000-000-2016 Luzon A Region 3 Tarlac 3rd Bamban Spawn Production and Marketing of Fruiting Bags and Fresh Mushroom Restoration / Rehabilitation Micro Enterprise Proponent Group 1 589,854.00 0.00 196,618.00 196,618.00 983,090.00 1 37 17 54 Completed (100%) 100% physical progress
273 PRDP-IR-R003-TAR-047-000-000-2016 Luzon A Region 3 Tarlac 3rd La Paz Farm Machinery Services in La Paz Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,200.00 0.00 199,400.00 199,400.00 997,000.00 1 25 13 38 Completed (100%) 100% physical progress
274 PRDP-IR-R003-TAR-048-000-000-2016 Luzon A Region 3 Tarlac 2nd Tarlac City Farm Machinery Services in Tariji Tarlac City Restoration / Rehabilitation Micro Enterprise Proponent Group 1 587,100.00 0.00 195,700.00 195,700.00 978,500.00 1 56 8 64 Completed (100%) 113% physical progress
275 PRDP-IR-R003-TAR-049-000-000-2016 Luzon A Region 3 Tarlac 2nd Tarlac City Farm Machinery Services in San Manuel Tarlac City Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 593,100.00 0.00 197,700.00 197,700.00 988,500.00 1 35 21 56 Completed (100%) 100% physical progress
276 PRDP-IR-R003-ZAM-003-000-000-2014 Luzon A Region 3 Zambales 2nd Santa Cruz Establishment of Mango Trading Station in Sta. Cruz Zambales Start-up Small Enterprise Proponent Group 1 1,273,422.60 0.00 424,474.20 424,474.20 2,122,371.00 1 15 22 37 Completed (100%) 100% physical progress
277 PRDP-IR-R003-ZAM-011-000-000-2016 Luzon A Region 3 Zambales 2nd Iba Free Range Chicken Production And Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,141.60 0.00 197,047.20 197,047.20 985,236.00 1 53 27 80 Completed (100%) 100% physical progress
278 PRDP-IR-R003-ZAM-006-000-000-2016 Luzon A Region 3 Zambales 2nd San Narciso Cattle Production And Fattening Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,679.97 0.00 199,559.99 199,559.99 997,799.95 1 33 19 52 Completed (100%) 100% physical progress
279 PRDP-IR-R003-ZAM-007-000-000-2016 Luzon A Region 3 Zambales 2nd San Antonio Farm Machinery Services in San Antonio Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 528,000.00 0.00 176,000.00 176,000.00 880,000.00 1 31 1 32 Completed (100%) 100% physical progress
280 PRDP-IR-R003-ZAM-008-000-000-2016 Luzon A Region 3 Zambales 1st Subic Farm Machinery Services in Subic, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 516,000.00 0.00 172,000.00 172,000.00 860,000.00 1 133 18 151 Completed (100%) 100% physical progress
281 PRDP-IR-R003-ZAM-010-000-000-2016 Luzon A Region 3 Zambales 2nd Palauig Squash Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,538.00 0.00 198,846.00 198,846.00 994,230.00 1 34 19 53 Completed (100%) 100% physical progress
282 PRDP-IR-R003-ZAM-012-000-000-2016 Luzon A Region 3 Zambales 1st Castillejos Farm Machinery Services in Castillejos, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 528,000.00 0.00 176,000.00 176,000.00 880,000.00 1 22 9 31 Completed (100%) 100% physical progress
283 PRDP-IR-R003-ZAM-013-000-000-2016 Luzon A Region 3 Zambales 1st San Marcelino Farm Machinery Services in San Marcelino, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 573,600.00 0.00 191,200.00 191,200.00 956,000.00 1 25 2 27 Completed (100%) 100% physical progress
284 PRDP-IR-R003-ZAM-014-000-000-2016 Luzon A Region 3 Zambales 2nd Botolan Chili Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,770.00 0.00 199,590.00 199,590.00 997,950.00 1 20 2 22 Completed (100%) 100% physical progress
285 PRDP-IR-R003-ZAM-015-000-000-2016 Luzon A Region 3 Zambales 2nd San Felipe Farm Machinery Services in San Felipe, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 516,000.00 0.00 172,000.00 172,000.00 860,000.00 1 50 25 75 Completed (100%) 100% physical progress
286 PRDP-IR-R003-ZAM-016-000-000-2016 Luzon A Region 3 Zambales 2nd Cabangan Farm Machinery Services in Cabangan, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 516,000.00 0.00 172,000.00 172,000.00 860,000.00 1 43 11 54 Completed (100%) 100% physical progress
287 PRDP-IR-R003-TAR-056-CON-001-2020 Luzon A Region 3 Tarlac 3rd Concepcion Establishment of Common Service Facility for Land Preparation and Marketing of Sweetpotato Start-up Small Enterprise Proponent Group 1 6,057,585.00 0.00 2,019,195.00 2,019,195.00 10,095,975.00 1 0 0 0 Business Plan Preparation Business Plan Under Technical Review by the RPCO
288 PRDP-IR-R003-BAT-007-000-000-2018 Luzon A Region 3 Bataan 2nd Bagac Establishment of Plant Nursery and Consolidation Facility for Sweetpotato Clean Planting Materials (CPM) in Bataan Start-up Small Enterprise Proponent Group 1 6,371,935.80 0.00 2,123,978.60 2,123,978.60 10,619,893.00 1 67 34 101 Completed (100%) 100% physical progress
289 PRDP-IR-R003-BUL-011-000-000-2017 Luzon A Region 3 Bulacan 3rd San Miguel Ampalaya Production, Consolidation and Marketing Start-up Small Enterprise Proponent Groups 2 5,073,141.29 0.00 1,691,047.10 1,691,047.10 8,455,235.49 2 71 9 80 Completed (100%) 100% physical progress
290 PRDP-IR-R003-ZAM-019-000-000-2018 Luzon A Region 3 Zambales 1st Castillejos Establishment of Custom Service Facilities for Production and Marketing of Sweetpotato Upgrading / Expansion Small Enterprise Proponent Group 1 6,551,700.00 0.00 2,183,900.00 2,183,900.00 10,919,500.00 1 22 9 31 Completed (100%) 101% physical progress
291 PRDP-IR-R003-BAT-004-000-000-2016 Luzon A Region 3 Bataan 2nd Bagac Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 576,000.00 0.00 192,000.00 192,000.00 960,000.00 1 67 34 101 Completed (100%) 117% physical progress
292 PRDP-IR-R003-BUL-011-000-000-2019 Luzon A Region 3 Bulacan 1st Hagonoy Establishment of Bangus Nursery and Custom Service Facility Start-up Small Enterprise Proponent Group 1 8,302,800.00 0.00 2,767,600.00 2,767,600.00 13,838,000.00 1 91 19 110 Completed (100%) 100% physical progress
293 PRDP-IR-R003-PAM-033-000-000-2016 Luzon A Region 3 Pampanga 2nd Lubao Sweet Potato Clean Planting Materials Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,730.00 0.00 196,910.00 196,910.00 984,550.00 1 47 31 78 Completed (100%) 100% physical progress
294 PRDP-IR-R003-TAR-054-000-000-2017 Luzon A Region 3 Tarlac 3rd La Paz Establishment of Mungbean Trading Post with Custom Service Facilities in the Province of Tarlac Start-up Small Enterprise Proponent Group 1 7,046,118.60 0.00 2,348,706.20 2,348,706.20 11,743,531.00 1 57 23 80 Completed (100%) 100% physical progress
295 PRDP-IR-R003-ZAM-005-000-000-2015 Luzon A Region 3 Zambales 2nd San Antonio Production of Farm Ready Lowland Vegetable Seedlings in San Antonio, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 595,393.39 0.00 198,464.46 198,464.46 992,322.31 1 32 5 37 Completed (100%) 100% physical progress
296 PRDP-IR-R003-NUE-003-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Sto. Domingo Onion Enterprise (Consolidation and Marketing) Start-up Small Enterprise Proponent Groups 2 3,160,002.60 0.00 1,053,334.20 1,053,334.20 5,266,671.00 2 180 46 226 Completed (100%) 100% physical progress
297 PRDP-IR-R003-AUR-002-000-000-2015 Luzon A Region 3 Aurora Lone Maria Aurora Organic Rice Production & Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 526,620.00 0.00 175,540.00 175,540.00 877,700.00 1 27 26 53 Completed (100%) 100% physical progress
298 PRDP-IR-R003-TAR-004-000-000-2015 Luzon A Region 3 Tarlac 1st Moncada Custom Service Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 587,400.00 0.00 195,800.00 195,800.00 979,000.00 1 97 30 127 Completed (100%) 100% physical progress
299 PRDP-IR-R003-TAR-005-000-000-2015 Luzon A Region 3 Tarlac 1st Moncada Yellow Corn Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 202 47 249 Completed (100%) 100% physical progress
300 PRDP-IR-R003-TAR-008-000-000-2015 Luzon A Region 3 Tarlac 3rd Concepcion Yellow Corn Production Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,100.00 0.00 199,700.00 199,700.00 998,500.00 1 54 55 109 Completed (100%) 100% physical progress
301 PRDP-IR-R003-TAR-010-000-000-2015 Luzon A Region 3 Tarlac 1st San Manuel Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 78 16 94 Completed (100%) 100% physical progress
302 PRDP-IR-R003-TAR-013-000-000-2015 Luzon A Region 3 Tarlac 3rd La Paz Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 575,400.00 0.00 191,800.00 191,800.00 959,000.00 1 60 24 84 Completed (100%) 100% physical progress
303 PRDP-IR-R003-TAR-014-000-000-2015 Luzon A Region 3 Tarlac 3rd Concepcion Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,919.20 0.00 199,306.40 199,306.40 996,532.00 1 60 38 98 Completed (100%) 100% physical progress
304 PRDP-IR-R003-TAR-016-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 539,400.00 0.00 179,800.00 179,800.00 899,000.00 1 18 2 20 Completed (100%) 100% physical progress
305 PRDP-IR-R003-TAR-017-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Custom Facility Service Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,100.00 0.00 199,700.00 199,700.00 998,500.00 1 50 24 74 Completed (100%) 100% physical progress
306 PRDP-IR-R003-TAR-018-000-000-2015 Luzon A Region 3 Tarlac 1st Mayantoc Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,890.00 0.00 199,630.00 199,630.00 998,150.00 1 20 4 24 Completed (100%) 100% physical progress
307 PRDP-IR-R003-TAR-021-000-000-2015 Luzon A Region 3 Tarlac 1st Camiling Custom Service Facility Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 575,400.00 0.00 191,800.00 191,800.00 959,000.00 1 38 11 49 Completed (100%) 100% physical progress
308 PRDP-IR-R003-TAR-022-000-000-2015 Luzon A Region 3 Tarlac 2nd Tarlac City Custom Service Facility in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 593,100.00 0.00 197,700.00 197,700.00 988,500.00 1 26 2 28 Completed (100%) 100% physical progress
309 PRDP-IR-R003-TAR-023-000-000-2015 Luzon A Region 3 Tarlac 1st Paniqui Custom Service Facility in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 575,400.00 0.00 191,800.00 191,800.00 959,000.00 1 421 785 1,206 Completed (100%) 100% physical progress
310 PRDP-IR-R003-TAR-027-000-000-2015 Luzon A Region 3 Tarlac 1st San Manuel Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 563,400.00 0.00 187,800.00 187,800.00 939,000.00 1 64 26 90 Completed (100%) 100% physical progress
311 PRDP-IR-R003-TAR-029-000-000-2015 Luzon A Region 3 Tarlac 1st Santa Ignacia Custom Service Facilities in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,964.00 0.00 198,988.00 198,988.00 994,940.00 1 30 50 80 Completed (100%) 100% physical progress
312 PRDP-IR-R003-TAR-030-000-000-2015 Luzon A Region 3 Tarlac 3rd Concepcion Custom Service Facilities in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,040.00 0.00 196,680.00 196,680.00 983,400.00 1 13 5 18 Completed (100%) 100% physical progress
313 PRDP-IR-R003-TAR-031-000-000-2015 Luzon A Region 3 Tarlac 1st Santa Ignacia Custom Service Facilities in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,729.60 0.00 198,243.20 198,243.20 991,216.00 1 32 18 50 Completed (100%) 100% physical progress
314 PRDP-IR-R003-TAR-034-000-000-2015 Luzon A Region 3 Tarlac 3rd Bamban Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,200.00 0.00 199,400.00 199,400.00 997,000.00 1 102 4 106 Completed (100%) 100% physical progress
315 PRDP-IR-R003-TAR-003-000-000-2015 Luzon A Region 3 Tarlac 1st Camiling Yellow Corn Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 594,766.80 0.00 198,255.60 198,255.60 991,278.00 1 113 27 140 Completed (100%) 100% physical progress
316 PRDP-IR-R003-TAR-006-000-000-2015 Luzon A Region 3 Tarlac 1st San Manuel Yellow Corn Production in San Manuel Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 551,744.40 0.00 183,914.80 183,914.80 919,574.00 1 150 47 197 Completed (100%) 100% physical progress
317 PRDP-IR-R003-TAR-007-000-000-2015 Luzon A Region 3 Tarlac 1st Paniqui Yellow Corn Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 592,200.00 0.00 197,400.00 197,400.00 987,000.00 1 54 55 109 Completed (100%) 100% physical progress
318 PRDP-IR-R003-TAR-012-000-000-2015 Luzon A Region 3 Tarlac 3rd La Paz Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,100.00 0.00 199,700.00 199,700.00 998,500.00 1 59 20 79 Completed (100%) 100% physical progress
319 PRDP-IR-R003-TAR-020-000-000-2015 Luzon A Region 3 Tarlac 3rd La Paz Custom Service Facility in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 581,100.00 0.00 193,700.00 193,700.00 968,500.00 1 39 6 45 Completed (100%) 100% physical progress
320 PRDP-IR-R003-TAR-025-000-000-2015 Luzon A Region 3 Tarlac 1st Santa Ignacia Custom Service Facility Restoration / Rehabilitation Micro Enterprise Proponent Group 1 593,400.00 0.00 197,800.00 197,800.00 989,000.00 1 53 35 88 Completed (100%) 100% physical progress
321 PRDP-IR-R003-TAR-028-000-000-2015 Luzon A Region 3 Tarlac 1st Santa Ignacia Custom Service Facilities in Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,964.00 0.00 198,988.00 198,988.00 994,940.00 1 18 16 34 Completed (100%) 100% physical progress
322 PRDP-IR-R003-BUL-006-000-000-2016 Luzon A Region 3 Bulacan 1st Hagonoy Post Harvest Facility For Aquaculture Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 56 11 67 Completed (100%) 100% physical progress
323 PRDP-IR-R003-NUE-002-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Talavera Custom Service Facility for Onion-Based Farmers (Onion Farm Mechanization Service Facility Enterprise) Start-up Small Enterprise Proponent Group 1 6,368,400.00 0.00 2,122,800.00 2,122,800.00 10,614,000.00 1 545 720 1,265 Completed (100%) 100% physical progress
324 PRDP-IR-R003-NUE-014-000-000-2015 Luzon A Region 3 Nueva Ecija 1st Cuyapo Consolidation and Marketing of Goats with Multiplier Farm and Contract Growing in Cuyapo, Nueva Ecija Start-up Small Enterprise Proponent Group 1 8,204,185.20 0.00 2,734,728.40 2,734,728.40 13,673,642.00 1 61 66 127 Completed (100%) 100% physical progress
325 PRDP-IR-R003-NUE-035-PAL-001-2019 Luzon A Region 3 Nueva Ecija 3rd Palayan City Mango Processing Center in Palayan City Start-up Small Enterprise Proponent Group 1 4,290,868.80 0.00 1,430,289.60 1,430,289.60 7,151,448.00 1 17 14 31 Completed (100%) 100% physical progress
326 PRDP-IR-R003-TAR-051-000-000-2017 Luzon A Region 3 Tarlac 1st Mayantoc Establishment of Nursery and Consolidation Area for the Production of Sweetpotato Clean Planting Materials in Tarlac Upgrading / Expansion Small Enterprise Proponent Group 1 3,899,253.83 0.00 1,299,751.28 1,299,751.28 6,498,756.39 1 35 15 50 Completed (100%) 100% physical progress
327 PRDP-IR-R003-TAR-055-000-000-2017 Luzon A Region 3 Tarlac 1st Santa Ignacia Establishment of Mango Trading Station in the Province of Tarlac Start-up Small Enterprise Proponent Group 1 1,851,600.00 0.00 617,200.00 617,200.00 3,086,000.00 1 40 24 64 Completed (100%) 100% physical progress
328 PRDP-IR-R003-ZAM-018-000-000-2017 Luzon A Region 3 Zambales 1st San Marcelino Establishment of Beef Cattle Breeder Farm in Zambales Start-up Small Enterprise Proponent Group 1 6,447,468.00 0.00 2,149,156.00 2,149,156.00 10,745,780.00 1 25 2 27 Completed (100%) 100% physical progress
329 PRDP-IR-R003-BUL-003-000-000-2015 Luzon A Region 3 Bulacan 3rd San Ildefonso Hog Fattening Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 572,615.94 0.00 190,871.98 190,871.98 954,359.90 1 89 61 150 Completed (100%) 100% physical progress
330 PRDP-IR-R003-PAM-001-000-000-2015 Luzon A Region 3 Pampanga 4th Candaba Custom Service Facility in Pampanga Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,280.00 0.00 196,760.00 196,760.00 983,800.00 1 19 11 30 Completed (100%) 100% physical progress
331 PRDP-IR-R003-NUE-006-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Lupao Hog Fattening Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 41 27 68 Completed (100%) 105% physical progress
332 PRDP-IR-R003-ZAM-001-000-000-2014 Luzon A Region 3 Zambales 2nd Iba Establishment of Mango Trading Station in Iba Zambales Start-up Small Enterprise Proponent Group 1 3,797,480.40 0.00 1,265,826.80 1,265,826.80 6,329,134.00 1 27 28 55 Completed (100%) 100% physical progress
333 PRDP-IR-R003-NUE-030-GEE-030-2016 Luzon A Region 3 Nueva Ecija 3rd General Tinio Land Preparation in Upland Area using Carabao and Marketing of Rice Restoration / Rehabilitation Micro Enterprise Proponent Group 1 568,800.00 0.00 189,600.00 189,600.00 948,000.00 1 8 45 53 Completed (100%) 100% physical progress
334 PRDP-IR-R003-BAT-005-000-000-2016 Luzon A Region 3 Bataan 1st Abucay Custom Service Facility Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,730.00 0.00 196,910.00 196,910.00 984,550.00 1 23 36 59 Completed (100%) 100% physical progress
335 PRDP-IR-R003-NUE-016-LUP-016-2016 Luzon A Region 3 Nueva Ecija 2nd Lupao Goat Production and Marketing in Brgy West Lupao Nueva Ecija Restoration / Rehabilitation Micro Enterprise Proponent Group 1 587,760.00 0.00 195,920.00 195,920.00 979,600.00 1 26 11 37 Completed (100%) 100% physical progress
336 PRDP-IR-R003-TAR-050-000-000-2016 Luzon A Region 3 Tarlac 1st Camiling Farm Machinery Services in Camiling Tarlac Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,400.00 0.00 199,800.00 199,800.00 999,000.00 1 235 415 650 Completed (100%) 100% physical progress
337 PRDP-IR-R003-BUL-002-000-000-2015 Luzon A Region 3 Bulacan 3rd San Ildefonso Free Range Chicken Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,807.60 0.00 197,269.20 197,269.20 986,346.00 1 144 52 196 Completed (100%) 100% physical progress
338 PRDP-IR-R003-ZAM-004-000-000-2015 Luzon A Region 3 Zambales 2nd Botolan Mungbean Production in Botolon, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 559,092.00 0.00 186,364.00 186,364.00 931,820.00 1 952 221 1,173 Completed (100%) 100% physical progress
339 PRDP-IR-R003-ZAM-017-000-000-2016 Luzon A Region 3 Zambales 2nd Masinloc Farm Machinery Services in Masinloc,Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 528,000.00 0.00 176,000.00 176,000.00 880,000.00 1 43 11 54 Completed (100%) 100% physical progress
340 PRDP-IR-R003-ZAM-009-000-000-2016 Luzon A Region 3 Zambales 2nd Candelaria Farm Machinery Services in Candelaria, Zambales Restoration / Rehabilitation Micro Enterprise Proponent Group 1 542,280.00 0.00 180,760.00 180,760.00 903,800.00 1 116 10 126 Completed (100%) 100% physical progress
341 PRDP-IR-R003-NUE-039-000-000-2021 Luzon A Region 3 Nueva Ecija 2nd Muñoz City Corn Silage Production and Marketing and Related Services Upgrading / Expansion Medium Enterprise Proponent Group 1 14,193,813.26 0.00 4,731,271.09 4,731,271.09 23,656,355.44 1 41 14 55 Less than fifty percent progress 31.48% physical progress
342 PRDP-IR-R003-NUE-042-TAL-001-2021 Luzon A Region 3 Nueva Ecija 1st Talavera Onion Postharvest Services, Consolidation and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 9 59,987,204.40 0.00 19,995,734.80 19,995,734.80 99,978,674.00 9 213 80 293 Completed (100%) 100% physical progress
343 PRDP-IR-R003-NUE-038-BON-001-2020 Luzon A Region 3 Nueva Ecija 3rd Bongabon Establishment of Onion Cold Storage (Consolidation and Marketing) Upgrading / Expansion Medium Enterprise Proponent Group 1 58,738,971.02 0.00 19,579,657.01 19,579,657.01 97,898,285.04 1 63 58 121 Less than fifty percent progress 22.61% physical progress
344 PRDP-IR-R003-BUL-004-000-000-2016 Luzon A Region 3 Bulacan 3rd San Miguel Hog Fattening Production in Bulacan Restoration / Rehabilitation Micro Enterprise Proponent Group 1 549,484.87 0.00 183,161.62 183,161.62 915,808.11 1 37 5 42 Completed (100%) 100% physical progress
345 PRDP-IR-R003-AUR-001-000-000-2014 Luzon A Region 3 Aurora Lone Maria Aurora Establishment of Processing Facilities with Solar Dryer for Coir & Coir by-Products Start-up Small Enterprise Proponent Group 1 2,422,245.90 0.00 807,415.30 807,415.30 4,037,076.50 1 375 1,001 1,376 Completed (100%) 100% physical progress
346 PRDP-IR-R003-NUE-037-CAR-008-2017 Luzon A Region 3 Nueva Ecija 2nd Carranglan Establishment of Common Service Facilities for Post -Harvest Operations of Aromatic Rice in Carranglan, Nueva Ecija Start-up Small Enterprise Proponent Group 1 7,376,559.34 0.00 2,458,853.11 2,458,853.11 12,294,265.56 1 38 2 40 Completed (100%) 100% physical progress
347 PRDP-IR-R003-TAR-037-000-000-2016 Luzon A Region 3 Tarlac 2nd Gerona Establishment of Nucleus Farm for the Production of Breeder Bucks and Does for Meat and Dairy Type Goats Start-up Medium Enterprise Proponent Group 1 9,761,100.00 0.00 3,253,700.00 3,253,700.00 16,268,500.00 1 30 13 43 Completed (100%) 100% physical progress
348 PRDP-IR-R003-TAR-052-000-000-2017 Luzon A Region 3 Tarlac 1st Santa Ignacia Establishment of Multiplier Farm for Cattle for Production of Manufacturing Grade and Premium Quality Beef Start-up Small Enterprise Proponent Group 1 5,689,200.00 0.00 1,896,400.00 1,896,400.00 9,482,000.00 1 58 40 98 Completed (100%) 100% physical progress
349 PRDP-IR-R003-TAR-053-000-000-2017 Luzon A Region 3 Tarlac 1st Paniqui Establishment of Common Service Facilities (Post-Harvest and Marketing Operations) for Aromatic and Pigmented Rice in the Province of Tarlac Start-up Small Enterprise Proponent Group 1 7,541,160.00 0.00 2,513,720.00 2,513,720.00 12,568,600.00 1 64 67 131 Completed (100%) 100% physical progress
350 PRDP-IR-R003-NUE-041-PAL-002-2021 Luzon A Region 3 Nueva Ecija 3rd Palayan City Establishment of Onion Cold Storage Facility and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 59,309,400.00 0.00 19,769,800.00 19,769,800.00 98,849,000.00 1 735 185 920 Completed (100%) 101% physical progress
351 PRDP-IR-R003-NUE-040-000-000-2021 Luzon A Region 3 Nueva Ecija 2nd Muñoz City Processing and Marketing of Carabao Milk Based Products Upgrading / Expansion Small Enterprise Proponent Group 1 5,963,622.93 0.00 1,987,874.31 1,987,874.31 9,939,371.55 1 81 24 105 Completed (100%) 103% physical progress
352 PRDP-IR-R04A-BTG-008-SAJ-005-2022 Luzon B Region 4A Batangas 4th San Juan San Juan Batangas CROFISLIV Coconut Oil Processing Upgrading / Expansion Medium Enterprise Proponent Group 1 22,033,800.00 0.00 7,344,600.00 7,344,600.00 36,723,000.00 1 19 21 40 Approved by RPAB Business Plan for Endorsement to PSO / NPCO for NOL 1
353 PRDP-IR-R04A-QUE-024-000-000-2022 Luzon B Region 4A Quezon 2nd San Antonio Establishment of Integrated Swine Production and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 59,999,731.67 0.00 19,999,910.56 19,999,910.56 99,999,552.79 1 62 68 130 Endorsed for Issuance of NOL 1 For Issuance of NOL 1
354 PRDP-IR-R04A-BTG-001-000-000-2017 Luzon B Region 4A Batangas 1st Nasugbu Batangas Kapeng Barako Production and Processing Upgrading / Expansion Micro Enterprise Proponent Groups 2 1,078,169.25 0.00 359,389.75 359,389.75 1,796,948.75 2 69 197 266 Completed (100%) 100% physical progress
355 PRDP-IR-R04A-BTG-004-000-000-2017 Luzon B Region 4A Batangas 4th Lipa City Batangas Dairy Cattle Production Upgrading / Expansion Medium Enterprise Proponent Group 1 11,169,254.82 0.00 3,723,084.94 3,723,084.94 18,615,424.70 1 15 11 26 Completed (100%) 100% physical progress
356 PRDP-IR-R04A-BTG-005-TAN-002-2017 Luzon B Region 4A Batangas 3rd Tanauan City Tanauan City Mango Trading and Processing Enterprise Start-up Small Enterprise Proponent Group 1 3,043,239.94 0.00 1,014,413.31 1,014,413.31 5,072,066.56 1 59 10 69 Completed (100%) 100% physical progress
357 PRDP-IR-R04A-BTG-006-TAN-003-2018 Luzon B Region 4A Batangas 3rd Tanauan City Tanauan City Banana Production, Trading and Processing Enterprise Start-up Small Enterprise Proponent Group 1 3,518,679.29 0.00 1,172,893.10 1,172,893.10 5,864,465.49 1 52 14 66 Completed (100%) 100% physical progress
358 PRDP-IR-R04A-LAG-003-LUI-001-2017 Luzon B Region 4A Laguna 4th Luisiana Luisiana Tablea Factory Start-up Small Enterprise Proponent Group 1 3,815,413.45 0.00 1,271,804.48 1,271,804.48 6,359,022.41 1 42 23 65 Completed (100%) 100% physical progress
359 PRDP-IR-R04A-QUE-020-000-000-2017 Luzon B Region 4A Quezon 4th Calauag Seaweeds Production and Marketing of Samahan ng Mangingisda at Magsi-Seaweeds sa Brgy. Villa San Isidro Start-up Small Enterprise Proponent Groups 5 5,175,518.46 0.00 1,725,172.82 1,725,172.82 8,625,864.10 5 51 9 60 Completed (100%) 100% physical progress
360 PRDP-IR-R04A-QUE-003-000-000-2017 Luzon B Region 4A Quezon 3rd San Francisco San Francisco Banana Production and Marketing Start-up Micro Enterprise Proponent Group 1 1,799,760.00 0.00 599,920.00 599,920.00 2,999,600.00 1 24 11 35 Completed (100%) 100% physical progress
361 PRDP-IR-R04A-QUE-004-000-000-2017 Luzon B Region 4A Quezon 1st Burdeos Seaweeds Production and Marketing Start-up Small Enterprise Proponent Groups 5 8,998,605.71 0.00 2,999,535.24 2,999,535.24 14,997,676.19 5 118 78 196 Completed (100%) 100% physical progress
362 PRDP-IR-R04A-QUE-005-000-000-2017 Luzon B Region 4A Quezon 2nd Sariaya Establishment of Dairy Multiplier Farm Start-up Small Enterprise Proponent Group 1 8,788,445.18 0.00 2,929,481.73 2,929,481.73 14,647,408.64 1 40 41 81 Completed (100%) 100% physical progress
363 PRDP-IR-R04A-QUE-015-000-000-2018 Luzon B Region 4A Quezon 4th Perez Seaweeds Production and Marketing in Perez, Quezon Start-up Small Enterprise Proponent Group 1 6,106,456.92 0.00 2,035,485.64 2,035,485.64 10,177,428.20 1 116 4 120 Completed (100%) 100% physical progress
364 PRDP-IR-R04A-QUE-016-000-000-2018 Luzon B Region 4A Quezon 3rd General Luna Pineapple Processing in General Luna, Quezon Start-up Small Enterprise Proponent Group 1 6,267,546.31 0.00 2,089,182.10 2,089,182.10 10,445,910.51 1 33 27 60 Completed (100%) 100% physical progress
365 PRDP-IR-R04A-QUE-017-000-000-2018 Luzon B Region 4A Quezon 4th Lopez Lopez Tablea Production Upgrading / Expansion Small Enterprise Proponent Group 1 3,625,306.14 0.00 1,208,435.38 1,208,435.38 6,042,176.90 1 41 17 58 Completed (100%) 100% physical progress
366 PRDP-IR-R04A-QUE-019-000-000-2019 Luzon B Region 4A Quezon 4th Gumaca Gumaca Mango Post-Harvest Facility Start-up Small Enterprise Proponent Group 1 4,571,358.06 0.00 1,523,786.02 1,523,786.02 7,618,930.10 1 35 7 42 Completed (100%) 100% physical progress
367 PRDP-IR-R04A-QUE-020-000-000-2019 Luzon B Region 4A Quezon 4th Guinayangan Guinayangan Coffee Processing Upgrading / Expansion Small Enterprise Proponent Group 1 3,227,220.00 0.00 1,075,740.00 1,075,740.00 5,378,700.00 1 16 8 24 Completed (100%) 100% physical progress
368 PRDP-IR-R04A-QUE-023-000-000-2020 Luzon B Region 4A Quezon 3rd Padre Burgos Coco Sugar Processing of Yakap at Halik Multi-Purpose Cooperative Quezon 2 Start-up Small Enterprise Proponent Group 1 8,956,920.00 0.00 2,985,640.00 2,985,640.00 14,928,200.00 1 22 8 30 Less than fifty percent progress 26.22% physical progress
369 PRDP-IR-R04A-QUE-001-000-000-2015 Luzon B Region 4A Quezon 1st Pagbilao Processing and Marketing of Virgin Coconut Oil (VCO) in Quezon Province Start-up Medium Enterprise Proponent Groups 4 33,540,639.09 0.00 11,180,213.03 11,180,213.03 55,901,065.15 4 501 1,284 1,785 Completed (100%) 100% physical progress
370 PRDP-IR-R04A-BTG-003-TAN-001-2017 Luzon B Region 4A Batangas 3rd Tanauan City Tanauan City Dairy Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 8,993,904.31 0.00 2,997,968.10 2,997,968.10 14,989,840.51 1 20 11 31 Completed (100%) 100% physical progress
371 PRDP-IR-R04A-QUE-002-GUI-001-2016 Luzon B Region 4A Quezon 4th Guinayangan Seaweeds Production and Marketing of CaCFFA at Ragay Gulf Restoration / Rehabilitation Micro Enterprise Proponent Group 1 451,436.40 0.00 150,478.80 150,478.80 752,394.00 1 51 9 60 Completed (100%) 125% physical progress
372 PRDP-IR-R04A-QUE-018-REA-002-2016 Luzon B Region 4A Quezon 1st Real Fish Catching, Marketing, and Tinapa Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 266,457.60 0.00 88,819.20 88,819.20 444,096.00 1 63 3 66 Completed (100%) 125% physical progress
373 PRDP-IR-R04A-QUE-006-PAD-001-2015 Luzon B Region 4A Quezon 3rd Padre Burgos Marine Cage Culture of Grouper (Lapu-lapu) Restoration / Rehabilitation Micro Enterprise Proponent Group 1 581,040.00 0.00 193,680.00 193,680.00 968,400.00 1 387 1,086 1,473 Completed (100%) 100% physical progress
374 PRDP-IR-R04A-QUE-016-TAY-006-2016 Luzon B Region 4A Quezon 1st Tayabas City Corn Production Plant Now Pay Later Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 581,040.00 0.00 193,680.00 193,680.00 968,400.00 1 55 10 65 Completed (100%) 101% physical progress
375 PRDP-IR-R04A-QUE-017-TAY-007-2016 Luzon B Region 4A Quezon 1st Tayabas City Guyabano Puree Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 311,475.82 0.00 103,825.27 103,825.27 519,126.36 1 40 25 65 Completed (100%) 125% physical progress
376 PRDP-IR-R04A-QUE-014-TAY-004-2016 Luzon B Region 4A Quezon 1st Tayabas City Native Pig Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 341,280.00 0.00 113,760.00 113,760.00 568,800.00 1 8 477 485 Completed (100%) 125% physical progress
377 PRDP-IR-R04A-QUE-019-REA-003-2016 Luzon B Region 4A Quezon 1st Real Quail Egg Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 123,364.80 0.00 41,121.60 41,121.60 205,608.00 1 19 51 70 Completed (100%) 125% physical progress
378 PRDP-IR-R04A-CAV-001-000-000-2015 Luzon B Region 4A Cavite 6th Amadeo Cavite Coffee Processing and Trading Upgrading / Expansion Small Enterprise Proponent Groups 2 7,635,362.38 0.00 2,545,120.79 2,545,120.79 12,725,603.96 2 48 60 108 Completed (100%) 100% physical progress
379 PRDP-IR-R04A-BTG-002-000-000-2017 Luzon B Region 4A Batangas 1st Calatagan Seaweeds Production and Marketing in Calatagan, Batangas Upgrading / Expansion Small Enterprise Proponent Groups 4 2,660,210.18 0.00 886,736.73 886,736.73 4,433,683.64 4 52 38 90 Completed (100%) 100% physical progress
380 PRDP-IR-R04A-BTG-007-000-000-2022 Luzon B Region 4A Batangas 2nd Batangas City SIDC Grains Terminal and Trading Project Upgrading / Expansion Medium Enterprise Proponent Groups 3 60,000,000.00 0.00 20,000,000.00 20,000,000.00 100,000,000.00 3 94 106 200 With NOL 1 Preparation of Purchase Order (PO)
381 PRDP-IR-R04A-LAG-002-SAA-002-2021 Luzon B Region 4A Laguna 4th Santa Maria Coffee Processing and Marketing in Sta. Maria Laguna Upgrading / Expansion Small Enterprise Proponent Group 1 4,979,024.73 0.00 1,659,674.91 1,659,674.91 8,298,374.55 1 0 0 0 Less than fifty percent progress 28.81% physical progress
382 PRDP-IR-R04B-MAR-002-000-000-2016 Luzon B Region 4B Marinduque Lone Buenavista Malbog Arrowroot Production and Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 583,200.00 0.00 194,400.00 194,400.00 972,000.00 1 25 33 58 Completed (100%) 100% physical progress
383 PRDP-IR-R04B-MAR-003-000-000-2016 Luzon B Region 4B Marinduque Lone Torrijos Nangka Coco Coir Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,280.00 0.00 199,760.00 199,760.00 998,800.00 1 62 39 101 Completed (100%) 100% physical progress
384 PRDP-IR-R04B-MAR-004-000-000-2016 Luzon B Region 4B Marinduque Lone Mogpog Butansapa Coco Coir Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 591,300.00 0.00 197,100.00 197,100.00 985,500.00 1 10 32 42 Completed (100%) 100% physical progress
385 PRDP-IR-R04B-OCM-003-ABR-001-2019 Luzon B Region 4B Occidental Mindoro Lone Abra De Ilog Abra De Ilog Cassava Processing and Marketing Start-up Small Enterprise Proponent Group 1 5,941,279.04 0.00 1,980,426.35 1,980,426.35 9,902,131.74 1 54 50 104 Completed (100%) 100% physical progress
386 PRDP-IR-R04B-ORM-001-000-000-2013 Luzon B Region 4B Oriental Mindoro 1st Calapan City Oriental Mindoro Calamansi Trading Center Start-up Small Enterprise Proponent Group 1 4,070,112.22 0.00 1,356,704.07 1,356,704.07 6,783,520.36 1 371 61 432 Completed (100%) 100% physical progress
387 PRDP-IR-R04B-ORM-003-000-000-2016 Luzon B Region 4B Oriental Mindoro 2nd Bongabong Milkfish Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 562,422.00 0.00 187,474.00 187,474.00 937,370.00 1 26 24 50 Completed (100%) 100% physical progress
388 PRDP-IR-R04B-ORM-015-000-000-2016 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Ricemill Rehabilitation & Upgrading Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 79 62 141 Completed (100%) 100% physical progress
389 PRDP-IR-R04B-ORM-013-000-000-2016 Luzon B Region 4B Oriental Mindoro 2nd Bansud Bansud Carabao Milking Support Microenterprises Restoration / Rehabilitation Micro Enterprise Proponent Group 1 561,000.00 0.00 187,000.00 187,000.00 935,000.00 1 21 6 27 Completed (100%) 100% physical progress
390 PRDP-IR-R04B-ORM-012-000-000-2016 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Veggie Canton Noodles and Veggie Snacks Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 426,295.20 0.00 142,098.40 142,098.40 710,492.00 1 11 40 51 Completed (100%) 100% physical progress
391 PRDP-IR-R04B-ORM-011-000-000-2016 Luzon B Region 4B Oriental Mindoro 1st Naujan Oriental Mindoro Nata de Coco Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 11 30 41 Completed (100%) 100% physical progress
392 PRDP-IR-R04B-ORM-010-000-000-2016 Luzon B Region 4B Oriental Mindoro 1st Pola Turmeric and Ginger Processing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 571,032.00 0.00 190,344.00 190,344.00 951,720.00 1 89 108 197 Completed (100%) 100% physical progress
393 PRDP-IR-R04B-ORM-005-000-000-2016 Luzon B Region 4B Oriental Mindoro 1st Victoria Provision of Custom 4-Wheel Farm Tractor with Accessories Restoration / Rehabilitation Micro Enterprise Proponent Group 1 501,000.00 0.00 167,000.00 167,000.00 835,000.00 1 54 92 146 Completed (100%) 100% physical progress
394 PRDP-IR-R04B-ORM-007-000-000-2016 Luzon B Region 4B Oriental Mindoro 1st Calapan City Improvement of Community Factory for Nipa Vinegar and Nipa Sugar Production in Calapan City Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 13 6 19 Completed (100%) 100% physical progress
395 PRDP-IR-R04B-ORM-015-000-000-2018 Luzon B Region 4B Oriental Mindoro 1st Pola Oriental Mindoro Calamansi Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 6,467,475.31 0.00 2,155,825.10 2,155,825.10 10,779,125.51 1 142 167 309 Completed (100%) 100% physical progress
396 PRDP-IR-R04B-PAL-002-000-000-2015 Luzon B Region 4B Palawan 1st Roxas Seaweeds Nursery, Production and Marketing Project Start-up Micro Enterprise Proponent Group 1 890,657.43 0.00 296,885.81 296,885.81 1,484,429.05 1 42 8 50 Completed (100%) 100% physical progress
397 PRDP-IR-R04B-PAL-009-ROX-009-2014 Luzon B Region 4B Palawan 1st Roxas Palawan Cashew Processing Center Start-up Medium Enterprise Proponent Group 1 4,825,395.00 0.00 1,608,465.00 1,608,465.00 8,042,325.00 1 66 50 116 Completed (100%) 100% physical progress
398 PRDP-IR-R04B-PAL-010-PUE-001-2017 Luzon B Region 4B Palawan 3rd Puerto Princesa City Mango Processing Facility and Marketing Start-up Small Enterprise Proponent Group 1 6,977,796.06 0.00 2,325,932.02 2,325,932.02 11,629,660.10 1 231 145 376 Completed (100%) 100% physical progress
399 PRDP-IR-R04B-PAL-011-PUE-002-2018 Luzon B Region 4B Palawan 3rd Puerto Princesa City Seaweeds Production and Marketing Start-up Small Enterprise Proponent Group 1 7,673,896.63 0.00 2,557,965.54 2,557,965.54 12,789,827.71 1 41 13 54 Completed (100%) 100% physical progress
400 PRDP-IR-R04B-PAL-003-ROX-001-2015 Luzon B Region 4B Palawan 1st Roxas Mangrove Crab Production Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,001,321.88 0.00 250,330.47 1,251,652.35 1 19 31 50 Completed (100%) 100% physical progress
401 PRDP-IR-R04B-PAL-004-ROX-002-2015 Luzon B Region 4B Palawan 1st Roxas Community-Based Green Grouper Livelihood Support Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 698,472.64 0.00 174,618.16 873,090.80 1 30 18 48 Completed (100%) 100% physical progress
402 PRDP-IR-R04B-PAL-007-ROX-007-2016 Luzon B Region 4B Palawan 1st Roxas Green Grouper Production and Marketing Project of Barangay Malcampo Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,172,040.00 0.00 293,010.00 1,465,050.00 1 37 18 55 Completed (100%) 100% physical progress
403 PRDP-IR-R04B-PAL-005-ROX-003-2016 Luzon B Region 4B Palawan 1st Roxas Seaweeds Culture and Production Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,271,240.00 0.00 317,810.00 1,589,050.00 1 226 98 324 Completed (100%) 100% physical progress
404 PRDP-IR-R04B-PAL-008-ROX-008-2016 Luzon B Region 4B Palawan 1st Roxas SMMT Green Grouper Culture Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,172,040.00 0.00 293,010.00 1,465,050.00 1 32 24 56 Completed (100%) 100% physical progress
405 PRDP-IR-R04B-PAL-006-ROX-006-2016 Luzon B Region 4B Palawan 1st Roxas Grouper Culture in Floating Net Cage Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,172,040.00 0.00 293,010.00 1,465,050.00 1 25 13 38 Completed (100%) 100% physical progress
406 PRDP-IR-R04B-PAL-009-ROX-009-2016 Luzon B Region 4B Palawan 1st Roxas Live Green Grouper Production Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,172,040.00 0.00 293,010.00 1,465,050.00 1 40 26 66 Completed (100%) 100% physical progress
407 PRDP-IR-R04B-PAL-013-ABO-001-2019 Luzon B Region 4B Palawan 3rd Aborlan Banana Trading, Processing and Marketing Start-up Small Enterprise Proponent Group 1 8,942,578.61 0.00 2,980,859.54 2,980,859.54 14,904,297.69 1 25 5 30 Completed (100%) 100% physical progress
408 PRDP-IR-R04B-ROM-002-000-000-2019 Luzon B Region 4B Romblon Lone Santa Maria Romblon Seaweeds Production and Processing Start-up Small Enterprise Proponent Groups 2 6,790,182.97 0.00 2,263,394.32 2,263,394.32 11,316,971.61 2 60 30 90 Completed (100%) 100% physical progress
409 PRDP-IR-R04B-ORM-011-000-000-2018 Luzon B Region 4B Oriental Mindoro 1st Pola Oriental Mindoro Virgin Coconut Oil (VCO) Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 6,982,681.61 0.00 2,327,560.54 2,327,560.54 11,637,802.69 1 89 108 197 Completed (100%) 100% physical progress
410 PRDP-IR-R04B-MAR-005-000-000-2018 Luzon B Region 4B Marinduque Lone Gasan Marinduque Arrowroot Production and Processing Upgrading / Expansion Small Enterprise Proponent Group 1 3,972,975.28 0.00 1,324,325.09 1,324,325.09 6,621,625.46 1 21 16 37 Completed (100%) 100% physical progress
411 PRDP-IR-R04B-MAR-001-000-000-2015 Luzon B Region 4B Marinduque Lone Boac Marinduque Coco Geonet Production and Trading Start-up Small Enterprise Proponent Group 1 2,002,800.00 0.00 667,600.00 667,600.00 3,338,000.00 1 243 577 820 Completed (100%) 100% physical progress
412 PRDP-IR-R04B-PAL-014-COR-001-2021 Luzon B Region 4B Palawan 1st Coron Seaweed Production and Post-harvest Facility Upgrading / Expansion Small Enterprise Proponent Group 1 7,199,665.86 0.00 2,399,888.62 2,399,888.62 11,999,443.10 1 23 14 37 Less than fifty percent progress 43.54% physical progress
413 PRDP-IR-R04B-MAR-006-000-000-2021 Luzon B Region 4B Marinduque Lone Santa Cruz Marinduque Swine Meat Processing Start-up Small Enterprise Proponent Group 1 6,884,338.66 0.00 2,294,779.55 2,294,779.55 11,473,897.76 1 132 356 488 Less than fifty percent progress 48.22% physical progress
414 PRDP-IR-R04B-ROM-005-000-000-2021 Luzon B Region 4B Romblon Lone Magdiwang Romblon Swine Meat Processing Start-up Small Enterprise Proponent Group 1 7,196,620.05 0.00 2,398,873.35 2,398,873.35 11,994,366.75 1 355 645 1,000 With NOL 1 For Procurement
415 PRDP-IR-R04B-OCM-005-SAJ-001-2021 Luzon B Region 4B Occidental Mindoro Lone San Jose Onion Consolidation and Trading with Cold Storage Facility in San Jose Upgrading / Expansion Medium Enterprise Proponent Group 1 59,133,023.73 0.00 19,711,007.91 19,711,007.91 98,555,039.55 1 420 318 738 Less than fifty percent progress 14.02% physical progress
416 PRDP-IR-R04B-OCM-004-RIZ-001-2021 Luzon B Region 4B Occidental Mindoro Lone Rizal Tuna Trading and Processing in Rizal, Occidental Mindoro Start-up Medium Enterprise Proponent Group 1 20,464,077.51 0.00 6,821,359.17 6,821,359.17 34,106,795.85 1 340 285 625 Less than fifty percent progress 16.94% physical progress
417 PRDP-IR-R04B-OCM-002-MAG-001-2021 Luzon B Region 4B Occidental Mindoro Lone Magsaysay Onion Consolidation and Trading with Cold Storage Facility in Magsaysay Upgrading / Expansion Medium Enterprise Proponent Group 1 59,144,485.18 0.00 19,714,828.39 19,714,828.39 98,574,141.96 1 169 54 223 Less than fifty percent progress 46.23% physical progress
418 PRDP-IR-R04B-ROM-004-000-000-2021 Luzon B Region 4B Romblon Lone San Fernando Romblon Mango Trading and Processing Start-up Small Enterprise Proponent Group 1 7,145,573.69 0.00 2,381,857.90 2,381,857.90 11,909,289.49 1 1,100 1,513 2,613 With NOL 1 For Procurement
419 PRDP-IR-R04B-ROM-003-ODI-001-2019 Luzon B Region 4B Romblon Lone Odiongan Odiongan Coco Sugar Processing Start-up Small Enterprise Proponent Group 1 5,056,756.66 0.00 1,685,585.55 1,685,585.55 8,427,927.76 1 38 46 84 Fifty percent and above progress 97.27% physical progress
420 PRDP-IR-R005-ALB-002-000-000-2016 Luzon B Region 5 Albay 2nd Legazpi City Enhancing Farm Capacity and Adoption of Nutrition Technology for Goat Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,200.00 0.00 199,400.00 199,400.00 997,000.00 1 8 25 33 Completed (100%) 100% physical progress
421 PRDP-IR-R005-ALB-004-MAL-001-2019 Luzon B Region 5 Albay 1st Malilipot Malilipot Abaca Twine Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 3,651,278.07 0.00 1,217,092.69 1,217,092.69 6,085,463.45 1 12 36 48 Completed (100%) 100% physical progress
422 PRDP-IR-R005-CAN-001-000-000-2014 Luzon B Region 5 Camarines Norte 1st Santa Elena Coco Geonet Production Project Start-up Small Enterprise Proponent Group 1 2,040,060.00 0.00 680,020.00 680,020.00 3,400,100.00 1 604 449 1,053 Completed (100%) 100% physical progress
423 PRDP-IR-R005-CAS-001-000-000-2014 Luzon B Region 5 Camarines Sur 5th Baao Camarines Sur Coco Sap Sugar Processing Start-up Small Enterprise Proponent Group 1 1,211,385.00 0.00 403,795.00 403,795.00 2,018,975.00 1 75 155 230 Completed (100%) 100% physical progress
424 PRDP-IR-R005-CAT-001-000-000-2015 Luzon B Region 5 Catanduanes Lone Virac Abaca Fiber Processing and Trading Enterprise Start-up Medium Enterprise Proponent Group 1 6,126,000.00 0.00 2,042,000.00 2,042,000.00 10,210,000.00 1 1,051 2,432 3,483 Completed (100%) 100% physical progress
425 PRDP-IR-R005-CAT-002-GIG-002-2016 Luzon B Region 5 Catanduanes Lone Gigmoto Commercial Palay Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 300,000.00 0.00 100,000.00 100,000.00 500,000.00 1 68 48 116 Completed (100%) 100% physical progress
426 PRDP-IR-R005-CAT-004-PAN-001-2016 Luzon B Region 5 Catanduanes Lone Pandan TAFFIA Broiler Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 223,152.00 0.00 74,384.00 74,384.00 371,920.00 1 24 5 29 Completed (100%) 100% physical progress
427 PRDP-IR-R005-MAS-004-ARO-001-2018 Luzon B Region 5 Masbate 2nd Aroroy Lubacon Coco Charcoal Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 6,250,593.21 0.00 2,083,531.07 2,083,531.07 10,417,655.35 1 48 12 60 Completed (100%) 107% physical progress
428 PRDP-IR-R005-SOR-001-000-000-2016 Luzon B Region 5 Sorsogon 2nd Gubat Bagacay Seaweeds Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,986.50 0.00 199,995.50 199,995.50 999,977.50 1 0 38 38 Completed (100%) 100% physical progress
429 PRDP-IR-R005-SOR-002-000-000-2016 Luzon B Region 5 Sorsogon 1st Castilla Tomalaytay Seaweed Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 598,092.00 0.00 199,364.00 199,364.00 996,820.00 1 17 54 71 Completed (100%) 100% physical progress
430 PRDP-IR-R005-SOR-003-000-000-2016 Luzon B Region 5 Sorsogon 1st Castilla Cogon Seaweeds Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,986.50 0.00 199,995.50 199,995.50 999,977.50 1 40 14 54 Completed (100%) 100% physical progress
431 PRDP-IR-R005-SOR-005-000-000-2016 Luzon B Region 5 Sorsogon 2nd Bulusan San Francisco Gabi and Ginger Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 208,494.00 0.00 69,498.00 69,498.00 347,490.00 1 0 26 26 Completed (100%) 100% physical progress
432 PRDP-IR-R005-SOR-006-000-000-2016 Luzon B Region 5 Sorsogon 2nd Barcelona Cagang RIC Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.01 0.00 200,000.00 200,000.00 1,000,000.01 1 0 35 35 Completed (100%) 100% physical progress
433 PRDP-IR-R005-SOR-008-000-000-2016 Luzon B Region 5 Sorsogon 2nd Prieto Diaz Carayat Seaweed Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,986.50 0.00 199,995.50 199,995.50 999,977.50 1 20 9 29 Completed (100%) 100% physical progress
434 PRDP-IR-R005-SOR-009-000-000-2016 Luzon B Region 5 Sorsogon 1st Sorsogon City SAMAGI Seaweeds Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 585,270.00 0.00 195,090.00 195,090.00 975,450.00 1 63 11 74 Completed (100%) 100% physical progress
435 PRDP-IR-R005-SOR-010-000-000-2016 Luzon B Region 5 Sorsogon 1st Sorsogon City Foodcrop Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 430,063.20 0.00 143,354.40 143,354.40 716,772.00 1 16 14 30 Completed (100%) 106% physical progress
436 PRDP-IR-R005-SOR-011-000-000-2016 Luzon B Region 5 Sorsogon 1st Magallanes Seaweeds Nursery, Production and Marketing Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,719,222.40 0.00 429,805.60 2,149,028.00 1 38 22 60 Completed (100%) 100% physical progress
437 PRDP-IR-R005-SOR-016-000-000-2017 Luzon B Region 5 Sorsogon 2nd Matnog Seaweeds Production Project and Grouper Culture Proponent in Matnog, Sorsogon Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 1,333,760.00 0.00 333,440.00 1,667,200.00 1 26 11 37 Completed (100%) 100% physical progress
438 PRDP-IR-R005-SOR-017-000-000-2017 Luzon B Region 5 Sorsogon 1st Pilar Milkfish Culture and Marketing in Pilar, Sorsogon Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 959,200.00 0.00 239,800.00 1,199,000.00 1 28 29 57 Completed (100%) 100% physical progress
439 PRDP-IR-R005-SOR-015-000-000-2017 Luzon B Region 5 Sorsogon 2nd Bulan Butag Green Grouper Fishcage Production Project Global Environmental Facility (GEF) Micro Enterprise Proponent Group 1 0.00 2,255,936.00 0.00 563,984.00 2,819,920.00 1 20 0 20 Fifty percent and above progress 81.85% physical progress
440 PRDP-IR-R005-ALB-003-000-000-2016 Luzon B Region 5 Albay 2nd Daraga Sweet Potato-based Products Processing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 5,764,374.13 0.00 1,921,458.04 1,921,458.04 9,607,290.21 1 32 31 63 Completed (100%) 104% physical progress
441 PRDP-IR-R005-MAS-007-000-000-2017 Luzon B Region 5 Masbate 3rd Cataingan Masbate Integrated Goat Production and Marketing Upgrading / Expansion Small Enterprise Proponent Groups 4 8,814,791.40 0.00 2,938,263.80 2,938,263.80 14,691,319.00 4 370 729 1,099 Completed (100%) 100% physical progress
442 PRDP-IR-R005-CAT-004-000-000-2016 Luzon B Region 5 Catanduanes Lone Panganiban Mangrove Crab Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,073,564.30 0.00 1,357,854.77 1,357,854.77 6,789,273.84 1 124 8 132 Completed (100%) 100% physical progress
443 PRDP-IR-R005-SOR-017-000-000-2018 Luzon B Region 5 Sorsogon 2nd Irosin Sorsogon Abaca Fiber and Processing (Almacen) Enterprise Start-up Small Enterprise Proponent Group 1 6,368,439.00 0.00 2,122,813.00 2,122,813.00 10,614,065.00 1 10 34 44 Completed (100%) 100% physical progress
444 PRDP-IR-R005-SOR-012-000-000-2016 Luzon B Region 5 Sorsogon 2nd Gubat Sorsogon Pili Enterprise Start-up Small Enterprise Proponent Groups 3 8,859,639.55 0.00 2,953,213.18 2,953,213.18 14,766,065.91 3 732 794 1,526 Completed (100%) 100% physical progress
445 PRDP-IR-R005-SOR-004-000-000-2016 Luzon B Region 5 Sorsogon 2nd Bulusan Establishment of Cassava Chip Processing Enterprise for Small Producers of San Bernardo Restoration / Rehabilitation Micro Enterprise Proponent Group 1 331,260.00 0.00 110,420.00 110,420.00 552,100.00 1 11 8 19 Completed (100%) 100% physical progress
446 PRDP-IR-R005-SOR-007-000-000-2016 Luzon B Region 5 Sorsogon 2nd Barcelona Establishment of Cottage Industry in Olandia, Barcelona, Sorsogon Restoration / Rehabilitation Micro Enterprise Proponent Group 1 228,867.00 0.00 76,289.00 76,289.00 381,445.00 1 0 47 47 Completed (100%) 100% physical progress
447 PRDP-IR-R005-CAN-002-000-000-2015 Luzon B Region 5 Camarines Norte 1st Labo Camarines Norte Pineapple Trading and Processing Project Upgrading / Expansion Medium Enterprise Proponent Group 1 9,493,422.04 0.00 3,164,474.01 3,164,474.01 15,822,370.06 1 1,854 7,286 9,140 Completed (100%) 103% physical progress
448 PRDP-IR-R005-ALB-001-000-000-2014 Luzon B Region 5 Albay 3rd Libon Albay Coco Geonets Manufacturing Enterprise Start-up Small Enterprise Proponent Group 1 2,783,136.00 0.00 927,712.00 927,712.00 4,638,560.00 1 59 47 106 Completed (100%) 100% physical progress
449 PRDP-IR-R005-MAS-001-ESP-001-2016 Luzon B Region 5 Masbate 3rd Esperanza Charcoal Briquette Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 555,600.00 0.00 185,200.00 185,200.00 926,000.00 1 0 21 21 Completed (100%) 100% physical progress
450 PRDP-IR-R005-CAS-003-GOA-001-2019 Luzon B Region 5 Camarines Sur 4th Goa Goa Maymatan Integrated Swine Enterprise Start-up Small Enterprise Proponent Group 1 8,424,300.00 0.00 2,808,100.00 2,808,100.00 14,040,500.00 1 85 65 150 Completed (100%) 100% physical progress
451 PRDP-IR-R005-CAT-005-000-000-2021 Luzon B Region 5 Catanduanes Lone Virac ARDCI Catanduanes Swine Hub Start-up Small Enterprise Proponent Group 1 8,953,710.00 0.00 2,984,570.00 2,984,570.00 14,922,850.00 1 8 67 75 Less than fifty percent progress 45.36% physical progress
452 PRDP-IR-R005-CAS-004-000-000-2019 Luzon B Region 5 Camarines Sur 5th Bula Camarines Sur Cassava Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 3,684,420.00 0.00 1,228,140.00 1,228,140.00 6,140,700.00 1 3 29 32 Fifty percent and above progress 62.75% physical progress
453 PRDP-IR-R005-CAS-005-BAT-001-2021 Luzon B Region 5 Camarines Sur 5th Bato Cassava Flour Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 6,485,820.00 0.00 2,161,940.00 2,161,940.00 10,809,700.00 1 43 30 73 Less than fifty percent progress 44.02% physical progress
454 PRDP-IR-R006-AKL-001-000-000-2014 Visayas Region 6 Aklan Lone Batan Oyster and Mussel Production and Marketing Upgrading / Expansion Micro Enterprise Proponent Groups 12 1,440,000.00 0.00 480,000.00 480,000.00 2,400,000.00 12 654 331 985 Completed (100%) 100% physical progress
455 PRDP-IR-R006-AKL-002-000-000-2014 Visayas Region 6 Aklan Lone Madalag Native Chicken Restocking/Production and Marketing Start-up Small Enterprise Proponent Groups 3 2,696,028.00 0.00 898,676.00 898,676.00 4,493,380.00 3 36 24 60 Completed (100%) 100% physical progress
456 PRDP-IR-R006-ANT-003-000-000-2015 Visayas Region 6 Antique Lone Sebaste Cattle Fattening Livelihood Project Restoration / Rehabilitation Micro Enterprise Proponent Groups 3 468,000.00 0.00 156,000.00 156,000.00 780,000.00 3 124 56 180 Completed (100%) 100% physical progress
457 PRDP-IR-R006-ANT-004-000-000-2014 Visayas Region 6 Antique Lone Barbaza Sustainable Swine Production As An Alternative Livelihood For The Farmers/ Fisherfolks Restoration / Rehabilitation Micro Enterprise Proponent Groups 2 475,200.00 0.00 158,400.00 158,400.00 792,000.00 2 12 11 23 Completed (100%) 103% physical progress
458 PRDP-IR-R006-ANT-006-000-000-2014 Visayas Region 6 Antique Lone Libertad Lambaklad Livelihood Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,976.00 0.00 159,992.00 159,992.00 799,960.00 1 61 51 112 Completed (100%) 100% physical progress
459 PRDP-IR-R006-CAP-001-000-000-2014 Visayas Region 6 Capiz 1st Roxas City Live Grouper Production and Marketing Upgrading / Expansion Small Enterprise Proponent Groups 2 2,443,800.00 0.00 814,600.00 814,600.00 4,073,000.00 2 38 12 50 Completed (100%) 100% physical progress
460 PRDP-IR-R006-CAP-004-000-000-2014 Visayas Region 6 Capiz 2nd Sapi-an LARC Shellfish Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 500,760.00 0.00 166,920.00 166,920.00 834,600.00 1 24 26 50 Completed (100%) 100% physical progress
461 PRDP-IR-R006-ILO-001-000-000-2014 Visayas Region 6 Iloilo 5th Dueñas Feedlot Cattle Fattening Restoration / Rehabilitation Micro Enterprise Proponent Groups 2 369,648.00 0.00 123,216.00 123,216.00 616,080.00 2 107 40 147 Completed (100%) 100% physical progress
462 PRDP-IR-R006-NOC-003-000-000-2014 Visayas Region 6 Negros Occidental 1st Escalante City Fish Coral Rehabilitation & Fish Trading Support Restoration / Rehabilitation Micro Enterprise Proponent Group 1 240,000.00 0.00 80,000.00 80,000.00 400,000.00 1 14 24 38 Completed (100%) 100% physical progress
463 PRDP-IR-R006-NOC-004-000-000-2014 Visayas Region 6 Negros Occidental 2nd Manapla Rehabilitation of Fishing Equipments for Blue Swimming Crab Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 240,000.00 0.00 80,000.00 80,000.00 400,000.00 1 32 19 51 Completed (100%) 100% physical progress
464 PRDP-IR-R006-NOC-007-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Swine Breeding Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,520.00 0.00 159,840.00 159,840.00 799,200.00 1 18 32 50 Completed (100%) 102% physical progress
465 PRDP-IR-R006-NOC-008-000-000-2015 Visayas Region 6 Negros Occidental 2nd Manapla Swine Breeding Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,520.00 0.00 159,840.00 159,840.00 799,200.00 1 30 20 50 Completed (100%) 100% physical progress
466 PRDP-IR-R006-NOC-009-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Swine Fattening Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 337,824.00 0.00 112,608.00 112,608.00 563,040.00 1 30 20 50 Completed (100%) 100% physical progress
467 PRDP-IR-R006-NOC-010-000-000-2015 Visayas Region 6 Negros Occidental 5th La Castellana Negros Swine Integrated Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 9 16,109,149.92 0.00 5,369,716.64 5,369,716.64 26,848,583.20 9 448 560 1,008 Completed (100%) 101% physical progress
468 PRDP-IR-R006-ANT-008-000-000-2016 Visayas Region 6 Antique Lone Laua-an Antique Muscovado Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 2 15,136,231.67 0.00 5,045,410.56 5,045,410.56 25,227,052.79 2 111 45 156 Completed (100%) 100% physical progress
469 PRDP-IR-R006-GUI-003-000-000-2018 Visayas Region 6 Guimaras Lone Sibunag Guimaras Mango Production, Consolidation, and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 8,468,807.90 0.00 2,822,935.97 2,822,935.97 14,114,679.84 3 73 39 112 Completed (100%) 100% physical progress
470 PRDP-IR-R006-NOC-009-000-000-2018 Visayas Region 6 Negros Occidental 2nd Cadiz City Negros Native Chicken Breeding, Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 5,163,030.70 0.00 1,721,010.23 1,721,010.23 8,605,051.16 3 149 87 236 Completed (100%) 100% physical progress
471 PRDP-IR-R006-GUI-006-000-000-2019 Visayas Region 6 Guimaras Lone Buenavista Isla de Guimaras Native Chicken Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 8,999,850.89 0.00 2,999,950.30 2,999,950.30 14,999,751.49 3 97 160 257 Completed (100%) 100% physical progress
472 PRDP-IR-R006-ILO-006-000-000-2018 Visayas Region 6 Iloilo 1st Oton Iloilo Integrated Swine Enterprise Start-up Small Enterprise Proponent Groups 4 5,535,382.56 0.00 1,845,127.52 1,845,127.52 9,225,637.60 4 461 507 968 Fifty percent and above progress 73.55% physical progress
473 PRDP-IR-R006-ANT-001-000-000-2014 Visayas Region 6 Antique Lone Bugasong Goat Breeding and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 3,166,305.12 0.00 1,055,435.04 1,055,435.04 5,277,175.20 3 129 45 174 Completed (100%) 110% physical progress
474 PRDP-IR-R006-ANT-007-000-000-2014 Visayas Region 6 Antique Lone Barbaza Production and Marketing of Abaca Planting Materials Restoration / Rehabilitation Micro Enterprise Proponent Group 1 475,200.00 0.00 158,400.00 158,400.00 792,000.00 1 30 16 46 Completed (100%) 104% physical progress
475 PRDP-IR-R006-GUI-003-000-000-2015 Visayas Region 6 Guimaras Lone Sibunag Sibunag Seaweed Production and Marketing Enterprise Global Environmental Facility (GEF) Small Enterprise Proponent Groups 3 0.00 3,626,560.00 0.00 906,640.00 4,533,200.00 3 50 80 130 Fifty percent and above progress 80.15% physical progress
476 PRDP-IR-R006-NOC-012-000-000-2020 Visayas Region 6 Negros Occidental 2nd Cadiz City Caridad Swine Production and Marketing of Pork Products Upgrading / Expansion Small Enterprise Proponent Group 1 6,725,477.68 0.00 2,241,825.89 2,241,825.89 11,209,129.46 1 24 27 51 Completed (100%) 100% physical progress
477 PRDP-IR-R006-CAP-005-000-000-2014 Visayas Region 6 Capiz 1st Panay Buntod Katibyugan Shellfish Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 511,980.00 0.00 170,660.00 170,660.00 853,300.00 1 13 46 59 Completed (100%) 100% physical progress
478 PRDP-IR-R006-NOC-006-000-000-2015 Visayas Region 6 Negros Occidental 1st Calatrava Rehabilitation of Rearing Houses and Cocoon Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 457,742.40 0.00 152,580.80 152,580.80 762,904.00 1 38 4 42 Completed (100%) 100% physical progress
479 PRDP-IR-R006-NOC-020-000-000-2022 Visayas Region 6 Negros Occidental 4th Bago City Swine Integrated Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 7,141,029.60 0.00 2,380,343.20 2,380,343.20 11,901,716.00 2 342 206 548 With NOL 1 For Procurement
480 PRDP-IR-R006-NOC-008-000-000-2017 Visayas Region 6 Negros Occidental 6th Kabankalan City Muscovado Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 15 11,483,527.87 0.00 3,827,842.62 3,827,842.62 19,139,213.11 15 161 122 283 Completed (100%) 100% physical progress
481 PRDP-IR-R006-AKL-003-000-000-2014 Visayas Region 6 Aklan Lone Altavas Rehabilitation of Coconut Mini Oil Mill for the Production of Small Scale Coco-based Crude Oil and Copra Cakes Upgrading / Expansion Small Enterprise Proponent Groups 3 997,032.00 0.00 332,344.00 332,344.00 1,661,720.00 3 108 129 237 Completed (100%) 100% physical progress
482 PRDP-IR-R006-ILO-004-000-000-2015 Visayas Region 6 Iloilo 5th San Rafael Swine Fattening Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 240,000.00 0.00 80,000.00 80,000.00 400,000.00 1 9 9 18 Completed (100%) 100% physical progress
483 PRDP-IR-R006-ILO-005-000-000-2015 Visayas Region 6 Iloilo 3rd Bingawan Production & Marketing of Vermicompost Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,640.00 0.00 159,880.00 159,880.00 799,400.00 1 9 14 23 Completed (100%) 100% physical progress
484 PRDP-IR-R006-AKL-004-000-000-2016 Visayas Region 6 Aklan Lone Libacao Abaca Fiber Production, Consolidation and Trading Enterprise Start-up Small Enterprise Proponent Groups 3 3,689,640.00 0.00 1,229,880.00 1,229,880.00 6,149,400.00 3 382 618 1,000 Completed (100%) 100% physical progress
485 PRDP-IR-R006-ANT-005-000-000-2014 Visayas Region 6 Antique Lone Sebaste Sebaste Lambaklad Livelihood Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,976.00 0.00 159,992.00 159,992.00 799,960.00 1 73 17 90 Completed (100%) 100% physical progress
486 PRDP-IR-R006-CAP-003-000-000-2014 Visayas Region 6 Capiz 2nd Cuartero Enterprising Corn-Based Crop-Animal Production Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 521,400.00 0.00 173,800.00 173,800.00 869,000.00 1 114 17 131 Completed (100%) 100% physical progress
487 PRDP-IR-R006-ILO-007-000-000-2018 Visayas Region 6 Iloilo 5th Ajuy Panay Native Chicken Enterprise (PaNCE) Start-up Small Enterprise Proponent Groups 2 8,998,911.45 0.00 2,999,637.15 2,999,637.15 14,998,185.75 2 54 91 145 Completed (100%) 100% physical progress
488 PRDP-IR-R006-ILO-002-000-000-2014 Visayas Region 6 Iloilo 2nd Zarraga Goat Production Project for Sustainable Livelihood Restoration / Rehabilitation Micro Enterprise Proponent Group 1 475,200.00 0.00 158,400.00 158,400.00 792,000.00 1 23 19 42 Completed (100%) 100% physical progress
489 PRDP-IR-R006-AKL-006-000-000-2022 Visayas Region 6 Aklan Lone Banga Aklan District I Swine Production and Marketing Start-up Small Enterprise Proponent Groups 2 6,017,832.32 0.00 2,005,944.11 2,005,944.11 10,029,720.54 2 77 74 151 Fifty percent and above progress 85.18% physical progress
490 PRDP-IR-R006-AKL-005-000-000-2021 Visayas Region 6 Aklan Lone Altavas Oyster Production, Processing and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 6,669,630.14 0.00 2,223,210.05 2,223,210.05 11,116,050.24 2 33 44 77 Fifty percent and above progress 93.43% physical progress
491 PRDP-IR-R006-NOC-022-000-000-2022 Visayas Region 6 Negros Occidental 4th Pontevedra Pontevedra Swine Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 7,045,719.60 0.00 2,348,573.20 2,348,573.20 11,742,866.00 2 126 148 274 With NOL 1 For Procurement
492 PRDP-IR-R006-NOC-023-000-000-2022 Visayas Region 6 Negros Occidental 6th Kabankalan City Upper Kabankalan Swine Breeding, Fattening and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 7,128,741.60 0.00 2,376,247.20 2,376,247.20 11,881,236.00 3 198 221 419 With NOL 1 For Procurement
493 PRDP-IR-R006-NOC-024-000-000-2022 Visayas Region 6 Negros Occidental 5th La Castellana Azucarera de La Castellana Muscovado Enterprise Start-up Small Enterprise Proponent Groups 2 7,128,228.97 0.00 2,376,076.32 2,376,076.32 11,880,381.61 2 40 32 72 With NOL 1 For Procurement
494 PRDP-IR-R006-ILO-003-000-000-2015 Visayas Region 6 Iloilo 3rd Janiuay Piglet Production and Marketing Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,520.00 0.00 159,840.00 159,840.00 799,200.00 1 15 20 35 Completed (100%) 100% physical progress
495 PRDP-IR-R006-NOC-011-000-000-2019 Visayas Region 6 Negros Occidental Lone Bacolod City Negros Occidental Goat Breeding and Marketing Enterprise Start-up Small Enterprise Proponent Groups 4 6,288,033.40 0.00 2,096,011.13 2,096,011.13 10,480,055.66 4 230 288 518 Fifty percent and above progress 63.70% physical progress
496 PRDP-IR-R006-NOC-015-000-000-2021 Visayas Region 6 Negros Occidental 6th Cauayan Negros Occidental Virgin Coconut Oil Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 6,959,488.99 0.00 2,319,829.66 2,319,829.66 11,599,148.31 2 69 66 135 Fifty percent and above progress 86.36% physical progress
497 PRDP-IR-R006-NOC-021-000-000-2022 Visayas Region 6 Negros Occidental 3rd Silay City Kansilay Swine Breeding, Fattening and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 5,850,510.17 0.00 1,950,170.06 1,950,170.06 9,750,850.29 3 52 90 142 Less than fifty percent progress 0.88% physical progress
498 PRDP-IR-R006-NOC-013-000-000-2021 Visayas Region 6 Negros Occidental 4th Pontevedra SALVANTICAM Native Chicken Breeding, Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 4 7,037,225.91 0.00 2,345,741.97 2,345,741.97 11,728,709.85 4 238 206 444 Completed (100%) 99% physical progress
499 PRDP-IR-R006-NOC-018-000-000-2022 Visayas Region 6 Negros Occidental 2nd Cadiz City Cadiz City Coffee Processing and Marketing Enterprise Start-up Small Enterprise Proponent Groups 8 7,023,494.44 0.00 2,341,164.81 2,341,164.81 11,705,824.06 8 107 70 177 Fifty percent and above progress 76.50% physical progress
500 PRDP-IR-R006-AKL-007-000-000-2022 Visayas Region 6 Aklan Lone Nabas Aklan District II Swine Production and Marketing of Pork Products Start-up Small Enterprise Proponent Groups 2 6,324,677.17 0.00 2,108,225.72 2,108,225.72 10,541,128.61 2 54 59 113 Fifty percent and above progress 86.63% physical progress
501 PRDP-IR-R006-ILO-009-000-000-2022 Visayas Region 6 Iloilo 2nd Pavia Iloilo Goat Breeding, Milk Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 6,613,471.95 0.00 2,204,490.65 2,204,490.65 11,022,453.25 2 36 21 57 Less than fifty percent progress 19.90% physical progress
502 PRDP-IR-R006-GUI-009-000-000-2022 Visayas Region 6 Guimaras Lone Nueva Valencia Guimaras Goat Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 3 8,117,157.50 0.00 2,705,719.17 2,705,719.17 13,528,595.84 3 29 72 101 Less than fifty percent progress 2.39% physical progress
503 PRDP-IR-R006-NOC-017-000-000-2022 Visayas Region 6 Negros Occidental 5th La Castellana Kape Primera De La Castellana Processing and Marketing Enterprise Start-up Small Enterprise Proponent Groups 6 6,471,386.40 0.00 2,157,128.80 2,157,128.80 10,785,644.00 6 115 78 193 Fifty percent and above progress 79.72% physical progress
504 PRDP-IR-R006-NOC-019-000-000-2022 Visayas Region 6 Negros Occidental 4th La Carlota City ARA-AL'S Coffee Processing and Marketing Enterprise Start-up Small Enterprise Proponent Groups 4 6,726,874.35 0.00 2,242,291.45 2,242,291.45 11,211,457.25 4 105 130 235 Fifty percent and above progress 61.92% physical progress
505 PRDP-IR-R006-NOC-016-000-000-2022 Visayas Region 6 Negros Occidental 6th Sipalay City CHICKS Area Coffee Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 2 7,161,475.80 0.00 2,387,158.60 2,387,158.60 11,935,793.00 2 222 157 379 Fifty percent and above progress 81.71% physical progress
506 PRDP-IR-R007-BOH-002-000-000-2014 Visayas Region 7 Bohol 1st Loon Coco Based Processing and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 18 16 34 Completed (100%) 100% physical progress
507 PRDP-IR-R007-BOH-003-000-000-2014 Visayas Region 7 Bohol 1st Balilihan Cassava Processing and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 21 31 52 Completed (100%) 100% physical progress
508 PRDP-IR-R007-BOH-004-000-000-2014 Visayas Region 7 Bohol 1st Dauis Vegetable Production and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 456,000.00 0.00 152,000.00 152,000.00 760,000.00 1 52 274 326 Completed (100%) 100% physical progress
509 PRDP-IR-R007-BOH-005-000-000-2014 Visayas Region 7 Bohol 1st Dauis Native Chicken Production and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 478,512.00 0.00 159,504.00 159,504.00 797,520.00 1 0 20 20 Completed (100%) 100% physical progress
510 PRDP-IR-R007-BOH-006-000-000-2014 Visayas Region 7 Bohol 3rd Anda Anda-ORBA Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 12 30 42 Completed (100%) 116% physical progress
511 PRDP-IR-R007-BOH-010-000-000-2015 Visayas Region 7 Bohol 1st Balilihan Squash Noodles (Fresh Miki) Processing & Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 0 100 100 Completed (100%) 100% physical progress
512 PRDP-IR-R007-BOH-011-000-000-2015 Visayas Region 7 Bohol 1st Balilihan Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 0 32 32 Completed (100%) 100% physical progress
513 PRDP-IR-R007-BOH-013-000-000-2015 Visayas Region 7 Bohol 3rd Mabini Squash Pretzels Processing & Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 40 210 250 Completed (100%) 100% physical progress
514 PRDP-IR-R007-BOH-015-000-000-2015 Visayas Region 7 Bohol 3rd Jagna Tableja Processing and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 0 30 30 Completed (100%) 100% physical progress
515 PRDP-IR-R007-BOH-016-000-000-2015 Visayas Region 7 Bohol 3rd Batuan Free Ranged Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 9 25 34 Completed (100%) 100% physical progress
516 PRDP-IR-R007-BOH-021-000-000-2015 Visayas Region 7 Bohol 1st Calape Seaweeds Processing and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 109 49 158 Completed (100%) 114% physical progress
517 PRDP-IR-R007-CEB-001-000-000-2014 Visayas Region 7 Cebu 5th San Francisco Cassava Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 480,000.00 0.00 160,000.00 160,000.00 800,000.00 1 30 16 46 Completed (100%) 100% physical progress
518 PRDP-IR-R007-CEB-003-000-000-2015 Visayas Region 7 Cebu 5th Poro Coconut Fluid Processing and Distribution (Coco Vinegar) Restoration / Rehabilitation Micro Enterprise Proponent Groups 25 456,000.00 0.00 152,000.00 152,000.00 760,000.00 25 1,581 1,133 2,714 Fifty percent and above progress 65.17% physical progress
519 PRDP-IR-R007-CEB-004-000-000-2015 Visayas Region 7 Cebu 4th San Remigio Swine Production & Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 452,160.00 0.00 150,720.00 150,720.00 753,600.00 1 55 110 165 Completed (100%) 100% physical progress
520 PRDP-IR-R007-NOR-004-000-000-2019 Visayas Region 7 Negros Oriental 3rd Valencia Negros Oriental Virgin Coconut Oil Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 3,960,511.18 0.00 1,320,170.39 1,320,170.39 6,600,851.96 1 66 102 168 Completed (100%) 100% physical progress
521 PRDP-IR-R007-BOH-025-000-000-2017 Visayas Region 7 Bohol 3rd Batuan Batuan Native Chicken Breeding and Chicks Hardening Facilities and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 3,700,653.00 0.00 1,233,551.00 1,233,551.00 6,167,755.00 1 28 53 81 Completed (100%) 103% physical progress
522 PRDP-IR-R007-BOH-024-000-000-2018 Visayas Region 7 Bohol 2nd Jetafe Bohol Seaweeds Production, Consolidation and Marketing Enterprise (BSPCME) Start-up Medium Enterprise Proponent Groups 4 11,091,138.82 0.00 3,697,046.27 3,697,046.27 18,485,231.36 4 171 107 278 Completed (100%) 100% physical progress
523 PRDP-IR-R007-SIQ-001-000-000-2016 Visayas Region 7 Siquijor Lone Siquijor Siquijor Beef Cattle Fattening and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 2,687,022.77 0.00 895,674.26 895,674.26 4,478,371.29 1 452 1,322 1,774 Completed (100%) 109% physical progress
524 PRDP-IR-R007-SIQ-002-000-000-2016 Visayas Region 7 Siquijor Lone San Juan Beef Choice Cuts Marketing Enterprise Start-up Small Enterprise Proponent Group 1 2,477,700.00 0.00 825,900.00 825,900.00 4,129,500.00 1 340 521 861 Completed (100%) 107% physical progress
525 PRDP-IR-R007-SIQ-003-000-000-2017 Visayas Region 7 Siquijor Lone San Juan Siquijor Native Chicken Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 6,544,338.67 0.00 2,181,446.22 2,181,446.22 10,907,231.11 2 26 63 89 Completed (100%) 100% physical progress
526 PRDP-IR-R007-CEB-005-000-000-2015 Visayas Region 7 Cebu 4th San Remigio Native Chicken Production & Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 478,398.00 0.00 159,466.00 159,466.00 797,330.00 1 27 49 76 Completed (100%) 100% physical progress
527 PRDP-IR-R007-CEB-006-000-000-2016 Visayas Region 7 Cebu 4th Bantayan Bantayan Island Seaweeds Production & Marketing Enterprise Start-up Small Enterprise Proponent Groups 19 8,522,400.00 0.00 2,840,800.00 2,840,800.00 14,204,000.00 19 1,061 592 1,653 Fifty percent and above progress 60.85% physical progress
528 PRDP-IR-R007-CEB-007-000-000-2017 Visayas Region 7 Cebu 4th Bogo City Bogo Native Chicken Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,514,987.22 0.00 1,504,995.74 1,504,995.74 7,524,978.70 1 70 84 154 Less than fifty percent progress 17.54% physical progress
529 PRDP-IR-R007-CEB-013-CAT-001-2018 Visayas Region 7 Cebu 5th Catmon Catmon Native Chicken Breeding, Production and Marketing Enterprise (CNCBPME) Start-up Small Enterprise Proponent Groups 12 3,586,859.63 0.00 1,195,619.88 1,195,619.88 5,978,099.39 12 346 496 842 Completed (100%) 100% physical progress
530 PRDP-IR-R007-CEB-014-ALE-001-2021 Visayas Region 7 Cebu 2nd Alegria United Peoples Organization Highland Vegetables Production and Trading Enterprise (UPOHVPTE) Start-up Small Enterprise Proponent Group 1 8,971,800.00 0.00 2,990,600.00 2,990,600.00 14,953,000.00 1 210 120 330 Completed (100%) 100% physical progress
531 PRDP-IR-R007-NOR-001-000-000-2017 Visayas Region 7 Negros Oriental 1st Canlaon City Negros Oriental Native Chicken Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 2 6,420,782.83 0.00 2,140,260.94 2,140,260.94 10,701,304.71 2 92 88 180 Completed (100%) 100% physical progress
532 PRDP-IR-R007-BOH-026-000-000-2019 Visayas Region 7 Bohol 3rd Jagna Bohol VCO Production and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 5 4,288,087.58 0.00 1,429,362.53 1,429,362.53 7,146,812.64 5 120 83 203 Completed (100%) 100% physical progress
533 PRDP-IR-R007-BOH-017-000-000-2015 Visayas Region 7 Bohol 1st Loon Bahalina Production and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Groups 16 480,000.00 0.00 160,000.00 160,000.00 800,000.00 16 328 70 398 Completed (100%) 101% physical progress
534 PRDP-IR-R007-BOH-001-000-000-2014 Visayas Region 7 Bohol 2nd Ubay Bohol Dairy Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Groups 22 4,339,058.33 0.00 1,446,352.78 1,446,352.78 7,231,763.89 22 326 142 468 Completed (100%) 100% physical progress
535 PRDP-IR-R007-CEB-015-MOA-001-2021 Visayas Region 7 Cebu 2nd Moalboal Moalboal Farmers Native Chicken Production and Trading Enterprise Start-up Small Enterprise Proponent Groups 10 4,655,482.73 0.00 1,551,827.58 1,551,827.58 7,759,137.89 10 27 31 58 Less than fifty percent progress 29.81% physical progress
536 PRDP-IR-R007-BOH-027-000-000-2022 Visayas Region 7 Bohol 3rd Sevilla Bohol Feeds Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,114,305.08 0.00 2,371,435.03 2,371,435.03 11,857,175.14 1 85 60 145 Less than fifty percent progress 31.18% physical progress
537 PRDP-IR-R007-BOH-029-000-000-2022 Visayas Region 7 Bohol 3rd Carmen Bohol Cassava Production, Consolidation, Processing and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 23,595,021.56 0.00 7,865,007.19 7,865,007.19 39,325,035.94 1 115 85 200 Less than fifty percent progress 25.15% physical progress
538 PRDP-IR-R007-BOH-030-000-000-2022 Visayas Region 7 Bohol 3rd Guindulman Bohol Highland Vegetables Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 7,196,312.09 0.00 2,398,770.70 2,398,770.70 11,993,853.49 1 251 85 336 Less than fifty percent progress 31.34% physical progress
539 PRDP-IR-R007-CEB-013-SAT-013-2022 Visayas Region 7 Cebu 4th Santa Fe Kinatarcan Island Seaweeds Growing and Marketing Enterprise Start-up Small Enterprise Proponent Groups 9 6,128,250.00 0.00 2,042,750.00 2,042,750.00 10,213,750.00 9 167 743 910 Less than fifty percent progress 20.82% physical progress
540 PRDP-IR-R007-BOH-028-000-000-2022 Visayas Region 7 Bohol 2nd San Miguel Bohol Silage Production and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 19,023,957.96 0.00 6,341,319.32 6,341,319.32 31,706,596.60 1 171 80 251 Less than fifty percent progress 33.89% physical progress
541 PRDP-IR-R008-BIL-001-000-000-2015 Visayas Region 8 Biliran Lone Almeria AARCO Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 474,016.08 0.00 158,005.36 158,005.36 790,026.80 1 10 15 25 Completed (100%) 100% physical progress
542 PRDP-IR-R008-BIL-004-000-000-2015 Visayas Region 8 Biliran Lone Almeria Swine Production Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 539,448.00 0.00 179,816.00 179,816.00 899,080.00 1 10 10 20 Completed (100%) 100% physical progress
543 PRDP-IR-R008-EAS-003-000-000-2014 Visayas Region 8 Eastern Samar Lone Guiuan Inapulangan Fish Catching and Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 50 0 50 Fifty percent and above progress 62.13% physical progress
544 PRDP-IR-R008-LEY-002-ALA-001-2014 Visayas Region 8 Leyte Alang-alang Bio-Organic Fertilizer Production Center Rehabilitation Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 335,160.00 0.00 111,720.00 111,720.00 558,600.00 1 31 7 38 Completed (100%) 106% physical progress
545 PRDP-IR-R008-LEY-003-TAC-001-2014 Visayas Region 8 Leyte 1st Tacloban City Swine Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 477,408.00 0.00 159,136.00 159,136.00 795,680.00 1 19 8 27 Completed (100%) 101% physical progress
546 PRDP-IR-R008-LEY-006-HIL-001-2015 Visayas Region 8 Leyte 5th Hilongos Ginger Production and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 373,410.00 0.00 124,470.00 124,470.00 622,350.00 1 33 27 60 Completed (100%) 103% physical progress
547 PRDP-IR-R008-LEY-007-ORM-001-2015 Visayas Region 8 Leyte Ormoc Vegetable Production Livelihood Project of OVFA Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 32 8 40 Completed (100%) 100% physical progress
548 PRDP-IR-R008-LEY-013-SAN-001-2015 Visayas Region 8 Leyte 3rd San Isidro SAJOFA Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 476,797.08 0.00 158,932.36 158,932.36 794,661.80 1 30 35 65 Completed (100%) 100% physical progress
549 PRDP-IR-R008-NOS-002-000-000-2014 Visayas Region 8 Northern Samar 1st Allen Bio-organic & Vermi Compost Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 477,154.20 0.00 159,051.40 159,051.40 795,257.00 1 23 14 37 Completed (100%) 105% physical progress
550 PRDP-IR-R008-NOS-003-000-000-2014 Visayas Region 8 Northern Samar 1st San Jose GFA Hog Fattening and Trading Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 437,724.00 0.00 145,908.00 145,908.00 729,540.00 1 12 18 30 Completed (100%) 100% physical progress
551 PRDP-IR-R008-NOS-004-000-000-2015 Visayas Region 8 Northern Samar 1st Mondragon BFA Hog Fattening Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 520,099.20 0.00 173,366.40 173,366.40 866,832.00 1 21 9 30 Completed (100%) 100% physical progress
552 PRDP-IR-R008-NOS-005-000-000-2015 Visayas Region 8 Northern Samar 1st Catarman Goat Production, Marketing and Trading Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 589,200.00 0.00 196,400.00 196,400.00 982,000.00 1 43 50 93 Completed (100%) 100% physical progress
553 PRDP-IR-R008-NOS-006-000-000-2015 Visayas Region 8 Northern Samar 1st Allen SAMASI Hog Fattening and Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 520,099.20 0.00 173,366.40 173,366.40 866,832.00 1 12 18 30 Completed (100%) 100% physical progress
554 PRDP-IR-R008-NOS-007-000-000-2016 Visayas Region 8 Northern Samar 1st Mondragon Itik Egg Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 584,151.00 0.00 194,717.00 194,717.00 973,585.00 1 7 23 30 Completed (100%) 100% physical progress
555 PRDP-IR-R008-NOS-008-000-000-2016 Visayas Region 8 Northern Samar 2nd Catubig HFA Hog Fattening and Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 558,912.00 0.00 186,304.00 186,304.00 931,520.00 1 12 18 30 Completed (100%) 100% physical progress
556 PRDP-IR-R008-NOS-009-000-000-2016 Visayas Region 8 Northern Samar 1st Catarman Duck Egg Production and Processing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 596,623.58 0.00 198,874.53 198,874.53 994,372.64 1 23 17 40 Completed (100%) 103% physical progress
557 PRDP-IR-R008-NOS-010-000-000-2016 Visayas Region 8 Northern Samar 1st Mondragon Duck (Mallard) Egg Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 590,016.00 0.00 196,672.00 196,672.00 983,360.00 1 18 15 33 Completed (100%) 100% physical progress
558 PRDP-IR-R008-NOS-011-000-000-2016 Visayas Region 8 Northern Samar 2nd Laoang Hog Fattening and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,132.00 0.00 199,044.00 199,044.00 995,220.00 1 10 20 30 Completed (100%) 100% physical progress
559 PRDP-IR-R008-NOS-012-000-000-2016 Visayas Region 8 Northern Samar 2nd Laoang Vegetables Enterprise and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 585,485.52 0.00 195,161.84 195,161.84 975,809.20 1 26 4 30 Completed (100%) 100% physical progress
560 PRDP-IR-R008-NOS-014-000-000-2016 Visayas Region 8 Northern Samar 1st Biri Siganid and Milkfish Fishpen Project Restoration / Rehabilitation Micro Enterprise Proponent Group 1 579,750.00 0.00 193,250.00 193,250.00 966,250.00 1 77 43 120 Completed (100%) 100% physical progress
561 PRDP-IR-R008-SAM-002-000-000-2014 Visayas Region 8 Samar 2nd Calbiga Ube "Yam" Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 435,411.00 0.00 145,137.00 145,137.00 725,685.00 1 15 11 26 Completed (100%) 100% physical progress
562 PRDP-IR-R008-SAM-003-000-000-2014 Visayas Region 8 Samar 2nd Basey Ube "Yam" Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 435,411.00 0.00 145,137.00 145,137.00 725,685.00 1 55 46 101 Completed (100%) 100% physical progress
563 PRDP-IR-R008-SAM-004-000-000-2014 Visayas Region 8 Samar 2nd Santa Rita Ube "Yam" Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 435,411.00 0.00 145,137.00 145,137.00 725,685.00 1 27 28 55 Completed (100%) 100% physical progress
564 PRDP-IR-R008-SAM-007-000-000-2015 Visayas Region 8 Samar 2nd Basey Meliponiculture "Stingless Bee Technology" Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 0 90 90 Completed (100%) 100% physical progress
565 PRDP-IR-R008-SAM-008-000-000-2015 Visayas Region 8 Samar 2nd Motiong Ube "Yam" Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 435,411.00 0.00 145,137.00 145,137.00 725,685.00 1 21 24 45 Completed (100%) 100% physical progress
566 PRDP-IR-R008-SOL-004-000-000-2014 Visayas Region 8 Southern Leyte Lone Maasin City Swine Fattening Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,175.00 0.00 199,725.00 199,725.00 998,625.00 1 10 20 30 Completed (100%) 108% physical progress
567 PRDP-IR-R008-SOL-005-000-000-2014 Visayas Region 8 Southern Leyte Lone Bontoc Rootcrop Production Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 37 17 54 Completed (100%) 100% physical progress
568 PRDP-IR-R008-SOL-007-000-000-2015 Visayas Region 8 Southern Leyte Lone San Ricardo Native Chicken Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,805.00 0.00 199,935.00 199,935.00 999,675.00 1 18 17 35 Completed (100%) 110% physical progress
569 PRDP-IR-R008-SOL-008-000-000-2015 Visayas Region 8 Southern Leyte Lone Padre Burgos Native Chicken Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,805.00 0.00 199,935.00 199,935.00 999,675.00 1 6 26 32 Completed (100%) 103% physical progress
570 PRDP-IR-R008-SOL-009-000-000-2015 Visayas Region 8 Southern Leyte Lone Macrohon Native Chicken Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,805.00 0.00 199,935.00 199,935.00 999,675.00 1 6 26 32 Completed (100%) 101% physical progress
571 PRDP-IR-R008-SOL-010-000-000-2015 Visayas Region 8 Southern Leyte Lone Maasin City Native Chicken Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,805.00 0.00 199,935.00 199,935.00 999,675.00 1 26 6 32 Completed (100%) 101% physical progress
572 PRDP-IR-R008-SOL-011-000-000-2015 Visayas Region 8 Southern Leyte Lone Tomas Oppus Native Chicken Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,805.00 0.00 199,935.00 199,935.00 999,675.00 1 20 10 30 Completed (100%) 110% physical progress
573 PRDP-IR-R008-SOL-012-000-000-2015 Visayas Region 8 Southern Leyte Lone Anahawan Duck Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,940.00 0.00 199,980.00 199,980.00 999,900.00 1 12 8 20 Completed (100%) 100% physical progress
574 PRDP-IR-R008-SOL-013-000-000-2015 Visayas Region 8 Southern Leyte Lone Hinunangan Duck Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,940.00 0.00 199,980.00 199,980.00 999,900.00 1 35 14 49 Completed (100%) 100% physical progress
575 PRDP-IR-R008-SOL-014-000-000-2015 Visayas Region 8 Southern Leyte Lone San Juan Duck Community Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,940.00 0.00 199,980.00 199,980.00 999,900.00 1 14 6 20 Completed (100%) 100% physical progress
576 PRDP-IR-R008-SOL-015-000-000-2015 Visayas Region 8 Southern Leyte Lone Limasawa Swine Fattening Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,175.00 0.00 199,725.00 199,725.00 998,625.00 1 0 20 20 Completed (100%) 100% physical progress
577 PRDP-IR-R008-SOL-016-000-000-2015 Visayas Region 8 Southern Leyte Lone Pintuyan Swine Fattening Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,175.00 0.00 199,725.00 199,725.00 998,625.00 1 34 12 46 Completed (100%) 100% physical progress
578 PRDP-IR-R008-SOL-017-000-000-2015 Visayas Region 8 Southern Leyte Lone San Francisco Swine Fattening Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,175.00 0.00 199,725.00 199,725.00 998,625.00 1 7 13 20 Completed (100%) 100% physical progress
579 PRDP-IR-R008-NOS-013-000-000-2016 Visayas Region 8 Northern Samar 2nd Las Navas Hog Fattening and Marketing Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 597,132.00 0.00 199,044.00 199,044.00 995,220.00 1 20 10 30 Completed (100%) 100% physical progress
580 PRDP-IR-R008-SOL-003-000-000-2014 Visayas Region 8 Southern Leyte Lone Malitbog Naturally Raised Swine Production Enterprise Restoration / Rehabilitation Micro Enterprise Proponent Group 1 599,844.00 0.00 199,948.00 199,948.00 999,740.00 1 10 5 15 Completed (100%) 101% physical progress
581 PRDP-IR-R008-LEY-012-ORM-001-2018 Visayas Region 8 Leyte 4th Ormoc City Jackfruit Enterprise of Ormoc Start-up Small Enterprise Proponent Group 1 5,149,559.84 0.00 1,716,519.95 1,716,519.95 8,582,599.74 1 76 20 96 Completed (100%) 100% physical progress
582 PRDP-IR-R008-SAM-001-000-000-2014 Visayas Region 8 Samar 2nd Pinabacdao Banana Production and Trading Enterprise Project Upgrading / Expansion Small Enterprise Proponent Groups 7 3,549,760.13 0.00 1,183,253.38 1,183,253.38 5,916,266.89 7 257 89 346 Completed (100%) 100% physical progress
583 PRDP-IR-R008-BIL-003-CAB-001-2018 Visayas Region 8 Biliran Lone Cabucgayan Banana Enterprise of Biliran Start-up Small Enterprise Proponent Group 1 5,479,116.00 0.00 1,826,372.00 1,826,372.00 9,131,860.00 1 37 61 98 Completed (100%) 100% physical progress
584 PRDP-IR-R008-LEY-013-CAR-001-2016 Visayas Region 8 Leyte 2nd Carigara Leyte Banana Production and Trading Enterprise Start-up Small Enterprise Proponent Group 1 5,973,827.05 0.00 1,991,275.68 1,991,275.68 9,956,378.41 1 190 214 404 Completed (100%) 102% physical progress
585 PRDP-IR-R008-LEY-012-BAR-001-2015 Visayas Region 8 Leyte 2nd Barugo Tuba Consolidation and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 583,200.00 0.00 194,400.00 194,400.00 972,000.00 1 96 226 322 Completed (100%) 116% physical progress
586 PRDP-IR-R008-EAS-001-000-000-2014 Visayas Region 8 Eastern Samar Lone San Policarpo Binogawan "Iliw" Fish Catching And Trading Support Restoration / Rehabilitation Micro Enterprise Proponent Group 1 615,837.00 0.00 205,279.00 205,279.00 1,026,395.00 1 41 2 43 Completed (100%) 103% physical progress
587 PRDP-IR-R008-EAS-004-000-000-2015 Visayas Region 8 Eastern Samar Lone Quinapondan Mud Crab Production and Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 401,753.57 0.00 133,917.86 133,917.86 669,589.29 1 15 11 26 Completed (100%) 100% physical progress
588 PRDP-IR-R008-LEY-009-ALB-001-2015 Visayas Region 8 Leyte 4th Albuera Bell/Sweet Pepper Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 56 109 165 Completed (100%) 102% physical progress
589 PRDP-IR-R008-LEY-008-000-000-2015 Visayas Region 8 Leyte 1st Tanauan Papaya Atchara Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 14 26 40 Completed (100%) 100% physical progress
590 PRDP-IR-R008-NOS-001-000-000-2014 Visayas Region 8 Northern Samar 2nd Laoang Northern Samar Coco Geonets Processing and Trading Enterprise Upgrading / Expansion Small Enterprise Proponent Groups 17 2,325,663.60 0.00 775,221.20 775,221.20 3,876,106.00 17 342 230 572 Fifty percent and above progress 82.71% physical progress
591 PRDP-IR-R008-LEY-001-ISA-001-2014 Visayas Region 8 Leyte 4th Isabel UGMAD Mahayag Native Chicken Production and Marketing Restoration / Rehabilitation Micro Enterprise Proponent Group 1 464,019.00 0.00 154,673.00 154,673.00 773,365.00 1 6 19 25 Completed (100%) 100% physical progress
592 PRDP-IR-R008-LEY-004-TAC-002-2014 Visayas Region 8 Leyte 1st Tacloban City Swine Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 477,408.00 0.00 159,136.00 159,136.00 795,680.00 1 53 68 121 Completed (100%) 101% physical progress
593 PRDP-IR-R008-EAS-002-000-000-2014 Visayas Region 8 Eastern Samar Lone Quinapondan Mud Crab Culture In Pen Enclosures And Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 479,850.00 0.00 159,950.00 159,950.00 799,750.00 1 35 0 35 Completed (100%) 100% physical progress
594 PRDP-IR-R008-LEY-014-HIL-011-2022 Visayas Region 8 Leyte 5th Hilongos Banana Production and Trading Enterprise of Hilongos Start-up Small Enterprise Proponent Groups 12 4,698,967.20 0.00 1,566,322.40 1,566,322.40 7,831,612.00 12 452 252 704 Completed (100%) 100% physical progress
595 PRDP-IR-R008-NOS-016-000-000-2019 Visayas Region 8 Northern Samar 1st Mondragon Northern Samar Abaca Fiber Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 6 9,971,853.06 0.00 3,323,951.02 3,323,951.02 16,619,755.10 6 228 108 336 Fifty percent and above progress 95.28% physical progress
596 PRDP-IR-R008-EAS-006-000-000-2020 Visayas Region 8 Eastern Samar Lone Arteche Eastern Samar Seaweeds Production and Trading Enterprise Start-up Small Enterprise Proponent Groups 10 7,860,825.28 0.00 2,620,275.09 2,620,275.09 13,101,375.46 10 325 18 343 Fifty percent and above progress 79.42% physical progress
597 PRDP-IR-R008-SOL-018-000-000-2017 Visayas Region 8 Southern Leyte Lone Saint Bernard Southern Leyte Geotextile Production and Marketing (SLGPM) Start-up Small Enterprise Proponent Groups 8 6,875,759.19 0.00 2,291,919.73 2,291,919.73 11,459,598.65 8 176 166 342 Completed (100%) 108% physical progress
598 PRDP-IR-R008-LEY-013-000-000-2022 Visayas Region 8 Leyte 4th Merida Seaweeds Production and Trading Enterprise of Leyte Start-up Small Enterprise Proponent Groups 5 7,071,790.63 0.00 2,357,263.54 2,357,263.54 11,786,317.71 5 490 38 528 Fifty percent and above progress 53.36% physical progress
599 PRDP-IR-R008-SAM-007-000-000-2021 Visayas Region 8 Samar 2nd Catbalogan City Jackfruit Production and Trading Enterprise of Samar (JPTES) Start-up Small Enterprise Proponent Groups 5 6,140,201.53 0.00 2,046,733.84 2,046,733.84 10,233,669.21 5 122 119 241 Fifty percent and above progress 69.43% physical progress
600 PRDP-IR-R008-SOL-017-SOG-001-2021 Visayas Region 8 Southern Leyte Lone Sogod Sogod Abaca Fiber Enterprise (SAFE) Start-up Small Enterprise Proponent Group 1 7,147,413.60 0.00 2,382,471.20 2,382,471.20 11,912,356.00 1 62 14 76 Fifty percent and above progress 61.28% physical progress
601 PRDP-IR-R009-ZDN-006-000-000-2019 Mindanao Region 9 Zamboanga Del Norte 3rd Kalawit Abaca Production, Processing and Trading Start-up Small Enterprise Proponent Group 1 2,100,000.00 0.00 700,000.00 700,000.00 3,500,000.00 1 18 22 40 Business Plan Preparation Business Plan (w/ WFP, Proc. Plan, DED) for endorsement by the PPMIU to RPCO
602 PRDP-IR-R009-ZDN-003-000-000-2017 Mindanao Region 9 Zamboanga Del Norte 3rd Kalawit Abaca Fiber Production and Marketing Enterprise Upgrading / Expansion Micro Enterprise Proponent Group 1 1,774,560.00 0.00 591,520.00 591,520.00 2,957,600.00 1 35 0 35 Completed (100%) 100% physical progress
603 PRDP-IR-R009-ZDN-006-KAL-001-2018 Mindanao Region 9 Zamboanga Del Norte 3rd Kalawit Swine Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,355,778.00 0.00 451,926.00 451,926.00 2,259,630.00 1 4 24 28 Completed (100%) 100% physical progress
604 PRDP-IR-R009-ZDN-005-000-000-2018 Mindanao Region 9 Zamboanga Del Norte 3rd Salug Swine Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,342,578.00 0.00 447,526.00 447,526.00 2,237,630.00 1 11 14 25 Completed (100%) 100% physical progress
605 PRDP-IR-R009-ZDS-002-DUM-001-2017 Mindanao Region 9 Zamboanga Del Sur 2nd Dumalinao Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,652,734.80 0.00 550,911.60 550,911.60 2,754,558.00 1 0 103 103 Completed (100%) 100% physical progress
606 PRDP-IR-R009-ZDS-003-DIM-001-2017 Mindanao Region 9 Zamboanga Del Sur 2nd Dimataling Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,493,116.80 0.00 497,705.60 497,705.60 2,488,528.00 1 0 106 106 Completed (100%) 100% physical progress
607 PRDP-IR-R009-ZDS-004-PIT-001-2017 Mindanao Region 9 Zamboanga Del Sur 2nd Pitogo Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 664,834.80 0.00 221,611.60 221,611.60 1,108,058.00 1 31 12 43 Completed (100%) 100% physical progress
608 PRDP-IR-R009-ZDN-007-000-000-2019 Mindanao Region 9 Zamboanga Del Norte 2nd Sindangan Cacao Primary Processing and Trading Start-up Small Enterprise Proponent Groups 3 8,993,641.80 0.00 2,997,880.60 2,997,880.60 14,989,403.00 3 110 76 186 Completed (100%) 101% physical progress
609 PRDP-IR-R009-ZDS-005-ZAM-001-2019 Mindanao Region 9 Zamboanga Del Sur 1st Zamboanga City Seaweeds Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 2,698,804.20 0.00 899,601.40 899,601.40 4,498,007.00 1 40 30 70 Completed (100%) 100% physical progress
610 PRDP-IR-R009-ZDN-001-000-000-2015 Mindanao Region 9 Zamboanga Del Norte 2nd Sindangan Cacao Production and Marketing Enterprise Package 1: Input Provision and Cacao Production Start-up Medium Enterprise Proponent Groups 3 8,037,928.20 0.00 2,679,309.40 2,679,309.40 13,396,547.00 3 148 105 253 Completed (100%) 154% physical progress
611 PRDP-IR-R009-ZDS-001-000-000-2017 Mindanao Region 9 Zamboanga Del Sur 1st Labangan Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 571,624.80 0.00 190,541.60 190,541.60 952,708.00 1 37 3 40 Completed (100%) 100% physical progress
612 PRDP-IR-R009-ZDN-008-000-000-2019 Mindanao Region 9 Zamboanga Del Norte 3rd Siocon Abaca Production, Processing and Marketing Start-up Small Enterprise Proponent Group 1 3,756,417.00 0.00 1,252,139.00 1,252,139.00 6,260,695.00 1 32 18 50 Completed (100%) 100% physical progress
613 PRDP-IR-R009-ZDN-002-000-000-2017 Mindanao Region 9 Zamboanga Del Norte 2nd Siayan Swine Production and Marketing Enterprise Start-up Small Enterprise Proponent Groups 5 2,860,501.80 0.00 953,500.60 953,500.60 4,767,503.00 5 26 29 55 Completed (100%) 100% physical progress
614 PRDP-IR-R009-ZDS-010-000-000-2022 Mindanao Region 9 Zamboanga Del Sur 2nd Dimataling Fresh Banana Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,398,600.00 0.00 1,466,200.00 1,466,200.00 7,331,000.00 1 0 410 410 Completed (100%) 100% physical progress
615 PRDP-IR-R009-ZDS-007-DUM-006-2022 Mindanao Region 9 Zamboanga Del Sur 2nd Dumalinao Consolidation and Trading for Raw Dried Seaweeds Upgrading / Expansion Small Enterprise Proponent Group 1 3,195,000.00 0.00 1,065,000.00 1,065,000.00 5,325,000.00 1 0 193 193 Completed (100%) 100% physical progress
616 PRDP-IR-R009-ZAS-002-000-000-2022 Mindanao Region 9 Zamboanga Sibugay 1st Payao Cacao Wet Beans Consolidation and Trading Upgrading / Expansion Micro Enterprise Proponent Group 1 1,630,969.76 0.00 543,656.59 543,656.59 2,718,282.94 1 57 63 120 Fifty percent and above progress 92.34% physical progress
617 PRDP-IR-R009-ZDS-008-000-000-2022 Mindanao Region 9 Zamboanga Del Sur 2nd Vincenzo A. Sagun Copra Consolidation and Trading Start-up Small Enterprise Proponent Group 1 7,488,128.48 0.00 2,496,042.83 2,496,042.83 12,480,214.14 1 22 42 64 Fifty percent and above progress 93.82% physical progress
618 PRDP-IR-R009-ZDS-009-ZAM-002-2022 Mindanao Region 9 Zamboanga Del Sur 1st Zamboanga City Cassava Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,034,996.81 0.00 1,344,998.94 1,344,998.94 6,724,994.69 1 6 80 86 Fifty percent and above progress 53.98% physical progress
619 PRDP-IR-R009-ZAS-003-MAB-003-2023 Mindanao Region 9 Zamboanga Sibugay 1st Mabuhay Consolidation and Trading of RDS with Drying Support Services Start-up Small Enterprise Proponent Groups 7 7,020,174.98 0.00 2,340,058.33 2,340,058.33 11,700,291.64 7 85 116 201 With NOL 1 -
620 PRDP-IR-R009-ZAS-004-TAL-004-2023 Mindanao Region 9 Zamboanga Sibugay 1st Talusan Integrated Cococoir Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,935,853.25 0.00 1,645,284.42 1,645,284.42 8,226,422.09 1 28 43 71 With NOL 1 For Procurement
621 PRDP-IR-R009-ZDS-002-000-000-2021 Mindanao Region 9 Zamboanga Del Sur 2nd Dinas Integrated Coco-Coir Processing and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Groups 2 9,618,251.40 0.00 3,206,083.80 3,206,083.80 16,030,419.00 2 144 117 261 Fifty percent and above progress 98.42% physical progress
622 PRDP-IR-R009-ZAS-001-000-000-2021 Mindanao Region 9 Zamboanga Sibugay 2nd Kabasalan Abaca Trading With Support Services To Processing Upgrading / Expansion Small Enterprise Proponent Group 1 7,106,125.98 0.00 2,368,708.66 2,368,708.66 11,843,543.30 1 10 51 61 Fifty percent and above progress 55.97% physical progress
623 PRDP-IR-R010-BUK-003-000-000-2016 Mindanao Region 10 Bukidnon 2nd Lantapan Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 83 33 116 Completed (100%) 100% physical progress
624 PRDP-IR-R010-BUK-005-000-000-2016 Mindanao Region 10 Bukidnon 3rd Quezon Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 75 30 105 Completed (100%) 100% physical progress
625 PRDP-IR-R010-BUK-009-000-000-2016 Mindanao Region 10 Bukidnon 2nd Cabanglasan Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 74 11 85 Completed (100%) 100% physical progress
626 PRDP-IR-R010-BUK-013-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 108 27 135 Completed (100%) 100% physical progress
627 PRDP-IR-R010-BUK-014-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 51 25 76 Completed (100%) 100% physical progress
628 PRDP-IR-R010-BUK-016-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 190 77 267 Completed (100%) 100% physical progress
629 PRDP-IR-R010-BUK-017-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support of Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 50 42 92 Completed (100%) 100% physical progress
630 PRDP-IR-R010-BUK-018-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 154 26 180 Completed (100%) 100% physical progress
631 PRDP-IR-R010-BUK-019-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 75 25 100 Completed (100%) 100% physical progress
632 PRDP-IR-R010-BUK-021-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 50 42 92 Completed (100%) 100% physical progress
633 PRDP-IR-R010-BUK-022-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 56 20 76 Completed (100%) 100% physical progress
634 PRDP-IR-R010-BUK-027-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 100 23 123 Completed (100%) 100% physical progress
635 PRDP-IR-R010-BUK-031-000-000-2016 Mindanao Region 10 Bukidnon 4th Kalilangan Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 117 33 150 Completed (100%) 100% physical progress
636 PRDP-IR-R010-BUK-033-000-000-2016 Mindanao Region 10 Bukidnon 3rd Quezon Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 161 26 187 Completed (100%) 100% physical progress
637 PRDP-IR-R010-BUK-040-000-000-2016 Mindanao Region 10 Bukidnon 4th Kalilangan Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 63 37 100 Completed (100%) 100% physical progress
638 PRDP-IR-R010-BUK-058-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 75 27 102 Completed (100%) 100% physical progress
639 PRDP-IR-R010-BUK-063-000-000-2016 Mindanao Region 10 Bukidnon 3rd Maramag Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 106 66 172 Completed (100%) 100% physical progress
640 PRDP-IR-R010-BUK-076-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 172 44 216 Completed (100%) 100% physical progress
641 PRDP-IR-R010-BUK-078-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 60 28 88 Completed (100%) 100% physical progress
642 PRDP-IR-R010-BUK-079-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 82 33 115 Completed (100%) 100% physical progress
643 PRDP-IR-R010-BUK-082-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 94 22 116 Completed (100%) 100% physical progress
644 PRDP-IR-R010-BUK-084-000-000-2016 Mindanao Region 10 Bukidnon 2nd Malaybalay City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 82 12 94 Completed (100%) 100% physical progress
645 PRDP-IR-R010-BUK-089-000-000-2016 Mindanao Region 10 Bukidnon 2nd Malaybalay City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 46 35 81 Completed (100%) 100% physical progress
646 PRDP-IR-R010-BUK-090-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 85 16 101 Completed (100%) 100% physical progress
647 PRDP-IR-R010-BUK-092-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 78 11 89 Completed (100%) 100% physical progress
648 PRDP-IR-R010-BUK-093-000-000-2016 Mindanao Region 10 Bukidnon 2nd Malaybalay City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 158 53 211 Completed (100%) 100% physical progress
649 PRDP-IR-R010-BUK-095-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 109 50 159 Completed (100%) 100% physical progress
650 PRDP-IR-R010-BUK-099-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 75 22 97 Completed (100%) 100% physical progress
651 PRDP-IR-R010-BUK-055-000-000-2016 Mindanao Region 10 Bukidnon 4th Valencia City Farm Mechanization in Support to Rice Production Restoration / Rehabilitation Micro Enterprise Proponent Group 1 600,000.00 0.00 200,000.00 200,000.00 1,000,000.00 1 183 60 243 Completed (100%) 100% physical progress
652 PRDP-IR-R010-BUK-033-000-000-2019 Mindanao Region 10 Bukidnon 2nd Lantapan Fermented Dried Cacao Beans Processing & Marketing Start-up Micro Enterprise Proponent Group 1 1,284,384.74 0.00 428,128.25 428,128.25 2,140,641.24 1 18 20 38 Completed (100%) 100% physical progress
653 PRDP-IR-R010-LDN-001-000-000-2014 Mindanao Region 10 Lanao Del Norte 1st Tubod Integrated Coconut-Based Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 4,607,476.66 0.00 1,535,825.55 1,535,825.55 7,679,127.76 1 1,110 948 2,058 Completed (100%) 107% physical progress
654 PRDP-IR-R010-LDN-002-000-000-2016 Mindanao Region 10 Lanao Del Norte 1st Kolambugan Seaweeds Semi-Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 4,328,334.44 0.00 1,442,778.15 1,442,778.15 7,213,890.74 1 73 116 189 Completed (100%) 100% physical progress
655 PRDP-IR-R010-LDN-005-000-000-2019 Mindanao Region 10 Lanao Del Norte 1st Tubod Banana Cardava Trading & Banana Flour Processing & Marketing Upgrading / Expansion Micro Enterprise Proponent Group 1 1,689,853.36 0.00 563,284.45 563,284.45 2,816,422.26 1 36 74 110 Completed (100%) 100% physical progress
656 PRDP-IR-R010-MOC-002-000-000-2017 Mindanao Region 10 Misamis Occidental 1st Plaridel Cacao Processing and Marketing Start-up Micro Enterprise Proponent Group 1 1,671,490.69 0.00 557,163.56 557,163.56 2,785,817.81 1 24 21 45 Completed (100%) 100% physical progress
657 PRDP-IR-R010-MOR-001-GIN-001-2016 Mindanao Region 10 Misamis Oriental 1st Gingoog City Coconut Sugar Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 1,981,651.83 0.00 660,550.61 660,550.61 3,302,753.05 1 203 217 420 Completed (100%) 100% physical progress
658 PRDP-IR-R010-BUK-002-000-000-2016 Mindanao Region 10 Bukidnon 3rd Maramag Coffee Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 4,994,696.35 0.00 1,664,898.78 1,664,898.78 8,324,493.91 1 0 442 442 Completed (100%) 100% physical progress
659 PRDP-IR-R010-MOR-002-000-000-2017 Mindanao Region 10 Misamis Oriental 2nd El Salvador City Dairy Milk Processing and Marketing Enterprise Upgrading / Expansion Medium Enterprise Proponent Group 1 10,346,511.07 0.00 3,448,837.02 3,448,837.02 17,244,185.11 1 2,525 1,572 4,097 Completed (100%) 100% physical progress
660 PRDP-IR-R010-LDN-003-ILI-001-2018 Mindanao Region 10 Lanao Del Norte Lone Iligan City Abaca Fiber Consolidation, Processing and Marketing Upgrading / Expansion Micro Enterprise Proponent Group 1 1,758,973.11 0.00 586,324.37 586,324.37 2,931,621.85 1 42 8 50 Completed (100%) 100% physical progress
661 PRDP-IR-R010-LDN-008-000-000-2021 Mindanao Region 10 Lanao Del Norte 2nd Munai Abaca Fiber Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 4,103,026.91 0.00 1,367,675.64 1,367,675.64 6,838,378.19 1 46 94 140 Completed (100%) 100% physical progress
662 PRDP-IR-R010-MOC-002-000-000-2019 Mindanao Region 10 Misamis Occidental 2nd Tudela Abaca Fiber Processing & Marketing Upgrading / Expansion Micro Enterprise Proponent Group 1 1,797,920.40 0.00 599,306.80 599,306.80 2,996,534.00 1 30 26 56 Completed (100%) 100% physical progress
663 PRDP-IR-R010-BUK-001-000-000-2016 Mindanao Region 10 Bukidnon 3rd Kadingilan Cacao Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 5,234,361.60 0.00 1,744,787.20 1,744,787.20 8,723,936.00 1 46 19 65 Completed (100%) 100% physical progress
664 PRDP-IR-R010-LDN-007-000-000-2022 Mindanao Region 10 Lanao Del Norte 1st Tubod Coconut Sugar Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 7,768,260.00 0.00 2,589,420.00 2,589,420.00 12,947,100.00 1 130 227 357 With NOL 1 For Procurement
665 PRDP-IR-R010-MOR-003-MAG-001-2022 Mindanao Region 10 Misamis Oriental 1st Magsaysay Coconut Sauce Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 11,260,800.00 0.00 3,753,600.00 3,753,600.00 18,768,000.00 1 159 84 243 With NOL 1 For Procurement
666 PRDP-IR-R010-BUK-036-000-000-2022 Mindanao Region 10 Bukidnon 3rd Damulog Crumb Rubber Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 38,581,320.00 0.00 12,860,440.00 12,860,440.00 64,302,200.00 1 102 22 124 With NOL 1 For Procurement
667 PRDP-IR-R010-BUK-035-000-000-2022 Mindanao Region 10 Bukidnon 4th Pangantucan Green Coffee Beans Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 15,486,660.00 0.00 5,162,220.00 5,162,220.00 25,811,100.00 1 258 264 522 With NOL 1 For Procurement
668 PRDP-IR-R010-LDN-006-ILI-003-2021 Mindanao Region 10 Lanao Del Norte Lone Iligan City Abaca Fiber Processing and Marketing Start-up Small Enterprise Proponent Group 1 4,499,092.20 0.00 1,499,697.40 1,499,697.40 7,498,487.00 1 88 68 156 Less than fifty percent progress 43.52% physical progress
669 PRDP-IR-R011-CVP-003-000-000-2016 Mindanao Region 11 Compostela Valley 1st New Bataan Enhancement of Cardava Banana Consolidation and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 2,345,103.72 0.00 781,701.24 781,701.24 3,908,506.20 1 26 45 71 Completed (100%) 103% physical progress
670 PRDP-IR-R011-CVP-002-000-000-2016 Mindanao Region 11 Compostela Valley 1st Monkayo Village Level Rubber Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 2,440,231.91 0.00 813,410.64 813,410.64 4,067,053.19 1 111 14 125 Completed (100%) 101% physical progress
671 PRDP-IR-R011-CVP-004-000-000-2019 Mindanao Region 11 Compostela Valley 2nd Nabunturan Cow's Milk Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 8,990,755.35 0.00 2,996,918.45 2,996,918.45 14,984,592.25 1 599 697 1,296 Completed (100%) 127% physical progress
672 PRDP-IR-R011-CVP-005-000-000-2019 Mindanao Region 11 Compostela Valley 2nd Pantukan Enhancement of Virgin Coconut Oil (VCO) and By-Product Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 5,220,494.90 0.00 1,740,164.97 1,740,164.97 8,700,824.84 1 47 42 89 Completed (100%) 100% physical progress
673 PRDP-IR-R011-DDN-001-000-000-2015 Mindanao Region 11 Davao Del Norte 1st Kapalong Cacao Production and Beans Marketing Start-up Medium Enterprise Proponent Groups 11 8,554,620.00 0.00 2,851,540.00 2,851,540.00 14,257,700.00 11 761 194 955 Completed (100%) 100% physical progress
674 PRDP-IR-R011-DDS-001-DAV-001-2015 Mindanao Region 11 Davao Del Sur 1st Davao City Cacao Production and Marketing of Dry-Fermented Beans Upgrading / Expansion Small Enterprise Proponent Groups 17 5,429,533.94 0.00 1,809,844.65 1,809,844.65 9,049,223.24 17 236 135 371 Completed (100%) 100% physical progress
675 PRDP-IR-R011-DDS-003-000-000-2017 Mindanao Region 11 Davao Del Sur 1st Padada Organic Fairtrade Banana Chips Processing Start-up Small Enterprise Proponent Group 1 6,626,445.45 0.00 2,208,815.15 2,208,815.15 11,044,075.75 1 89 78 167 Completed (100%) 104% physical progress
676 PRDP-IR-R011-DDS-004-MAG-001-2018 Mindanao Region 11 Davao Del Sur 1st Magsaysay Cardava Banana Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 4,742,854.41 0.00 1,580,951.47 1,580,951.47 7,904,757.35 1 113 67 180 Completed (100%) 115% physical progress
677 PRDP-IR-R011-DOC-001-000-000-2019 Mindanao Region 11 Davao Occidental Lone Santa Maria Dried Fermented Beans (Cacao) Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 4,833,904.80 0.00 1,611,301.60 1,611,301.60 8,056,508.00 1 82 16 98 Completed (100%) 103% physical progress
678 PRDP-IR-R011-DOR-003-000-000-2018 Mindanao Region 11 Davao Oriental 2nd San Isidro Enhancement of Tablea Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 4,332,164.11 0.00 1,444,054.70 1,444,054.70 7,220,273.51 1 105 36 141 Completed (100%) 125% physical progress
679 PRDP-IR-R011-DOR-004-MAT-001-2018 Mindanao Region 11 Davao Oriental 2nd Mati City Fresh Green Cardava Trading Enterprise Start-up Small Enterprise Proponent Group 1 1,963,894.20 0.00 654,631.40 654,631.40 3,273,157.00 1 56 100 156 Completed (100%) 104% physical progress
680 PRDP-IR-R011-DDN-006-000-000-2019 Mindanao Region 11 Davao Del Norte 2nd Panabo City Chocolate Processing Upgrading / Expansion Medium Enterprise Proponent Group 1 9,597,883.80 0.00 3,199,294.60 3,199,294.60 15,996,473.00 1 90 60 150 Completed (100%) 126% physical progress
681 PRDP-IR-R011-DOR-002-000-000-2017 Mindanao Region 11 Davao Oriental 2nd San Isidro Fermented Cacao Beans Marketing Enterprise Start-up Small Enterprise Proponent Groups 7 6,962,644.34 0.00 2,320,881.45 2,320,881.45 11,604,407.24 7 592 405 997 Completed (100%) 178% physical progress
682 PRDP-IR-R011-DDS-007-000-000-2019 Mindanao Region 11 Davao Del Sur 2nd Kiblawan Dried Fermented Cacao Beans Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 6,260,709.08 0.00 2,086,903.03 2,086,903.03 10,434,515.14 1 81 76 157 Completed (100%) 100% physical progress
683 PRDP-IR-R011-DDS-007-DAV-004-2018 Mindanao Region 11 Davao Del Sur 1st Davao City Tablea Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 3,202,864.47 0.00 1,067,621.49 1,067,621.49 5,338,107.45 1 171 36 207 Completed (100%) 237% physical progress
684 PRDP-IR-R011-CVP-007-000-000-2021 Mindanao Region 11 Compostela Valley 1st Monkayo Cardava Banana Consolidation and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 1,807,800.00 0.00 602,600.00 602,600.00 3,013,000.00 1 53 9 62 Completed (100%) 100% physical progress
685 PRDP-IR-R011-DDS-014-MAG-002-2022 Mindanao Region 11 Davao Del Sur 1st Magsaysay WholeNut Trading and Husk Processing Upgrading / Expansion Small Enterprise Proponent Group 1 7,139,947.61 0.00 2,379,982.54 2,379,982.54 11,899,912.69 1 223 121 344 Completed (100%) 100% physical progress
686 PRDP-IR-R011-CVP-006-000-000-2021 Mindanao Region 11 Compostela Valley 1st Maragusan Enhancement of Tablea Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 3,193,200.00 0.00 1,064,400.00 1,064,400.00 5,322,000.00 1 102 44 146 Completed (100%) 100% physical progress
687 PRDP-IR-R011-DDN-003-000-000-2019 Mindanao Region 11 Davao Del Norte 1st Kapalong Banana Cardava Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 1,937,312.40 0.00 645,770.80 645,770.80 3,228,854.00 1 739 1,569 2,308 Completed (100%) 100% physical progress
688 PRDP-IR-R011-DDS-012-000-000-2022 Mindanao Region 11 Davao Del Sur 2nd Kiblawan Fresh Mango Consolidation and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 5,040,000.00 0.00 1,680,000.00 1,680,000.00 8,400,000.00 1 0 0 0 Business Plan Preparation Business Plan Under Technical Review by the PSO
689 PRDP-IR-R011-CVP-001-000-000-2015 Mindanao Region 11 Compostela Valley 1st Maragusan Tablea Processing and Marketing Enterprise Upgrading / Expansion Micro Enterprise Proponent Group 1 1,013,908.99 0.00 337,969.66 337,969.66 1,689,848.31 1 44 26 70 Completed (100%) 100% physical progress
690 PRDP-IR-R011-DDS-005-DAV-002-2018 Mindanao Region 11 Davao Del Sur 1st Davao City Abaca Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 6,489,532.31 0.00 2,163,177.44 2,163,177.44 10,815,887.19 1 64 27 91 Completed (100%) 100% physical progress
691 PRDP-IR-R011-DDS-006-DAV-003-2018 Mindanao Region 11 Davao Del Sur 1st Davao City Chocolate Processing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 6,284,731.35 0.00 2,094,910.45 2,094,910.45 10,474,552.25 1 125 53 178 Completed (100%) 100% physical progress
692 PRDP-IR-R011-DDS-009-000-000-2022 Mindanao Region 11 Davao Del Sur 1st Bansalan Rubber Cup Lump Consolidation and Marketing Enterprise Upgrading / Expansion Micro Enterprise Proponent Group 1 1,434,387.90 0.00 478,129.30 478,129.30 2,390,646.50 1 63 44 107 Completed (100%) 183% physical progress
693 PRDP-IR-R011-CVP-008-000-000-2022 Mindanao Region 11 Compostela Valley 2nd Mabini Abaca Fiber Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 3,427,392.22 0.00 1,142,464.07 1,142,464.07 5,712,320.36 1 40 15 55 Completed (100%) 100% physical progress
694 PRDP-IR-R011-DDS-013-000-000-2022 Mindanao Region 11 Davao Del Sur 2nd Malalag Dried Fermented Cacao Beans Processing and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 2,979,245.18 0.00 993,081.73 993,081.73 4,965,408.64 1 50 28 78 Completed (100%) 107% physical progress
695 PRDP-IR-R011-DDS-010-000-000-2022 Mindanao Region 11 Davao Del Sur 1st Santa Cruz Green Coffee Beans Processing and Marketing Enterprise Upgrading / Expansion Small Enterprise Proponent Group 1 8,815,348.49 0.00 2,938,449.50 2,938,449.50 14,692,247.49 1 48 55 103 Completed (100%) 103% physical progress
696 PRDP-IR-R011-CVP-009-000-000-2022 Mindanao Region 11 Compostela Valley 1st Maragusan Establishment of Banana Tissue Culture Laboratory and Nursery Upgrading / Expansion Medium Enterprise Proponent Group 1 9,788,787.86 0.00 3,262,929.29 3,262,929.29 16,314,646.44 1 5,699 3,027 8,726 Fifty percent and above progress 73.13% physical progress
697 PRDP-IR-R012-NCO-002-TUL-001-2016 Mindanao Region 12 North Cotabato 3rd Tulunan Organic Palay Production Expansion, Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 4,416,600.00 0.00 1,472,200.00 1,472,200.00 7,361,000.00 1 110 44 154 Completed (100%) 100% physical progress
698 PRDP-IR-R012-NCO-003-MID-001-2017 Mindanao Region 12 North Cotabato 1st Midsayap Production, Processing and Marketing of Organic Palay Start-up Small Enterprise Proponent Group 1 2,507,939.58 0.00 835,979.86 835,979.86 4,179,899.30 1 15 10 25 Completed (100%) 100% physical progress
699 PRDP-IR-R012-NCO-004-KID-001-2017 Mindanao Region 12 North Cotabato 2nd Kidapawan City Enhancement Consolidation and Marketing of Fresh Lakatan Bananas Upgrading / Expansion Small Enterprise Proponent Group 1 4,392,360.00 0.00 1,464,120.00 1,464,120.00 7,320,600.00 1 29 49 78 Completed (100%) 100% physical progress
700 PRDP-IR-R012-NCO-007-PIG-001-2019 Mindanao Region 12 North Cotabato 1st Pigkawayan Consolidation, Processing and Marketing of Copra Start-up Small Enterprise Proponent Group 1 2,396,766.88 0.00 798,922.29 798,922.29 3,994,611.46 1 24 13 37 Completed (100%) 100% physical progress
701 PRDP-IR-R012-SAR-002-000-000-2015 Mindanao Region 12 Sarangani Lone Kiamba Enhancement of Production, Processing and Marketing to High Quality Abaca Fiber Upgrading / Expansion Medium Enterprise Proponent Groups 6 11,190,777.00 0.00 3,730,259.00 3,730,259.00 18,651,295.00 6 316 54 370 Completed (100%) 100% physical progress
702 PRDP-IR-R012-SOC-002-000-000-2015 Mindanao Region 12 South Cotabato 1st Tupi Enhancement of Production and Marketing of Dried Green Coffee Beans Upgrading / Expansion Medium Enterprise Proponent Groups 6 4,145,919.00 0.00 1,381,973.00 1,381,973.00 6,909,865.00 6 84 16 100 Completed (100%) 104% physical progress
703 PRDP-IR-R012-SOC-001-000-000-2014 Mindanao Region 12 South Cotabato 1st Polomolok Production of Cassava Granules and Marketing Upgrading / Expansion Medium Enterprise Proponent Groups 5 16,857,000.00 0.00 5,619,000.00 5,619,000.00 28,095,000.00 5 157 93 250 Completed (100%) 105% physical progress
704 PRDP-IR-R012-SOC-005-GEN-001-2016 Mindanao Region 12 South Cotabato 1st General Santos City Consolidation, Processing and Marketing of Coco Nuts Start-up Small Enterprise Proponent Group 1 2,340,000.00 0.00 780,000.00 780,000.00 3,900,000.00 1 191 273 464 Completed (100%) 103% physical progress
705 PRDP-IR-R012-SOC-006-GEN-002-2016 Mindanao Region 12 South Cotabato 1st General Santos City Processing and Marketing of Coco Syrup Upgrading / Expansion Micro Enterprise Proponent Group 1 1,632,571.20 0.00 544,190.40 544,190.40 2,720,952.00 1 28 56 84 Completed (100%) 100% physical progress
706 PRDP-IR-R012-SOC-007-000-000-2018 Mindanao Region 12 South Cotabato 1st Polomolok Dairy Production, Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 20,276,229.05 0.00 6,758,743.02 6,758,743.02 33,793,715.09 1 365 378 743 Completed (100%) 100% physical progress
707 PRDP-IR-R012-SUK-001-000-000-2015 Mindanao Region 12 Sultan Kudarat 2nd Bagumbayan Production and Marketing of Green Coffee Beans Upgrading / Expansion Small Enterprise Proponent Group 1 6,193,504.01 0.00 2,064,501.34 2,064,501.34 10,322,506.69 1 96 104 200 Completed (100%) 103% physical progress
708 PRDP-IR-R012-SOC-003-000-000-2016 Mindanao Region 12 South Cotabato 1st Polomolok Integrated Cacao Production, Processing and Marketing of Fermented Cacao Beans Start-up Small Enterprise Proponent Groups 6 6,969,336.30 0.00 2,323,112.10 2,323,112.10 11,615,560.50 6 124 75 199 Completed (100%) 100% physical progress
709 PRDP-IR-R012-NCO-005-ANT-001-2018 Mindanao Region 12 North Cotabato 2nd Antipas Dried Cacao Beans Production and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 7,237,770.00 0.00 2,412,590.00 2,412,590.00 12,062,950.00 1 128 226 354 Completed (100%) 100% physical progress
710 PRDP-IR-R012-NCO-001-000-000-2014 Mindanao Region 12 North Cotabato 1st Aleosan Rubber Sheet Processing and Marketing Start-up Small Enterprise Proponent Groups 5 2,985,000.00 0.00 995,000.00 995,000.00 4,975,000.00 5 232 59 291 Completed (100%) 100% physical progress
711 PRDP-IR-R012-NCO-008-MAK-001-2020 Mindanao Region 12 North Cotabato 2nd Makilala Whole Nut and Copra Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 2,771,112.31 0.00 923,704.10 923,704.10 4,618,520.51 1 11 27 38 Completed (100%) 100% physical progress
712 PRDP-IR-R012-SAR-004-000-000-2018 Mindanao Region 12 Sarangani Lone Malungon Consolidation, Trading and Marketing of Whole Coconuts Upgrading / Expansion Medium Enterprise Proponent Group 1 10,947,000.00 0.00 3,649,000.00 3,649,000.00 18,245,000.00 1 111 61 172 Completed (100%) 100% physical progress
713 PRDP-IR-R012-NCO-010-000-000-2021 Mindanao Region 12 North Cotabato 2nd President Roxas Whole Nuts Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 8,588,400.00 0.00 2,862,800.00 2,862,800.00 14,314,000.00 1 47 89 136 Completed (100%) 100% physical progress
714 PRDP-IR-R012-NCO-006-MLA-001-2018 Mindanao Region 12 North Cotabato 3rd M'lang Expansion of Rubber Production, Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 36,057,000.00 0.00 12,019,000.00 12,019,000.00 60,095,000.00 1 310 130 440 Less than fifty percent progress Implementation (Construction)
715 PRDP-IR-R012-SAR-001-000-000-2014 Mindanao Region 12 Sarangani Lone Malapatan Sarangani Virgin Coconut Oil Processing Start-up Medium Enterprise Proponent Groups 7 11,148,000.00 0.00 3,716,000.00 3,716,000.00 18,580,000.00 7 442 374 816 Fifty percent and above progress 93.75% physical progress
716 PRDP-IR-R012-SAR-003-000-000-2017 Mindanao Region 12 Sarangani Lone Malungon Expansion of Cacao Production, Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 5,306,741.74 0.00 1,768,913.91 1,768,913.91 8,844,569.56 1 50 14 64 Fifty percent and above progress 78.13% physical progress
717 PRDP-IR-R012-NCO-011-MID-003-2021 Mindanao Region 12 North Cotabato 1st Midsayap Mango Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 17,460,400.00 0.00 5,820,133.33 5,820,133.33 29,100,666.66 1 22 15 37 Approved by RPAB Business Plan for Endorsement to PSO / NPCO for NOL 1
718 PRDP-IR-R012-NCO-009-MID-002-2020 Mindanao Region 12 North Cotabato 1st Midsayap Whole Nuts and Copra Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 7,115,662.42 0.00 2,371,887.47 2,371,887.47 11,859,437.36 1 94 74 168 Fifty percent and above progress 87.03% physical progress
719 PRDP-IR-R012-SUK-002-000-000-2022 Mindanao Region 12 Sultan Kudarat 2nd Lebak Green Coffee Beans Consolidation, Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 13,089,600.00 0.00 4,363,200.00 4,363,200.00 21,816,000.00 1 64 35 99 With NOL 1 For Procurement
720 PRDP-IR-R012-SUK-003-000-000-2022 Mindanao Region 12 Sultan Kudarat 2nd Kalamansig Coffee Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 2,851,200.00 0.00 950,400.00 950,400.00 4,752,000.00 1 12 13 25 With NOL 1 -
721 PRDP-IR-R012-SOC-008-GEN-003-2019 Mindanao Region 12 South Cotabato 1st General Santos City Production, Consolidation and Marketing of Fresh Mango Start-up Small Enterprise Proponent Group 1 8,999,500.80 0.00 2,999,833.60 2,999,833.60 14,999,168.00 1 54 17 71 Completed (100%) 100% physical progress
722 PRDP-IR-R012-NCO-013-000-000-2022 Mindanao Region 12 North Cotabato 2nd Kidapawan City Rubber Cuplumps Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 5,093,400.00 0.00 1,697,800.00 1,697,800.00 8,489,000.00 1 63 28 91 With NOL 1 -
723 PRDP-IR-R012-NCO-012-000-000-2022 Mindanao Region 12 North Cotabato 2nd Kidapawan City Rubber Cuplumps Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 4,763,400.00 0.00 1,587,800.00 1,587,800.00 7,939,000.00 1 39 40 79 With NOL 1 -
724 PRDP-IR-R013-ADN-001-000-000-2014 Mindanao Region 13 Agusan Del Norte 2nd Santiago Integrated Abaca Enhancement Enterprises for Agusan del Norte Upgrading / Expansion Medium Enterprise Proponent Groups 5 7,775,400.00 0.00 2,591,800.00 2,591,800.00 12,959,000.00 5 392 346 738 Completed (100%) 101% physical progress
725 PRDP-IR-R013-ADS-002-000-000-2016 Mindanao Region 13 Agusan Del Sur 2nd Veruela Banana Production and Trading Restoration / Rehabilitation Micro Enterprise Proponent Group 1 311,925.37 0.00 103,975.12 103,975.12 519,875.61 1 73 33 106 Completed (100%) 100% physical progress
726 PRDP-IR-R013-DII-005-000-000-2016 Mindanao Region 13 Dinagat Islands Lone Dinagat Cassava Granules Processing and Marketing Start-up Small Enterprise Proponent Groups 10 4,857,236.92 0.00 1,619,078.97 1,619,078.97 8,095,394.86 10 811 258 1,069 Completed (100%) 100% physical progress
727 PRDP-IR-R013-DII-002-000-000-2016 Mindanao Region 13 Dinagat Islands Lone Dinagat Input Provision/Support for Seaweeds Production, Processing and Marketing Start-up Small Enterprise Proponent Group 1 2,155,445.88 0.00 718,481.96 718,481.96 3,592,409.80 1 73 44 117 Completed (100%) 100% physical progress
728 PRDP-IR-R013-DII-004-000-000-2016 Mindanao Region 13 Dinagat Islands Lone Libjo Input Provision for Cardava Production and Cardava Marketing Start-up Small Enterprise Proponent Groups 3 1,885,680.00 0.00 628,560.00 628,560.00 3,142,800.00 3 43 54 97 Completed (100%) 100% physical progress
729 PRDP-IR-R013-SDN-001-000-000-2016 Mindanao Region 13 Surigao Del Norte 2nd Placer Banana Consolidation and Marketing Start-up Micro Enterprise Proponent Group 1 1,656,300.00 0.00 552,100.00 552,100.00 2,760,500.00 1 30 89 119 Completed (100%) 100% physical progress
730 PRDP-IR-R013-SDN-002-000-000-2016 Mindanao Region 13 Surigao Del Norte 2nd Claver Geonet Production and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 6,300,600.00 0.00 2,100,200.00 2,100,200.00 10,501,000.00 1 33 62 95 Completed (100%) 100% physical progress
731 PRDP-IR-R013-SDS-001-000-000-2016 Mindanao Region 13 Surigao Del Sur 1st Lianga Abaca Fiber Consolidation and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 2,309,997.13 0.00 769,999.04 769,999.04 3,849,995.21 1 31 12 43 Completed (100%) 113% physical progress
732 PRDP-IR-R013-SDS-002-000-000-2016 Mindanao Region 13 Surigao Del Sur 2nd Barobo Bangus Production and Marketing Upgrading / Expansion Micro Enterprise Proponent Group 1 698,481.33 0.00 232,827.11 232,827.11 1,164,135.55 1 25 22 47 Completed (100%) 107% physical progress
733 PRDP-IR-R013-ADN-007-000-000-2017 Mindanao Region 13 Agusan Del Norte 1st Las Nieves Green Coffee Beans Production and Marketing Start-up Small Enterprise Proponent Groups 8 8,829,391.23 0.00 2,943,130.41 2,943,130.41 14,715,652.05 8 461 275 736 Completed (100%) 100% physical progress
734 PRDP-IR-R013-SDS-007-000-000-2022 Mindanao Region 13 Surigao Del Sur 2nd Bislig City Tuna Consolidation, Marketing and Cold Chain Facilities Upgrading / Expansion Medium Enterprise Proponent Group 1 59,548,795.40 0.00 19,849,598.47 19,849,598.47 99,247,992.34 1 0 0 0 Business Plan Preparation Business Plan for Approval by the RPAB
735 PRDP-IR-R013-ADN-004-000-000-2021 Mindanao Region 13 Agusan Del Norte 2nd Nasipit Bangus Production and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 4,089,498.60 0.00 1,363,166.20 1,363,166.20 6,815,831.00 1 29 4 33 Completed (100%) 100% physical progress
736 PRDP-IR-R013-ADN-003-BUT-001-2015 Mindanao Region 13 Agusan Del Norte 1st Butuan City Integrated Rubber Production and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 10,466,294.35 0.00 3,488,764.78 3,488,764.78 17,443,823.91 1 115 43 158 Completed (100%) 102% physical progress
737 PRDP-IR-R013-ADS-004-000-000-2022 Mindanao Region 13 Agusan Del Sur 1st San Luis Abaca Fiber Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 1,825,504.80 0.00 608,501.60 608,501.60 3,042,508.00 1 27 20 47 Completed (100%) 102% physical progress
738 PRDP-IR-R013-ADS-003-000-000-2022 Mindanao Region 13 Agusan Del Sur 2nd Loreto Consolidation, Processing and Marketing of Naturally Grown Rice Upgrading / Expansion Medium Enterprise Proponent Group 1 9,913,534.00 0.00 3,304,511.33 3,304,511.33 16,522,556.66 1 41 13 54 With NOL 1 For Procurement
739 PRDP-IR-R013-SDS-005-000-000-2022 Mindanao Region 13 Surigao Del Sur 1st Lanuza Abaca Fiber Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 3,190,491.00 0.00 1,063,497.00 1,063,497.00 5,317,485.00 1 3 65 68 Fifty percent and above progress 91.97% physical progress
740 PRDP-IR-R013-SDS-005-000-000-2021 Mindanao Region 13 Surigao Del Sur 2nd Hinatuan Seaweeds Production and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 4,944,066.00 0.00 1,648,022.00 1,648,022.00 8,240,110.00 1 47 33 80 Completed (100%) 100% physical progress
741 PRDP-IR-R013-SDS-003-000-000-2018 Mindanao Region 13 Surigao Del Sur 1st Cantilan Bangus Production and Marketing Upgrading / Expansion Small Enterprise Proponent Groups 5 6,794,490.00 0.00 2,264,830.00 2,264,830.00 11,324,150.00 5 355 240 595 Completed (100%) 103% physical progress
742 PRDP-IR-R013-ADS-001-000-000-2015 Mindanao Region 13 Agusan Del Sur 1st Bayugan City Quality Raw Rubber Production, Processing and Marketing Upgrading / Expansion Medium Enterprise Proponent Group 1 5,634,000.00 0.00 1,878,000.00 1,878,000.00 9,390,000.00 1 109 71 180 Completed (100%) 100% physical progress
743 PRDP-IR-R013-SDS-006-000-000-2022 Mindanao Region 13 Surigao Del Sur 2nd Tagbina Consolidation and Processing of Green Coffee Beans Upgrading / Expansion Small Enterprise Proponent Groups 5 4,529,966.63 0.00 1,509,988.88 1,509,988.88 7,549,944.39 5 141 112 253 Fifty percent and above progress 98.23% physical progress
744 PRDP-IR-RARM-TAW-002-SOU-001-2017 Mindanao ARMM Tawi-tawi Lone South Ubian Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,529,591.54 0.00 509,863.85 509,863.85 2,549,319.24 1 37 3 40 Completed (100%) 100% physical progress
745 PRDP-IR-RARM-TAW-005-SIT-001-2017 Mindanao ARMM Tawi-tawi Lone Sitangkai Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,771,956.70 0.00 590,652.23 590,652.23 2,953,261.16 1 24 6 30 Completed (100%) 100% physical progress
746 PRDP-IR-RARM-MAG-004-000-000-2017 Mindanao ARMM Maguindanao 2nd Rajah Buayan Goat Multiplication, Fattening and Marketing Start-up Micro Enterprise Proponent Group 1 1,340,370.00 0.00 446,790.00 446,790.00 2,233,950.00 1 25 0 25 Completed (100%) 105% physical progress
747 PRDP-IR-RARM-MAG-005-000-000-2017 Mindanao ARMM Maguindanao 2nd Sultan Sa Barongis Goat Multiplication, Fattening and Marketing Start-up Micro Enterprise Proponent Group 1 1,340,370.00 0.00 446,790.00 446,790.00 2,233,950.00 1 21 4 25 Completed (100%) 100% physical progress
748 PRDP-IR-RARM-TAW-004-SIB-001-2017 Mindanao ARMM Tawi-tawi Lone Sibutu Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,152,878.66 0.00 384,292.89 384,292.89 1,921,464.44 1 24 6 30 Completed (100%) 105% physical progress
749 PRDP-IR-RARM-MAG-002-000-000-2017 Mindanao ARMM Maguindanao 2nd Mangudadatu Goat Multiplication, Fattening and Marketing Start-up Micro Enterprise Proponent Group 1 1,323,570.00 0.00 441,190.00 441,190.00 2,205,950.00 1 3 31 34 Completed (100%) 100% physical progress
750 PRDP-IR-RARM-MAG-001-000-000-2017 Mindanao ARMM Maguindanao 2nd Buluan Goat Multiplication, Fattening and Marketing Start-up Micro Enterprise Proponent Group 1 1,323,570.00 0.00 441,190.00 441,190.00 2,205,950.00 1 24 0 24 Completed (100%) 100% physical progress
751 PRDP-IR-RARM-TAW-001-PAN-001-2017 Mindanao ARMM Tawi-tawi Lone Panglima Sugala Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,306,478.66 0.00 435,492.89 435,492.89 2,177,464.44 1 19 11 30 Completed (100%) 100% physical progress
752 PRDP-IR-RARM-MAG-008-000-000-2020 Mindanao ARMM Maguindanao 2nd Guindulungan Goat Multiplication, Fattening and Marketing Start-up Small Enterprise Proponent Group 1 2,166,091.17 0.00 722,030.39 722,030.39 3,610,151.95 1 40 10 50 Less than fifty percent progress 41.92% physical progress
753 PRDP-IR-RARM-MAG-009-000-000-2020 Mindanao ARMM Maguindanao 2nd Datu Paglas Goat Multiplication, Fattening and Marketing Start-up Small Enterprise Proponent Group 1 2,166,091.17 0.00 722,030.39 722,030.39 3,610,151.95 1 25 0 25 Less than fifty percent progress 41.94% physical progress
754 PRDP-IR-RARM-TAW-010-SOU-003-2022 Mindanao ARMM Tawi-tawi Lone South Ubian Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,129,058.70 0.00 376,352.90 376,352.90 1,881,764.50 1 16 8 24 With NOL 1 For Procurement
755 PRDP-IR-RARM-TAW-003-TAN-001-2017 Mindanao ARMM Tawi-tawi Lone Tandubas Seaweeds Production and Marketing Enterprise Start-up Small Enterprise Proponent Group 1 1,529,591.54 0.00 509,863.85 509,863.85 2,549,319.24 1 22 18 40 Completed (100%) 100% physical progress
756 PRDP-IR-RARM-TAW-011-PAN-002-2022 Mindanao ARMM Tawi-tawi Lone Panglima Sugala Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,417,548.00 0.00 472,516.00 472,516.00 2,362,580.00 1 28 5 33 With NOL 1 For / On-going request funds from the LGU (by the PE)
757 PRDP-IR-RARM-TAW-008-TAN-004-2022 Mindanao ARMM Tawi-tawi Lone Tandubas Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,463,810.70 0.00 487,936.90 487,936.90 2,439,684.50 1 33 7 40 With NOL 1 For / On-going request funds from the LGU (by the PE)
758 PRDP-IR-RARM-MAG-007-000-000-2020 Mindanao ARMM Maguindanao 2nd Ampatuan Goat Multiplication, Fattening and Marketing Start-up Small Enterprise Proponent Group 1 2,166,091.17 0.00 722,030.39 722,030.39 3,610,151.95 1 39 11 50 Less than fifty percent progress 41.94% physical progress
759 PRDP-IR-RARM-TAW-006-TAN-002-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,125,230.70 0.00 375,076.90 375,076.90 1,875,384.50 1 25 0 25 With NOL 1 For / On-going request funds from the LGU (by the PE)
760 PRDP-IR-RARM-MAG-006-000-000-2020 Mindanao ARMM Maguindanao 2nd Gen. S. K. Pendatun Goat Multiplication, Fattening and Marketing Start-up Small Enterprise Proponent Group 1 2,166,091.17 0.00 722,030.39 722,030.39 3,610,151.95 1 18 7 25 Less than fifty percent progress 41.94% physical progress
761 PRDP-IR-RARM-TAW-009-SOU-002-2022 Mindanao ARMM Tawi-tawi Lone South Ubian Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,447,100.40 0.00 482,366.80 482,366.80 2,411,834.00 1 34 1 35 With NOL 1 For Procurement
762 PRDP-IR-RARM-MAG-010-000-000-2022 Mindanao ARMM Maguindanao 1st Datu Odin Sinsuat Goat Multiplication, Fattening and Marketing Start-up Small Enterprise Proponent Group 1 3,086,133.97 0.00 1,028,711.32 1,028,711.32 5,143,556.61 1 19 6 25 With NOL 1 For Procurement
763 PRDP-IR-RARM-LDS-001-000-000-2022 Mindanao ARMM Lanao Del Sur 1st Bumbaran Green Coffee Beans Consolidation, Processing and Marketing Start-up Small Enterprise Proponent Group 1 1,967,122.76 0.00 655,707.59 655,707.59 3,278,537.94 1 25 3 28 With NOL 1 For Procurement
764 PRDP-IR-RARM-SUL-001-000-000-2022 Mindanao ARMM Sulu 1st Patikul Powder Coffee Processing and Marketing Upgrading / Expansion Small Enterprise Proponent Group 1 1,850,877.20 0.00 616,959.07 616,959.07 3,084,795.34 1 18 32 50 With NOL 1 For Procurement
765 PRDP-IR-RARM-TAW-007-TAN-003-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Seaweeds Production and Marketing Enterprise Start-up Micro Enterprise Proponent Group 1 1,125,230.70 0.00 375,076.90 375,076.90 1,875,384.50 1 0 25 25 With NOL 1 -
766 PRDP-IR-RARM-MAG-003-000-000-2017 Mindanao ARMM Maguindanao 2nd Gen. S. K. Pendatun Goat Multiplication, Fattening and Marketing Start-up Micro Enterprise Proponent Group 1 1,340,370.00 0.00 446,790.00 446,790.00 2,233,950.00 1 25 0 25 Completed (100%) 100% physical progress
767 PRDP-IR-RARM-MAG-011-000-000-2022 Mindanao ARMM Maguindanao 2nd South Upi Coffee Processing and Marketing Start-up Small Enterprise Proponent Group 1 2,096,217.21 0.00 698,739.07 698,739.07 3,493,695.35 1 13 12 25 With NOL 1 For Procurement