Subproject Database as of December 17, 2024

Download CSV
Count No. ID Subproject Location Name of Subproject Type of Subproject Unit of Measurement Quantity (Unit) Cost in Pesos Beneficiaries Stage Status Contractor
Cluster Region Province District Municipality Loan Proceeds Government of the Philippines Local Goverment Unit Equity European Union Grant Total No. of Households Population
Male Female Total
1 PRDP-IB-RCAR-KAL-004-000-000-2015 Luzon A CAR Kalinga Lone Tabuk City Improvement of Bado Dangwa-Guilayon Farm to Market Road Farm to Market Road (FMR) Kilometer 10.410 184,520,410.40 23,065,051.30 23,065,051.30 0.00 230,650,513.00 1,015 2,650 2,446 5,096 Completed (100%) 100.00% physical progress as of Sep. 06, 2020 » VIEW S-CURVE Omengan Construction and Development Corporation & Royal Sea Bees Construction (JV)
2 PRDP-IB-RCAR-KAL-005-000-000-2015 Luzon A CAR Kalinga Lone Pinukpuk Improvement of Catabbogan-Wagud Farm to Market Road Farm to Market Road (FMR) Kilometer 13.500 173,820,771.70 21,727,596.46 21,727,596.46 0.00 217,275,964.62 1,631 4,432 4,230 8,662 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE Omengan Construction & Development Corporation
3 PRDP-IB-RCAR-BEN-001-000-000-2015 Luzon A CAR Benguet Lone Atok Improvement Along Jose-Mencio Farm to Market Road Farm to Market Road (FMR) Kilometer 11.910 161,869,447.94 20,233,680.99 20,233,680.99 0.00 202,336,809.92 2,561 6,117 5,672 11,789 Completed (100%) 100.00% physical progress as of Aug. 14, 2020 » VIEW S-CURVE NORTHERN BUILDERS/JOMARCANN GENERAL CONSTRUCTION (JOINT VENTURE)
4 PRDP-IB-RCAR-MOP-004-000-000-2015 Luzon A CAR Mountain Province Lone Bauko Mt. Province Arabica Coffee Enterprise-Civil Works Others Square Meter 526.000 6,017,500.11 752,187.51 752,187.51 0.00 7,521,875.13 2,803 1,177 1,626 2,803 Completed (100%) 100.00% physical progress as of Nov. 27, 2019 » VIEW S-CURVE DYANGGO CONSTRUCTION
5 PRDP-IB-RCAR-KAL-002-000-000-2014 Luzon A CAR Kalinga Lone Tabuk City Improvement of Bulanao - Amlao Farm to Market Road Farm to Market Road (FMR) Kilometer 15.800 170,440,912.15 21,305,114.02 21,305,114.02 0.00 213,051,140.19 1,225 3,296 3,120 6,416 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Omengan Construction and Development Corporation
6 PRDP-IB-RCAR-MOP-001-000-000-2014 Luzon A CAR Mountain Province Lone Besao Improvement of Besao-Nacawang and Tadian-Mabalite Farm to Market Road Farm to Market Road (FMR) Kilometer 13.630 155,833,309.85 19,479,163.73 19,479,163.73 0.00 194,791,637.31 4,270 10,972 10,542 21,514 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE Upland Construction and Engineering Services
7 PRDP-IB-RCAR-MOP-002-000-000-2014 Luzon A CAR Mountain Province Lone Bauko Improvement of Banata-Sumey-Ang-Sadsadan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.580 57,027,239.41 7,128,404.93 7,128,404.93 0.00 71,284,049.27 828 2,422 2,236 4,658 Completed (100%) 100.00% physical progress as of Oct. 19, 2021 » VIEW S-CURVE 3K ROCK ENGINEERING
8 PRDP-IB-RCAR-IFU-001-000-000-2015 Luzon A CAR Ifugao Lone Asipulo Improvement of Pula - Cawayan-Camandag Farm to Market Road with Bridge FMR with Bridge Kilometer 9.060 176,160,505.20 22,020,063.15 22,020,063.15 0.00 220,200,631.50 1,327 3,932 3,674 7,606 Less than fifty percent progress 24.18% physical progress as of Sep. 23, 2019 » VIEW S-CURVE LSD Construction and supplies
9 PRDP-IB-RCAR-BEN-002-000-000-2015 Luzon A CAR Benguet Lone Kabayan Improvement of KM 49 - Ambakian Farm to Market Road Farm to Market Road (FMR) Kilometer 10.790 220,064,060.27 27,508,007.53 27,508,007.53 0.00 275,080,075.33 1,263 3,194 3,158 6,352 Completed (100%) 99.99% physical progress as of Dec. 31, 2022 » VIEW S-CURVE 3K Rock Engineering
10 PRDP-IB-RCAR-KAL-011-000-000-2015 Luzon A CAR Kalinga Lone Tanudan Improvement of Banneng-Darulog-Bawac Farm to Market Road Farm to Market Road (FMR) Kilometer 6.160 116,845,672.88 14,605,709.11 14,605,709.11 0.00 146,057,091.10 497 1,502 1,369 2,871 Completed (100%) 99.98% physical progress as of Mar. 15, 2024 » VIEW S-CURVE Omengan Construction and Development Corporation
11 PRDP-IB-RCAR-KAL-001-000-000-2014 Luzon A CAR Kalinga Lone Tanudan Improvement of Banneng-Gombowoy Farm to Market Road Farm to Market Road (FMR) Kilometer 13.000 104,520,722.46 13,065,090.31 13,065,090.31 0.00 130,650,903.08 673 2,126 1,892 4,018 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE Royal Sea Bees Construction
12 PRDP-IB-RCAR-KAL-003-000-000-2015 Luzon A CAR Kalinga Lone Tanudan Establishment of Coffee Trading Post - Civil Works Others Square Meter 649.000 1,919,562.58 239,945.32 239,945.32 0.00 2,399,453.22 649 346 303 649 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE ROYAL SEA BEES CONSTRUCTION
13 PRDP-IB-RCAR-MOP-003-000-000-2014 Luzon A CAR Mountain Province Lone Paracelis Improvement of Poblacion-Bantay Farm to Market Road Farm to Market Road (FMR) Kilometer 3.200 32,861,558.62 4,107,694.83 4,107,694.83 0.00 41,076,948.28 2,845 7,255 6,972 14,227 Completed (100%) 100.00% physical progress as of Mar. 28, 2019 » VIEW S-CURVE Edison Development and Construction/Upland Construction and Engineering Services (JV)
14 PRDP-IB-RCAR-BEN-005-000-000-2015 Luzon A CAR Benguet Lone Kibungan Benguet Arabica Coffee Enterprise-Civil Works Others Square Meter 145.520 3,299,451.54 412,431.44 412,431.44 0.00 4,124,314.42 1,367 544 472 1,016 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ICO CONSTRUCTION AND SERVICES
15 PRDP-IB-RCAR-BEN-006-KAB-001-2016 Luzon A CAR Benguet Lone Kabayan Improvement of Balang-Bocao FMR with Vehicular Bridge FMR with Bridge Kilometer 2.340 73,205,530.90 9,150,691.36 9,150,691.36 0.00 91,506,913.62 175 435 417 852 Fifty percent and above progress 52.84% physical progress as of Nov. 15, 2024 » VIEW S-CURVE BALINTUGAN CONSTRUCTION
16 PRDP-IB-RCAR-APA-003-000-000-2016 Luzon A CAR Apayao Lone Pudtol Construction of Warehouse at Barangay Suan, Pudtol, Apayao Others Square Meter 720.000 8,697,285.44 1,087,160.68 1,087,160.68 0.00 10,871,606.80 1,137 6,878 6,427 13,305 Completed (100%) 100.00% physical progress as of Nov. 20, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
17 PRDP-IB-RCAR-APA-004-000-000-2016 Luzon A CAR Apayao Lone Kabugao Construction of Warehouse (Kalyat, Lenneng, Kabugao, Apayao) Others Square Meter 720.000 9,091,754.55 1,136,469.32 1,136,469.32 0.00 11,364,693.19 3,281 8,308 7,593 15,901 Completed (100%) 100.00% physical progress as of Nov. 20, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
18 PRDP-IB-RCAR-APA-006-000-000-2016 Luzon A CAR Apayao Lone Luna Construction of Warehouse (San Gregorio, Luna, Apayao) Others Square Meter 720.000 8,149,108.81 1,018,638.60 1,018,638.60 0.00 10,186,386.01 116 321 260 581 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
19 PRDP-IB-RCAR-APA-007-000-000-2016 Luzon A CAR Apayao Lone Santa Marcela Construction of Warehouse (Panay, Sta. Marcela, Apayao) Others Square Meter 720.000 8,594,280.13 1,074,285.02 1,074,285.02 0.00 10,742,850.17 763 6,070 5,940 12,010 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
20 PRDP-IB-RCAR-APA-008-000-000-2016 Luzon A CAR Apayao Lone Conner Construction of Warehouse at Barangay Calafug, Conner, Apayao Others Square Meter 720.000 7,883,121.83 985,390.23 985,390.23 0.00 9,853,902.29 5,193 13,621 11,928 25,549 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE CAMIA Construction Development Corporation
21 PRDP-IB-RCAR-BEN-013-LAT-001-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Puguis Others Square Meter 661.000 8,806,490.63 1,100,811.33 1,100,811.33 0.00 11,008,113.29 1,624 3,360 3,336 6,696 Completed (100%) 100.00% physical progress as of Jun. 29, 2020 » VIEW S-CURVE Kalahan General Construction and Supplies
22 PRDP-IB-RCAR-BEN-017-BOK-002-2018 Luzon A CAR Benguet Lone Bokod Construction of Wakal Tramline Others Square Meter 450.000 3,776,227.18 472,028.40 472,028.40 0.00 4,720,283.98 39 98 97 195 Completed (100%) 100.00% physical progress as of Aug. 04, 2019 » VIEW S-CURVE Summerlin Construction & Development Corporation
23 PRDP-IB-RCAR-IFU-019-BAN-010-2017 Luzon A CAR Ifugao Lone Banaue Construction of Dalipe Communal Irrigation System Communal Irrigation System (CIS) Hectare 10.600 6,041,540.59 755,192.57 755,192.57 0.00 7,551,925.73 29 97 81 178 Completed (100%) 100.00% physical progress as of Jun. 01, 2019 » VIEW S-CURVE Wangjo Construction
24 PRDP-IB-RCAR-BEN-016-BOK-001-2018 Luzon A CAR Benguet Lone Bokod Construction of Surek-Salat Tramline Others Square Meter 360.000 3,498,087.92 437,260.99 437,260.99 0.00 4,372,609.90 53 69 40 109 Completed (100%) 100.00% physical progress as of Apr. 14, 2020 » VIEW S-CURVE BLDY Engineering and Construction
25 PRDP-IB-RCAR-ABR-008-VIL-001-2016 Luzon A CAR Abra Lone Villaviciosa Construction of Slope Protection at Villaviciosa, Abra Others Square Meter 1731.750 23,998,509.05 2,999,813.63 2,999,813.63 0.00 29,998,136.31 564 1,446 1,468 2,914 Completed (100%) 100.00% physical progress as of Oct. 03, 2019 » VIEW S-CURVE Legacy Construction Corporation
26 PRDP-IB-RCAR-IFU-008-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Cambulo Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 206.000 2,976,195.68 372,024.46 372,024.46 0.00 3,720,244.60 206 639 618 1,257 Completed (100%) 100.00% physical progress as of Mar. 15, 2022 » VIEW S-CURVE
27 PRDP-IB-RCAR-IFU-020-000-000-2018 Luzon A CAR Ifugao Lone Mayoyao Junction-Alimit-Nattum Farm to Market Road Improvement Farm to Market Road (FMR) Kilometer 4.960 112,422,423.90 14,052,802.99 14,052,802.99 0.00 140,528,029.88 296 977 839 1,816 Completed (100%) 100.00% physical progress as of May. 28, 2022 » VIEW S-CURVE ALFALFA CONSTRUCTION
28 PRDP-IB-RCAR-IFU-021-BAN-011-2018 Luzon A CAR Ifugao Lone Banaue Construction of Anaba-Ducligan-Banao Farm to Market Road FMR with Bridge Kilometer 8.000 196,508,934.63 24,563,616.83 24,563,616.83 0.00 245,636,168.29 275 641 614 1,255 Completed (100%) 100.00% physical progress as of May. 02, 2022 » VIEW S-CURVE ALFALFA CONSTRUCTION
29 PRDP-IB-RCAR-MOP-006-BON-001-2017 Luzon A CAR Mountain Province Lone Bontoc Construction of Talubin Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 366.000 4,495,511.08 561,938.89 561,938.89 0.00 5,619,388.86 366 918 840 1,758 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE BONTOC BUILDERS
30 PRDP-IB-RCAR-MOP-007-BON-002-2017 Luzon A CAR Mountain Province Lone Bontoc Improvement of Mainit Chorngowan PWS Potable Water Supply (PWS) Level 2 Number of Households 249.000 5,596,181.70 699,522.71 699,522.71 0.00 6,995,227.12 308 559 480 1,039 Completed (100%) 100.00% physical progress as of Aug. 06, 2020 » VIEW S-CURVE BONTOC BUILDERS
31 PRDP-IB-RCAR-BEN-010-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Alno, La Trinidad, Benguet Others Square Meter 209.650 1,400,463.06 175,057.88 175,057.88 0.00 1,750,578.82 488 1,184 1,128 2,312 Completed (100%) 100.00% physical progress as of Jun. 30, 2018 » VIEW S-CURVE ROCKY 5G BUILDERS
32 PRDP-IB-RCAR-BEN-009-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Beckel, La Trinidad Others Square Meter 1590.280 5,510,023.40 688,752.93 688,752.93 0.00 6,887,529.26 766 1,628 1,553 3,181 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE APB CONSTRUCTION
33 PRDP-IB-RCAR-BEN-011-000-000-2016 Luzon A CAR Benguet Lone La Trinidad Construction of Slope Protection of Brgy. Alapang, La Trinidad, Benguet Others Square Meter 531.250 3,260,116.15 407,514.52 407,514.52 0.00 4,075,145.19 400 1,892 1,843 3,735 Completed (100%) 100.00% physical progress as of Oct. 15, 2017 » VIEW S-CURVE ROCKY 5G BUILDERS
34 PRDP-IB-RCAR-BEN-012-000-000-2016 Luzon A CAR Benguet Lone Bakun Construction of Slope Protection in Brgy. Bagu, Bakun, Benguet Others Square Meter 2997.000 12,375,445.11 1,546,930.64 1,546,930.64 0.00 15,469,306.39 216 562 518 1,080 Completed (100%) 100.00% physical progress as of Feb. 23, 2018 » VIEW S-CURVE FB Bantales Engineering Construction
35 PRDP-IB-RCAR-APA-009-000-000-2016 Luzon A CAR Apayao Lone Flora Construction of Warehouse (Poblacion East, Flora, Apayao) Others Square Meter 720.000 8,777,088.26 1,097,136.03 1,097,136.03 0.00 10,971,360.32 403 1,588 855 2,443 Completed (100%) 100.00% physical progress as of Dec. 07, 2019 » VIEW S-CURVE CAMIA Construction Development Corporation
36 PRDP-IB-RCAR-APA-010-000-000-2016 Luzon A CAR Apayao Lone Calanasan Construction of Warehouse at Tanglagan, Calanasan, Apayao Others Square Meter 720.000 8,515,215.02 1,064,401.88 1,064,401.88 0.00 10,644,018.78 449 1,203 802 2,005 Completed (100%) 100.00% physical progress as of Nov. 25, 2021 » VIEW S-CURVE CAMIA Construction Development Corporation
37 PRDP-IB-RCAR-IFU-007-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Uhaj Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 673.000 1,984,657.04 248,082.13 248,082.13 0.00 2,480,821.30 673 2,126 1,892 4,018 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE Marcia-Joi Construction
38 PRDP-IB-RCAR-BEN-014-000-000-2016 Luzon A CAR Benguet Lone Bakun Construction of Consolidation Facility, Ampusongan, Bakun, Benguet Others Square Meter 86.400 2,574,069.34 321,758.67 321,758.67 0.00 3,217,586.68 594 888 1,033 1,921 Completed (100%) 100.00% physical progress as of Feb. 20, 2019 » VIEW S-CURVE REASONS CONSTRUCTION
39 PRDP-IB-RCAR-IFU-010-BAN-001-2017 Luzon A CAR Ifugao Lone Banaue Construction of Amchu-uy – Bae CIS Communal Irrigation System (CIS) Hectare 6.000 1,151,127.46 143,890.93 143,890.93 0.00 1,438,909.32 372 910 844 1,754 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE
40 PRDP-IB-RCAR-IFU-012-BAN-003-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Aparnga-o – Ligligan CIS Communal Irrigation System (CIS) Hectare 40.000 5,949,478.00 743,684.75 743,684.75 0.00 7,436,847.50 242 674 627 1,301 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE Alfalfa Construction
41 PRDP-IB-RCAR-IFU-018-BAN-009-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Bong-bongna - Dalican Communal Irrigation System Communal Irrigation System (CIS) Hectare 17.000 4,126,195.54 515,774.44 515,774.44 0.00 5,157,744.42 85 183 157 340 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE Wangjo Construction
42 PRDP-IB-RCAR-IFU-013-BAN-004-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Bongbongna – Poitan CIS Communal Irrigation System (CIS) Hectare 36.220 5,864,325.41 733,040.68 733,040.68 0.00 7,330,406.77 291 845 850 1,695 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE Alfalfa Construction
43 PRDP-IB-RCAR-IFU-014-BAN-005-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Luutan – Imbangnge – Bayungon CIS Communal Irrigation System (CIS) Hectare 19.750 5,823,591.34 727,948.92 727,948.92 0.00 7,279,489.18 330 767 773 1,540 Completed (100%) 100.00% physical progress as of Jul. 15, 2019 » VIEW S-CURVE Alfalfa Construction
44 PRDP-IB-RCAR-IFU-011-BAN-002-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Aparnga-o – Ki-iyang CIS Communal Irrigation System (CIS) Hectare 51.200 5,414,421.80 676,802.73 676,802.73 0.00 6,768,027.26 699 1,766 1,652 3,418 Completed (100%) 99.97% physical progress as of Oct. 15, 2019 » VIEW S-CURVE Alfalfa Construction
45 PRDP-IB-RCAR-IFU-016-BAN-007-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Epeheng Communal Irrigation System Communal Irrigation System (CIS) Hectare 20.550 6,000,179.62 750,022.45 750,022.45 0.00 7,500,224.52 330 767 773 1,540 Completed (100%) 100.00% physical progress as of Aug. 15, 2021 » VIEW S-CURVE Wangjo Construction
46 PRDP-IB-RCAR-IFU-017-BAN-008-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Nabalit Communal Irrigation System Communal Irrigation System (CIS) Hectare 10.270 3,920,006.79 490,000.85 490,000.85 0.00 4,900,008.49 72 187 173 360 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE Wangjo Construction
47 PRDP-IB-RCAR-APA-001-000-000-2015 Luzon A CAR Apayao Lone Flora Improvement of Sta.Maria - Mallig - Upper Atok Farm to Market Road Farm to Market Road (FMR) Kilometer 11.800 172,407,497.77 21,550,937.22 21,550,937.22 0.00 215,509,372.21 298 958 828 1,786 Completed (100%) 100.00% physical progress as of Jun. 30, 2022 » VIEW S-CURVE
48 PRDP-IB-RCAR-IFU-005-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Bangaan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 144.000 3,550,619.59 443,827.45 443,827.45 0.00 4,438,274.49 206 639 618 1,257 Completed (100%) 100.00% physical progress as of Oct. 18, 2022 » VIEW S-CURVE
49 PRDP-IB-RCAR-IFU-006-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Ducligan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 217.000 2,431,077.29 303,884.66 303,884.66 0.00 3,038,846.61 217 537 479 1,016 Completed (100%) 99.99% physical progress as of Aug. 15, 2022 » VIEW S-CURVE
50 PRDP-IB-RCAR-IFU-009-000-000-2016 Luzon A CAR Ifugao Lone Banaue Construction of Poitan Level-II Water System Potable Water Supply (PWS) Level 2 Number of Households 330.000 2,513,984.70 314,248.09 314,248.09 0.00 3,142,480.88 330 845 850 1,695 Completed (100%) 99.99% physical progress as of Feb. 11, 2022 » VIEW S-CURVE
51 PRDP-IB-RCAR-IFU-015-BAN-006-2017 Luzon A CAR Ifugao Lone Banaue Improvement of Viewpoint - San Fernando Farm to Market Road Farm to Market Road (FMR) Kilometer 4.600 108,489,239.46 13,561,154.93 13,561,154.93 0.00 135,611,549.32 362 965 876 1,841 Completed (100%) 100.00% physical progress as of Feb. 24, 2022 » VIEW S-CURVE Wangjo Construction
52 PRDP-IB-RCAR-MOP-021-BAR-021-2021 Luzon A CAR Mountain Province Lone Barlig Construction of Lias PWS Level II Potable Water Supply (PWS) Level 2 Number of Households 365.000 5,486,387.16 685,798.40 685,798.40 0.00 6,857,983.96 365 525 444 969 Completed (100%) 100.00% physical progress as of Feb. 19, 2024 » VIEW S-CURVE CNL Construction
53 PRDP-IB-RCAR-IFU-036-AGU-001-2020 Luzon A CAR Ifugao Aguinaldo Improvement of Ubao - Manaot FMR Farm to Market Road (FMR) Kilometer 8.400 173,325,417.49 21,665,677.19 21,665,677.19 0.00 216,656,771.87 446 995 878 1,873 Fifty percent and above progress 80.79% physical progress as of Nov. 15, 2024 » VIEW S-CURVE 3W BUILDERS INC.
54 PRDP-IB-R001-ILS-001-000-000-2014 Luzon A Region 1 Ilocos Sur 1st Sinait Rehabilitation of Tubigay-Baracbac-Nagcullooban Farm to Market Road Farm to Market Road (FMR) Kilometer 6.170 61,223,775.11 7,652,971.89 7,652,971.89 0.00 76,529,718.89 356 824 841 1,665 Completed (100%) 100.00% physical progress as of Nov. 15, 2019 » VIEW S-CURVE Firm Builders Inc.
55 PRDP-IB-R001-LAU-001-000-000-2014 Luzon A Region 1 La Union 2nd Naguilian Rehabilitation of Balecbec-Basca Farm to Market Road and Balecbec Bridge FMR with Bridge Kilometer 7.920 103,116,636.74 12,889,579.59 12,889,579.59 0.00 128,895,795.92 957 2,267 2,326 4,593 Completed (100%) 100.00% physical progress as of Jan. 15, 2019 » VIEW S-CURVE Goldrich Construction and Trading
56 PRDP-IB-R001-ILN-001-000-000-2014 Luzon A Region 1 Ilocos Norte 2nd Batac City Rehabilitation of Billoca-San Juan Farm to Market Road and Eight (8) Bridges FMR with Bridge Kilometer 12.240 149,122,888.92 18,640,361.12 18,640,361.12 0.00 186,403,611.16 1,254 2,515 3,764 6,279 Completed (100%) 100.00% physical progress as of Sep. 24, 2020 » VIEW S-CURVE AJ Taylan Construction Corporation
57 PRDP-IB-R001-ILN-006-PAO-001-2015 Luzon A Region 1 Ilocos Norte 2nd Paoay Rehabilitation of Nalasin-Sungadan-Langiden Farm to Market Road Farm to Market Road (FMR) Kilometer 4.930 53,864,271.19 6,733,033.90 6,733,033.90 0.00 67,330,338.99 301 1,292 1,304 2,596 Completed (100%) 100.00% physical progress as of Aug. 30, 2019 » VIEW S-CURVE Viking Construction and Supplies
58 PRDP-IB-R001-ILN-012-CUR-001-2015 Luzon A Region 1 Ilocos Norte 2nd Currimao Rehabilitation of Tapao Tigue-Poblacion 2-Sta. Cruz-Lang-ayan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.900 42,027,432.49 5,253,429.06 5,253,429.06 0.00 52,534,290.61 225 623 448 1,071 Completed (100%) 100.00% physical progress as of Jul. 26, 2019 » VIEW S-CURVE Badoc Builders and Supply, Inc.
59 PRDP-IB-R001-LAU-005-000-000-2015 Luzon A Region 1 La Union 2nd Rosario Construction of Malicnao Bridge Bridge Linear Meter 56.100 31,157,813.78 3,894,726.72 3,894,726.72 0.00 38,947,267.22 1,353 3,444 3,320 6,764 Completed (100%) 100.00% physical progress as of Dec. 05, 2020 » VIEW S-CURVE R.G. Benito Construction and Supply Corporation
60 PRDP-IB-R001-PAN-003-MAN-002-2015 Luzon A Region 1 Pangasinan 4th Manaoag Construction of Oraan Bridge with Approaches Bridge Linear Meter 21.000 16,460,028.86 2,057,503.61 2,057,503.61 0.00 20,575,036.08 815 750 661 1,411 Completed (100%) 100.00% physical progress as of Oct. 26, 2018 » VIEW S-CURVE BET Construction and Supply
61 PRDP-IB-R001-LAU-006-000-000-2015 Luzon A Region 1 La Union 2nd Rosario Rehabilitation of Parasapas Farm to Market Road and Parasapas Bridge FMR with Bridge Kilometer 2.980 62,425,373.84 7,803,171.73 7,803,171.73 0.00 78,031,717.30 294 698 672 1,370 Completed (100%) 100.00% physical progress as of May. 20, 2021 » VIEW S-CURVE Goldrich Construction and Trading
62 PRDP-IB-R001-PAN-001-000-000-2014 Luzon A Region 1 Pangasinan 6th Umingan Rehabilitation of Gonzales-San Juan Farm to Market Road Farm to Market Road (FMR) Kilometer 10.630 95,416,491.82 11,927,061.48 11,927,061.48 0.00 119,270,614.78 2,872 7,142 6,052 13,194 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE Joint Venture - Alcel Construction and BET Construction and Supply
63 PRDP-IB-R001-ILS-002-000-000-2015 Luzon A Region 1 Ilocos Sur 1st Cabugao Rehabilitation of Pug-Os-Nagcullooban Farm to Market Road Farm to Market Road (FMR) Kilometer 15.480 165,078,000.37 20,634,750.05 20,634,750.05 0.00 206,347,500.47 1,843 4,629 4,260 8,889 Completed (100%) 100.00% physical progress as of Dec. 06, 2022 » VIEW S-CURVE BMK Construction Corporation
64 PRDP-IB-R001-ILN-014-NUE-001-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Uguis Solar Dryer Others Square Meter 1020.000 1,834,681.28 229,335.16 229,335.16 0.00 2,293,351.60 38 573 530 1,103 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
65 PRDP-IB-R001-ILN-015-NUE-002-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Garnaden Solar Dryer Others Square Meter 480.000 884,576.31 110,572.04 110,572.04 0.00 1,105,720.39 121 335 300 635 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
66 PRDP-IB-R001-ILN-016-NUE-003-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Naguilian Solar Dryer Others Square Meter 594.000 1,052,009.54 131,501.19 131,501.19 0.00 1,315,011.92 148 410 386 796 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
67 PRDP-IB-R001-ILN-018-ADA-001-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Sinidangan Solar Dryer Others Square Meter 420.000 810,323.03 101,290.38 101,290.38 0.00 1,012,903.79 36 78 57 135 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
68 PRDP-IB-R001-ILN-019-ADA-002-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Maligligay Solar Dryer Others Square Meter 420.000 1,118,383.75 139,797.97 139,797.97 0.00 1,397,979.69 23 54 26 80 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
69 PRDP-IB-R001-ILN-020-ADA-003-2016 Luzon A Region 1 Ilocos Norte 1st Adams Construction of Malaggao Solar Dryer Others Square Meter 420.000 1,071,418.41 133,927.30 133,927.30 0.00 1,339,273.01 131 151 135 286 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE Blue Mountain Builders and General Merchandise
70 PRDP-IB-R001-ILN-021-000-000-2016 Luzon A Region 1 Ilocos Norte 1st Vintar Construction of Mabanbanag Solar Dryer Others Square Meter 420.000 1,098,415.39 137,301.92 137,301.92 0.00 1,373,019.23 20 346 340 686 Completed (100%) 100.00% physical progress as of Jul. 07, 2017 » VIEW S-CURVE Remar Construction
71 PRDP-IB-R001-ILN-022-000-000-2016 Luzon A Region 1 Ilocos Norte 1st Vintar Construction of Salsalamagui Solar Dryer Others Square Meter 420.000 921,727.47 115,215.93 115,215.93 0.00 1,152,159.33 26 609 589 1,198 Completed (100%) 100.00% physical progress as of Jun. 15, 2017 » VIEW S-CURVE Remar Construction
72 PRDP-IB-R001-ILN-024-PAO-002-2017 Luzon A Region 1 Ilocos Norte 2nd Paoay Rehabilitation of Paoay Communal Irrigation System Communal Irrigation System (CIS) Hectare 538.670 109,255,764.64 13,656,970.58 13,656,970.58 0.00 136,569,705.80 1,086 2,700 2,728 5,428 Completed (100%) 100.00% physical progress as of Dec. 13, 2021 » VIEW S-CURVE N.A. Ibarra Construction
73 PRDP-IB-R001-ILN-017-NUE-004-2016 Luzon A Region 1 Ilocos Norte 2nd Nueva Era Construction of Acnam Solar Dryer Others Square Meter 420.000 854,847.41 106,855.93 106,855.93 0.00 1,068,559.27 130 335 300 635 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE JLP Construction and Supply
74 PRDP-IB-R001-ILS-004-000-000-2015 Luzon A Region 1 Ilocos Sur 1st Cabugao Construction of Cabugao Mango Packaging Center Others Square Meter 234.000 3,862,584.55 482,823.07 482,823.07 0.00 4,828,230.69 45 39 6 45 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE Vigan Fortune Construction
75 PRDP-IB-R001-ILS-005-CER-001-2016 Luzon A Region 1 Ilocos Sur 2nd Cervantes Construction of Namita Agricultural Tramline System Others Square Meter 1590.000 3,749,639.57 468,704.95 468,704.95 0.00 4,687,049.47 101 259 358 617 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE Remnant Builders
76 PRDP-IB-R001-ILS-006-SAO-001-2016 Luzon A Region 1 Ilocos Sur 1st Santo Domingo Construction of Sto. Domingo Municipal Warehouse with Multi-Purpose Drying Pavement Others Square Meter 1000.000 7,470,531.93 933,816.49 933,816.49 0.00 9,338,164.91 2,296 4,679 1,294 5,973 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE JENBA Construction
77 PRDP-IB-R001-PAN-004-MAN-003-2016 Luzon A Region 1 Pangasinan 4th Manaoag Construction of Municipal Warehouse with Multi-Purpose Drying Pavement Others Square Meter 477.500 8,335,702.29 1,041,962.79 1,041,962.79 0.00 10,419,627.87 754 2,192 827 3,019 Completed (100%) 100.00% physical progress as of Jul. 14, 2018 » VIEW S-CURVE JG Garcia Construction and Supply
78 PRDP-IB-R001-ILN-023-VIN-001-2017 Luzon A Region 1 Ilocos Norte 1st Vintar Rehabilitation of San Jose Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 124.000 3,191,540.81 398,942.60 398,942.60 0.00 3,989,426.01 124 232 215 447 Completed (100%) 100.00% physical progress as of Nov. 12, 2019 » VIEW S-CURVE JB Felipe Construction
79 PRDP-IB-R001-PAN-006-BAY-001-2018 Luzon A Region 1 Pangasinan 3rd Bayambang Improvement of San Gabriel II Farm To Market Road with Bridge FMR with Bridge Kilometer 1.870 2,801,867.90 350,233.49 350,233.49 0.00 3,502,334.88 2,017 4,375 4,337 8,712 Completed (100%) 99.99% physical progress as of Jun. 28, 2024 » VIEW S-CURVE CHRISTIAN IAN CONSTRUCTION CORPORATION
80 PRDP-IB-R001-LAU-008-BAU-001-2017 Luzon A Region 1 La Union 2nd Bauang Rehabilitation and Road Opening of Cabalayangan-Sta. Monica Farm to Market Road Farm to Market Road (FMR) Kilometer 4.750 80,405,982.10 10,050,747.76 10,050,747.76 0.00 100,507,477.62 3,168 1,590 578 2,168 Fifty percent and above progress 65.96% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Tarlac 3-G Construction and Development Corporation
81 PRDP-IB-R001-ILS-009-SAM-001-2020 Luzon A Region 1 Ilocos Sur 2nd Santa Maria Construction of Cabaroan-Silag-Pacang (CASIPA) Bridge with Approaches Bridge Linear Meter 120.900 82,273,541.30 10,284,192.66 10,284,192.66 0.00 102,841,926.62 1,162 2,559 2,502 5,061 Fifty percent and above progress 86.86% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Viking Construction
82 PRDP-IB-R002-ISA-007-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Rehabilitation/Improvement of Virgoneza-Salay-Sinaoangan-Palacian Farm to Market Road with Bridge FMR with Bridge Kilometer 14.030 154,275,806.41 19,284,475.80 19,284,475.80 0.00 192,844,758.01 885 1,843 1,816 3,659 Approved by RPAB For endorsement to NPCO
83 PRDP-IB-R002-QUI-001-000-000-2014 Luzon A Region 2 Quirino Lone Saguday Improvement / Rehabilitation of NRJ-Gamis-Banuar-Dumabel-Cabugao-Eden-Burgos-PRJ Burgos-Gomez-Calaocan Farm to Market Road Farm to Market Road (FMR) Kilometer 19.380 124,024,766.44 15,503,095.81 15,503,095.81 0.00 155,030,958.06 1,338 3,159 2,868 6,027 Completed (100%) 100.00% physical progress as of Dec. 14, 2019 » VIEW S-CURVE APD CONSTRUCTION
84 PRDP-IB-R002-QUI-002-000-000-2014 Luzon A Region 2 Quirino Lone Aglipay Rehabilitation of NRJ-Palacian-Ramos Farm to Market Road Farm to Market Road (FMR) Kilometer 11.790 107,848,941.87 13,481,117.73 13,481,117.73 0.00 134,811,177.33 983 2,182 2,081 4,263 Completed (100%) 100.00% physical progress as of Nov. 30, 2017 » VIEW S-CURVE RDI Jr. Construction
85 PRDP-IB-R002-QUI-003-000-000-2014 Luzon A Region 2 Quirino Lone Maddela Quirino Coffee Enterprise - Infra Others Square Meter 120.000 1,901,979.46 237,747.43 237,747.43 0.00 2,377,474.32 245 734 369 1,103 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE GB Carlos Construction
86 PRDP-IB-R002-QUI-006-000-000-2014 Luzon A Region 2 Quirino Lone Aglipay Rehabilitation of National Road Junction- Ligaya-Villa Pagaduan Farm to Market Road Farm to Market Road (FMR) Kilometer 5.300 41,109,415.63 5,138,676.95 5,138,676.95 0.00 51,386,769.53 892 2,037 1,943 3,980 Completed (100%) 100.00% physical progress as of Dec. 05, 2017 » VIEW S-CURVE RDI Jr. Construction
87 PRDP-IB-R002-QUI-007-000-000-2015 Luzon A Region 2 Quirino Lone Diffun Rehabilitation of National Road Junction- Ricarte Sur-Magsaysay Farm to Market Road Farm to Market Road (FMR) Kilometer 8.070 118,666,165.39 14,833,270.67 14,833,270.67 0.00 148,332,706.73 729 1,680 1,549 3,229 Completed (100%) 100.00% physical progress as of Jul. 06, 2021 » VIEW S-CURVE APD CONSTRUCTION
88 PRDP-IB-R002-QUI-008-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of Lusod-Sto Niño Farm to Market Road Farm to Market Road (FMR) Kilometer 3.890 44,793,425.26 5,599,178.16 5,599,178.16 0.00 55,991,781.58 873 2,065 2,013 4,078 Completed (100%) 100.00% physical progress as of Dec. 13, 2021 » VIEW S-CURVE Ocean Construction Services
89 PRDP-IB-R002-ISA-001-000-000-2014 Luzon A Region 2 Isabela 1st Cabagan Rehabilitation/Improvement of Magassi-Union-Camasi Farm to Market Road Farm to Market Road (FMR) Kilometer 4.930 34,654,673.76 4,331,834.22 4,331,834.22 0.00 43,318,342.20 1,139 2,827 2,711 5,538 Completed (100%) 100.00% physical progress as of Sep. 15, 2016 » VIEW S-CURVE RRC Construction
90 PRDP-IB-R002-ISA-002-000-000-2014 Luzon A Region 2 Isabela 2nd Mallig Rehabilitation/Construction of Olango-Siempre Viva-Trinidad-Manano Farm to Market Road Farm to Market Road (FMR) Kilometer 9.170 53,193,981.59 6,649,247.70 6,649,247.70 0.00 66,492,476.99 1,898 4,277 4,240 8,517 Completed (100%) 100.00% physical progress as of Jun. 30, 2016 » VIEW S-CURVE A. De Guia Construction
91 PRDP-IB-R002-ISA-003-000-000-2014 Luzon A Region 2 Isabela 2nd Mallig Isabela Dairy Enterprise - Infra (Construction of Dairy Processing Plant) Others Square Meter 240.000 4,081,144.13 510,143.02 510,143.02 0.00 5,101,430.17 1,152 1,369 1,111 2,480 Completed (100%) 100.00% physical progress as of Aug. 17, 2017 » VIEW S-CURVE _______________________
92 PRDP-IB-R002-ISA-005-000-000-2014 Luzon A Region 2 Isabela 2nd Roxas Rehabilitation/Concreting of San Placido-Muñoz West-Sinamar Farm to Market Road Farm to Market Road (FMR) Kilometer 8.150 71,882,388.34 8,985,298.54 8,985,298.54 0.00 89,852,985.42 2,029 4,735 4,459 9,194 Completed (100%) 100.00% physical progress as of Feb. 19, 2019 » VIEW S-CURVE C.R Domingo Const./Alfalfa Const. (JV)
93 PRDP-IB-R002-ISA-006-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Rehabilitation/Improvement of Virgoneza-Quimalabasa-San Antonio-Sto Niño-Dabubu Grande Farm to Market Road Farm to Market Road (FMR) Kilometer 8.010 54,691,455.82 6,836,431.98 6,836,431.98 0.00 68,364,319.78 1,331 2,797 2,559 5,356 Completed (100%) 100.00% physical progress as of Jul. 08, 2020 » VIEW S-CURVE BHM Construction
94 PRDP-IB-R002-ISA-008-000-000-2014 Luzon A Region 2 Isabela 4th San Agustin Dairy Carabao Enterprise of Isabela - Infra (Construction of Milking Barn with Water System and Electrical Facilities) Others Square Meter 202.500 2,754,680.41 344,335.05 344,335.05 0.00 3,443,350.51 78 55 23 78 Completed (100%) 100.00% physical progress as of Aug. 03, 2018 » VIEW S-CURVE A.F Manuel Construction
95 PRDP-IB-R002-CAG-001-000-000-2014 Luzon A Region 2 Cagayan 3rd Tuguegarao City Construction/Rehabilitation of Namabbalan Norte-Baliuag-Bical-Cabbo Farm to Market Road with bridges FMR with Bridge Kilometer 17.420 160,489,574.43 20,061,196.80 20,061,196.80 0.00 200,611,968.03 894 2,257 2,275 4,532 Completed (100%) 100.00% physical progress as of Oct. 15, 2019 » VIEW S-CURVE R.D. Interior Jr. Construction
96 PRDP-IB-R002-CAG-002-000-000-2014 Luzon A Region 2 Cagayan 3rd Tuguegarao City Cagayan Dairy Enterprise - Infra Others Square Meter 1019.780 7,775,525.84 971,940.73 971,940.73 0.00 9,719,407.30 64 171 83 254 Completed (100%) 100.00% physical progress as of Jul. 25, 2019 » VIEW S-CURVE M.G. JACINTO CONSTRUCTION
97 PRDP-IB-R002-CAG-004-000-000-2014 Luzon A Region 2 Cagayan 3rd Amulung Rehabilitation of Iraga-Bayabat Farm to Market Road and Bridges FMR with Bridge Kilometer 20.250 162,555,785.31 20,319,473.16 20,319,473.16 0.00 203,194,731.63 5,654 13,409 13,302 26,711 Completed (100%) 100.00% physical progress as of Jun. 17, 2019 » VIEW S-CURVE RDI JR CONSTRUCTION/CREST CONSTRUCTION (JV)
98 PRDP-IB-R002-CAG-005-000-000-2014 Luzon A Region 2 Cagayan 1st Alcala Alcala Dairy Production and Marketing Enterprise - Infra Others Square Meter 902.800 7,523,782.40 940,472.80 940,472.80 0.00 9,404,728.00 169 137 69 206 Completed (100%) 100.00% physical progress as of Dec. 20, 2018 » VIEW S-CURVE Pacific Star Erectors
99 PRDP-IB-R002-ISA-011-SAO-002-2015 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Baluarte-Sinili Farm to Market Road Farm to Market Road (FMR) Kilometer 7.370 72,304,112.00 9,038,014.00 9,038,014.00 0.00 90,380,140.00 761 1,446 1,599 3,045 Completed (100%) 99.99% physical progress as of Oct. 17, 2021 » VIEW S-CURVE NTL Builders and Developer
100 PRDP-IB-R002-QUI-010-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of NRJ-Dungo-San Salvador-Divisoria Sur Farm to Market Road Farm to Market Road (FMR) Kilometer 10.480 93,303,809.33 11,662,976.17 11,662,976.17 0.00 116,629,761.67 473 989 896 1,885 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE APD Construction
101 PRDP-IB-R002-QUI-009-000-000-2015 Luzon A Region 2 Quirino Lone Cabarroguis Rehabilitation of Gundaway-Doña Imelda Farm to Market Road Farm to Market Road (FMR) Kilometer 3.840 50,974,754.71 6,371,844.34 6,371,844.34 0.00 63,718,443.39 377 847 787 1,634 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE APD Construction
102 PRDP-IB-R002-ISA-010-SAO-001-2015 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Calaocan-Batal Farm-to-Market Road Farm to Market Road (FMR) Kilometer 11.190 105,608,463.22 13,201,057.90 13,201,057.90 0.00 132,010,579.02 5,331 12,140 11,469 23,609 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE NTL Builders and Developer
103 PRDP-IB-R002-ISA-009-000-000-2015 Luzon A Region 2 Isabela 2nd Quezon Rehabilitation / Improvement of San Juan - Barucboc - Estrada - Dummon Farm To Market Road Farm to Market Road (FMR) Kilometer 12.420 111,933,152.19 13,991,644.02 13,991,644.02 0.00 139,916,440.23 1,698 3,469 3,283 6,752 Fifty percent and above progress 98.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ Construction
104 PRDP-IB-R002-ISA-024-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Cauayan City Warehouse, Barangay San Pablo, Cauayan City, Isabela Others Square Meter 584.400 10,744,006.53 1,343,000.82 1,343,000.82 0.00 13,430,008.17 539 945 925 1,870 Approved by RPAB For Issuance of NOL 1
105 PRDP-IB-R002-ISA-025-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Warehouse with Solar Dryer (at Barangay Buyon, Cauayan city) Others Square Meter 1112.000 9,236,800.00 1,154,600.00 1,154,600.00 0.00 11,546,000.00 239 630 605 1,235 Approved by RPAB For Issuance of NOL 1
106 PRDP-IB-R002-ISA-026-000-000-2016 Luzon A Region 2 Isabela 1st Cabagan Construction of Cansan Warehouse with Solar Dryer, Barangay Cansan, Cabagan, Isabela Others Square Meter 540.000 10,460,725.21 1,307,590.65 1,307,590.65 0.00 13,075,906.51 959 2,598 2,451 5,049 Approved by RPAB For Issuance of NOL 1
107 PRDP-IB-R002-ISA-031-000-000-2016 Luzon A Region 2 Isabela 3rd Angadanan Construction of Sinalugan Communal Pump Irrigation Project Communal Irrigation System (CIS) Hectare 300.000 21,200,000.00 2,650,000.00 2,650,000.00 0.00 26,500,000.00 630 1,313 1,262 2,575 Approved by RPAB For Issuance of NOL 1
108 PRDP-IB-R002-ISA-044-000-000-2019 Luzon A Region 2 Isabela 1st San Pablo Construction of Annanuman Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 195.000 9,486,400.00 1,185,800.00 1,185,800.00 0.00 11,858,000.00 195 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
109 PRDP-IB-R002-ISA-045-000-000-2019 Luzon A Region 2 Isabela 1st San Pablo Construction of Limbauan Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 300.000 12,073,600.00 1,509,200.00 1,509,200.00 0.00 15,092,000.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
110 PRDP-IB-R002-ISA-046-000-000-2019 Luzon A Region 2 Isabela 1st Delfin Albano Construction of Bayabo Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 272.000 3,753,164.80 469,145.60 469,145.60 0.00 4,691,456.00 272 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
111 PRDP-IB-R002-CAG-014-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Rehabilitation of Dalaya Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 300.000 3,622,080.00 452,760.00 452,760.00 0.00 4,527,600.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
112 PRDP-IB-R002-BTN-001-000-000-2017 Luzon A Region 2 Batanes Lone Sabtang Construction of Sinakan Agricultural Tramline System Others Square Meter 1.500 9,423,161.88 1,177,895.24 1,177,895.24 0.00 11,778,952.36 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
113 PRDP-IB-R002-CAG-010-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Construction of Dalaya-Sta. Maria FMR Farm to Market Road (FMR) Kilometer 6.000 86,134,799.46 10,766,849.93 10,766,849.93 0.00 107,668,499.32 920 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
114 PRDP-IB-R002-CAG-011-000-000-2019 Luzon A Region 2 Cagayan 1st Aparri Rehabilitation/Construction of Bukig-Caagaman-Navagan FMR and Bridge FMR with Bridge Kilometer 8.910 126,772,800.00 15,846,600.00 15,846,600.00 0.00 158,466,000.00 647 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
115 PRDP-IB-R002-CAG-013-000-000-2019 Luzon A Region 2 Cagayan 1st Lal-lo Rehabilitation of Bicud Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 195.000 2,354,352.00 294,294.00 294,294.00 0.00 2,942,940.00 195 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
116 PRDP-IB-R002-ISA-037-000-000-2018 Luzon A Region 2 Isabela 3rd Cabatuan Rehabilitation / Improvement of La Paz - Canan FMR Farm to Market Road (FMR) Kilometer 5.900 56,640,000.00 7,080,000.00 7,080,000.00 0.00 70,800,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
117 PRDP-IB-R002-ISA-047-000-000-2019 Luzon A Region 2 Isabela 1st Delfin Albano Construction of San Antonio Potable Water System (Level II) Potable Water Supply (PWS) Level 2 Number of Households 117.000 1,614,412.80 201,801.60 201,801.60 0.00 2,018,016.00 117 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
118 PRDP-IB-R002-QUI-013-000-000-2019 Luzon A Region 2 Quirino Lone Maddela Rehabilitation of San Pedro-Villa Agullana-Villa Yllana-San Martin FMR Farm to Market Road (FMR) Kilometer 10.170 122,012,352.00 15,251,544.00 15,251,544.00 0.00 152,515,440.00 778 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
119 PRDP-IB-R002-NUV-003-000-000-2015 Luzon A Region 2 Nueva Vizcaya Lone Solano Mandarin Production and Marketing Enterprise - Infra (Construction of Malabing Valley Trading Center) Others Square Meter 200.000 3,612,398.18 451,549.77 451,549.77 0.00 4,515,497.72 560 336 224 560 Completed (100%) 100.00% physical progress as of Oct. 23, 2018 » VIEW S-CURVE DENISSE-JOHN CONSTRUCTION & SUPPLIES
120 PRDP-IB-R002-QUI-004-000-000-2014 Luzon A Region 2 Quirino Lone Diffun Rehabilitation of National Road Junction- Maria Clara-Gabriela Silang Farm to Market Road Farm to Market Road (FMR) Kilometer 4.700 43,751,929.30 5,468,991.16 5,468,991.16 0.00 54,689,911.62 589 1,173 1,212 2,385 Completed (100%) 100.00% physical progress as of Jan. 23, 2018 » VIEW S-CURVE RDI Jr. Construction
121 PRDP-IB-R002-QUI-005-000-000-2014 Luzon A Region 2 Quirino Lone Cabarroguis Rehabilitation of PRJ-Dibibi-Dingasan Farm to Market Road Farm to Market Road (FMR) Kilometer 3.900 32,610,715.90 4,076,339.49 4,076,339.49 0.00 40,763,394.88 406 1,003 846 1,849 Completed (100%) 100.00% physical progress as of May. 11, 2017 » VIEW S-CURVE RDI Jr. Construction
122 PRDP-IB-R002-QUI-012-000-000-2015 Luzon A Region 2 Quirino Lone Maddela Quirino Banana Enterprise - Infra Others Square Meter 120.000 1,757,537.96 219,692.25 219,692.25 0.00 2,196,922.46 26 14 104 118 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE GB Carlos Construction
123 PRDP-IB-R002-ISA-000-000-000-2016 Luzon A Region 2 Isabela 2nd Gamu Construction of Warehouse with Solar Dryer (at Barangay District 3, Gamu) Others Square Meter 1112.000 9,811,370.60 1,226,421.33 1,226,421.33 0.00 12,264,213.26 280 216 64 280 Completed (100%) 100.00% physical progress as of Aug. 23, 2020 » VIEW S-CURVE Isabela EBC Builders Construction, Inc.
124 PRDP-IB-R002-ISA-004-000-000-2014 Luzon A Region 2 Isabela 2nd San Manuel Rehabilitation/Construction of Barangay District III-Barangay Sta. Cruz Farm to Market Road Farm to Market Road (FMR) Kilometer 6.590 51,399,826.94 6,424,978.37 6,424,978.37 0.00 64,249,783.68 472 728 770 1,498 Completed (100%) 100.00% physical progress as of Jun. 02, 2018 » VIEW S-CURVE Danysons Construction/ Marcphil Construction (Joint Venture)
125 PRDP-IB-R002-ISA-012-000-000-2016 Luzon A Region 2 Isabela 1st Tumauini Construction of Namnama Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 60.000 8,408,286.01 1,051,035.75 1,051,035.75 0.00 10,510,357.51 331 797 770 1,567 Completed (100%) 100.00% physical progress as of Mar. 29, 2019 » VIEW S-CURVE EGB Construction
126 PRDP-IB-R002-ISA-013-000-000-2016 Luzon A Region 2 Isabela 2nd Naguilian Construction of Aguinaldo Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 25.000 2,778,719.46 347,339.93 347,339.93 0.00 3,473,399.32 92 201 200 401 Completed (100%) 100.00% physical progress as of Mar. 29, 2019 » VIEW S-CURVE EGB CONSTRUCTION
127 PRDP-IB-R002-ISA-014-000-000-2016 Luzon A Region 2 Isabela 2nd Naguilian Construction of Lapu-Lapu Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 45.000 8,853,856.36 1,106,732.05 1,106,732.05 0.00 11,067,320.46 82 188 160 348 Completed (100%) 100.00% physical progress as of Sep. 25, 2019 » VIEW S-CURVE E.G.B CONSTRUCTION
128 PRDP-IB-R002-ISA-015-000-000-2016 Luzon A Region 2 Isabela 2nd Quirino Construction of Timpuyog Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 40.000 10,143,269.58 1,267,908.70 1,267,908.70 0.00 12,679,086.98 749 1,447 1,355 2,802 Completed (100%) 100.00% physical progress as of Jan. 21, 2020 » VIEW S-CURVE EGB Construction
129 PRDP-IB-R002-ISA-016-000-000-2016 Luzon A Region 2 Isabela 2nd Quezon Construction of Santos Small Water Impounding Project II (SWIP) Communal Irrigation System (CIS) Hectare 35.000 6,114,395.88 764,299.49 764,299.49 0.00 7,642,994.86 761 1,723 1,645 3,368 Completed (100%) 100.00% physical progress as of Jun. 29, 2019 » VIEW S-CURVE EGB Construction
130 PRDP-IB-R002-ISA-017-000-000-2016 Luzon A Region 2 Isabela 2nd Quezon Construction of Dummon Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 30.000 2,644,523.33 330,565.42 330,565.42 0.00 3,305,654.17 139 224 225 449 Completed (100%) 100.00% physical progress as of Aug. 29, 2018 » VIEW S-CURVE EGB Construction
131 PRDP-IB-R002-ISA-018-000-000-2016 Luzon A Region 2 Isabela 2nd Roxas Construction of Kabigaan Small Water Impounding Project II (SWIP) Communal Irrigation System (CIS) Hectare 40.000 9,680,000.00 1,210,000.00 1,210,000.00 0.00 12,100,000.00 829 1,807 1,774 3,581 Completed (100%) 100.00% physical progress as of Mar. 24, 2019 » VIEW S-CURVE Gacutan Construction
132 PRDP-IB-R002-ISA-019-000-000-2016 Luzon A Region 2 Isabela 4th Jones Construction of San Jose Small Water Impounding Project (SWIP) Communal Irrigation System (CIS) Hectare 35.000 7,775,088.87 971,886.11 971,886.11 0.00 9,718,861.09 111 278 254 532 Completed (100%) 100.00% physical progress as of Apr. 22, 2020 » VIEW S-CURVE C.R DOMINGO CONSTRUCTION
133 PRDP-IB-R002-ISA-020-000-000-2016 Luzon A Region 2 Isabela 4th Cordon Construction of Capirpiriwan Diversion Dam (DD) Communal Irrigation System (CIS) Hectare 36.000 4,535,319.05 566,914.88 566,914.88 0.00 5,669,148.81 865 1,924 1,944 3,868 Completed (100%) 100.00% physical progress as of Nov. 17, 2018 » VIEW S-CURVE AHB Construction and Supply
134 PRDP-IB-R002-ISA-022-000-000-2016 Luzon A Region 2 Isabela 2nd Roxas Construction of Warehouse with Solar Dryer (at Barangay Doña Concha, Roxas) Others Square Meter 1112.000 10,029,600.00 1,253,700.00 1,253,700.00 0.00 12,537,000.00 233 700 466 1,166 Completed (100%) 100.00% physical progress as of Sep. 02, 2020 » VIEW S-CURVE COLBY Construction
135 PRDP-IB-R002-ISA-023-000-000-2016 Luzon A Region 2 Isabela 3rd Cauayan City Construction of Warehouse with Solar Dryer (at Barangay Alinam, Cauayan City) Others Square Meter 1112.000 9,294,651.83 1,161,831.48 1,161,831.48 0.00 11,618,314.79 239 670 523 1,193 Completed (100%) 100.00% physical progress as of Sep. 12, 2019 » VIEW S-CURVE Limestone Construction and Development Corporation
136 PRDP-IB-R002-ISA-027-000-000-2016 Luzon A Region 2 Isabela 4th Echague Construction of Warehouse with Solar Dryer (at Barangay San Fabian, Echague) Others Square Meter 1112.000 9,766,624.80 1,220,828.10 1,220,828.10 0.00 12,208,281.00 175 137 38 175 Completed (100%) 100.00% physical progress as of Jun. 01, 2020 » VIEW S-CURVE AHB Construction and Supply
137 PRDP-IB-R002-ISA-033-RAM-001-2017 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of Oscariz - Nagbacalan Farm to Market Road Farm to Market Road (FMR) Kilometer 6.800 101,560,000.00 12,695,000.00 12,695,000.00 0.00 126,950,000.00 3,157 6,674 6,459 13,133 Completed (100%) 100.00% physical progress as of Jan. 27, 2021 » VIEW S-CURVE C. R. Domingo Construction and POwer Development, Inc.
138 PRDP-IB-R002-ISA-048-000-000-2019 Luzon A Region 2 Isabela 4th San Agustin Construction of Dairy Microbiological Facility Others Square Meter 110.000 5,492,485.92 686,560.74 686,560.74 0.00 6,865,607.40 3,049 1,810 1,239 3,049 Completed (100%) 100.00% physical progress as of May. 21, 2021 » VIEW S-CURVE A.T DUMLAO CONSTRUCTION INC.
139 PRDP-IB-R002-CAG-009-BAG-001-2016 Luzon A Region 2 Cagayan 1st Baggao Rehabilitation of Bitag-Pequeño Communal Irrigation System Communal Irrigation System (CIS) Hectare 260.000 10,687,406.92 1,335,925.87 1,335,925.87 0.00 13,359,258.66 400 743 1,180 1,923 Completed (100%) 100.00% physical progress as of May. 18, 2021 » VIEW S-CURVE Four M Builders
140 PRDP-IB-R002-ISA-038-000-000-2018 Luzon A Region 2 Isabela 3rd Angadanan Rehabilitation/Improvement of Lourdes - Duroc-Malasin-Dipaluda FMR (Aromatic/Pigmented Rice) Farm to Market Road (FMR) Kilometer 9.800 110,042,240.00 13,755,280.00 13,755,280.00 0.00 137,552,800.00 738 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
141 PRDP-IB-R002-NUV-004-AMB-001-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Tiblac – Duli Farm To Market Road Farm to Market Road (FMR) Kilometer 7.850 111,220,546.98 13,902,568.37 13,902,568.37 0.00 139,025,683.72 1,121 2,351 2,163 4,514 Completed (100%) 100.00% physical progress as of Jun. 27, 2022 » VIEW S-CURVE Christian Ian Construction Corp./Edfrobon Construction & Services Inc. - JV
142 PRDP-IB-R002-ISA-035-SAO-004-2018 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of the Sinsayon - Cabulay Farm To Market Road Farm to Market Road (FMR) Kilometer 6.030 95,527,949.62 11,940,993.70 11,940,993.70 0.00 119,409,937.02 370 842 789 1,631 Approved by RPAB For Issuance of NOL 1
143 PRDP-IB-R002-NUV-007-AMB-003-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Poblacion-Labang Farm to Market Road Farm to Market Road (FMR) Kilometer 3.430 69,089,980.40 8,636,247.55 8,636,247.55 0.00 86,362,475.50 414 888 811 1,699 Approved by RPAB For Issuance of NOL 1
144 PRDP-IB-R002-ISA-039-000-000-2018 Luzon A Region 2 Isabela 2nd Gamu Rehabilitation / Improvement of Union - Barcolan Farm To Market Road Farm to Market Road (FMR) Kilometer 6.130 86,900,556.95 10,862,569.62 10,862,569.62 0.00 108,625,696.19 566 902 1,103 2,005 Approved by RPAB For Issuance of NOL 1
145 PRDP-IB-R002-ISA-034-SAO-003-2017 Luzon A Region 2 Isabela 4th Santiago City Rehabilitation of Rizal-Abra Farm to Market Road Farm to Market Road (FMR) Kilometer 7.710 51,841,600.00 6,480,200.00 6,480,200.00 0.00 64,802,000.00 3,997 8,813 8,619 17,432 Approved by RPAB For Issuance of NOL 1
146 PRDP-IB-R002-CAG-003-000-000-2014 Luzon A Region 2 Cagayan 1st Alcala Rehabilitation of Alcala East Farm to Market Road with Bridges FMR with Bridge Kilometer 13.100 160,019,998.73 20,002,499.84 20,002,499.84 0.00 200,024,998.41 1,898 4,458 4,792 9,250 Completed (100%) 100.00% physical progress as of Jul. 15, 2021 » VIEW S-CURVE A.M. Oreta & Co., Inc./Camia Construction Dev't. Corp. (JV)
147 PRDP-IB-R002-ISA-028-000-000-2016 Luzon A Region 2 Isabela 2nd Mallig Construction of Warehouse with Solar Dryer (at Barangay Centro 2, Mallig) Others Square Meter 1112.000 10,051,200.00 1,256,400.00 1,256,400.00 0.00 12,564,000.00 1,992 1,740 252 1,992 Completed (100%) 100.00% physical progress as of May. 22, 2021 » VIEW S-CURVE COLBY CONSTRUCTION
148 PRDP-IB-R002-ISA-042-NAG-001-2018 Luzon A Region 2 Isabela 2nd Naguilian Rehabilitation of Quinalabasa - Sta. Victoria - Bagong Sikat Farm - to - Market Road Farm to Market Road (FMR) Kilometer 7.240 83,380,729.09 10,422,591.14 10,422,591.14 0.00 104,225,911.37 635 990 971 1,961 Completed (100%) 100.00% physical progress as of Oct. 15, 2023 » VIEW S-CURVE Christian Ian Construction Corporation
149 PRDP-IB-R002-ISA-041-RAM-003-2019 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of General Aguinaldo-Planas Farm to Market Road Farm to Market Road (FMR) Kilometer 8.060 96,077,573.42 12,009,696.68 12,009,696.68 0.00 120,096,966.78 2,895 6,119 5,648 11,767 Completed (100%) 100.00% physical progress as of Oct. 15, 2023 » VIEW S-CURVE Christian Ian Construction Corporation
150 PRDP-IB-R002-ISA-043-DIN-001-2019 Luzon A Region 2 Isabela 4th Dinapigue Rehabilitation/Construction of Digumased-Ayod Farm to Market Road (FMR) with Bridge FMR with Bridge Kilometer 8.300 185,725,919.34 23,215,739.92 23,215,739.92 0.00 232,157,399.18 1,010 2,330 2,164 4,494 Fifty percent and above progress 95.55% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Christian Ian Construction Corporation
151 PRDP-IB-R002-NUV-006-AMB-002-2018 Luzon A Region 2 Nueva Vizcaya Lone Ambaguio Rehabilitation of Ammoweg-Camandag Farm to Market Road Farm to Market Road (FMR) Kilometer 10.060 163,041,981.13 20,380,247.64 20,380,247.64 0.00 203,802,476.41 796 1,777 1,609 3,386 Fifty percent and above progress 86.98% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ CONSTRUCTION
152 PRDP-IB-R002-NUV-005-KAS-001-2018 Luzon A Region 2 Nueva Vizcaya Lone Kasibu Rehabilitation of Malabing Valley Farm to Market Roads Farm to Market Road (FMR) Kilometer 12.070 154,816,529.00 19,352,066.13 19,352,066.13 0.00 193,520,661.26 165 388 349 737 Completed (100%) 100.00% physical progress as of Oct. 30, 2024 » VIEW S-CURVE OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION
153 PRDP-IB-R002-ISA-057-000-000-2020 Luzon A Region 2 Isabela 2nd Burgos Construction of MARIIS Burgos SPC Warehouse with Solar Dryer, Barangay Caliguian, Burgos, Isabela Others Square Meter 576.000 11,808,065.65 1,476,008.21 1,476,008.21 0.00 14,760,082.07 1,570 3,281 3,152 6,433 Approved by RPAB For endorsement to NPCO
154 PRDP-IB-R002-ISA-060-000-000-2020 Luzon A Region 2 Isabela 3rd San Guillermo Construction of San Guillermo Warehouse with Solar Dryer, Barangay Nakar, San Guillermo, Isabela Others Square Meter 584.000 12,179,211.98 1,522,401.50 1,522,401.50 0.00 15,224,014.98 4,524 10,706 9,484 20,190 Approved by RPAB For endorsement to NPCO
155 PRDP-IB-R002-ISA-061-000-000-2020 Luzon A Region 2 Isabela 4th San Isidro Construction of San Isidro Warehouse with Solar Dryer, Barangay Gomez, San Isidro, Isabela Others Square Meter 584.000 13,453,853.07 1,681,731.63 1,681,731.63 0.00 16,817,316.33 5,831 12,689 12,172 24,861 Approved by RPAB For endorsement to NPCO
156 PRDP-IB-R002-ISA-062-000-000-2021 Luzon A Region 2 Isabela 3rd Cauayan City Construction of NMI Agri Coop Warehouse, Barangay Nungnungan II, Cauayan City, Isabela Others Square Meter 1080.000 17,621,541.46 2,202,692.68 2,202,692.68 0.00 22,026,926.82 6,488 5,948 2,701 8,649 Approved by RPAB For endorsement to NPCO
157 PRDP-IB-R002-ISA-063-000-000-2020 Luzon A Region 2 Isabela 4th Cordon Rehabilitation/Improvement of Rizaluna - Camarao Farm to Market Road Farm to Market Road (FMR) Kilometer 4.600 75,573,570.83 9,446,696.35 9,446,696.35 0.00 94,466,963.53 1,161 1,959 2,232 4,191 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
158 PRDP-IB-R002-ISA-055-SAI-001-2020 Luzon A Region 2 Isabela 4th San Isidro Concreting of Rizal West - Ramos West - Ramos East Farm to Market Road Farm to Market Road (FMR) Kilometer 7.020 125,357,042.78 15,669,630.35 15,669,630.35 0.00 156,696,303.48 1,070 2,260 2,167 4,427 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
159 PRDP-IB-R002-ISA-056-SAI-002-2020 Luzon A Region 2 Isabela 4th San Isidro Concreting of Villaflor-Nagbukel-Gud Farm to Market Road Farm to Market Road (FMR) Kilometer 7.450 83,440,000.00 10,430,000.00 10,430,000.00 0.00 104,300,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
160 PRDP-IB-R002-ISA-058-000-000-2020 Luzon A Region 2 Isabela Construction of Warehouse (Naguilian, Isabela) Others Square Meter 612.000 8,800,000.00 1,100,000.00 1,100,000.00 0.00 11,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
161 PRDP-IB-R002-CAG-016-GON-001-2020 Luzon A Region 2 Cagayan 1st Gonzaga Rehabilitation of the Pateng-Callao Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.640 27,421,600.00 3,427,700.00 3,427,700.00 0.00 34,277,000.00 664 715 345 1,060 Approved by RPAB For endorsement to NPCO
162 PRDP-IB-R002-QUI-014-000-000-2018 Luzon A Region 2 Quirino Lone Nagtipunan Rehabilitation of NRJ-Sangbay- Anak Farm to Market Road (with Anak-Dibunglin Spur Road) Farm to Market Road (FMR) Kilometer 10.370 277,927,334.10 34,740,916.76 34,740,916.76 0.00 347,409,167.62 - - - - Under Validation No validation date
163 PRDP-IB-R002-CAG-015-CAM-001-2020 Luzon A Region 2 Cagayan 1st Camalaniugan Rehabilitation/Construction of Agusi Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.630 47,855,200.00 5,981,900.00 5,981,900.00 0.00 59,819,000.00 1,045 2,166 2,075 4,241 Approved by RPAB For endorsement to NPCO
164 PRDP-IB-R002-NUV-008-KAY-001-2020 Luzon A Region 2 Nueva Vizcaya Lone Kayapa Upgrading of Pangawan-Banao Farm to Market Road Farm to Market Road (FMR) Kilometer 10.440 242,909,360.00 30,363,670.00 30,363,670.00 0.00 303,636,700.00 385 878 777 1,655 Approved by RPAB For endorsement to NPCO
165 PRDP-IB-R002-ISA-059-QUI-001-2019 Luzon A Region 2 Isabela 2nd Quirino Rehabilitation of Sta. Lucia - Sta. Catalina Farm to Market Road with Bridge FMR with Bridge Kilometer 13.640 181,579,924.64 22,697,490.58 22,697,490.58 0.00 226,974,905.80 1,547 3,144 3,019 6,163 Approved by RPAB For endorsement to NPCO
166 PRDP-IB-R002-ISA-054-RAM-008-2020 Luzon A Region 2 Isabela 4th Ramon Rehabilitation of Bugallon Proper- Villa Carmen- San Antonio FMR Farm to Market Road (FMR) Kilometer 11.790 122,185,942.01 15,273,242.75 15,273,242.75 0.00 152,732,427.51 2,843 11,464 11,292 22,756 Approved by RPAB For endorsement to NPCO
167 PRDP-IB-R002-ISA-049-DIV-001-2020 Luzon A Region 2 Isabela 1st Divilacan Rehabilitation / Concreting of Dimapula - Dilakit Farm to Market Road with Bridges FMR with Bridge Kilometer 5.660 196,354,400.00 24,544,300.00 24,544,300.00 0.00 245,443,000.00 452 929 848 1,777 Approved by RPAB For endorsement to NPCO
168 PRDP-IB-R002-CAG-017-RIZ-001-2020 Luzon A Region 2 Cagayan 2nd Rizal Rehabilitation/Construction of Nanauatan-Lattut Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.880 184,317,600.00 23,039,700.00 23,039,700.00 0.00 230,397,000.00 708 1,585 1,430 3,015 Approved by RPAB For endorsement to NPCO
169 PRDP-IB-R002-ISA-053-RAM-007-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, San Miguel, Ramon, Isabela Others Square Meter 612.000 25,137,277.41 3,142,159.68 3,142,159.68 0.00 31,421,596.77 887 1,878 1,809 3,687 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A Construction
170 PRDP-IB-R002-ISA-050-RAM-004-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Ambatali, Ramon, Isabela Others Square Meter 612.000 33,323,411.24 4,165,426.41 4,165,426.41 0.00 41,654,264.06 2,290 4,545 4,533 9,078 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A Construction
171 PRDP-IB-R002-ISA-051-RAM-005-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Bugallon Proper, Ramon, Isabela Others Square Meter 1224.000 35,292,172.46 4,411,521.56 4,411,521.56 0.00 44,115,215.58 3,691 7,500 7,373 14,873 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE A.I.A Construction
172 PRDP-IB-R002-ISA-052-RAM-006-2020 Luzon A Region 2 Isabela 4th Ramon Proposed Warehouse with Solar Dryer, Burgos, Ramon, Isabela Others Square Meter 612.000 13,792,878.38 1,724,109.80 1,724,109.80 0.00 17,241,097.98 526 1,097 1,117 2,214 Completed (100%) 99.99% physical progress as of Dec. 15, 2023 » VIEW S-CURVE A.I.A. CONSTRUCTION
173 PRDP-IB-R003-TAR-003-000-000-2015 Luzon A Region 3 Tarlac 1st Camiling Construction of Sitio Pantul, Carael-Ablang Sapang Farm to Market Road Farm to Market Road (FMR) Kilometer 7.700 61,600,000.00 7,700,000.00 7,700,000.00 0.00 77,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
174 PRDP-IB-R003-TAR-004-000-000-2015 Luzon A Region 3 Tarlac 3rd Capas Improvement of Sto. Rosario-Cutcut Farm to Market Road with Bridge FMR with Bridge Kilometer 17.400 163,200,000.00 20,400,000.00 20,400,000.00 0.00 204,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
175 PRDP-IB-R003-TAR-005-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Improvement of Sta. Barbara - Cruz Balayang - Palacpalac Farm to Market Road Farm to Market Road (FMR) Kilometer 10.580 115,443,807.61 14,430,475.95 14,430,475.95 0.00 144,304,759.51 2,752 6,316 6,070 12,386 Approved by RPAB For Issuance of NOL 1
176 PRDP-IB-R003-TAR-006-000-000-2015 Luzon A Region 3 Tarlac 2nd Victoria Improvement of Lalapac Farm to Market Road Farm to Market Road (FMR) Kilometer 4.000 32,000,000.00 4,000,000.00 4,000,000.00 0.00 40,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
177 PRDP-IB-R003-TAR-007-000-000-2015 Luzon A Region 3 Tarlac 1st Mayantoc Improvement of Melicio Manganaan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.000 32,000,000.00 4,000,000.00 4,000,000.00 0.00 40,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
178 PRDP-IB-R003-ZAM-005-000-000-2015 Luzon A Region 3 Zambales 1st Subic Improvement of Batiawan Farm to Market Road Farm to Market Road (FMR) Kilometer 8.500 68,000,000.00 8,500,000.00 8,500,000.00 0.00 85,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
179 PRDP-IB-R003-AUR-001-000-000-2014 Luzon A Region 3 Aurora Lone Maria Aurora Construction and Improvement of San Joaquin - Cadayakan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.300 20,031,836.00 2,503,979.50 2,503,979.50 0.00 25,039,795.00 719 1,624 1,562 3,186 Completed (100%) 100.00% physical progress as of Aug. 20, 2017 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC./TRIBU DESIGN CONSTRUCTION-JOINT VENTURE
180 PRDP-IB-R003-AUR-004-000-000-2015 Luzon A Region 3 Aurora Lone San Luis Improvement of Nonong Sr.-L.Pimentel Farm to Market Road Farm to Market Road (FMR) Kilometer 5.850 46,687,182.30 5,835,897.79 5,835,897.79 0.00 58,358,977.88 1,019 2,458 2,513 4,971 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE ZF CONSTRUCTION
181 PRDP-IB-R003-BAT-001-000-000-2014 Luzon A Region 3 Bataan 2nd Bagac New Construction of San Antonio - Parang - Saysain Farm to Market Road Farm to Market Road (FMR) Kilometer 14.970 138,299,892.82 17,287,486.60 17,287,486.60 0.00 172,874,866.02 2,403 4,973 4,778 9,751 Completed (100%) 100.00% physical progress as of Jan. 09, 2020 » VIEW S-CURVE 4B Construction Corporation
182 PRDP-IB-R003-BAT-002-000-000-2014 Luzon A Region 3 Bataan 2nd Mariveles Establishment of Iceplant and Cold Storage Building Others Square Meter 200.400 7,020,963.98 877,620.50 877,620.50 0.00 8,776,204.98 146 44 102 146 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE POLYMER-VIC CONSTRUCTION
183 PRDP-IB-R003-BUL-001-000-000-2014 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Bubulong Malake-Bulusukan-Bubulong Munti-Bohol na Manga Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.810 85,519,074.91 10,689,884.36 10,689,884.36 0.00 106,898,843.63 1,617 3,595 3,583 7,178 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE A.R. LUSTRE JR. CONSTRUCTION /A.R.L. CONSTRUCTION (JV)
184 PRDP-IB-R003-BUL-002-000-000-2014 Luzon A Region 3 Bulacan 3rd San Ildefonso Construction of Ampalaya Production and Processing Building at Bulusukan, San Ildefonso, Bulacan Others Square Meter 187.600 2,885,595.47 360,699.43 360,699.43 0.00 3,606,994.33 284 372 60 432 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE Chanbar Builders Corportion
185 PRDP-IB-R003-BUL-005-000-000-2015 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Sumandig - Bubulong Malaki Farm to Market Road Farm to Market Road (FMR) Kilometer 2.930 40,118,403.20 5,014,800.40 5,014,800.40 0.00 50,148,004.00 1,615 3,532 3,414 6,946 Completed (100%) 100.00% physical progress as of Mar. 22, 2021 » VIEW S-CURVE NORTHERN BUILDERS
186 PRDP-IB-R003-NUE-001-000-000-2014 Luzon A Region 3 Nueva Ecija 2nd San Jose City Improvement of San Juan-Villa Joson- Porais Farm to Market Road Farm to Market Road (FMR) Kilometer 5.170 40,171,921.00 5,021,490.13 5,021,490.13 0.00 50,214,901.26 1,432 3,435 3,301 6,736 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE Wizard Trading and Construction
187 PRDP-IB-R003-NUE-002-000-000-2014 Luzon A Region 3 Nueva Ecija 2nd San Jose City Construction of Ampalaya Packing Building with Ground Improvement Others Square Meter 110.000 2,300,171.88 287,521.49 287,521.49 0.00 2,875,214.86 121 73 48 121 Completed (100%) 100.00% physical progress as of Oct. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
188 PRDP-IB-R003-NUE-004-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Talavera Improvement of Basang Hamog-Pantoc-Bulac-Bulac Farm to Market Road Farm to Market Road (FMR) Kilometer 2.950 19,417,482.51 2,427,185.31 2,427,185.31 0.00 24,271,853.13 974 2,181 2,069 4,250 Completed (100%) 100.00% physical progress as of Jun. 30, 2017 » VIEW S-CURVE JRS CONSTRUCTION & XP BUILDERS
189 PRDP-IB-R003-NUE-005-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Onion Hanger Type Storage Others Square Meter 132.000 2,564,435.34 320,554.42 320,554.42 0.00 3,205,544.18 153 125 28 153 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
190 PRDP-IB-R003-NUE-006-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Farm Machinery Shed Others Square Meter 126.000 988,599.26 123,574.91 123,574.91 0.00 1,235,749.08 1,265 545 720 1,265 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE R.D. TALENS CONSTRUCTION & TRADING
191 PRDP-IB-R003-NUE-007-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Llanera Improvement of San Felipe- San Nicolas via A. Bonifacio Norte Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.210 44,674,341.82 5,584,292.73 5,584,292.73 0.00 55,842,927.28 1,132 2,663 2,575 5,238 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE JRS and XP BUILDERS JOINT VENTURES
192 PRDP-IB-R003-NUE-009-000-000-2015 Luzon A Region 3 Nueva Ecija 2nd Carranglan Improvement of R.A. Padilla - Bunga Farm to Market Road Farm to Market Road (FMR) Kilometer 5.680 57,532,562.34 7,191,570.29 7,191,570.29 0.00 71,915,702.92 1,337 3,028 2,911 5,939 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE ALCEL CONSTRUCTION
193 PRDP-IB-R003-TAR-001-000-000-2015 Luzon A Region 3 Tarlac 1st Moncada Improvement of Capaoayan- Banaoang- Ablang Sapang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 14.640 118,481,823.30 14,810,227.91 14,810,227.91 0.00 148,102,279.12 2,119 4,521 4,219 8,740 Completed (100%) 100.00% physical progress as of Feb. 04, 2019 » VIEW S-CURVE R.R. RICAFORT CONSTRUCTION & SUPLLIES/ RM MALLARI BUILDERS & ENTERPRISE JOINT VENTURE
194 PRDP-IB-R003-TAR-002-000-000-2014 Luzon A Region 3 Tarlac 1st Moncada Construction of Processing Center and Storage Facilities with Solar Dryer Others Square Meter 512.000 9,798,346.97 1,224,793.37 1,224,793.37 0.00 12,247,933.71 165 124 55 179 Completed (100%) 100.00% physical progress as of Dec. 15, 2017 » VIEW S-CURVE RM MALLARI BUILDERS & ENTERPRISE
195 PRDP-IB-R003-ZAM-001-000-000-2014 Luzon A Region 3 Zambales 2nd Iba Trading and Consolidation Building- Amungan, Iba, Zambales Others Square Meter 255.250 2,819,533.82 352,441.73 352,441.73 0.00 3,524,417.28 45 27 28 55 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE MONTEONE CONSTRUCTION CORP.
196 PRDP-IB-R003-ZAM-003-000-000-2014 Luzon A Region 3 Zambales 2nd Santa Cruz Trading and Consolidation Building- Sta. Cruz, Zambales Others Square Meter 255.250 2,788,570.64 348,571.33 348,571.33 0.00 3,485,713.30 32 15 22 37 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE NEW MASINLOC HENRY'S CONSTRUCTION & SUPPLY
197 PRDP-IB-R003-AUR-002-000-000-2014 Luzon A Region 3 Aurora Lone Maria Aurora Establishment of Processing Facilities for Coco Coir and Coir By-Products-Civil Works Others Square Meter 309.000 6,005,879.28 750,734.91 750,734.91 0.00 7,507,349.10 1,878 375 1,001 1,376 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
198 PRDP-IB-R003-AUR-005-000-000-2015 Luzon A Region 3 Aurora Lone Baler Improvement of Pingit Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.610 22,214,938.80 2,776,867.35 2,776,867.35 0.00 27,768,673.50 1,168 700 660 1,360 Completed (100%) 100.00% physical progress as of Jan. 15, 2019 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
199 PRDP-IB-R003-ZAM-004-000-000-2015 Luzon A Region 3 Zambales 2nd Iba Improvement of Dirita - San Agustin Farm to Market Road Farm to Market Road (FMR) Kilometer 10.220 84,248,327.78 10,531,040.97 10,531,040.97 0.00 105,310,409.72 1,267 2,479 2,291 4,770 Completed (100%) 100.00% physical progress as of Jan. 15, 2022 » VIEW S-CURVE TJ Velaco Construction and Supply
200 PRDP-IB-R003-PAM-001-000-000-2014 Luzon A Region 3 Pampanga 2nd Floridablanca Improvement of Calantas - Planas - San Jose Farm to Market Road Farm to Market Road (FMR) Kilometer 5.860 47,835,574.81 5,979,446.85 5,979,446.85 0.00 59,794,468.51 3,986 9,313 8,887 18,200 Completed (100%) 100.00% physical progress as of Jun. 15, 2022 » VIEW S-CURVE POWER K CONSTRUCTION SUPPLY & SERVICES
201 PRDP-IB-R003-NUE-008-TAL-001-2015 Luzon A Region 3 Nueva Ecija 1st Talavera Improvement of Poblacion Sur, La Torre, Bantug - Mamandil Farm to Market Road Farm to Market Road (FMR) Kilometer 3.760 30,264,265.26 3,783,033.16 3,783,033.16 0.00 37,830,331.58 2,862 6,511 6,429 12,940 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE SPJ Construction
202 PRDP-IB-R003-NUE-003-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Improvement of Hulo-Malaya-Dolores Farm-to-Market Road with Two (2) Lane Bridge FMR with Bridge Kilometer 3.180 67,119,779.95 8,389,972.49 8,389,972.49 0.00 83,899,724.93 1,642 3,275 3,412 6,687 Completed (100%) 100.00% physical progress as of Nov. 15, 2022 » VIEW S-CURVE TJ Velasco
203 PRDP-IB-R003-PAM-003-000-000-2015 Luzon A Region 3 Pampanga 4th Macabebe Improvement of San Jose - Castuli Farm to Market Road Farm to Market Road (FMR) Kilometer 2.680 37,880,451.31 4,735,056.41 4,735,056.41 0.00 47,350,564.13 14,287 2,524 2,372 4,896 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE ORANI BUILDERS SUPPLY
204 PRDP-IB-R003-BAT-004-000-000-2015 Luzon A Region 3 Bataan 1st Hermosa Improvement of Sitio Nazareno - Culis Farm to Market Road Farm to Market Road (FMR) Kilometer 5.720 72,251,528.50 9,031,441.06 9,031,441.06 0.00 90,314,410.62 211 513 475 988 Fifty percent and above progress 51.55% physical progress as of Oct. 15, 2024 » VIEW S-CURVE Viking Construction and Supplies
205 PRDP-IB-R003-AUR-009-000-000-2019 Luzon A Region 3 Aurora Lone Dinalungan Construction of Warehouse with Multi Purpose Drying Pavement, Brgy. Paleg Dinalungan Others Square Meter 420.000 30,638,496.00 3,829,812.00 3,829,812.00 0.00 38,298,120.00 296 654 624 1,278 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
206 PRDP-IB-R003-BUL-010-000-000-2017 Luzon A Region 3 Bulacan 3rd San Miguel Improvement of Lambakin -Malibay Farm to Market Road Farm to Market Road (FMR) Kilometer 5.000 68,992,000.00 8,624,000.00 8,624,000.00 0.00 86,240,000.00 1,020 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
207 PRDP-IB-R003-NUE-010-000-000-2014 Luzon A Region 3 Nueva Ecija 4th Peñaranda Improvement of Partida Road (Las Pinas - Sinasajan - San Mariano Farm - to Market Road) Farm to Market Road (FMR) Kilometer 5.600 65,688,000.00 8,211,000.00 8,211,000.00 0.00 82,110,000.00 1,837 4,247 4,204 8,451 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
208 PRDP-IB-R003-NUE-011-000-000-2014 Luzon A Region 3 Nueva Ecija 1st Cuyapo Improvement of Bonifacio - San Juan Farm - to - Market Road Farm to Market Road (FMR) Kilometer 4.400 29,760,172.97 3,720,021.62 3,720,021.62 0.00 37,200,216.21 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
209 PRDP-IB-R003-PAM-003-000-000-2018 Luzon A Region 3 Pampanga 3rd Arayat Construction of Tilapia Hatchery Others Square Meter 15141.000 129,360,000.00 16,170,000.00 16,170,000.00 0.00 161,700,000.00 800 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
210 PRDP-IB-R003-PAM-004-000-000-2019 Luzon A Region 3 Pampanga 2nd Floridablanca Proposed Nabuclod PWS Potable Water Supply (PWS) Level 2 Number of Households 600.000 10,348,800.00 1,293,600.00 1,293,600.00 0.00 12,936,000.00 350 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
211 PRDP-IB-R003-PAM-005-000-000-2019 Luzon A Region 3 Pampanga 2nd Porac Proposed Villa Maria PWS Potable Water Supply (PWS) Level 2 Number of Households 300.000 6,899,200.00 862,400.00 862,400.00 0.00 8,624,000.00 300 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
212 PRDP-IB-R003-NUE-023-000-000-2019 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Cold Storage Others Square Meter 1895.000 86,240,000.00 10,780,000.00 10,780,000.00 0.00 107,800,000.00 1,350 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
213 PRDP-IB-R003-AUR-006-000-000-2016 Luzon A Region 3 Aurora Lone Casiguran Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,827,900.40 853,487.55 853,487.55 0.00 8,534,875.50 146 292 290 582 Completed (100%) 100.00% physical progress as of Nov. 15, 2018 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
214 PRDP-IB-R003-AUR-007-000-000-2016 Luzon A Region 3 Aurora Lone Dilasag Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,395,381.04 549,422.63 549,422.63 0.00 5,494,226.30 463 1,118 1,075 2,193 Completed (100%) 100.00% physical progress as of May. 17, 2018 » VIEW S-CURVE EDFROBON CONSTRUCTION SERVICES INC.
215 PRDP-IB-R003-NUE-013-CAR-002-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,325,187.12 790,648.39 790,648.39 0.00 7,906,483.90 33 32 1 33 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
216 PRDP-IB-R003-NUE-014-CAR-003-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,379,249.74 797,406.22 797,406.22 0.00 7,974,062.18 29 29 1 30 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
217 PRDP-IB-R003-NUE-015-CAR-004-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,112,755.30 514,094.41 514,094.41 0.00 5,140,944.12 27 26 4 30 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE RAQ RIVERA TRADING, DESIGN AND CONSTRUCTION
218 PRDP-IB-R003-NUE-016-CAR-005-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 300.000 4,088,054.96 511,006.87 511,006.87 0.00 5,110,068.70 100 100 - 100 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE Vyragus Construction
219 PRDP-IB-R003-NUE-017-CAR-006-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Barangay San Agustin Communal Irrigation System (Tabon Mayor SWIP), Carranglan Nueva Ecija Communal Irrigation System (CIS) Hectare 949.000 45,126,264.06 5,640,783.01 5,640,783.01 0.00 56,407,830.08 2,569 6,400 6,446 12,846 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE Vyragus Construction
220 PRDP-IB-R003-NUE-018-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,324,681.74 790,585.22 790,585.22 0.00 7,905,852.18 1,850 847 1,020 1,867 Completed (100%) 100.00% physical progress as of Jun. 15, 2018 » VIEW S-CURVE Ayana Construction and Trading
221 PRDP-IB-R003-NUE-019-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,380,986.14 797,623.27 797,623.27 0.00 7,976,232.68 36 29 11 40 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Adroit Construction
222 PRDP-IB-R003-NUE-020-000-000-2016 Luzon A Region 3 Nueva Ecija 1st Santo Domingo Construction of Warehouse with Multi-Purpose Drying Pavement Others Square Meter 300.000 4,116,731.07 514,591.38 514,591.38 0.00 5,145,913.83 45 38 12 50 Completed (100%) 100.00% physical progress as of Nov. 15, 2018 » VIEW S-CURVE R.D. Talens Construction and Trading
223 PRDP-IB-R003-BUL-008-000-000-2017 Luzon A Region 3 Bulacan 3rd San Ildefonso Improvement of Gabihan-Basuit-Sapang Putik Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.180 62,364,061.43 7,795,507.68 7,795,507.68 0.00 77,955,076.79 2,188 4,783 4,624 9,407 Approved by RPAB For Issuance of NOL 1
224 PRDP-IB-R003-NUE-021-PAL-001-2017 Luzon A Region 3 Nueva Ecija 3rd Palayan City Construction of Cold Storage Others Square Meter 2225.200 152,640,613.96 19,080,076.75 19,080,076.75 0.00 190,800,767.46 3,760 605 147 752 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ARN BUILDERS
225 PRDP-IB-R003-NUE-012-CAR-001-2016 Luzon A Region 3 Nueva Ecija 2nd Carranglan Construction of Warehouse with Multi-purpose Drying Pavement Others Square Meter 558.000 6,379,249.74 797,406.22 797,406.22 0.00 7,974,062.18 25 - 25 25 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE Vyragus Construction
226 PRDP-IB-R003-BAT-006-000-000-2017 Luzon A Region 3 Bataan 2nd Orion Construction of Multi Commodity Solar Tunnel Dryer Others Square Meter 340.000 7,960,146.98 995,018.37 995,018.37 0.00 9,950,183.72 420 45 108 153 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE RZ TIGAS Construction and Trading
227 PRDP-IB-R003-BAT-008-000-000-2019 Luzon A Region 3 Bataan 1st Orani Construction of Fish Landing and Trading Facility Others Square Meter 3385.680 147,140,853.43 18,392,606.68 18,392,606.68 0.00 183,926,066.79 - 4,824 4,788 9,612 Fifty percent and above progress 83.28% physical progress as of Nov. 15, 2024 » VIEW S-CURVE FFJJ CONSTRUCTION
228 PRDP-IB-R003-NUE-024-BON-023-2019 Luzon A Region 3 Nueva Ecija 3rd Bongabon Construction of Cold Storage Others Square Meter 2500.000 169,467,085.58 21,183,385.70 21,183,385.70 0.00 211,833,856.98 14,990 32,475 31,698 64,173 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE ARN BUIILDERS INC.
229 PRDP-IB-R003-PAM-007-000-000-2020 Luzon A Region 3 Pampanga 4th Minalin Construction of Feed Mill Plant for Tilapia Others Square Meter 0.000 80,000,000.00 10,000,000.00 10,000,000.00 0.00 100,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
230 PRDP-IB-R003-PAM-006-000-000-2020 Luzon A Region 3 Pampanga 3rd Santa Ana Construction of Consolidation & Trading Area for Tilapia & other commodity Others Square Meter 400.000 12,503,998.70 1,562,999.84 1,562,999.84 0.00 15,629,998.38 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
231 PRDP-IB-R003-NUE-028-TAL-024-2019 Luzon A Region 3 Nueva Ecija 1st Talavera Construction of Cold Storage Others Square Meter 12452.000 164,934,564.62 20,616,820.58 20,616,820.58 0.00 206,168,205.78 8,241 20,838 20,203 41,041 Approved by RPAB For endorsement to NPCO
232 PRDP-IB-R003-PAM-008-MIN-001-2020 Luzon A Region 3 Pampanga 4th Minalin Construction of Aqua Feed Mill Others Square Meter 3364.000 227,823,813.67 28,477,976.71 28,477,976.71 0.00 284,779,767.09 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
233 PRDP-IB-R003-AUR-009-000-000-2023 Luzon A Region 3 Aurora Improvement of Agues-Cozo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.800 144,000,000.00 18,000,000.00 18,000,000.00 0.00 180,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
234 PRDP-IB-R003-AUR-008-000-000-2023 Luzon A Region 3 Aurora Improvement of Salay – Kadayakan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.500 79,200,000.00 9,900,000.00 9,900,000.00 0.00 99,000,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
235 PRDP-IB-R003-ZAM-006-PAL-006-2023 Luzon A Region 3 Zambales 2nd Palauig Improvement of Pangolingan Farm to Market Road Farm to Market Road (FMR) Kilometer 6.820 98,912,800.00 12,364,100.00 12,364,100.00 0.00 123,641,000.00 1,267 2,479 2,291 4,770 Under Validation No validation date
236 PRDP-IB-R003-ZAM-006-MAS-001-2019 Luzon A Region 3 Zambales 2nd Masinloc Improvement of Baloganon - Sitio Coto, Taltal Farm-to-Market Road and Construction of Two Lane Bridges FMR with Bridge Kilometer 26.190 593,600,000.00 74,200,000.00 74,200,000.00 0.00 742,000,000.00 3,953 6,693 7,816 14,509 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
237 PRDP-IB-R003-NUE-031-000-000-2020 Luzon A Region 3 Nueva Ecija 2nd Muñoz City Construction of Nueva Ecija Onion Cold Storage Facility Others Square Meter 2500.000 167,964,000.00 20,995,500.00 20,995,500.00 0.00 209,955,000.00 8,241 20,203 41,041 61,244 Fifty percent and above progress 93.96% physical progress as of Nov. 30, 2024 » VIEW S-CURVE ARN BUIILDERS INC.
238 PRDP-IB-R04A-QUE-013-SAF-001-2014 Luzon B Region 4A Quezon 3rd San Francisco Concreting of Barangay Huyon- Uyon - Pagsangahan and Huyon-Uyon - Sto. Niño FMR Farm to Market Road (FMR) Kilometer 12.200 199,101,562.40 24,887,695.30 24,887,695.30 0.00 248,876,953.00 2,587 8,137 7,386 15,523 Approved by RPAB For endorsement to NPCO
239 PRDP-IB-R04A-QUE-029-INF-002-2015 Luzon B Region 4A Quezon 1st Infanta Concreting of Tongohin FMR Farm to Market Road (FMR) Kilometer 2.130 17,547,792.91 2,193,474.11 2,193,474.11 0.00 21,934,741.13 2,360 5,740 5,618 11,358 Approved by RPAB For endorsement to NPCO
240 PRDP-IB-R04A-QUE-036-GUI-002-2015 Luzon B Region 4A Quezon 4th Guinayangan Concreting of Sta. Cruz-Magallanes Farm to Market Road Farm to Market Road (FMR) Kilometer 21.190 130,215,337.63 16,276,917.20 16,276,917.20 0.00 162,769,172.03 1,522 3,422 3,230 6,652 Approved by RPAB For endorsement to NPCO
241 PRDP-IB-R04A-QUE-038-PIT-001-2015 Luzon B Region 4A Quezon 3rd Pitogo Construction of Brgy. Pina - Cabulihan FMR Farm to Market Road (FMR) Kilometer 8.560 63,688,752.00 7,961,094.00 7,961,094.00 0.00 79,610,940.00 - 1,129 968 2,097 Approved by RPAB For endorsement to NPCO
242 PRDP-IB-R04A-QUE-003-GUI-001-2014 Luzon B Region 4A Quezon 4th Guinayangan Concreting of Manggagawa - Capuluan Central FMR Farm to Market Road (FMR) Kilometer 15.740 94,500,646.17 11,812,580.77 11,812,580.77 0.00 118,125,807.71 2,877 6,549 6,234 12,783 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE C. B. Garay Philwide Construction/Bomel Construction(JV)
243 PRDP-IB-R04A-QUE-002-CAN-001-2014 Luzon B Region 4A Quezon 2nd Candelaria Improvement of Sta. Catalina Norte-San Isidro-Kinatihan I -Kinatihan II-Pahinga Norte FMR Farm to Market Road (FMR) Kilometer 12.480 74,572,784.14 9,321,598.02 9,321,598.02 0.00 93,215,980.18 3,334 10,069 9,936 20,005 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE R.V. LABORTE BUILDER
244 PRDP-IB-R04A-QUE-006-LUE-002-2014 Luzon B Region 4A Quezon 2nd Lucena City Rehabilitation of Purok Baybayin-Ibabang Dupay-Purok Centro Itaas-Ilayang Dupay FMR Farm to Market Road (FMR) Kilometer 1.920 12,553,117.28 1,569,139.66 1,569,139.66 0.00 15,691,396.60 1,565 4,642 4,749 9,391 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE Jemak Construction
245 PRDP-IB-R04A-QUE-009-SAM-001-2014 Luzon B Region 4A Quezon 1st Sampaloc Construction of Mamala - Taquico - Caldong FMR Farm to Market Road (FMR) Kilometer 10.380 127,526,882.22 15,940,860.28 15,940,860.28 0.00 159,408,602.78 94 189 155 344 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE DQT BUILDERS
246 PRDP-IB-R04A-QUE-010-SAA-001-2014 Luzon B Region 4A Quezon 3rd San Andres Concreting of Camflora FMR Project Farm to Market Road (FMR) Kilometer 6.710 59,891,205.12 7,486,400.64 7,486,400.64 0.00 74,864,006.40 1,354 3,898 4,224 8,122 Completed (100%) 100.00% physical progress as of Aug. 15, 2021 » VIEW S-CURVE DUMDUMA CONSTRUCTION AND TRADING CORPORATION
247 PRDP-IB-R04A-QUE-012-SAN-001-2014 Luzon B Region 4A Quezon 2nd San Antonio Concreting of San Jose - Del Valle FMR Farm to Market Road (FMR) Kilometer 9.630 78,741,665.20 9,842,708.15 9,842,708.15 0.00 98,427,081.50 2,276 5,366 6,831 12,197 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE NDM Sanchez Builders Corporation
248 PRDP-IB-R04A-QUE-018-MAC-001-2015 Luzon B Region 4A Quezon 3rd Macalelon Concreting of San Nicolas-Malabahay FMR Farm to Market Road (FMR) Kilometer 6.060 20,111,685.52 2,513,960.69 2,513,960.69 0.00 25,139,606.90 923 2,592 1,785 4,377 Completed (100%) 100.00% physical progress as of Sep. 15, 2018 » VIEW S-CURVE Edison Development and Construction / Lead Tek Construction
249 PRDP-IB-R04A-LAG-002-LUI-001-2015 Luzon B Region 4A Laguna 4th Luisiana Construction of Luisiana Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 4735.000 58,968,765.33 7,371,095.67 7,371,095.67 0.00 73,710,956.67 4,735 12,790 10,885 23,675 Less than fifty percent progress 45.26% physical progress as of Oct. 15, 2018 » VIEW S-CURVE ILG Enterprises and C.T. Leoncio Construction and Trading (Joint Venture)
250 PRDP-IB-R04A-QUE-031-PER-001-2015 Luzon B Region 4A Quezon 4th Perez Concreting of Mainit Sur - Mainit Norte - Pambuhan FMR Project Farm to Market Road (FMR) Kilometer 5.120 46,330,450.02 5,791,306.25 5,791,306.25 0.00 57,913,062.52 1,211 2,922 2,848 5,770 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE RAM Builders
251 PRDP-IB-R04A-QUE-004-LUC-001-2014 Luzon B Region 4A Quezon 1st Lucban Concreting of Nalunao-Kalangay-Mahabang Parang-Aliliw-Kabatete-Piis FMR Farm to Market Road (FMR) Kilometer 15.480 60,574,627.99 7,571,828.50 7,571,828.50 0.00 75,718,284.99 419 890 653 1,543 Completed (100%) 103.37% physical progress as of Dec. 15, 2022 » VIEW S-CURVE R.A. Mendiola Construction & Developer
252 PRDP-IB-R04A-QUE-001-MUL-001-2014 Luzon B Region 4A Quezon 3rd Mulanay Concreting of Brgy. San Isidro-Canuyep-F. Nañadiego-Matataja-Patabog Farm-to-Market Road with Bridge Component FMR with Bridge Kilometer 8.180 112,740,179.05 14,092,522.38 14,092,522.38 0.00 140,925,223.81 2,250 6,304 5,870 12,174 Completed (100%) 101.86% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Dumduma Construction and Trading Corporation
253 PRDP-IB-R04A-QUE-040-GEN-001-2015 Luzon B Region 4A Quezon 3rd General Luna Concreting of San Vicente-Malaya, Quezon Farm to Market Road Farm to Market Road (FMR) Kilometer 15.400 138,259,200.00 17,282,400.00 17,282,400.00 0.00 172,824,000.00 1,562 6,747 6,314 13,061 Fifty percent and above progress 88.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Linear Construction Corporation
254 PRDP-IB-R04A-QUE-026-POL-001-2015 Luzon B Region 4A Quezon 1st Polillo Construction of Atulayan - Bislian - Pamatdan FMR Farm to Market Road (FMR) Kilometer 11.860 125,001,357.66 15,625,169.71 15,625,169.71 0.00 156,251,697.08 979 2,321 2,174 4,495 Less than fifty percent progress 25.86% physical progress as of Nov. 15, 2022 » VIEW S-CURVE LSD Construction and Supplies
255 PRDP-IB-R04A-BTG-001-LOB-001-2015 Luzon B Region 4A Batangas 2nd Lobo Concreting of Farm to Market Road, Barangay Olo-olo, Mabilog na Bundok and Nagtaluntong (Phase I) Farm to Market Road (FMR) Kilometer 8.060 103,082,243.54 12,885,280.44 12,885,280.44 0.00 128,852,804.42 1,796 4,631 4,349 8,980 Completed (100%) 100.00% physical progress as of Mar. 15, 2019 » VIEW S-CURVE Pacific Concrete Products
256 PRDP-IB-R04A-QUE-008-BUE-001-2014 Luzon B Region 4A Quezon 3rd Buenavista Improvement/ Concreting of Cadlit-Manlana-Mabutag-Cawa FMR Farm to Market Road (FMR) Kilometer 12.080 96,501,568.58 12,062,696.07 12,062,696.07 0.00 120,626,960.72 1,812 4,521 4,095 8,616 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Edison Development And Construction
257 PRDP-IB-R04A-QUE-014-SAR-001-2014 Luzon B Region 4A Quezon 3rd San Narciso Concreting of Barangay Binay, Busok Busokan, San Vicente FMR Farm to Market Road (FMR) Kilometer 9.050 71,652,914.24 8,956,614.28 8,956,614.28 0.00 89,566,142.80 8,862 22,434 21,878 44,312 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE Edison Development Corporation
258 PRDP-IB-R04A-LAG-001-CAV-001-2014 Luzon B Region 4A Laguna 4th Cavinti Construction of Level II Cavinti Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 2624.000 21,159,598.00 2,644,949.75 2,644,949.75 0.00 26,449,497.50 2,624 5,405 5,091 10,496 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE ARDC Construction & Supplies
259 PRDP-IB-R04A-QUE-032-TAG-002-2015 Luzon B Region 4A Quezon 4th Tagkawayan Concreting of Sta. Monica – Sto. Niño – Manato Station FMR Farm to Market Road (FMR) Kilometer 10.040 115,564,615.70 14,445,576.96 14,445,576.96 0.00 144,455,769.62 885 2,004 2,046 4,050 Fifty percent and above progress 86.50% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Hi-Tri Development Corporation
260 PRDP-IB-R04A-QUE-039-PAN-001-2015 Luzon B Region 4A Quezon 1st Panukulan Concreting of Poblacion - Pinag-agan Farm to Market Road Farm to Market Road (FMR) Kilometer 8.140 105,211,560.26 13,151,445.03 13,151,445.03 0.00 131,514,450.32 698 1,721 1,779 3,500 Fifty percent and above progress 97.64% physical progress as of Nov. 30, 2024 » VIEW S-CURVE C. B. Garay Philwide Builders
261 PRDP-IB-R04A-BTG-003-000-000-2018 Luzon B Region 4A Batangas 4th San Juan Concreting of Sapangan-Libato FMR Farm to Market Road (FMR) Kilometer 7.320 86,058,400.00 10,757,300.00 10,757,300.00 0.00 107,573,000.00 2,289 5,202 5,100 10,302 Approved by RPAB For endorsement to NPCO
262 PRDP-IB-R04A-BTG-008-IBA-007-2019 Luzon B Region 4A Batangas 4th Ibaan Poultry/Breeder Farm Others Square Meter 1666.670 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 30 20 10 30 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
263 PRDP-IB-R04A-BTG-009-PAD-008-2019 Luzon B Region 4A Batangas 4th Padre Garcia Slaughter House & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
264 PRDP-IB-R04A-BTG-010-IBA-009-2019 Luzon B Region 4A Batangas 4th Ibaan Culled Dressing & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 30 80 90 170 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
265 PRDP-IB-R04A-BTG-011-ROS-010-2019 Luzon B Region 4A Batangas 4th Rosario Poultry/Swine Breeder Farm Others Square Meter 1666.670 43,120,000.00 5,390,000.00 5,390,000.00 0.00 53,900,000.00 50 120 100 220 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
266 PRDP-IB-R04A-BTG-012-BAT-001-2019 Luzon B Region 4A Batangas 2nd Batangas City Grain Storage Facility Others Square Meter 2166.670 20,000,000.00 2,500,000.00 2,500,000.00 0.00 25,000,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
267 PRDP-IB-R04A-BTG-013-SAN-011-2019 Luzon B Region 4A Batangas 4th San Jose Culled Dressing & Cold Storage Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
268 PRDP-IB-R04A-BTG-014-SAN-012-2019 Luzon B Region 4A Batangas 4th San Jose Powdered Egg Processing Others Square Meter 666.670 17,248,000.00 2,156,000.00 2,156,000.00 0.00 21,560,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
269 PRDP-IB-R04A-BTG-015-000-000-2019 Luzon B Region 4A Batangas Shared Facility for the processing of Banana, Rootcrops, Cacao and Coffee Others Square Meter 300.000 7,761,600.00 970,200.00 970,200.00 0.00 9,702,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
270 PRDP-IB-R04A-BTG-016-000-000-2019 Luzon B Region 4A Batangas Dairy Processing Facility (Carabao) Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
271 PRDP-IB-R04A-CAV-001-MAR-001-2019 Luzon B Region 4A Cavite 7th Maragondon Slaughter House Facility Others Square Meter 519.210 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
272 PRDP-IB-R04A-CAV-002-GER-002-2019 Luzon B Region 4A Cavite 6th General Trias Dairy Processing Facility (Carabao) Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
273 PRDP-IB-R04A-CAV-003-SIL-003-2019 Luzon B Region 4A Cavite 5th Silang Pineapple Processing Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 80 80 160 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
274 PRDP-IB-R04A-LAG-006-000-000-2019 Luzon B Region 4A Laguna Coco Water Processing Center Others Square Meter 1000.000 25,872,000.00 3,234,000.00 3,234,000.00 0.00 32,340,000.00 40 100 100 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
275 PRDP-IB-R04A-LAG-007-CAA-007-2019 Luzon B Region 4A Laguna 3rd Calauan Rehab. Of Dairy Processing Facility Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 70 80 150 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
276 PRDP-IB-R04A-LAG-008-SAA-008-2019 Luzon B Region 4A Laguna 4th Santa Maria Establishment of Coffee Shop Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 70 90 160 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
277 PRDP-IB-R04A-QUE-029-MAU-001-2018 Luzon B Region 4A Quezon 1st Mauban Upgrade, Rehabilitate and Expansion of Mauban Batok-Toro Potable Water System Level II Subproject Potable Water Supply (PWS) Level 2 Number of Households 0.000 72,494,577.15 9,061,822.14 9,061,822.14 0.00 90,618,221.43 4,582 10,344 10,000 20,344 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
278 PRDP-IB-R04A-QUE-030-LUE-002-2019 Luzon B Region 4A Quezon 2nd Lucena City Cold Storage Facility Others Square Meter 268.460 8,624,000.00 1,078,000.00 1,078,000.00 0.00 10,780,000.00 40 102 80 182 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
279 PRDP-IB-R04A-QUE-031-REA-029-2019 Luzon B Region 4A Quezon 1st Real Fish Landing & Cold Storage Others Square Meter 1342.280 43,120,000.00 5,390,000.00 5,390,000.00 0.00 53,900,000.00 50 120 80 200 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
280 PRDP-IB-R04A-QUE-032-GEE-030-2019 Luzon B Region 4A Quezon 1st General Nakar Poultry Farm Facility Others Square Meter 100.000 2,587,200.00 323,400.00 323,400.00 0.00 3,234,000.00 30 90 80 170 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
281 PRDP-IB-R04A-QUE-033-SAR-031-2019 Luzon B Region 4A Quezon 3rd San Narciso Coconut Sap Sugar Processing Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 30 60 80 140 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
282 PRDP-IB-R04A-QUE-034-UNI-032-2019 Luzon B Region 4A Quezon 3rd Unisan Geonet/Twine Rope Project Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
283 PRDP-IB-R04A-QUE-035-MAU-033-2019 Luzon B Region 4A Quezon 1st Mauban Geonet/Twine Rope Project Others Square Meter 166.670 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
284 PRDP-IB-R04A-QUE-036-SAI-034-2019 Luzon B Region 4A Quezon 2nd Sariaya Cold Storage Facility Others Square Meter 134.230 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
285 PRDP-IB-R04A-QUE-037-ATI-035-2019 Luzon B Region 4A Quezon 4th Atimonan Processing of Dried Cacao Beans Others Square Meter 200.000 5,174,400.00 646,800.00 646,800.00 0.00 6,468,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
286 PRDP-IB-R04A-QUE-042-000-000-2018 Luzon B Region 4A Quezon 4th Lopez Rehabilitation/Concreting of Circumferential FMR Brgy. Jongo-Cogorin Ibaba Farm to Market Road (FMR) Kilometer 15.740 206,383,731.58 25,797,966.45 25,797,966.45 0.00 257,979,664.48 1,354 3,463 3,307 6,770 Approved by RPAB For endorsement to NPCO
287 PRDP-IB-R04A-QUE-043-000-000-2018 Luzon B Region 4A Quezon 3rd Unisan Concreting of Mairok Ibaba-cIlaya-Burgos-Bulo Ilaya-Kalilayan Ilaya FMR Farm to Market Road (FMR) Kilometer 10.000 130,076,914.38 16,259,614.30 16,259,614.30 0.00 162,596,142.98 647 1,366 1,578 2,944 Approved by RPAB For endorsement to NPCO
288 PRDP-IB-R04A-QUE-044-000-000-2018 Luzon B Region 4A Quezon 4th Atimonan Road Opening/Construction of Farm-to-Market Road in Barangay San Rafael-San Jose Balatok-Manggalayan Bundok Farm to Market Road (FMR) Kilometer 12.000 119,694,341.22 14,961,792.65 14,961,792.65 0.00 149,617,926.52 574 1,202 1,040 2,242 Approved by RPAB For endorsement to NPCO
289 PRDP-IB-R04A-RIZ-001-MOR-001-2019 Luzon B Region 4A Rizal 2nd Morong Sitio Pugala to Yapak, Lagundi, Morong, Rizal Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.400 76,948,777.88 9,618,597.24 9,618,597.24 0.00 96,185,972.36 - - - - Approved by RPAB For endorsement to NPCO
290 PRDP-IB-R04A-BTG-004-000-000-2018 Luzon B Region 4A Batangas 4th Taysan Concreting and Improvement of San Isidro-Pinagbayanan-Guinhawa Farm-to-Market Road Taysan, Batangas Farm to Market Road (FMR) Kilometer 17.000 224,150,230.42 28,018,778.80 28,018,778.80 0.00 280,187,788.02 1,371 3,289 3,207 6,496 Approved by RPAB For endorsement to NPCO
291 PRDP-IB-R04A-QUE-041-REA-036-2018 Luzon B Region 4A Quezon 1st Real Construction of Pandan-Masikap FMR Farm to Market Road (FMR) Kilometer 13.110 199,804,713.51 24,975,589.19 24,975,589.19 0.00 249,755,891.89 350 822 750 1,572 Approved by RPAB For endorsement to NPCO
292 PRDP-IB-R04A-LAG-005-CAV-002-2018 Luzon B Region 4A Laguna 4th Cavinti Construction of Level II Potable Water System in Brgy. Cansuso and Paowin, Cavinti, Laguna Potable Water Supply (PWS) Level 2 Number of Households 0.000 46,068,135.54 5,758,516.94 5,758,516.94 0.00 57,585,169.42 506 1,209 1,135 2,344 Approved by RPAB For endorsement to NPCO
293 PRDP-IB-R04A-QUE-045-000-000-2018 Luzon B Region 4A Quezon 4th Alabat Construction/Concreting of Villa Jesus Este-Pantay Sabang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.180 59,794,250.66 7,474,281.33 7,474,281.33 0.00 74,742,813.32 91 349 - 349 Approved by RPAB For endorsement to NPCO
294 PRDP-IB-R04A-QUE-041-CAT-001-2017 Luzon B Region 4A Quezon 3rd Catanauan Construction of San Isidro – Bolo – San Vicente Kanluran- San Vicente Silangan-Sta. Maria DAO FMR Farm to Market Road (FMR) Kilometer 12.360 136,854,038.85 17,106,754.86 17,106,754.86 0.00 171,067,548.57 3,073 6,898 6,875 13,773 Completed (100%) 100.00% physical progress as of Nov. 15, 2021 » VIEW S-CURVE DQT Builders Corporation
295 PRDP-IB-R04A-LAG-003-SAA-001-2018 Luzon B Region 4A Laguna 4th Santa Maria Concreting of Kayhakat-Bubucal-Inayapan-Calangay-Coralan-Bagumbayan-Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.170 84,869,860.74 10,608,732.59 10,608,732.59 0.00 106,087,325.92 2,261 5,568 5,330 10,898 Completed (100%) 100.00% physical progress as of May. 15, 2022 » VIEW S-CURVE DUMDUMA CONSTRUCTION AND TRADING CORPORATION
296 PRDP-IB-R04A-QUE-042-SAI-001-2017 Luzon B Region 4A Quezon 2nd Sariaya Rehabilitation and Concreting of Concepcion Palasan to Manggalang Kiling Farm-To-Market-Road with Line Canal Farm to Market Road (FMR) Kilometer 13.900 149,918,002.43 18,739,750.30 18,739,750.30 0.00 187,397,503.03 8,862 20,634 19,960 40,594 Completed (100%) 100.00% physical progress as of Jan. 15, 2022 » VIEW S-CURVE L.A. Clamor Construction
297 PRDP-IB-R04A-BTG-002-TAN-001-2016 Luzon B Region 4A Batangas 3rd Tanauan City Construction of Brgy. Pantay Matanda, Pagaspas, Trapiche, Sambat, Natatas, Bagumbayan, Tinurik, BanJo West, and Banjo East, Farm to Market Road FMR with Bridge Kilometer 7.800 164,800,000.00 20,600,000.00 20,600,000.00 0.00 206,000,000.00 8,533 - - - Approved by RPAB For Issuance of NOL 1
298 PRDP-IB-R04A-BTG-006-TAY-005-2018 Luzon B Region 4A Batangas 4th Taysan Improvement of Brgy. Sto. Niño to Brgy. Piña Farm-to-Market Road with Bridge FMR with Bridge Kilometer 4.300 81,535,372.86 10,191,921.61 10,191,921.61 0.00 101,919,216.08 887 2,245 2,213 4,458 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE N.D.M. Sanchez Builders Development Corporation
299 PRDP-IB-R04A-LAG-009-MAJ-001-2018 Luzon B Region 4A Laguna 4th Majayjay Rehabilitation and Improvement of Level II Potable Water System in Majayjay, Laguna Potable Water Supply (PWS) Level 2 Number of Households 0.000 72,505,817.78 9,063,227.22 9,063,227.22 0.00 90,632,272.22 960 1,994 1,912 3,906 Approved by RPAB For endorsement to NPCO
300 PRDP-IB-R04A-BTG-007-SAL-001-2018 Luzon B Region 4A Batangas 2nd San Luis Rehabilitation of Farm-to-Market Road of Calumpang East and Calumpang West Farm to Market Road (FMR) Kilometer 1.590 16,914,363.02 2,114,295.38 2,114,295.38 0.00 21,142,953.78 750 1,339 1,285 2,624 Completed (100%) 100.00% physical progress as of Nov. 15, 2020 » VIEW S-CURVE V.R Patron Builders & Developers Corporation
301 PRDP-IB-R04A-BTG-005-000-000-2018 Luzon B Region 4A Batangas 4th Rosario Concreting and Improvement of Rosario FMR (Phase 1) Farm to Market Road (FMR) Kilometer 4.440 58,939,932.94 7,367,491.62 7,367,491.62 0.00 73,674,916.18 3,151 12,310 11,688 23,998 Fifty percent and above progress 71.01% physical progress as of Nov. 15, 2024 » VIEW S-CURVE M.V. Caldo Construction and Supply Corporation
302 PRDP-IB-R04A-LAG-011-CAV-011-2020 Luzon B Region 4A Laguna 4th Cavinti Rehabilitation/Concreting of Poblacion – Sisilimin - Bukal- Cansuso- Paowin Farm-to-Market Road with Bridge Component FMR with Bridge Kilometer 10.850 197,221,799.12 24,652,724.89 24,652,724.89 0.00 246,527,248.90 1,136 2,413 2,363 4,776 Approved by RPAB For endorsement to NPCO
303 PRDP-IB-R04A-QUE-038-PAD-036-2021 Luzon B Region 4A Quezon 3rd Padre Burgos Construction/Concreting of Cabuyao Norte - Walay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.220 93,655,186.42 11,706,898.30 11,706,898.30 0.00 117,068,983.02 555 1,403 1,310 2,713 Approved by RPAB For endorsement to NPCO
304 PRDP-IB-R04A-LAG-010-SAA-010-2021 Luzon B Region 4A Laguna 4th Santa Maria Construction of Bagumbayan-Pao-o – Parang ng Buho Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.490 79,209,913.67 9,901,239.21 9,901,239.21 0.00 99,012,392.09 3,295 4,828 4,452 9,280 Approved by RPAB For endorsement to NPCO
305 PRDP-IB-R04A-QUE-039-CAT-037-2020 Luzon B Region 4A Quezon 3rd Catanauan Construction of Brgy. San Roque-San Antonio Magcopa-San Pablo Suha-Doongan Ilaya Farm to Market Road w/ Bridge Component FMR with Bridge Kilometer 11.000 191,690,211.82 23,961,276.48 23,961,276.48 0.00 239,612,764.78 2,367 5,576 5,427 11,003 Approved by RPAB For endorsement to NPCO
306 PRDP-IB-R04A-QUE-044-SAM-042-2021 Luzon B Region 4A Quezon 1st Sampaloc Construction of Ilayang Owain - Bataan FMR Farm to Market Road (FMR) Kilometer 6.980 126,195,728.35 15,774,466.04 15,774,466.04 0.00 157,744,660.43 - - - - Approved by RPAB For endorsement to NPCO
307 PRDP-IB-R04A-QUE-042-BUE-040-2022 Luzon B Region 4A Quezon 3rd Buenavista Concreting of Brgy. Lilukin to Villa Magsaysay Farm To Market Road Farm to Market Road (FMR) Kilometer 8.980 186,323,231.23 23,290,403.90 23,290,403.90 0.00 232,904,039.03 - - - - Approved by RPAB For endorsement to NPCO
308 PRDP-IB-R04A-QUE-040-GEE-038-2021 Luzon B Region 4A Quezon 1st General Nakar Concreting of Anoling - Magsikap Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.960 116,844,147.17 14,605,518.40 14,605,518.40 0.00 146,055,183.97 1,572 3,643 3,389 7,032 Approved by RPAB For endorsement to NPCO
309 PRDP-IB-R04A-QUE-041-SAI-039-2022 Luzon B Region 4A Quezon 2nd Sariaya Concreting and Rehabilitation of Farm-to-Market Road of Castañas-Limbon-Canda-Janagdong 2-Janagdong 1-Tumbaga 2-Sampaloc 2 with Line Canal and Bridge FMR with Bridge Kilometer 13.270 173,895,147.58 21,736,893.45 21,736,893.45 0.00 217,368,934.48 720 1,484 677 2,161 Fifty percent and above progress 81.32% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Jemak Construction & Supply
310 PRDP-IB-R04A-LAG-009-RIZ-009-2020 Luzon B Region 4A Laguna 3rd Rizal Concreting of Brgy. Tala-Antipolo Farm To Market Road Farm to Market Road (FMR) Kilometer 2.470 38,603,356.47 4,825,419.56 4,825,419.56 0.00 48,254,195.59 1,515 2,677 3,216 5,893 Fifty percent and above progress 81.09% physical progress as of Nov. 15, 2024 » VIEW S-CURVE N.D.M. Sanchez Builders and Development Corporation
311 PRDP-IB-R04A-BTG-017-AGO-015-2020 Luzon B Region 4A Batangas 3rd Agoncillo Concreting of Barigon-Bilibinwang Farm-to-Market Road Farm to Market Road (FMR) Kilometer 4.640 71,286,499.38 8,910,812.42 8,910,812.42 0.00 89,108,124.22 1,978 5,005 4,685 9,690 Fifty percent and above progress 61.61% physical progress as of Nov. 15, 2024 » VIEW S-CURVE T Solomon Construction and Development Corporation
312 PRDP-IB-R04B-ORM-001-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Victoria Concreting of Bagong Silang - Macatoc FMR Farm to Market Road (FMR) Kilometer 2.790 19,333,164.47 2,416,645.56 2,416,645.56 0.00 24,166,455.59 1,570 3,768 3,451 7,219 Completed (100%) 100.00% physical progress as of Sep. 30, 2016 » VIEW S-CURVE Monolithic Construction & Concrete Products, Inc.
313 PRDP-IB-R04B-ORM-002-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Victoria Construction of Calamansi Trading Center and Buying Station Others Square Meter 210.000 1,844,289.60 230,536.20 230,536.20 0.00 2,305,362.00 2,802 371 61 432 Completed (100%) 100.00% physical progress as of Oct. 15, 2016 » VIEW S-CURVE F.S. Sugay Construction & Supplies
314 PRDP-IB-R04B-ORM-003-000-000-2014 Luzon B Region 4B Oriental Mindoro 1st Baco Rehabilitation/Upgrading of Dulangan I - Dulangan II FMR Farm to Market Road (FMR) Kilometer 5.310 41,769,043.88 5,221,130.49 5,221,130.49 0.00 52,211,304.86 2,155 5,314 4,912 10,226 Completed (100%) 100.00% physical progress as of Nov. 10, 2016 » VIEW S-CURVE R.D. Interior Junior Construction
315 PRDP-IB-R04B-PAL-005-000-000-2014 Luzon B Region 4B Palawan 1st Dumaran Construction and Upgrading of Junction Salban-Culasian-Magsaysay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 17.170 157,767,307.99 19,720,913.50 19,720,913.50 0.00 197,209,134.99 1,488 2,379 2,163 4,542 Completed (100%) 100.00% physical progress as of Jun. 17, 2022 » VIEW S-CURVE Ivy Michelle Trading and Construction
316 PRDP-IB-R04B-OCM-001-000-000-2015 Luzon B Region 4B Occidental Mindoro Lone Magsaysay Upgrading/Concreting of Brgy. Poblacion Farm-To-Market Road Farm to Market Road (FMR) Kilometer 5.000 76,504,410.57 9,563,051.32 9,563,051.32 0.00 95,630,513.21 1,672 4,200 4,161 8,361 Completed (100%) 100.00% physical progress as of Jun. 04, 2021 » VIEW S-CURVE F.A Torres Construction
317 PRDP-IB-R04B-ROM-001-000-000-2015 Luzon B Region 4B Romblon Lone Odiongan Construction of Brgy. Pato-o Proper- Sitio Aurora, Odiongan, Romblon Farm to Market Road with Two Bridges FMR with Bridge Kilometer 5.800 139,795,925.45 17,474,490.68 17,474,490.68 0.00 174,744,906.81 4,702 3,610 14,437 18,047 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE RCDG Construction Corporation
318 PRDP-IB-R04B-PAL-002-PUE-001-2014 Luzon B Region 4B Palawan 3rd Puerto Princesa City Concreting of Bukang Liwayway - Makandring FMR Farm to Market Road (FMR) Kilometer 8.000 62,140,215.06 7,767,526.88 7,767,526.88 0.00 77,675,268.82 528 1,165 946 2,111 Completed (100%) 100.00% physical progress as of Jun. 15, 2017 » VIEW S-CURVE BCT Trading and Construction
319 PRDP-IB-R04B-PAL-007-PUE-002-2014 Luzon B Region 4B Palawan 3rd Puerto Princesa City Construction and Concreting of Bual Bualan FMR Farm to Market Road (FMR) Kilometer 3.000 25,595,571.02 3,199,446.38 3,199,446.38 0.00 31,994,463.78 297 600 589 1,189 Completed (100%) 100.00% physical progress as of Apr. 30, 2019 » VIEW S-CURVE BCT Trading and Construction
320 PRDP-IB-R04B-PAL-009-PUE-003-2015 Luzon B Region 4B Palawan 3rd Puerto Princesa City Construction of Maruyugon to Buenavista Farm to Market Road Farm to Market Road (FMR) Kilometer 6.500 94,396,325.50 11,799,540.69 11,799,540.69 0.00 117,995,406.88 1,305 2,863 2,809 5,672 Completed (100%) 100.00% physical progress as of Dec. 06, 2020 » VIEW S-CURVE BCT Trading and Construction
321 PRDP-IB-R04B-ORM-008-000-000-2019 Luzon B Region 4B Oriental Mindoro Concreting of Barangay Merit - Concepcion, Victoria - Barangay Ma. Concepcion - Happy Valley - Bugtong na Tuog, Socorro Farm to Market Road with Bridge FMR with Bridge Kilometer 10.730 132,447,376.08 16,555,922.01 16,555,922.01 0.00 165,559,220.10 935 2,158 1,999 4,157 Approved by RPAB For Issuance of NOL 1
322 PRDP-IB-R04B-ORM-007-BON-007-2019 Luzon B Region 4B Oriental Mindoro 2nd Bongabong Concreting of Centro - Panluan - Balite, Hagan Farm to Market Road Farm to Market Road (FMR) Kilometer 10.000 109,703,130.70 13,712,891.34 13,712,891.34 0.00 137,128,913.38 787 1,850 1,977 3,827 Approved by RPAB For Issuance of NOL 1
323 PRDP-IB-R04B-ORM-009-000-000-2019 Luzon B Region 4B Oriental Mindoro Rehabilitation/ Construction/ Concreting of Rosacara FMR with Bridges FMR with Bridge Kilometer 8.280 124,523,515.62 15,565,439.45 15,565,439.45 0.00 155,654,394.52 516 - - - Approved by RPAB For Issuance of NOL 1
324 PRDP-IB-R04B-PAL-014-ROX-003-2016 Luzon B Region 4B Palawan 1st Roxas Construction & Upgrading of Antonino - Taradungan FMR with 30 L.M. RCDG Bridge FMR with Bridge Kilometer 10.400 125,600,000.00 15,700,000.00 15,700,000.00 0.00 157,000,000.00 587 1,301 1,184 2,485 Approved by RPAB For Issuance of NOL 1
325 PRDP-IB-R04B-MAR-002-000-000-2016 Luzon B Region 4B Marinduque Lone Santa Cruz Improvement/Upgrading of Pantayin-Jolo-Napo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.520 38,173,812.46 4,771,726.56 4,771,726.56 0.00 47,717,265.58 410 1,244 1,194 2,438 Completed (100%) 100.00% physical progress as of Dec. 19, 2020 » VIEW S-CURVE DQT Builders Corporation
326 PRDP-IB-R04B-MAR-003-000-000-2015 Luzon B Region 4B Marinduque Lone Boac Construction of Warehouse with office area, Weaving Shed, Soaking Pond, Multi-Purpose Pavement and Winnowing Shed Others Square Meter 347.500 1,760,480.62 220,060.08 220,060.08 0.00 2,200,600.78 821 243 577 820 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE DQT Builders Corporation
327 PRDP-IB-R04B-OCM-002-000-000-2016 Luzon B Region 4B Occidental Mindoro Lone Sablayan Expansion and Development of Fish Landing Others Square Meter 648.000 15,810,882.01 1,976,360.25 1,976,360.25 0.00 19,763,602.51 3,039 2,735 304 3,039 Completed (100%) 100.00% physical progress as of Jan. 07, 2019 » VIEW S-CURVE C.T Leoncio Construction & Trading
328 PRDP-IB-R04B-PAL-013-ROX-002-2014 Luzon B Region 4B Palawan 1st Roxas Construction of Palawan Cashew Processing Center, Warehouse, Store, and Solar Drier Others Square Meter 535.950 6,083,649.04 760,456.13 760,456.13 0.00 7,604,561.30 116 66 50 116 Completed (100%) 100.00% physical progress as of Jul. 07, 2018 » VIEW S-CURVE A. P. Consebido Construction & Trading
329 PRDP-IB-R04B-PAL-012-ROX-001-2014 Luzon B Region 4B Palawan 1st Roxas Construction and Upgrading of Nicanor Zabala - San Miguel -Jolo FMR Farm to Market Road (FMR) Kilometer 11.710 93,950,387.65 11,743,798.46 11,743,798.46 0.00 117,437,984.57 845 2,200 2,025 4,225 Completed (100%) 100.00% physical progress as of Jun. 15, 2020 » VIEW S-CURVE BCT Trading and Construction/ Tagusao Construction and Trading (JV)
330 PRDP-IB-R04B-ORM-011-SAN-011-2018 Luzon B Region 4B Oriental Mindoro 1st San Teodoro Concreting of Barangay Bigaan - Saclag, Caagutayan Farm To Market Road with Bridge FMR with Bridge Kilometer 5.250 76,043,621.40 9,505,452.68 9,505,452.68 0.00 95,054,526.76 999 2,478 2,186 4,664 Completed (100%) 100.00% physical progress as of Dec. 19, 2023 » VIEW S-CURVE Framecon Builders
331 PRDP-IB-R04B-MAR-003-000-000-2020 Luzon B Region 4B Marinduque Lone Boac Improvement/ Upgrading of Caganhao - Amoingon - Maybo Farm To Market Road Farm to Market Road (FMR) Kilometer 5.140 83,068,398.38 10,383,549.80 10,383,549.80 0.00 103,835,497.98 814 1,586 1,585 3,171 Fifty percent and above progress 92.09% physical progress as of Nov. 11, 2024 » VIEW S-CURVE DQT Builders Corporation
332 PRDP-IB-R04B-MAR-004-BOA-004-2019 Luzon B Region 4B Marinduque Lone Boac Concreting of Cawit - Tugos Farm To Market Road Farm to Market Road (FMR) Kilometer 2.890 68,696,865.89 8,587,108.24 8,587,108.24 0.00 85,871,082.37 2,771 6,000 5,897 11,897 Fifty percent and above progress 83.84% physical progress as of Nov. 17, 2024 » VIEW S-CURVE ARKY Construction & Supply
333 PRDP-IB-R04B-MAR-008-000-000-2020 Luzon B Region 4B Marinduque Lone Santa Cruz Rehabilitation/Improvement of Brgy. Kaganhao - Banogbog Farm To Market Road Farm to Market Road (FMR) Kilometer 3.370 71,375,399.15 8,921,924.89 8,921,924.89 0.00 89,219,248.93 1,217 3,022 2,413 5,435 Fifty percent and above progress 90.30% physical progress as of Nov. 05, 2024 » VIEW S-CURVE DQT Builders Corporation
334 PRDP-IB-R04B-OCM-005-000-000-2018 Luzon B Region 4B Occidental Mindoro Construction of Surong Bridge and Upgrading of Brgy. Aguas Farm to Market Road FMR with Bridge Kilometer 4.700 179,997,600.00 22,499,700.00 22,499,700.00 0.00 224,997,000.00 662 1,255 1,273 2,528 Approved by RPAB For endorsement to NPCO
335 PRDP-IB-R04B-PAL-010-000-000-2019 Luzon B Region 4B Palawan Construction and Upgrading of Aramaywan to Cacarigan Farm to Market Road FMR with Bridge Kilometer 12.280 181,964,224.01 22,745,528.00 22,745,528.00 0.00 227,455,280.01 1,399 2,666 2,928 5,594 Approved by RPAB For Issuance of NOL 1
336 PRDP-IB-R04B-PAL-011-000-000-2019 Luzon B Region 4B Palawan Rehabilitation/Improvement of Sandoval-Silanga Farm to Market Road Farm to Market Road (FMR) Kilometer 7.640 117,336,800.00 14,667,100.00 14,667,100.00 0.00 146,671,000.00 900 2,349 2,124 4,473 Approved by RPAB For Issuance of NOL 1
337 PRDP-IB-R04B-MAR-006-000-000-2020 Luzon B Region 4B Marinduque Establishment/ Construction of AAA Slaughterhouse Others Square Meter 15000.000 226,626,476.98 28,328,309.62 28,328,309.62 0.00 283,283,096.22 8,326 12,704 29,228 41,932 Approved by RPAB For Issuance of NOL 1
338 PRDP-IB-R04B-ORM-015-PIN-002-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Road Concreting and Upgrading of Brgy. Del Razon - Brgy. Malaya Farm To Market Road with Bridge FMR with Bridge Kilometer 5.480 125,485,115.37 15,685,639.42 15,685,639.42 0.00 156,856,394.21 2,176 5,669 3,778 9,447 Approved by RPAB For Issuance of NOL 1
339 PRDP-IB-R04B-OCM-007-000-000-2023 Luzon B Region 4B Occidental Mindoro Upgrading/ concreting of JNR Kabangkalan - So. Guitong, Brgy. Ilvita - Brgy. Claudio Salgado Farm to Market Road Farm to Market Road (FMR) Kilometer 9.270 157,813,600.00 19,726,700.00 19,726,700.00 0.00 197,267,000.00 2,141 4,442 4,249 8,691 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
340 PRDP-IB-R04B-OCM-008-000-000-2023 Luzon B Region 4B Occidental Mindoro Upgrading/ concreting of JNR Bubog - Artemia - (D6) Brgy. San Agustin farm to Market Road with Two (2) Bridges San Jose, Occidental Mindoro FMR with Bridge Kilometer 8.100 200,021,600.00 25,002,700.00 25,002,700.00 0.00 250,027,000.00 4,303 9,014 8,269 17,283 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
341 PRDP-IB-R04B-ORM-019-GLO-001-2023 Luzon B Region 4B Oriental Mindoro 2nd Gloria Establishment of Gloria Abattoir Others Square Meter 367.130 44,800,000.00 5,600,000.00 5,600,000.00 0.00 56,000,000.00 4,300 3,785 1,262 5,047 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
342 PRDP-IB-R04B-ORM-018-ROX-001-2023 Luzon B Region 4B Oriental Mindoro 2nd Roxas Establishment of Roxas Abattoir Others Square Meter 367.130 44,800,000.00 5,600,000.00 5,600,000.00 0.00 56,000,000.00 13,564 29,796 29,019 58,815 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
343 PRDP-IB-R04B-OCM-006-RIZ-001-2018 Luzon B Region 4B Occidental Mindoro Lone Rizal Upgrading of Brgy. Manoot Farm to Market Road and Construction of Manoot Bridge II FMR with Bridge Kilometer 3.720 179,995,668.63 22,499,458.58 22,499,458.58 0.00 224,994,585.79 483 995 236 1,231 Approved by RPAB For Issuance of NOL 1
344 PRDP-IB-R04B-ORM-012-000-000-2021 Luzon B Region 4B Oriental Mindoro 1st Victoria Construction of Oriental Mindoro Trading and Consolidation Facility Others Square Meter 966.750 26,808,513.59 3,351,064.20 3,351,064.20 0.00 33,510,641.99 103 211 193 404 Completed (100%) 100.00% physical progress as of Aug. 05, 2024 » VIEW S-CURVE MADSAM ENTERPRISES
345 PRDP-IB-R04B-ORM-016-PIN-003-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Construction of Pinamalayan Slaughterhouse AA Others Square Meter 676.000 39,804,654.26 4,975,581.78 4,975,581.78 0.00 49,755,817.82 19,551 55,333 35,050 90,383 Completed (100%) 100.00% physical progress as of Dec. 27, 2023 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
346 PRDP-IB-R04B-ORM-014-PIN-001-2021 Luzon B Region 4B Oriental Mindoro 2nd Pinamalayan Concreting and Opening of Sta. Isabel Farm To Market Road Farm to Market Road (FMR) Kilometer 2.500 39,829,621.65 4,978,702.71 4,978,702.71 0.00 49,787,027.07 2,176 3,468 3,778 7,246 Completed (100%) 100.00% physical progress as of Oct. 03, 2023 » VIEW S-CURVE Sixteen Enterprises
347 PRDP-IB-R04B-ORM-017-MAN-002-2021 Luzon B Region 4B Oriental Mindoro 2nd Mansalay Construction of Mansalay Slaughterhouse AA Others Square Meter 676.000 39,995,586.66 4,999,448.33 4,999,448.33 0.00 49,994,483.32 650 8,205 5,005 13,210 Completed (100%) 100.00% physical progress as of Nov. 24, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
348 PRDP-IB-R04B-ORM-013-MAN-001-2021 Luzon B Region 4B Oriental Mindoro 2nd Mansalay Concreting of Brgy. Teresita to Brgy. Waygan to Brgy. Balugo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.540 99,977,978.21 12,497,247.28 12,497,247.28 0.00 124,972,472.77 2,342 4,773 4,596 9,369 Fifty percent and above progress 92.35% physical progress as of Nov. 30, 2024 » VIEW S-CURVE LUMEL GLENN CONSTRUCTION
349 PRDP-IB-R005-ALB-001-000-000-2014 Luzon B Region 5 Albay 3rd Oas Rehabilitation Improvement of Pistola Tablon Road with 3 units bridges FMR with Bridge Kilometer 15.030 164,136,396.06 20,517,049.51 20,517,049.51 0.00 205,170,495.08 1,943 5,112 4,608 9,720 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE WCS Construction
350 PRDP-IB-R005-CAN-003-000-000-2014 Luzon B Region 5 Camarines Norte 1st Santa Elena Coco Geonet Production and Coco Peat Processing Project Others Square Meter 150.000 3,077,697.20 384,712.15 384,712.15 0.00 3,847,121.50 1,053 604 449 1,053 Completed (100%) 100.00% physical progress as of Mar. 17, 2018 » VIEW S-CURVE OMNICON BUILDERS
351 PRDP-IB-R005-CAN-007-000-000-2015 Luzon B Region 5 Camarines Norte 2nd Basud Concreting of Angas - Lidong FMR in Basud Farm to Market Road (FMR) Kilometer 5.770 39,109,851.18 4,888,731.40 4,888,731.40 0.00 48,887,313.98 457 1,185 1,102 2,287 Completed (100%) 100.00% physical progress as of Aug. 12, 2019 » VIEW S-CURVE Hi-Tone Construction and Development Corporation/JCO Construction and Supply (JV)
352 PRDP-IB-R005-CAN-011-000-000-2015 Luzon B Region 5 Camarines Norte 1st Labo Camarines Norte Pineapple Trading and Processing Project Others Square Meter 324.000 6,158,036.28 769,754.54 769,754.54 0.00 7,697,545.36 9,140 1,854 7,286 9,140 Completed (100%) 100.00% physical progress as of Jun. 29, 2018 » VIEW S-CURVE JCO CONSTRUCTION AND SUPPLY
353 PRDP-IB-R005-CAS-002-000-000-2014 Luzon B Region 5 Camarines Sur 2nd Libmanan Rehabilitation of San Isidro - Pag Oring Nuevo Farm to Market Road Farm to Market Road (FMR) Kilometer 6.000 35,428,922.13 4,428,615.27 4,428,615.27 0.00 44,286,152.67 1,514 3,749 3,538 7,287 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE MARCBILT CONSTRUCTION
354 PRDP-IB-R005-CAS-003-000-000-2014 Luzon B Region 5 Camarines Sur 2nd Pasacao Upgrading of Cuco - Bagong Silang Farm to Market Road Farm to Market Road (FMR) Kilometer 8.500 61,739,925.79 7,717,490.72 7,717,490.72 0.00 77,174,907.23 546 1,265 1,095 2,360 Completed (100%) 100.00% physical progress as of Jun. 30, 2020 » VIEW S-CURVE MARCBILT CONSTRUCTION, INC.
355 PRDP-IB-R005-CAS-004-000-000-2014 Luzon B Region 5 Camarines Sur 5th Baao Camarines Sur Coco Sap Sugar Processing Others Square Meter 141.000 2,491,958.49 311,494.81 311,494.81 0.00 3,114,948.11 230 75 155 230 Completed (100%) 100.00% physical progress as of Oct. 30, 2018 » VIEW S-CURVE Beltran SB Aga General Merchandise and Construction
356 PRDP-IB-R005-CAS-006-000-000-2015 Luzon B Region 5 Camarines Sur 2nd Pamplona Road Opening and concreting of Batang - San Gabriel FMR Farm to Market Road (FMR) Kilometer 6.160 60,665,502.42 7,583,187.80 7,583,187.80 0.00 75,831,878.02 542 1,409 1,301 2,710 Completed (100%) 100.00% physical progress as of Feb. 20, 2021 » VIEW S-CURVE GCI. CONSTRUCTION AND DEVELOPMENT CORP.
357 PRDP-IB-R005-CAT-002-000-000-2015 Luzon B Region 5 Catanduanes Lone Bato Construction of Main and Satellite Warehouse Building Others Square Meter 392.000 4,762,497.50 595,312.19 595,312.19 0.00 5,953,121.88 3,483 1,051 2,432 3,483 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE JR CONTRACTOR
358 PRDP-IB-R005-MAS-001-PLA-001-2015 Luzon B Region 5 Masbate 3rd Placer Concreting of Aguada - Locso-an FMR Project Farm to Market Road (FMR) Kilometer 9.500 96,703,806.45 12,087,975.81 12,087,975.81 0.00 120,879,758.07 1,087 2,904 2,942 5,846 Completed (100%) 100.00% physical progress as of Apr. 30, 2019 » VIEW S-CURVE ALGIMAR Construction
359 PRDP-IB-R005-ALB-002-000-000-2014 Luzon B Region 5 Albay 3rd Libon Construction of 150 sq.m. Warehouse for coco Geonets Others Square Meter 150.000 1,502,670.86 187,833.86 187,833.86 0.00 1,878,338.58 106 59 47 106 Completed (100%) 100.00% physical progress as of Mar. 15, 2018 » VIEW S-CURVE ALXM Construction
360 PRDP-IB-R005-CAN-001-000-000-2014 Luzon B Region 5 Camarines Norte 2nd Basud Construction/Rehabilitation of Pinagwarasan - Lanot FMR in (Basud & Mercedes) Farm to Market Road (FMR) Kilometer 8.500 89,246,073.45 11,155,759.18 11,155,759.18 0.00 111,557,591.81 4,629 10,007 9,298 19,305 Completed (100%) 100.00% physical progress as of Oct. 20, 2020 » VIEW S-CURVE J.D. LEGASPI CONSTRUCTION / JB ROS CONSTRUCTION CORPORATION JOINT VENTURE
361 PRDP-IB-R005-CAN-006-000-000-2015 Luzon B Region 5 Camarines Norte 1st Santa Elena Concreting of Poblacion to Pulongguit-guit FMR Farm to Market Road (FMR) Kilometer 3.440 56,419,281.99 7,052,410.25 7,052,410.25 0.00 70,524,102.49 2,088 5,324 5,115 10,439 Completed (100%) 100.00% physical progress as of Oct. 15, 2020 » VIEW S-CURVE EUS Construction (Efren U. Sale)
362 PRDP-IB-R005-MAS-002-ESP-001-2015 Luzon B Region 5 Masbate 3rd Esperanza Concreting of (Segment A) Domorog- Tawad & (Segment B) San Roque - Baras FMR Project Farm to Market Road (FMR) Kilometer 10.390 83,496,759.65 10,437,094.96 10,437,094.96 0.00 104,370,949.57 1,764 4,030 3,813 7,843 Completed (100%) 100.00% physical progress as of Dec. 12, 2019 » VIEW S-CURVE ARKY CONSTRUCTION AND SUPPLY
363 PRDP-IB-R005-CAN-005-000-000-2015 Luzon B Region 5 Camarines Norte 2nd San Vicente Concreting of Sto. Domingo - Fabrica FMR Farm to Market Road (FMR) Kilometer 8.610 70,483,093.89 8,810,386.74 8,810,386.74 0.00 88,103,867.37 1,173 4,375 4,197 8,572 Fifty percent and above progress 71.15% physical progress as of Apr. 15, 2021 » VIEW S-CURVE HEXAMINDZ CORPORATION
364 PRDP-IB-R005-CAS-001-000-000-2014 Luzon B Region 5 Camarines Sur 1st Sipocot Upgrading of Manangle - Caima Farm to Market Road Farm to Market Road (FMR) Kilometer 19.150 104,829,662.14 13,103,707.77 13,103,707.77 0.00 131,037,077.68 1,437 3,385 3,306 6,691 Less than fifty percent progress 49.25% physical progress as of Jun. 30, 2021 » VIEW S-CURVE Marc Built Construction
365 PRDP-IB-R005-CAN-010-JOS-010-2017 Luzon B Region 5 Camarines Norte 1st Jose Panganiban Upgrading of Nakalaya to Sta. Elena Farm to Market Road Farm to Market Road (FMR) Kilometer 4.430 67,635,536.90 8,454,442.11 8,454,442.11 0.00 84,544,421.12 769 1,652 1,658 3,310 Approved by RPAB For Issuance of NOL 1
366 PRDP-IB-R005-SOR-002-SAN-001-2020 Luzon B Region 5 Sorsogon 2nd Santa Magdalena Concreting of San Antontio to La Esperanza Farm to Market Farm to Market Road (FMR) Kilometer 5.600 79,998,400.00 9,999,800.00 9,999,800.00 0.00 99,998,000.00 420 1,120 1,077 2,197 Approved by RPAB For endorsement to NPCO
367 PRDP-IB-R005-CAS-008-LUP-002-2019 Luzon B Region 5 Camarines Sur 1st Lupi Construction of Slaughter House Others Square Meter 0.000 40,000,000.00 5,000,000.00 5,000,000.00 0.00 50,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
368 PRDP-IB-R005-CAS-009-PAM-001-2019 Luzon B Region 5 Camarines Sur 2nd Pamplona Concreting of Barangay Tambo to San Vicente Farm to Market Road Farm to Market Road (FMR) Kilometer 4.200 63,360,000.00 7,920,000.00 7,920,000.00 0.00 79,200,000.00 1,773 4,405 4,069 8,474 Approved by RPAB For endorsement to NPCO
369 PRDP-IB-R005-MAS-008-CAW-003-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Junction Recodo to Begia Farm to Market Road Farm to Market Road (FMR) Kilometer 4.160 53,805,702.40 6,725,712.80 6,725,712.80 0.00 67,257,128.00 1,241 3,000 2,776 5,776 Approved by RPAB For endorsement to NPCO
370 PRDP-IB-R005-MAS-011-USO-001-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Buenasuerte to Centro Farm to Market Roads Farm to Market Road (FMR) Kilometer 9.100 199,887,139.20 24,985,892.40 24,985,892.40 0.00 249,858,924.00 - - - - Approved by RPAB For endorsement to NPCO
371 PRDP-IB-R005-CAT-014-PAN-001-2020 Luzon B Region 5 Catanduanes Lone Pandan Concreting of San Andres to Balangonan to Farm to Market Road Farm to Market Road (FMR) Kilometer 2.500 61,600,000.00 7,700,000.00 7,700,000.00 0.00 77,000,000.00 506 844 748 1,592 Approved by RPAB For endorsement to NPCO
372 PRDP-IB-R005-MAS-010-000-000-2020 Luzon B Region 5 Masbate 2nd Balud Concreting of San Andres to San Antonio FMR with bridge FMR with Bridge Kilometer 8.180 176,000,000.00 22,000,000.00 22,000,000.00 0.00 220,000,000.00 596 2,145 1,431 3,576 Approved by RPAB For endorsement to NPCO
373 PRDP-IB-R005-MAS-012-BAT-001-2019 Luzon B Region 5 Masbate 2nd Balud Concreting of Junction Dao to San Antonio Farm to Market Road Farm to Market Road (FMR) Kilometer 6.000 84,000,000.00 10,500,000.00 10,500,000.00 0.00 105,000,000.00 851 - - - Approved by RPAB For endorsement to NPCO
374 PRDP-IB-R005-SOR-004-000-000-2017 Luzon B Region 5 Sorsogon 1st Castilla Concreting of Cumadcad-Canjela Farm to Market Road Farm to Market Road (FMR) Kilometer 5.210 63,464,800.00 7,933,100.00 7,933,100.00 0.00 79,331,000.00 1,442 3,857 3,704 7,561 Approved by RPAB For Issuance of NOL 1
375 PRDP-IB-R005-MAS-006-CAW-001-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Junction Pulot to RM Magbalon Farm to Market Road Farm to Market Road (FMR) Kilometer 5.740 98,554,368.00 12,319,296.00 12,319,296.00 0.00 123,192,960.00 309 1,114 742 1,856 Approved by RPAB For endorsement to NPCO
376 PRDP-IB-R005-MAS-023-000-000-2020 Luzon B Region 5 Masbate 1st San Jacinto Concreting of Bagahanglad to Danao Farm to Market Road FMR with Bridge Kilometer 9.040 168,000,000.00 21,000,000.00 21,000,000.00 0.00 210,000,000.00 2,337 8,413 5,608 14,021 Approved by RPAB For Issuance of NOL 1
377 PRDP-IB-R005-MAS-022-000-000-2020 Luzon B Region 5 Masbate 1st San Jacinto Concreting of Burgos to Bagacay Farm to Market Road Farm to Market Road (FMR) Kilometer 11.460 199,200,000.00 24,900,000.00 24,900,000.00 0.00 249,000,000.00 3,195 11,503 7,668 19,171 Approved by RPAB For Issuance of NOL 1
378 PRDP-IB-R005-MAS-010-PLA-003-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Matagangtang to Manlut-od Farm to Market Road with Bridge FMR with Bridge Kilometer 4.080 112,000,000.00 14,000,000.00 14,000,000.00 0.00 140,000,000.00 600 1,512 1,490 3,002 Approved by RPAB For endorsement to NPCO
379 PRDP-IB-R005-CAT-002-CAR-001-2019 Luzon B Region 5 Catanduanes Lone Caramoran Construction of Barangay Tubli to Maysuram Farm to Market Road Farm to Market Road (FMR) Kilometer 6.360 182,345,600.00 22,793,200.00 22,793,200.00 0.00 227,932,000.00 1,478 3,855 3,534 7,389 Approved by RPAB For endorsement to NPCO
380 PRDP-IB-R005-CAT-011-000-000-2020 Luzon B Region 5 Catanduanes Lone Pandan Concreting of Junction Libod to Panuto Farm to Market Road Farm to Market Road (FMR) Kilometer 4.960 140,382,877.94 17,547,859.74 17,547,859.74 0.00 175,478,597.42 676 1,802 1,694 3,496 Approved by RPAB For endorsement to NPCO
381 PRDP-IB-R005-MAS-009-000-000-2020 Luzon B Region 5 Masbate 3rd Uson Concreting of Marcella to Madao FMR with bridge FMR with Bridge Kilometer 8.120 160,000,000.00 20,000,000.00 20,000,000.00 0.00 200,000,000.00 898 3,233 2,155 5,388 Approved by RPAB For endorsement to NPCO
382 PRDP-IB-R005-CAT-009-000-000-2017 Luzon B Region 5 Catanduanes Lone Caramoran Concreting of Junction Sabangan-Datag East FMR, Caramoran Farm to Market Road (FMR) Kilometer 7.370 101,591,367.00 12,698,920.88 12,698,920.88 0.00 126,989,208.76 811 2,142 1,916 4,058 Completed (100%) 100.00% physical progress as of Oct. 27, 2020 » VIEW S-CURVE Honeyville Construction
383 PRDP-IB-R005-ALB-004-MAN-001-2018 Luzon B Region 5 Albay 2nd Manito Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 1476.000 28,480,578.29 3,560,072.29 3,560,072.29 0.00 35,600,722.87 1,476 3,794 3,586 7,380 Approved by RPAB For Issuance of NOL 1
384 PRDP-IB-R005-MAS-003-ARO-001-2017 Luzon B Region 5 Masbate 2nd Aroroy Concreting of San Agustin -Tigbao Farm to Market Road Farm to Market Road (FMR) Kilometer 15.000 194,044,946.87 24,255,618.36 24,255,618.36 0.00 242,556,183.59 2,231 5,968 5,573 11,541 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE ARKY Construction and Supply
385 PRDP-IB-R005-ALB-011-TIW-002-2019 Luzon B Region 5 Albay 1st Tiwi Construction of Slaughterhouse Others Square Meter 0.000 40,000,000.00 5,000,000.00 5,000,000.00 0.00 50,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
386 PRDP-IB-R005-CAT-010-000-000-2020 Luzon B Region 5 Catanduanes Lone Viga Concreting of Junction Ogbong to Mabini Farm to Market Road Farm to Market Road (FMR) Kilometer 5.500 141,577,107.87 17,697,138.48 17,697,138.48 0.00 176,971,384.83 619 1,614 1,479 3,093 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Legaspi Premium Development Corporation
387 PRDP-IB-R005-MAS-015-ARO-002-2020 Luzon B Region 5 Masbate 2nd Aroroy Concreting of Tigbao to Mataba Farm to Market Road FMR with Bridge Kilometer 12.100 199,124,000.00 24,890,500.00 24,890,500.00 0.00 248,905,000.00 1,481 5,333 3,555 8,888 Approved by RPAB For endorsement to NPCO
388 PRDP-IB-R005-ALB-006-TAB-001-2017 Luzon B Region 5 Albay 1st Tabaco City Rehabilitation / Improvement of Hacienda-Rawis FMR Farm to Market Road (FMR) Kilometer 8.300 154,190,593.77 19,273,824.22 19,273,824.22 0.00 192,738,242.21 3,007 7,689 7,157 14,846 Completed (100%) 100.00% physical progress as of May. 05, 2022 » VIEW S-CURVE Legazpi Premuim & Development Corporation/3RB Construction & Supply (Joint Venture)
389 PRDP-IB-R005-MAS-016-ARO-003-2020 Luzon B Region 5 Masbate 2nd Aroroy Concreting of San Agustin to Macabug Farm to Market Road with Bridge Farm to Market Road (FMR) Kilometer 9.460 199,349,850.02 24,918,731.25 24,918,731.25 0.00 249,187,312.52 1,033 3,718 2,478 6,196 Completed (100%) 100.00% physical progress as of Sep. 15, 2023 » VIEW S-CURVE ARKY Construction and Supply
390 PRDP-IB-R005-MAS-014-MOB-001-2019 Luzon B Region 5 Masbate 2nd Mobo Concreting of Sta. Maria to Pinamalatican Farm-to-Market Road with Bridge Farm to Market Road (FMR) Kilometer 12.000 200,000,000.00 25,000,000.00 25,000,000.00 0.00 250,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
391 PRDP-IB-R005-MAS-007-CAW-002-2019 Luzon B Region 5 Masbate 3rd Cawayan Concreting of Segment( A) Palobandera to Dalipe and Segment (B) Calumpang to Iraya Farm to Market Road Farm to Market Road (FMR) Kilometer 15.080 198,378,576.00 24,797,322.00 24,797,322.00 0.00 247,973,220.00 775 2,791 1,861 4,652 Completed (100%) 100.00% physical progress as of Feb. 21, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
392 PRDP-IB-R005-MAS-005-000-000-2019 Luzon B Region 5 Masbate 2nd Milagros Concreting of San Carlos to Magsalangui Farm to Market Road Farm to Market Road (FMR) Kilometer 8.100 155,292,653.64 19,411,581.71 19,411,581.71 0.00 194,115,817.06 791 2,233 1,490 3,723 Completed (100%) 100.00% physical progress as of Dec. 15, 2023 » VIEW S-CURVE HGG BUILDERS & SUPPLY
393 PRDP-IB-R005-MAS-001-000-000-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Del Carmen to Malatawan Farm to Market Road Farm to Market Road (FMR) Kilometer 14.140 199,135,566.89 24,891,945.86 24,891,945.86 0.00 248,919,458.61 1,226 3,822 3,526 7,348 Completed (100%) 100.00% physical progress as of Aug. 28, 2024 » VIEW S-CURVE MGB CONSTRUCTION & TRADING
394 PRDP-IB-R005-MAS-011-000-000-2020 Luzon B Region 5 Masbate 2nd Masbate City Concreting of Mapiña to Batuhan FMR Farm to Market Road (FMR) Kilometer 6.330 103,441,468.21 12,930,183.53 12,930,183.53 0.00 129,301,835.27 2,577 9,277 6,184 15,461 Completed (100%) 100.00% physical progress as of Oct. 31, 2024 » VIEW S-CURVE CL CARANDANG
395 PRDP-IB-R005-MAS-009-PLA-002-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Puro to Camayabsan FMR Farm to Market Road (FMR) Kilometer 6.460 94,957,495.38 11,869,686.92 11,869,686.92 0.00 118,696,869.22 787 1,901 1,881 3,782 Completed (100%) 100.00% physical progress as of Feb. 29, 2024 » VIEW S-CURVE ARKY CONSTRUCTION AND SUPPLY
396 PRDP-IB-R005-MAS-003-000-000-2019 Luzon B Region 5 Masbate 3rd Uson Concreting of Del Carmen to San Ramon Farm to Market Road with Bridge FMR with Bridge Kilometer 10.260 198,949,231.40 24,868,653.93 24,868,653.93 0.00 248,686,539.26 1,464 5,271 3,514 8,785 Completed (100%) 100.00% physical progress as of Oct. 15, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
397 PRDP-IB-R005-ALB-011-TIW-001-2019 Luzon B Region 5 Albay 1st Tiwi Construction of Tiwi Level II Water System Potable Water Supply (PWS) Level 2 Number of Households 5301.000 161,535,142.58 20,191,892.82 20,191,892.82 0.00 201,918,928.22 5,331 12,084 12,089 24,173 Fifty percent and above progress 99.05% physical progress as of Oct. 15, 2024 » VIEW S-CURVE VERZONTAL INFRASTRUCTURE CORPORATION
398 PRDP-IB-R005-MAS-004-000-000-2019 Luzon B Region 5 Masbate 2nd Milagros Concreting of San Antonio to San Carlos Farm to Market Road with Bridge FMR with Bridge Kilometer 9.060 195,673,010.80 24,459,126.35 24,459,126.35 0.00 244,591,263.50 662 2,318 1,588 3,906 Fifty percent and above progress 94.57% physical progress as of Nov. 15, 2024 » VIEW S-CURVE NFH CONSTRUCTION & SUPPLY
399 PRDP-IB-R005-MAS-002-000-000-2019 Luzon B Region 5 Masbate 3rd Placer Concreting of Cabangcalan to Malatawan Farm to Market Road with Bridge FMR with Bridge Kilometer 12.120 199,199,505.98 24,899,938.25 24,899,938.25 0.00 248,999,382.48 994 3,283 2,190 5,473 Fifty percent and above progress 80.90% physical progress as of Nov. 15, 2024 » VIEW S-CURVE NFH CONSTRUCTION & SUPPLY
400 PRDP-IB-R005-MAS-007-000-000-2020 Luzon B Region 5 Masbate 2nd Balud Concreting of Dao to Bungcanaway FMR with bridge FMR with Bridge Kilometer 11.160 197,891,414.62 24,736,426.83 24,736,426.83 0.00 247,364,268.28 1,657 5,966 3,977 9,943 Fifty percent and above progress 66.23% physical progress as of Nov. 15, 2024 » VIEW S-CURVE ARKY CONSTRUCTION & SUPPLY
401 PRDP-IB-R005-MAS-020-000-000-2020 Luzon B Region 5 Masbate 1st Claveria Concreting of Junction Gaway-Gaway to Pasig FMR Farm to Market Road (FMR) Kilometer 10.160 199,156,968.80 24,894,621.10 24,894,621.10 0.00 248,946,211.00 1,630 5,867 3,912 9,779 Completed (100%) 100.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY & DEVELOPMENT CORPORATION
402 PRDP-IB-R005-MAS-021-000-000-2020 Luzon B Region 5 Masbate 1st Claveria Concreting of Calpi to Cawayan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.780 103,205,173.73 12,900,646.72 12,900,646.72 0.00 129,006,467.17 510 1,834 1,223 3,057 Completed (100%) 100.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE A3 CONSTRUCTION & SUPPLY
403 PRDP-IB-R005-MAS-008-000-000-2020 Luzon B Region 5 Masbate 3rd Placer Concreting of Manlut-od to Guindawahan FMR Farm to Market Road (FMR) Kilometer 11.860 197,628,897.47 24,703,612.18 24,703,612.18 0.00 247,036,121.83 1,542 5,549 3,699 9,248 Completed (100%) 100.00% physical progress as of May. 15, 2024 » VIEW S-CURVE ALGIMAR CONSTRUCTION
404 PRDP-IB-R005-ALB-009-PIO-001-2019 Luzon B Region 5 Albay 3rd Pio Duran Rehabilitation/Concreting of Barangay Caratagan to Buyo Farm to Market Road Farm to Market Road (FMR) Kilometer 13.500 160,733,134.96 20,091,641.87 20,091,641.87 0.00 200,916,418.70 1,739 3,647 3,544 7,191 Completed (100%) 100.00% physical progress as of Oct. 01, 2024 » VIEW S-CURVE HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
405 PRDP-IB-R005-ALB-008-POL-001-2019 Luzon B Region 5 Albay 3rd Polangui Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 4342.000 155,588,393.22 19,448,549.15 19,448,549.15 0.00 194,485,491.52 4,342 11,064 11,029 22,093 Fifty percent and above progress 98.96% physical progress as of Nov. 15, 2024 » VIEW S-CURVE CB Garay Philwide Builders
406 PRDP-IB-R005-MAS-033-MIL-001-2020 Luzon B Region 5 Masbate 2nd Milagros Concreting of Magsalangui FMR Farm to Market Road (FMR) Kilometer 6.520 128,000,000.00 16,000,000.00 16,000,000.00 0.00 160,000,000.00 - - - - With NOL 1 BER under review by the PSO / NPCO for NOL 2
407 PRDP-IB-R005-MAS-032-DIM-001-2020 Luzon B Region 5 Masbate 3rd Dimasalang Concreting of Gregorio Aliño to Cabanoyoan FMR Farm to Market Road (FMR) Kilometer 16.240 172,264,145.01 21,533,018.13 21,533,018.13 0.00 215,330,181.27 2,024 7,284 6,915 14,199 Fifty percent and above progress 95.03% physical progress as of Nov. 15, 2024 » VIEW S-CURVE V.R. PATRON BUILDERS & DEVELOPERS CORP.
408 PRDP-IB-R005-MAS-034-PAL-001-2020 Luzon B Region 5 Masbate 3rd Palanas Concreting of Malibas to San Isidro Farm to Market Road Farm to Market Road (FMR) Kilometer 11.650 198,213,105.30 24,776,638.16 24,776,638.16 0.00 247,766,381.62 637 1,411 1,402 2,813 Fifty percent and above progress 94.71% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY AND DEVELOPMENT CORPORATION
409 PRDP-IB-R005-MAS-025-000-000-2020 Luzon B Region 5 Masbate 1st San Pascual Concreting of San Pedro to Malaking Ilog FMR Farm to Market Road (FMR) Kilometer 11.060 198,844,928.82 24,855,616.10 24,855,616.10 0.00 248,556,161.02 2,698 5,476 3,651 9,127 Fifty percent and above progress 94.60% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDENVILLE REALTY AND DEVELOPMENT CORP.
410 PRDP-IB-R005-MAS-026-000-000-2020 Luzon B Region 5 Masbate 1st San Pascual Concreting of Mabuhay to Sta. Cruz FMR Farm to Market Road (FMR) Kilometer 7.040 135,302,785.69 16,912,848.21 16,912,848.21 0.00 169,128,482.11 587 2,113 1,409 3,522 Fifty percent and above progress 94.20% physical progress as of Nov. 15, 2024 » VIEW S-CURVE HI-TONE CONSTRUCTION AND DEVELOPMENT CORPORATION
411 PRDP-IB-R005-CAS-007-LUP-001-2019 Luzon B Region 5 Camarines Sur 1st Lupi Construction/Improvement of Bulawan Jr. to Bangon Farm to Market Road Farm to Market Road (FMR) Kilometer 4.700 66,527,703.46 8,315,962.93 8,315,962.93 0.00 83,159,629.32 411 1,069 987 2,056 Fifty percent and above progress 97.05% physical progress as of Nov. 15, 2024 » VIEW S-CURVE PRECIOUS CONSTRUCTION
412 PRDP-IB-R005-SOR-007-SOR-001-2020 Luzon B Region 5 Sorsogon 1st Sorsogon City Improvement / Rehabilitation of AA Slaughterhouse Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
413 PRDP-IB-R005-SOR-008-JUB-001-2020 Luzon B Region 5 Sorsogon 2nd Juban Construction of AA Slaughter house Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
414 PRDP-IB-R005-SOR-010-SAN-002-2020 Luzon B Region 5 Sorsogon 2nd Santa Magdalena Construction of AA Slaughterhouse Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
415 PRDP-IB-R005-ALB-014-MAL-001-2020 Luzon B Region 5 Albay 1st Malilipot Construction of AA Slaughter House Others Square Meter 1500.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
416 PRDP-IB-R005-ALB-015-LIG-001-2020 Luzon B Region 5 Albay 3rd Ligao City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 35,200,000.00 4,400,000.00 4,400,000.00 0.00 44,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
417 PRDP-IB-R005-ALB-013-LEG-001-2020 Luzon B Region 5 Albay 2nd Legazpi City Improvement / Rehabilitation of AA Slaughterhouse Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
418 PRDP-IB-R005-CAN-013-SAV-001-2020 Luzon B Region 5 Camarines Norte 2nd San Vicente Construction of AA Slaughter House Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 1,209 - - - Approved by RPAB For endorsement to NPCO
419 PRDP-IB-R005-CAN-015-JOS-002-2020 Luzon B Region 5 Camarines Norte 1st Jose Panganiban Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
420 PRDP-IB-R005-CAN-016-DAE-001-2020 Luzon B Region 5 Camarines Norte 2nd Daet Construction of AA Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
421 PRDP-IB-R005-CAN-017-VIN-001-2020 Luzon B Region 5 Camarines Norte 2nd Vinzons Construction of AA Slaughter House Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
422 PRDP-IB-R005-CAS-022-OCA-001-2020 Luzon B Region 5 Camarines Sur 3rd Ocampo Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
423 PRDP-IB-R005-CAS-018-MIL-001-2020 Luzon B Region 5 Camarines Sur 2nd Milaor Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
424 PRDP-IB-R005-CAS-020-NAG-001-2020 Luzon B Region 5 Camarines Sur 3rd Naga City Improvement / Rehabilitation of AA Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
425 PRDP-IB-R005-CAS-029-SAG-001-2020 Luzon B Region 5 Camarines Sur 4th Sagnay Construction of AA Slaughter house Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
426 PRDP-IB-R005-MAS-017-ARO-004-2020 Luzon B Region 5 Masbate 2nd Aroroy Construction of Level II Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 7545.000 199,884,000.00 24,985,500.00 24,985,500.00 0.00 249,855,000.00 7,545 27,161 18,107 45,268 Approved by RPAB For endorsement to NPCO
427 PRDP-IB-R005-MAS-027-PLA-004-2020 Luzon B Region 5 Masbate 3rd Placer Construction of 'AA" Slaughter House Others Square Meter 2000.000 44,000,000.00 5,500,000.00 5,500,000.00 0.00 55,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
428 PRDP-IB-R005-MAS-027-000-000-2021 Luzon B Region 5 Masbate 2nd Baleno Concreting of Población to Ubongan Dacu Farm to Market Road with Bridge FMR with Bridge Kilometer 10.900 283,404,800.00 35,425,600.00 35,425,600.00 0.00 354,256,000.00 1,253 4,511 3,007 7,518 Approved by RPAB For endorsement to NPCO
429 PRDP-IB-R005-CAT-012-BAT-001-2020 Luzon B Region 5 Catanduanes Lone Bato Construction of AA Slaughter House Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
430 PRDP-IB-R005-CAN-014-CAP-002-2020 Luzon B Region 5 Camarines Norte 1st Capalonga Construction of AA Slaughter House Others Square Meter 2000.000 26,400,000.00 3,300,000.00 3,300,000.00 0.00 33,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
431 PRDP-IB-R005-CAS-018-IRI-001-2020 Luzon B Region 5 Camarines Sur 5th Iriga City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 35,200,000.00 4,400,000.00 4,400,000.00 0.00 44,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
432 PRDP-IB-R005-CAS-027-DEL-001-2020 Luzon B Region 5 Camarines Sur 1st Del Gallego Construction of AA Slaughter house Others Square Meter 2000.000 17,600,000.00 2,200,000.00 2,200,000.00 0.00 22,000,000.00 - - - - Approved by RPAB For endorsement to NPCO
433 PRDP-IB-R005-CAS-028-BAT-001-2020 Luzon B Region 5 Camarines Sur 5th Bato Construction of AA Slaughterhouse Others Square Meter 2000.000 22,000,000.00 2,750,000.00 2,750,000.00 0.00 27,500,000.00 - - - - Approved by RPAB For endorsement to NPCO
434 PRDP-IB-R005-CAS-025-RAG-002-2020 Luzon B Region 5 Camarines Sur 1st Ragay Construction of AA Slaughter House Others Square Meter 2000.000 22,348,644.92 2,793,580.62 2,793,580.62 0.00 27,935,806.16 12,333 26,187 24,613 50,800 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE SYSTEM PROCESSOR AND CONSTRUCTION CORPORATION
435 PRDP-IB-R005-MAS-028-000-000-2021 Luzon B Region 5 Masbate 2nd Mobo Concreting of Baang to Barag FMR with bridges FMR with Bridge Kilometer 8.760 240,000,000.00 30,000,000.00 30,000,000.00 0.00 300,000,000.00 2,577 2,567 1,317 3,884 Approved by RPAB For endorsement to NPCO
436 PRDP-IB-R005-CAS-030-PIL-001-2023 Luzon B Region 5 Camarines Sur 3rd Pili Establishment of Pili Abattoir Others Square Meter 0.000 39,480,859.14 4,935,107.39 4,935,107.39 0.00 49,351,073.92 21,266 50,160 48,571 98,731 Approved by RPAB For endorsement to NPCO
437 PRDP-IB-R005-CAS-021-BUH-001-2020 Luzon B Region 5 Camarines Sur 1st Buhi Construction of AA Slaughterhouse Others Square Meter 2000.000 35,172,587.94 4,396,573.49 4,396,573.49 0.00 43,965,734.92 16,541 39,241 37,902 77,143 Completed (100%) 100.00% physical progress as of Feb. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
438 PRDP-IB-R005-ALB-012-DAR-001-2020 Luzon B Region 5 Albay 2nd Daraga Construction of AA Slaughterhouse Others Square Meter 2000.000 37,999,990.54 4,749,998.82 4,749,998.82 0.00 47,499,988.18 - - - - With NOL 2 For awarding of contract
439 PRDP-IB-R005-SOR-005-BAR-001-2020 Luzon B Region 5 Sorsogon 2nd Barcelona Construction of AA Slaughter House Others Square Meter 2100.000 17,599,076.62 2,199,884.58 2,199,884.58 0.00 21,998,845.78 5,250 11,653 11,346 22,999 Fifty percent and above progress 95.12% physical progress as of Nov. 15, 2024 » VIEW S-CURVE System Processor and Construction Corporation
440 PRDP-IB-R005-CAS-017-BUL-001-2020 Luzon B Region 5 Camarines Sur 5th Bula Construction of AA Slaughter House Others Square Meter 2000.000 26,394,964.99 3,299,370.62 3,299,370.62 0.00 32,993,706.23 13,362 34,021 35,409 69,430 Fifty percent and above progress 94.33% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
441 PRDP-IB-R005-CAS-019-CAL-001-2020 Luzon B Region 5 Camarines Sur 3rd Calabanga Construction of AA Slaughter House Others Square Meter 2000.000 34,456,799.67 4,307,099.96 4,307,099.96 0.00 43,070,999.59 17,211 42,526 40,507 83,033 Less than fifty percent progress 38.17% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GOLDEN DEER ENTERPRISES
442 PRDP-IB-R005-ALB-016-TAB-002-2020 Luzon B Region 5 Albay 1st Tabaco City Improvement/Rehabilitation of AA Slaughter House Others Square Meter 2000.000 39,983,837.24 4,997,979.66 4,997,979.66 0.00 49,979,796.56 32,039 71,838 69,528 141,366 Fifty percent and above progress 82.45% physical progress as of Nov. 15, 2024 » VIEW S-CURVE CEBU 7H TECHNOCHEM INDUSTRIES, INC.
443 PRDP-IB-R005-SOR-009-GUB-001-2020 Luzon B Region 5 Sorsogon 2nd Gubat Construction of AA Slaughter House Others Square Meter 3630.000 31,344,193.05 3,918,024.13 3,918,024.13 0.00 39,180,241.31 13,471 29,912 29,622 59,534 Fifty percent and above progress 81.65% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Cebu 7H Technochem Industries, Inc.
444 PRDP-IB-R005-CAT-013-VIR-001-2020 Luzon B Region 5 Catanduanes Lone Virac Construction of AA Slaughter House Others Square Meter 2000.000 35,199,514.69 4,399,939.34 4,399,939.34 0.00 43,999,393.37 - - - - Fifty percent and above progress 79.32% physical progress as of Nov. 15, 2024 » VIEW S-CURVE SYSTEM PROCESSOR AND CONSTRUCTION CORPORATION
445 PRDP-IB-R006-ANT-001-000-000-2014 Visayas Region 6 Antique Lone Laua-an Rehabilitation/Concreting of Liya-Liya-Casit-an FMR Farm to Market Road (FMR) Kilometer 1.380 17,437,616.14 2,179,702.02 2,179,702.02 0.00 21,797,020.18 383 878 891 1,769 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE FLT Enterprise
446 PRDP-IB-R006-CAP-001-000-000-2014 Visayas Region 6 Capiz 1st Ma-ayon Concreting and Improvement of Hipona-Canapian-Quinabonglan FMR with Bridge FMR with Bridge Kilometer 18.120 157,430,408.62 19,678,801.08 19,678,801.08 0.00 196,788,010.78 6,766 14,501 20,431 34,932 Completed (100%) 100.00% physical progress as of Jan. 07, 2022 » VIEW S-CURVE J.E. TICO Conctruction Co.,Inc. & F. Gurrea Construction Inc.
447 PRDP-IB-R006-ILO-001-000-000-2014 Visayas Region 6 Iloilo 4th Passi City Rehabilitation of Imbang Grande-Tagubong-Gemumua Agahon-Agtabo FMR Farm to Market Road (FMR) Kilometer 28.000 219,874,581.28 27,484,322.66 27,484,322.66 0.00 274,843,226.60 4,080 9,983 9,204 19,187 Completed (100%) 100.00% physical progress as of Jun. 15, 2020 » VIEW S-CURVE International Builders Corporation
448 PRDP-IB-R006-NOC-002-000-000-2014 Visayas Region 6 Negros Occidental 2nd Cadiz City Rehabilitation of Brgy. Caduha-an to Sitio Aluyan Farm to Market Road Farm to Market Road (FMR) Kilometer 12.460 117,231,591.60 14,653,948.95 14,653,948.95 0.00 146,539,489.50 633 1,656 1,509 3,165 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Dynamic Builders and Construction Company, (Phil.) Inc.
449 PRDP-IB-R006-NOC-008-000-000-2015 Visayas Region 6 Negros Occidental 2nd Manapla Rehabilitation of Brgy. 1-A to Brgy. Punta Salong FMR Farm to Market Road (FMR) Kilometer 3.100 38,799,531.67 4,849,941.46 4,849,941.46 0.00 48,499,414.59 992 2,475 2,285 4,760 Completed (100%) 100.00% physical progress as of May. 15, 2021 » VIEW S-CURVE Silver Dragon Construction, Lumber, and Glass Supply, Inc.
450 PRDP-IB-R006-NOC-009-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Construction of 75 l.m. Sicaba Bridge along Rehabilitation of Brgy. Caduha-an to Sitio Aluyan FMR Bridge Linear Meter 75.000 29,550,364.22 3,693,795.53 3,693,795.53 0.00 36,937,955.28 1,819 4,960 4,325 9,285 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE Wilkinson Construction
451 PRDP-IB-R006-NOC-010-000-000-2015 Visayas Region 6 Negros Occidental 2nd Cadiz City Construction of 40 l.m. Dalayapan Bridge along Rehabilitation of Brgy. Caduha-an to Sitio Aluyan FMR Bridge Linear Meter 40.000 18,757,129.96 2,344,641.25 2,344,641.25 0.00 23,446,412.46 1,819 1,656 1,509 3,165 Completed (100%) 100.00% physical progress as of Aug. 15, 2019 » VIEW S-CURVE WILKINSON CONSTRUCTION
452 PRDP-IB-R006-NOC-011-000-000-2015 Visayas Region 6 Negros Occidental 1st Toboso Construction of 75 l.m. Himoga-an Bridge along Rehabilitation of Sitio Magtu-od to Sitio Vergara FMR Bridge Linear Meter 75.000 31,689,709.18 3,961,213.65 3,961,213.65 0.00 39,612,136.48 1,173 2,346 5,320 7,666 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Dynamic Builders and Construction Company, (Phil.) Inc.
453 PRDP-IB-R006-NOC-012-000-000-2015 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of 120 L.M. Himoga-an Bridge Bridge Linear Meter 120.000 61,037,062.46 7,629,632.81 7,629,632.81 0.00 76,296,328.08 1,951 4,264 4,096 8,360 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE ESJ and Sons Construction and Construction Supply, Inc
454 PRDP-IB-R006-NOC-004-000-000-2015 Visayas Region 6 Negros Occidental 3rd Enrique B. Magalona Rehabilitation of Hinicayan - Violeta FMR with Napilas Bridge FMR with Bridge Kilometer 10.110 130,055,448.99 16,256,931.12 16,256,931.12 0.00 162,569,311.23 974 2,188 2,130 4,318 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE Dynamic Builders and Construction Company Incorporated/Wilkinson Construction Joint Venture
455 PRDP-IB-R006-GUI-002-000-000-2014 Visayas Region 6 Guimaras Lone Jordan Improvement / Rehabiltation of Bugnay-Sapal-Maabay Farm to Market Road Farm to Market Road (FMR) Kilometer 10.870 112,748,236.65 14,093,529.58 14,093,529.58 0.00 140,935,295.81 2,068 4,838 4,484 9,322 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE J.E.TICO CONSTRUCTION CO., INC.
456 PRDP-IB-R006-NOC-005-000-000-2015 Visayas Region 6 Negros Occidental 4th Pontevedra Rehabilitation of Brgy. Gomez - Brgy. Zamora Farm to Market Road Farm to Market Road (FMR) Kilometer 3.230 38,736,322.14 4,842,040.27 4,842,040.27 0.00 48,420,402.68 435 1,054 978 2,032 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE SILVER DRAGON CONSTRUCTION LUMBER & GLASS SUPPLY
457 PRDP-IB-R006-NOC-001-000-000-2013 Visayas Region 6 Negros Occidental 1st Toboso Rehabilitation of Brgy Bug-ang - Sitio Magtu-od - Sitio Vergara FMR Farm to Market Road (FMR) Kilometer 4.200 49,333,316.30 6,166,664.54 6,166,664.54 0.00 61,666,645.38 448 949 1,341 2,290 Completed (100%) 100.00% physical progress as of Jan. 15, 2018 » VIEW S-CURVE Silver Dragon Construction Lumber abd Glass Supply
458 PRDP-IB-R006-ILO-002-000-000-2015 Visayas Region 6 Iloilo 1st Tigbauan Rehabilitation of Parara - Jamog Farm to Market Road Farm to Market Road (FMR) Kilometer 7.890 69,952,110.94 8,744,013.87 8,744,013.87 0.00 87,440,138.68 4,663 10,176 10,090 20,266 Completed (100%) 100.00% physical progress as of Oct. 15, 2018 » VIEW S-CURVE UY CONDEV CORP./G.UY CONSTRUCTION JOINT VENTURE
459 PRDP-IB-R006-ILO-005-000-000-2015 Visayas Region 6 Iloilo 4th Dingle Rehabilitation /Concreting of Tinocuan-Maribuyong Farm to Market Road Farm to Market Road (FMR) Kilometer 9.750 83,600,588.02 10,450,073.50 10,450,073.50 0.00 104,500,735.02 1,281 2,915 2,830 5,745 Completed (100%) 100.00% physical progress as of Mar. 16, 2020 » VIEW S-CURVE Uy Condev Corporation / G. Uy Construction (Joint Venture)
460 PRDP-IB-R006-ILO-007-000-000-2015 Visayas Region 6 Iloilo 2nd Leon Concreting of Poblacion to Tacuyong Norte Farm to Market Road Farm to Market Road (FMR) Kilometer 10.470 96,684,933.54 12,085,616.69 12,085,616.69 0.00 120,856,166.92 2,930 7,107 7,183 14,290 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE INTERNATIONA BUILDERS CORPORATION
461 PRDP-IB-R006-AKL-001-000-000-2014 Visayas Region 6 Aklan Lone Banga Rehab/Improvement of Banga Libacao FMR with Bridge FMR with Bridge Kilometer 14.280 132,308,619.26 16,538,577.41 16,538,577.41 0.00 165,385,774.08 2,756 6,794 6,156 12,950 Completed (100%) 100.00% physical progress as of Feb. 15, 2021 » VIEW S-CURVE BSP & Company Inc.
462 PRDP-IB-R006-AKL-002-LIB-001-2015 Visayas Region 6 Aklan Lone Libacao Concreting of Brgy. Pampango-Rosal-Loctuga-Manika FMR with Four (4) Bridges FMR with Bridge Kilometer 4.900 138,922,858.59 17,365,357.32 17,365,357.32 0.00 173,653,573.23 1,411 4,421 4,623 9,044 Completed (100%) 100.00% physical progress as of Nov. 15, 2022 » VIEW S-CURVE BSP & Co., Inc.
463 PRDP-IB-R006-ILO-006-000-000-2015 Visayas Region 6 Iloilo 3rd Cabatuan Rehabilitation/Concreting of Bongol-Tambal-Quipot FMR with Two Bridges FMR with Bridge Kilometer 14.460 172,430,300.93 21,553,787.62 21,553,787.62 0.00 215,537,876.17 2,026 7,790 7,005 14,795 Completed (100%) 100.00% physical progress as of Dec. 27, 2022 » VIEW S-CURVE BSP & Company Inc.
464 PRDP-IB-R006-AKL-003-000-000-2015 Visayas Region 6 Aklan Lone Batan Rehabilitation and Improvement of Lalab-Bay-ang-Magpag-ong FMR Farm to Market Road (FMR) Kilometer 4.200 62,357,120.66 7,794,640.08 7,794,640.08 0.00 77,946,400.82 1,375 3,377 3,353 6,730 Completed (100%) 100.00% physical progress as of Oct. 21, 2021 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
465 PRDP-IB-R006-GUI-003-000-000-2016 Visayas Region 6 Guimaras Lone Sibunag Construction of Ten (10) Units Seaweeds Dryer cum Storage Others Square Meter 200.000 8,662,407.35 1,082,800.92 1,082,800.92 0.00 10,828,009.19 130 11 119 130 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE J.E. TICO CONSTRUCTION COMPANY, INC.
466 PRDP-IB-R006-NOC-016-000-000-2016 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of Sagay Feeder Port/ Fish Landing Others Square Meter 280.000 122,813,318.00 15,351,664.75 15,351,664.75 0.00 153,516,647.50 3,648 6,753 5,768 12,521 Completed (100%) 100.00% physical progress as of Oct. 15, 2022 » VIEW S-CURVE BSP and Company, Inc.
467 PRDP-IB-R006-AKL-004-000-000-2014 Visayas Region 6 Aklan Lone Altavas Rehabilitation of Coconut Mini Oil Mill for the Production of Small Scale Coco-Based Crude Oil and Copra Cakes Others Square Meter 185.420 3,456,640.00 432,080.00 432,080.00 0.00 4,320,800.00 237 108 129 237 Completed (100%) 100.00% physical progress as of Aug. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
468 PRDP-IB-R006-AKL-005-000-000-2018 Visayas Region 6 Aklan Lone Batan Construction of Magpag-ong Fishport Others Square Meter 147.800 10,206,019.81 1,275,752.48 1,275,752.48 0.00 12,757,524.77 3,840 - - - Completed (100%) 100.00% physical progress as of Jul. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
469 PRDP-IB-R006-ILO-008-000-000-2018 Visayas Region 6 Iloilo 2nd Alimodian Proposed Construction of Sixty (60) L.M. Pre-Stressed Concrete Girder Cabacanan Bridge Bridge Linear Meter 60.000 36,595,200.00 4,574,400.00 4,574,400.00 0.00 45,744,000.00 495 1,492 1,431 2,923 Fifty percent and above progress 75.14% physical progress as of Oct. 15, 2024 » VIEW S-CURVE F. Gurrea Construction Inc.
470 PRDP-IB-R006-AKL-006-000-000-2018 Visayas Region 6 Aklan Lone Altavas Rehabilitation and Improvement of Cabangila-Angas-Palay-Camanci Road Farm to Market Road (FMR) Kilometer 4.610 64,695,200.00 8,086,900.00 8,086,900.00 0.00 80,869,000.00 2,750 4,939 4,904 9,843 Fifty percent and above progress 84.34% physical progress as of Nov. 15, 2024 » VIEW S-CURVE F. GURREA CONSTRUCTION INCORPORATED
471 PRDP-IB-R006-AKL-008-LIB-001-2019 Visayas Region 6 Aklan Lone Libacao Construction/Concreting of Manika-Oyang Farm to Market Road Farm to Market Road (FMR) Kilometer 9.740 209,040,191.17 26,130,023.90 26,130,023.90 0.00 261,300,238.97 851 1,709 1,691 3,400 Less than fifty percent progress 38.79% physical progress as of Nov. 15, 2024 » VIEW S-CURVE KHAN KON CHI CONSTRUCTION AND DEVELOPMENT CORP.
472 PRDP-IB-R006-NOC-012-000-000-2019 Visayas Region 6 Negros Occidental 2nd Sagay City Construction of 90-ln. m. Himogaan (Brgy. Puey) Bridge III Bridge Linear Meter 90.000 50,244,765.15 6,280,595.64 6,280,595.64 0.00 62,805,956.43 1,107 2,089 1,811 3,900 Fifty percent and above progress 89.60% physical progress as of Nov. 15, 2024 » VIEW S-CURVE ESJ and Sons Construction and Construction Supply, Inc
473 PRDP-IB-R006-GUI-008-NUE-001-2021 Visayas Region 6 Guimaras Lone Nueva Valencia Establishment of Nueva Valencia Municipal Abattoir Others Square Meter 534.000 29,501,599.26 3,687,699.91 3,687,699.91 0.00 36,876,999.08 8,525 20,479 19,297 39,776 Fifty percent and above progress 98.77% physical progress as of Sep. 15, 2024 » VIEW S-CURVE J.E. TICO CONSTRUCTION CO., INC.
474 PRDP-IB-R006-GUI-009-JOR-001-2021 Visayas Region 6 Guimaras Lone Jordan Establishment of Jordan Municipal Abattoir Others Square Meter 0.000 28,065,791.98 3,508,224.00 3,508,224.00 0.00 35,082,239.98 - - - - Fifty percent and above progress 78.15% physical progress as of Sep. 15, 2024 » VIEW S-CURVE GEMWEALTH CONSTRUCTION & TRADING
475 PRDP-IB-R006-ILO-010-000-000-2020 Visayas Region 6 Iloilo 1st Oton Establishment of Oton Abattoir Others Square Meter 1231.340 38,525,502.12 4,815,687.77 4,815,687.77 0.00 48,156,877.66 22,471 49,956 49,512 99,468 Fifty percent and above progress 94.40% physical progress as of Nov. 15, 2024 » VIEW S-CURVE F. Gurrea Construction, Inc.
476 PRDP-IB-R006-NOC-014-000-000-2021 Visayas Region 6 Negros Occidental 6th Cauayan Establishment of Cauayan Municipal Abattoir Others Square Meter 2842.060 2,634,725.02 329,340.63 329,340.63 0.00 3,293,406.28 22,858 53,220 49,418 102,638 Fifty percent and above progress 82.67% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Almana Construction and Development Corporation
477 PRDP-IB-R006-NOC-018-000-000-2021 Visayas Region 6 Negros Occidental 1st San Carlos City Establishment of San Carlos Abattoir Others Square Meter 2443.180 39,913,182.93 4,989,147.87 4,989,147.87 0.00 49,891,478.67 32,220 67,054 67,566 134,620 Fifty percent and above progress 82.25% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Kenneth Construction and Development Corporation
478 PRDP-IB-R006-NOC-015-000-000-2021 Visayas Region 6 Negros Occidental Establishment of Hinobaan Municipal Abattoir Others Square Meter 3895.800 39,737,600.00 4,967,200.00 4,967,200.00 0.00 49,672,000.00 13,830 31,291 29,574 60,865 Fifty percent and above progress 87.98% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Jaime B Ching Enterprises
479 PRDP-IB-R006-NOC-013-000-000-2021 Visayas Region 6 Negros Occidental Establishment of Binalbagan Municipal Abattoir Others Square Meter 2341.900 39,056,000.00 4,882,000.00 4,882,000.00 0.00 48,820,000.00 15,495 34,733 34,456 69,189 Fifty percent and above progress 73.30% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Silver Dragon Construction & Lumber & Glass Supply, Inc.
480 PRDP-IB-R006-ILO-016-000-000-2021 Visayas Region 6 Iloilo Danao-Danao Island Solar-Powered Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 213.000 10,275,946.26 1,284,493.28 1,284,493.28 0.00 12,844,932.82 213 453 401 854 Completed (100%) 100.00% physical progress as of Dec. 26, 2023 » VIEW S-CURVE NXTLVL WATER TECHNOLOGY INCORPORATED
481 PRDP-IB-R006-NOC-016-000-000-2021 Visayas Region 6 Negros Occidental 3rd Murcia Establishment of Murcia Municipal Abattoir Others Square Meter 4311.080 37,884,800.00 4,735,600.00 4,735,600.00 0.00 47,356,000.00 1,822 41,454 39,832 81,286 Fifty percent and above progress 80.88% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Almana Construction and Development Corporation
482 PRDP-IB-R006-NOC-019-000-000-2021 Visayas Region 6 Negros Occidental 1st Toboso Establishment of Toboso Municipal Abattoir Others Square Meter 3895.080 37,468,800.00 4,683,600.00 4,683,600.00 0.00 46,836,000.00 9,745 21,661 20,453 42,114 Fifty percent and above progress 89.79% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Patrila Builders Incorporated
483 PRDP-IB-R006-ILO-011-000-000-2021 Visayas Region 6 Iloilo Establishment of Concepcion Abattoir Others Square Meter 534.000 23,960,000.00 2,995,000.00 2,995,000.00 0.00 29,950,000.00 9,218 22,362 20,797 43,159 Fifty percent and above progress 51.18% physical progress as of Nov. 15, 2024 » VIEW S-CURVE GC & S Construction Supply
484 PRDP-IB-R007-BOH-001-000-000-2014 Visayas Region 7 Bohol 2nd Sagbayan Rehabilitation of San Agustin-Canmaya Diot Farm to Market Road Farm to Market Road (FMR) Kilometer 5.980 38,551,612.41 4,818,951.55 4,818,951.55 0.00 48,189,515.51 1,183 1,887 1,828 3,715 Completed (100%) 100.00% physical progress as of Sep. 21, 2016 » VIEW S-CURVE YS Construction
485 PRDP-IB-R007-BOH-003-000-000-2014 Visayas Region 7 Bohol 1st Catigbian Rehabilitation of Baang-Mahayag Norte Farm to Market Road Farm to Market Road (FMR) Kilometer 3.530 23,886,256.17 2,985,782.02 2,985,782.02 0.00 29,857,820.21 595 1,507 1,588 3,095 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE WYNN Construction
486 PRDP-IB-R007-CEB-013-000-000-2015 Visayas Region 7 Cebu 2nd Santander Rehabilitation of Looc-Talisay Farm to Market Road Farm to Market Road (FMR) Kilometer 6.250 55,872,565.89 6,984,070.74 6,984,070.74 0.00 69,840,707.37 1,176 2,280 2,211 4,491 Completed (100%) 100.00% physical progress as of Sep. 14, 2020 » VIEW S-CURVE QM BUILDERS
487 PRDP-IB-R007-BOH-004-000-000-2014 Visayas Region 7 Bohol 3rd Loboc Rehabilitation of Alegria - Bugho Farm to Market Road Farm to Market Road (FMR) Kilometer 5.500 45,283,465.48 5,660,433.19 5,660,433.19 0.00 56,604,331.86 295 761 714 1,475 Completed (100%) 100.00% physical progress as of Aug. 15, 2022 » VIEW S-CURVE YU Construction
488 PRDP-IB-R007-CEB-003-000-000-2014 Visayas Region 7 Cebu 4th San Remigio Rehabilitation of Kinawahan - Canagahan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.710 23,756,370.26 2,969,546.28 2,969,546.28 0.00 29,695,462.82 725 1,428 1,417 2,845 Completed (100%) 100.00% physical progress as of Jun. 04, 2022 » VIEW S-CURVE J.A. ACHACOSO ENTERPRISES AND GENERAL SERVICES
489 PRDP-IB-R007-BOH-002-000-000-2014 Visayas Region 7 Bohol 1st Balilihan Rehabilitation of Del Carmen Weste via Tugbas Farm to Market Road Farm to Market Road (FMR) Kilometer 2.840 22,172,102.80 2,771,512.85 2,771,512.85 0.00 27,715,128.50 181 413 410 823 Completed (100%) 100.00% physical progress as of Mar. 16, 2019 » VIEW S-CURVE Contractor: CCM Construction
490 PRDP-IB-R007-CEB-001-000-000-2014 Visayas Region 7 Cebu 4th Bogo City Rehabilitation of Anonang Sur - Lambusan Farm to Market Road Farm to Market Road (FMR) Kilometer 5.820 45,595,541.32 5,699,442.67 5,699,442.67 0.00 56,994,426.66 1,052 2,665 2,996 5,661 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE Duros Development Corporation
491 PRDP-IB-R007-BOH-005-000-000-2014 Visayas Region 7 Bohol 2nd Inabanga Rehabilitation of Dagnawan - Dagohoy Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.940 100,045,055.27 12,505,631.91 12,505,631.91 0.00 125,056,319.09 4,570 11,298 10,765 22,063 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE YS Construction
492 PRDP-IB-R007-CEB-005-000-000-2015 Visayas Region 7 Cebu 2nd Alegria Alegria Integrated Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 3187.000 81,568,550.57 10,196,068.82 10,196,068.82 0.00 101,960,688.21 3,187 8,594 8,271 16,865 Completed (100%) 100.00% physical progress as of Dec. 15, 2022 » VIEW S-CURVE REX E. MORALES CONSTRUCTION
493 PRDP-IB-R007-BOH-006-000-000-2014 Visayas Region 7 Bohol 3rd Bilar Rehabilitation of Campagao - Cabacnitan Farm to Market Road Farm to Market Road (FMR) Kilometer 10.970 136,416,909.36 17,052,113.67 17,052,113.67 0.00 170,521,136.70 652 1,555 1,562 3,117 Fifty percent and above progress 67.68% physical progress as of Nov. 15, 2024 » VIEW S-CURVE BSP & Company, Inc.
494 PRDP-IB-R007-BOH-007-000-000-2014 Visayas Region 7 Bohol 1st Loon Rehabilitation of Pondol - Candaigan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.740 73,158,880.96 9,144,860.12 9,144,860.12 0.00 91,448,601.20 557 1,286 1,297 2,583 Fifty percent and above progress 95.22% physical progress as of Nov. 15, 2024 » VIEW S-CURVE BSP and Company, Inc.
495 PRDP-IB-R007-NOR-001-000-000-2017 Visayas Region 7 Negros Oriental 1st Guihulngan City Rehabilitation and Improvement of Hilaitan to Trinidad Farm to Market Road Farm to Market Road (FMR) Kilometer 18.500 253,978,244.71 31,747,280.59 31,747,280.59 0.00 317,472,805.89 9,849 22,130 20,238 42,368 Completed (100%) 100.00% physical progress as of Jun. 24, 2022 » VIEW S-CURVE PHILSOUTH BUILDERS
496 PRDP-IB-R007-SIQ-002-000-000-2017 Visayas Region 7 Siquijor Lone Larena Construction of Siquijor Provincial AA Abattoir Others Square Meter 534.000 26,785,408.28 3,348,176.04 3,348,176.04 0.00 33,481,760.36 22,883 48,717 47,267 95,984 Completed (100%) 100.00% physical progress as of Dec. 27, 2022 » VIEW S-CURVE Teknibuild Construction
497 PRDP-IB-R007-BOH-010-000-000-2018 Visayas Region 7 Bohol 2nd Talibon Brgy. Guindacpan Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 513.000 10,186,035.14 1,273,254.39 1,273,254.39 0.00 12,732,543.92 513 1,299 1,221 2,520 Completed (100%) 100.00% physical progress as of Jun. 15, 2024 » VIEW S-CURVE NXTLVL Water Technology Incorporated
498 PRDP-IB-R007-BOH-009-000-000-2018 Visayas Region 7 Bohol 1st Tubigon Bilangbilangan Island Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 672.000 10,186,035.14 1,273,254.39 1,273,254.39 0.00 12,732,543.92 672 1,662 1,632 3,294 Completed (100%) 100.00% physical progress as of Jun. 15, 2024 » VIEW S-CURVE NXTLVL Water Technology Incorporated
499 PRDP-IB-R007-BOH-008-000-000-2018 Visayas Region 7 Bohol Brgy. Hingotanan West Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 1002.000 10,186,035.14 1,273,254.39 1,273,254.39 0.00 12,732,543.92 1,002 2,426 2,294 4,720 Completed (100%) 100.00% physical progress as of Apr. 15, 2024 » VIEW S-CURVE NXTLVL Water Technology Incorporated
500 PRDP-IB-R007-BOH-011-000-000-2018 Visayas Region 7 Bohol 2nd Talibon Brgy. Cataban Potable Water System Potable Water Supply (PWS) Level 2 Number of Households 1390.000 10,186,035.14 1,273,254.39 1,273,254.39 0.00 12,732,543.92 1,390 2,746 2,453 5,199 Completed (100%) 100.00% physical progress as of Apr. 15, 2024 » VIEW S-CURVE NXTLVL Water Technology Incorporated
501 PRDP-IB-R008-SOL-002-000-000-2014 Visayas Region 8 Southern Leyte Lone Saint Bernard Rehabilitation/ Improvement of Mahayahay - Manalog Farm-to-Market Road Farm to Market Road (FMR) Kilometer 14.480 141,450,652.40 17,681,331.55 17,681,331.55 0.00 176,813,315.50 2,118 5,395 4,889 10,284 Completed (100%) 100.00% physical progress as of Jul. 31, 2020 » VIEW S-CURVE MAC Builders
502 PRDP-IB-R008-SOL-003-SOG-002-2014 Visayas Region 8 Southern Leyte Lone Sogod Rehabilitation/Concreting of San Pedro - Milagroso Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.830 23,245,416.54 2,905,677.07 2,905,677.07 0.00 29,056,770.68 476 1,189 1,130 2,319 Completed (100%) 100.00% physical progress as of Dec. 31, 2019 » VIEW S-CURVE Victoria Development and Construction Supply Corporation
503 PRDP-IB-R008-SAM-001-000-000-2014 Visayas Region 8 Samar 2nd Basey Concreting of Brgy Cogon to Brgy Mabini FMR Farm to Market Road (FMR) Kilometer 11.660 68,233,980.99 8,529,247.62 8,529,247.62 0.00 85,292,476.23 2,241 5,547 4,991 10,538 Completed (100%) 100.00% physical progress as of Feb. 27, 2020 » VIEW S-CURVE B. Vicencio Construction
504 PRDP-IB-R008-SAM-003-000-000-2014 Visayas Region 8 Samar 2nd San Sebastian Improvement/ Concreting of Brgy. Camanhagay - Poblacion 1 Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.350 21,897,147.11 2,737,143.39 2,737,143.39 0.00 27,371,433.89 1,116 2,923 2,724 5,647 Completed (100%) 100.00% physical progress as of Aug. 23, 2019 » VIEW S-CURVE B. Vicencio Construction - Burnary Construction & Development Co. (JV)
505 PRDP-IB-R008-NOS-001-000-000-2014 Visayas Region 8 Northern Samar 2nd San Roque Rehabilitation/Improvement of Bantayan Malobago-Pagsang-an FMR Farm to Market Road (FMR) Kilometer 6.880 44,031,580.02 5,503,947.50 5,503,947.50 0.00 55,039,475.02 1,717 4,011 5,318 9,329 Completed (100%) 100.00% physical progress as of Aug. 31, 2019 » VIEW S-CURVE Aqualine Construction
506 PRDP-IB-R008-LEY-005-DAG-001-2014 Visayas Region 8 Leyte 2nd Dagami Concreting of Brgy. Abaca - Panda Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.010 23,310,542.79 2,913,817.85 2,913,817.85 0.00 29,138,178.49 345 780 695 1,475 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE LANOY Construction
507 PRDP-IB-R008-NOS-005-BOB-001-2015 Visayas Region 8 Northern Samar 1st Bobon Construction/Improvement of Brgy. Dancalan - Sitio Inamburacay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.890 30,410,402.44 3,801,300.31 3,801,300.31 0.00 38,013,003.06 797 1,710 1,707 3,417 Completed (100%) 100.00% physical progress as of Mar. 15, 2021 » VIEW S-CURVE SAL Construction
508 PRDP-IB-R008-NOS-007-ROS-001-2015 Visayas Region 8 Northern Samar 1st Rosario Concreting of Salhag to Kailingan Farm - to - Market Road Farm to Market Road (FMR) Kilometer 2.960 39,907,940.25 4,988,492.53 4,988,492.53 0.00 49,884,925.31 310 832 783 1,615 Completed (100%) 100.00% physical progress as of Jan. 15, 2021 » VIEW S-CURVE Tuscan Construction and Supplies
509 PRDP-IB-R008-EAS-001-000-000-2014 Visayas Region 8 Eastern Samar Lone Balangkayan Improvement of Maytigbao-Balogo Farm to Market Road Farm to Market Road (FMR) Kilometer 1.770 26,416,114.32 3,302,014.29 3,302,014.29 0.00 33,020,142.90 253 557 508 1,065 Completed (100%) 100.00% physical progress as of Feb. 24, 2021 » VIEW S-CURVE PABLO S. LABASBAS CONSTRUCTION CORPORATION
510 PRDP-IB-R008-SAM-010-000-000-2015 Visayas Region 8 Samar 2nd Basey Improvement/Concreting of Brgy Cogon thru Canca-iyas -Brgy. Villa Aurora Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.950 70,338,372.03 8,792,296.50 8,792,296.50 0.00 87,922,965.03 1,285 3,141 2,767 5,908 Completed (100%) 100.00% physical progress as of May. 30, 2022 » VIEW S-CURVE CDU CONSTRUCTION
511 PRDP-IB-R008-NOS-003-000-000-2014 Visayas Region 8 Northern Samar 2nd Gamay Concreting of Burabod -Cadac-an Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.850 41,259,432.36 5,157,429.05 5,157,429.05 0.00 51,574,290.46 860 2,093 1,912 4,005 Completed (100%) 100.00% physical progress as of May. 31, 2022 » VIEW S-CURVE NORSAM BUILDERS AND CONSTRUCTION SUPPLY
512 PRDP-IB-R008-SOL-001-SOG-001-2014 Visayas Region 8 Southern Leyte Lone Sogod Rehabilitation/Concreting of Suba-Kanangkaan-San Vicente-San Juan Farm to Market Road Farm to Market Road (FMR) Kilometer 4.790 26,538,112.90 3,317,264.11 3,317,264.11 0.00 33,172,641.12 438 1,115 1,036 2,151 Completed (100%) 100.00% physical progress as of Oct. 31, 2017 » VIEW S-CURVE Victoria Development and Construction Supply Corporation
513 PRDP-IB-R008-SAM-002-000-000-2014 Visayas Region 8 Samar 2nd Santa Rita Improvement/Concreting of So. Dau - Brgy. San Eduardo Farm to Market Road Farm to Market Road (FMR) Kilometer 2.840 16,211,477.80 2,026,434.73 2,026,434.73 0.00 20,264,347.26 1,209 3,319 3,030 6,349 Completed (100%) 100.00% physical progress as of Nov. 07, 2019 » VIEW S-CURVE B. Vicencio Construction
514 PRDP-IB-R008-EAS-002-MAY-001-2014 Visayas Region 8 Eastern Samar Lone Maydolong Concreting of Brgy. Lapgap-Guindalitan FMR Farm to Market Road (FMR) Kilometer 2.130 12,723,144.00 1,590,393.00 1,590,393.00 0.00 15,903,930.00 434 576 519 1,095 Completed (100%) 100.00% physical progress as of Feb. 15, 2019 » VIEW S-CURVE PABLO S. LABASBAS CONSTRUCTION
515 PRDP-IB-R008-SOL-009-MAA-001-2015 Visayas Region 8 Southern Leyte Lone Maasin City Construction and Concreting of Brgy. Hantag – Brgy. Laboon Farm to Market Road Farm to Market Road (FMR) Kilometer 4.440 140,847,914.18 17,605,989.27 17,605,989.27 0.00 176,059,892.72 1,050 2,346 2,284 4,630 Fifty percent and above progress 99.19% physical progress as of Oct. 18, 2024 » VIEW S-CURVE JQD CONSTRUCTION AND GENERAL SERVICES
516 PRDP-IB-R008-SAM-005-000-000-2014 Visayas Region 8 Samar 1st Pagsanghan Improvement/Concreting of Brgy. Hinugacan – Brgy. Villahermosa Oriental Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.930 103,231,200.00 12,903,900.00 12,903,900.00 0.00 129,039,000.00 562 1,426 1,369 2,795 Fifty percent and above progress 95.06% physical progress as of Oct. 15, 2024 » VIEW S-CURVE B. VICENCIO BUILDERS (BVB) INC.
517 PRDP-IB-R008-SOL-008-000-000-2014 Visayas Region 8 Southern Leyte Lone Liloan Rehabilitation/Improvement of San Roque - Bahay Farm-to-Market Road FMR with Bridge Kilometer 19.400 191,316,378.48 23,914,547.31 23,914,547.31 0.00 239,145,473.10 2,203 5,180 5,352 10,532 Fifty percent and above progress 96.89% physical progress as of Jul. 31, 2019 » VIEW S-CURVE Unimasters Conglomerate Inc./ Viguz Construction Corporation (JV)
518 PRDP-IB-R008-NOS-008-000-000-2014 Visayas Region 8 Northern Samar 1st San Jose Northern Samar Coco Geonets Processing and Trading Enterprise Others Square Meter 300.000 2,144,143.92 268,017.99 268,017.99 0.00 2,680,179.90 60 30 30 60 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE Christfer Construction and Supply
519 PRDP-IB-R008-LEY-006-HIL-001-2016 Visayas Region 8 Leyte 5th Hilongos Concreting of Concepcion-Bagumbayan-Hampangan Farm to Market Road Farm to Market Road (FMR) Kilometer 9.660 105,742,687.66 13,217,835.96 13,217,835.96 0.00 132,178,359.58 4,252 10,212 9,563 19,775 Completed (100%) 100.00% physical progress as of Nov. 21, 2019 » VIEW S-CURVE CNE Construction
520 PRDP-IB-R008-LEY-007-HIL-002-2019 Visayas Region 8 Leyte 5th Hilongos Hilongos Barangay Water Supply Development Project Potable Water Supply (PWS) Level 2 Number of Households 3319.000 100,749,440.28 12,593,680.04 12,593,680.04 0.00 125,936,800.36 3,319 7,734 7,254 14,988 Completed (100%) 100.00% physical progress as of Apr. 30, 2023 » VIEW S-CURVE Rex E. Morales Construction
521 PRDP-IB-R008-EAS-006-000-000-2016 Visayas Region 8 Eastern Samar Lone Llorente Improvement/Concreting of Brgy. Burak - Mabuhay - Bantayan - Kalaw Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.060 129,277,470.06 16,159,683.76 16,159,683.76 0.00 161,596,837.58 794 1,633 3,123 4,756 Fifty percent and above progress 83.10% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Pablo S. Labasbas Construction Corporation
522 PRDP-IB-R009-ZAS-001-BUU-001-2013 Mindanao Region 9 Zamboanga Sibugay 1st Buug Rehabilitation/Upgrading of Pamintayan-Bawang Farm to Market Road Farm to Market Road (FMR) Kilometer 3.620 37,556,867.87 4,694,608.48 4,694,608.48 0.00 46,946,084.83 490 1,238 1,168 2,406 Completed (100%) 100.00% physical progress as of Nov. 01, 2016 » VIEW S-CURVE Rudhil Construction and Enterprises
523 PRDP-IB-R009-ZAS-008-TAL-002-2014 Mindanao Region 9 Zamboanga Sibugay 1st Talusan Rehabilitation/Upgrading of Brgy. Baganipay-Laparay-Dungkaan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.660 25,787,635.46 3,223,454.43 3,223,454.43 0.00 32,234,544.32 959 2,685 2,133 4,818 Completed (100%) 100.00% physical progress as of Jan. 27, 2018 » VIEW S-CURVE Rudhil Construction and Enterprises
524 PRDP-IB-R009-ZAS-002-ROS-001-2013 Mindanao Region 9 Zamboanga Sibugay 2nd Roseller Lim Rehabilitation/Concreting of Sto. Rosario to Sitio Pinili Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.140 29,030,052.82 3,628,756.60 3,628,756.60 0.00 36,287,566.02 299 799 656 1,455 Completed (100%) 100.00% physical progress as of Aug. 28, 2018 » VIEW S-CURVE Min Construction
525 PRDP-IB-R009-ZAS-007-TAL-001-2014 Mindanao Region 9 Zamboanga Sibugay 1st Talusan Construction of Bualan ( Upper - Lower ) Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.300 12,754,183.38 1,594,272.92 1,594,272.92 0.00 15,942,729.22 190 611 527 1,138 Completed (100%) 100.00% physical progress as of Feb. 15, 2017 » VIEW S-CURVE Min Construction
526 PRDP-IB-R009-ZAS-011-SIA-001-2013 Mindanao Region 9 Zamboanga Sibugay 2nd Siay Rehabilitation/Concreting of Bagong Silang-Magsaysay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.960 48,824,292.37 6,103,036.55 6,103,036.55 0.00 61,030,365.47 227 706 645 1,351 Completed (100%) 100.00% physical progress as of Dec. 24, 2017 » VIEW S-CURVE RCDG Const. Corp. & BENRAM CONSTRUCTION-JV
527 PRDP-IB-R009-ZAS-004-ROS-003-2013 Mindanao Region 9 Zamboanga Sibugay 2nd Roseller Lim Rehabilitation/Concreting of Brgy Casacon - Tilasan FMR Farm to Market Road (FMR) Kilometer 3.640 33,231,819.78 4,153,977.47 4,153,977.47 0.00 41,539,774.72 352 907 769 1,676 Completed (100%) 100.00% physical progress as of Dec. 01, 2016 » VIEW S-CURVE Rudhil Construction/Belvic Construction and Enterprises JV
528 PRDP-IB-R009-ZAS-005-ALI-001-2013 Mindanao Region 9 Zamboanga Sibugay 1st Alicia Rehabilitation of Dawa-Dawa-Sitio Tubig Sina Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.480 20,523,261.27 2,565,407.66 2,565,407.66 0.00 25,654,076.59 678 1,100 1,037 2,137 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE Genetian Builders
529 PRDP-IB-R009-ZAS-006-ALI-002-2013 Mindanao Region 9 Zamboanga Sibugay 1st Alicia Rehabilitation of Gulayon-Sitio Tantawan FMR Farm to Market Road (FMR) Kilometer 2.050 16,671,525.43 2,083,940.68 2,083,940.68 0.00 20,839,406.79 268 611 278 889 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE Genetian Builders
530 PRDP-IB-R009-ZAS-003-ROS-002-2013 Mindanao Region 9 Zamboanga Sibugay 2nd Roseller Lim Rehabilitation/Concreting of San Antonio-Sitio Lugami Farm to Market Road Farm to Market Road (FMR) Kilometer 3.500 33,323,856.01 4,165,482.00 4,165,482.00 0.00 41,654,820.01 281 835 761 1,596 Completed (100%) 100.00% physical progress as of Nov. 26, 2016 » VIEW S-CURVE Rudhil Construction/Belvic Construction and Enterprises Joint Venture
531 PRDP-IB-R009-ZDS-003-000-000-2014 Mindanao Region 9 Zamboanga Del Sur 1st Mahayag Concreting of PRJ Gumahan-Diwan-Parasan-Mabuhay-Sudlon (NRJ) FMR Farm to Market Road (FMR) Kilometer 18.220 165,525,776.88 20,690,722.11 20,690,722.11 0.00 206,907,221.10 7,559 18,157 17,446 35,603 Completed (100%) 100.00% physical progress as of Aug. 15, 2021 » VIEW S-CURVE Fiat Construction Services/Mamsar Construction and Industrial Corporation (JV)
532 PRDP-IB-R009-ZDS-004-000-000-2014 Mindanao Region 9 Zamboanga Del Sur 1st Ramon Magsaysay Concreting of NRJ Gapasan-Laperian-Buenasuerte-Sambulawan-Navalan (NRJ) FMR Farm to Market Road (FMR) Kilometer 11.880 87,077,366.90 10,884,670.86 10,884,670.86 0.00 108,846,708.62 1,847 4,439 4,264 8,703 Completed (100%) 100.00% physical progress as of Feb. 18, 2021 » VIEW S-CURVE Fiat Construction Services/Mamsar Construction and Industrial Corporation (JV)
533 PRDP-IB-R009-ZAS-010-TUN-001-2013 Mindanao Region 9 Zamboanga Sibugay 2nd Tungawan Rehabilitation/Concreting of Junction Provincial Road San Isidro-Little Margos and San Isidro-Sitio Limanon Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.950 70,226,429.20 8,778,303.65 8,778,303.65 0.00 87,783,036.50 504 1,191 1,077 2,268 Completed (100%) 100.00% physical progress as of Jan. 24, 2019 » VIEW S-CURVE Supreme ABF Construction and Construction Supply
534 PRDP-IB-R009-ZAS-012-TIT-001-2015 Mindanao Region 9 Zamboanga Sibugay 2nd Titay Concreting of San Antonio-Balocon - San Isidro Farm to Market Road Farm to Market Road (FMR) Kilometer 2.990 46,247,176.59 5,780,897.07 5,780,897.07 0.00 57,808,970.73 1,788 4,105 3,945 8,050 Completed (100%) 100.00% physical progress as of Jan. 04, 2022 » VIEW S-CURVE JAYKRIS ENTERPRISES AND CONSTRUCTION
535 PRDP-IB-R009-ZDN-002-000-000-2014 Mindanao Region 9 Zamboanga Del Norte 3rd Tampilisan Rehabilitation of Poblacion-Farmington-Galingon-Balacbaan-Cabong-Tilubog FMR Farm to Market Road (FMR) Kilometer 13.820 150,539,462.08 18,817,432.76 18,817,432.76 0.00 188,174,327.60 2,047 5,032 4,627 9,659 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE CB Garay Philwide Builders/Long Island Builders and Construction (Joint Venture)
536 PRDP-IB-R009-ZDN-001-BAL-001-2013 Mindanao Region 9 Zamboanga Del Norte 3rd Baliguian Rehabilitation/Concreting of Junction National Highway Mamawan-Diculom-Milidan Farm to Market Road Farm to Market Road (FMR) Kilometer 6.500 61,045,940.97 7,630,742.62 7,630,742.62 0.00 76,307,426.21 1,941 5,142 4,560 9,702 Completed (100%) 100.00% physical progress as of Apr. 19, 2018 » VIEW S-CURVE Long Island Builders/J.D. Legaspi (JV)
537 PRDP-IB-R009-ZAS-009-MAB-001-2013 Mindanao Region 9 Zamboanga Sibugay 1st Mabuhay Construction and Upgrading of 7.95km. Punawan-Sitio Pagaypayan-Sioton FMR with 28.60 meters Concrete Bridge FMR with Bridge Kilometer 7.950 111,531,138.60 13,941,392.33 13,941,392.33 0.00 139,413,923.26 445 1,080 1,129 2,209 Completed (100%) 100.00% physical progress as of Oct. 12, 2021 » VIEW S-CURVE St. Gerrard Construction/GTM Construction and Enterprises (JV)
538 PRDP-IB-R009-ZDS-006-000-000-2014 Mindanao Region 9 Zamboanga Del Sur 2nd Lakewood Concreting of Biswangan-Gasa Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.940 67,484,088.00 8,435,511.00 8,435,511.00 0.00 84,355,110.00 496 1,214 1,167 2,381 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Mamsar Construction and Industrial Corporation
539 PRDP-IB-R009-ZDS-005-000-000-2014 Mindanao Region 9 Zamboanga Del Sur 2nd Lakewood Concreting of NRJ Poblacion (Tigbao)-Libayoy-Lacarayan-Lukuan (NRJ) Farm to Market Road (FMR) Kilometer 12.380 132,870,030.18 16,608,753.77 16,608,753.77 0.00 166,087,537.72 1,081 2,598 2,496 5,094 Completed (100%) 100.00% physical progress as of Dec. 27, 2022 » VIEW S-CURVE FFJJ Construction
540 PRDP-IB-R009-ZDN-003-000-000-2015 Mindanao Region 9 Zamboanga Del Norte 3rd Labason Rehabilitation/Concreting of NRJ Gatas, Kalawit-Batayan-Poblacion (Pagkaing Bayan)-Daniel Maing-Gabu, Labason-Lawigan-Osukan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 32.270 372,718,177.59 46,589,772.20 46,589,772.20 0.00 465,897,721.99 3,661 9,541 8,615 18,156 Completed (100%) 101.13% physical progress as of Dec. 15, 2022 » VIEW S-CURVE WTG CONSTRUCTION & DEVELOPMENT CORPORATION / EDANNA CONSTRUCTION JOINT VENTURE
541 PRDP-IB-R009-ZDS-002-000-000-2014 Mindanao Region 9 Zamboanga Del Sur 2nd Dinas Concreting of NRJ Poblacion Guipos-Singclot-Sagacad-Dongos-Old Mirapao Farm to Market Road (FMR) with Bridge Farm to Market Road (FMR) Kilometer 11.500 181,627,922.40 22,703,490.30 22,703,490.30 0.00 227,034,903.00 5,761 17,156 9,979 27,135 Approved by RPAB For endorsement to NPCO
542 PRDP-IB-R009-ZAS-016-OLU-016-2017 Mindanao Region 9 Zamboanga Sibugay 1st Olutanga Rehab/Concreting of Solar-Maatim Farm to Market Road Farm to Market Road (FMR) Kilometer 3.000 36,187,200.00 4,523,400.00 4,523,400.00 0.00 45,234,000.00 345 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
543 PRDP-IB-R009-ZAS-017-BUU-017-2018 Mindanao Region 9 Zamboanga Sibugay 1st Buug Rehab/Concreting of Buug - Bayog (Talamimi Section) FMR Farm to Market Road (FMR) Kilometer 3.690 49,508,311.44 6,188,538.93 6,188,538.93 0.00 61,885,389.30 865 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
544 PRDP-IB-R009-ZAS-018-TAL-018-2017 Mindanao Region 9 Zamboanga Sibugay 1st Talusan Rehab/Conc. of Kawilan-Bolingan FMR Farm to Market Road (FMR) Kilometer 5.040 67,542,305.60 8,442,788.20 8,442,788.20 0.00 84,427,882.00 456 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
545 PRDP-IB-R009-ZAS-019-ROS-019-2016 Mindanao Region 9 Zamboanga Sibugay 2nd Roseller Lim Rehab/Concreting of Silingan - Sto. Rosario - Taruc- Siawang - R1 FMR Farm to Market Road (FMR) Kilometer 9.140 141,030,859.20 17,628,857.40 17,628,857.40 0.00 176,288,574.00 835 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
546 PRDP-IB-R009-ZDN-009-MAN-009-2018 Mindanao Region 9 Zamboanga Del Norte 2nd Manukan Concreting of Brgy. Gupot -Dipane FMR Farm to Market Road (FMR) Kilometer 3.290 44,937,609.60 5,617,201.20 5,617,201.20 0.00 56,172,012.00 353 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
547 PRDP-IB-R009-ZDS-006-000-000-2016 Mindanao Region 9 Zamboanga Del Sur Infra Component for the Establishment of Feed Mill,Cassava Processing and Marketing Others Square Meter 650.000 12,397,905.52 1,549,738.19 1,549,738.19 0.00 15,497,381.90 70 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
548 PRDP-IB-R009-ZDN-004-000-000-2015 Mindanao Region 9 Zamboanga Del Norte 2nd Sindangan Infra Component for the Cacao Production and Marketing Enterprise Others Square Meter 2170.000 1,698,800.00 212,350.00 212,350.00 0.00 2,123,500.00 253 148 105 253 Completed (100%) 100.00% physical progress as of Sep. 27, 2017 » VIEW S-CURVE RGS Construction
549 PRDP-IB-R009-ZAS-014-OLU-001-2017 Mindanao Region 9 Zamboanga Sibugay 1st Olutanga Concreting of Gandaan - San Jose Farm to Market Road Farm to Market Road (FMR) Kilometer 6.150 88,120,179.64 11,015,022.46 11,015,022.46 0.00 110,150,224.56 1,555 4,045 4,166 8,211 Completed (100%) 100.00% physical progress as of Nov. 25, 2022 » VIEW S-CURVE BADSBRO CONSTRUCTION
550 PRDP-IB-R009-ZAS-013-BUU-002-2017 Mindanao Region 9 Zamboanga Sibugay 1st Buug Road Concreting of Agutayan Farm to Market Road FMR with Bridge Kilometer 3.420 72,562,660.37 9,070,332.55 9,070,332.55 0.00 90,703,325.47 270 728 625 1,353 Completed (100%) 100.00% physical progress as of Dec. 26, 2022 » VIEW S-CURVE DL ENTERPRISES
551 PRDP-IB-R009-ZDN-005-SIB-001-2017 Mindanao Region 9 Zamboanga Del Norte 3rd Sibuco Concreting of Poblacion-Sto. Niño (Sitio Log Deck) – Tangarak FMR Farm to Market Road (FMR) Kilometer 16.520 198,591,243.79 24,823,905.47 24,823,905.47 0.00 248,239,054.73 835 5,203 4,481 9,684 Completed (100%) 100.00% physical progress as of Dec. 26, 2022 » VIEW S-CURVE MICHAEL ABUBAKAR CONSTRUCTION & ENGINEERING
552 PRDP-IB-R009-ZDN-010-TAM-010-2018 Mindanao Region 9 Zamboanga Del Norte 3rd Tampilisan Rehab/Concreting of Farmington-Tubod-Tininggaan FMR Farm to Market Road (FMR) Kilometer 3.690 50,838,393.76 6,354,799.22 6,354,799.22 0.00 63,547,992.20 910 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
553 PRDP-IB-R009-ZDN-006-SIA-001-2018 Mindanao Region 9 Zamboanga Del Norte 2nd Siayan Rehab/Conc. of Gonayen-Balunokan FMR Farm to Market Road (FMR) Kilometer 5.040 42,728,267.60 8,545,653.52 8,545,653.52 25,636,960.56 85,456,535.20 1,342 3,344 3,074 6,418 Fifty percent and above progress 88.99% physical progress as of Nov. 15, 2024 » VIEW S-CURVE DL ENTERPRISES
554 PRDP-IB-R009-ZDN-007-RIZ-001-2018 Mindanao Region 9 Zamboanga Del Norte 1st Rizal Rehab/Concreting Of Mapang - Mabuhay FMR Farm to Market Road (FMR) Kilometer 3.260 24,919,524.08 4,983,904.82 4,983,904.82 14,951,714.45 49,839,048.17 353 830 837 1,667 Fifty percent and above progress 96.52% physical progress as of Nov. 15, 2024 » VIEW S-CURVE M. ABUBAKAR CONSTRUCTION & ENGINEERING, INC.
555 PRDP-IB-R009-ZDN-008-RIZ-002-2018 Mindanao Region 9 Zamboanga Del Norte 1st Rizal Rehab/Concreting Of NRJ San Roque - Rizalina FMR Farm to Market Road (FMR) Kilometer 5.850 37,454,118.80 7,490,823.76 7,490,823.76 22,472,471.28 74,908,237.60 236 527 538 1,065 Fifty percent and above progress 97.50% physical progress as of Nov. 15, 2024 » VIEW S-CURVE DL Enterprises
556 PRDP-IB-R009-ZDS-008-000-000-2021 Mindanao Region 9 Zamboanga Del Sur Construction of Feeder Port with Access Road at Margosatubig Others Square Meter 0.000 14,895,200.00 1,861,900.00 1,861,900.00 0.00 18,619,000.00 3,989 9,577 9,203 18,780 Approved by RPAB For endorsement to NPCO
557 PRDP-IB-R009-ZDS-009-000-000-2021 Mindanao Region 9 Zamboanga Del Sur Construction of Fish Landing with Access Road at V-Sagun Others Square Meter 0.000 14,895,200.00 1,861,900.00 1,861,900.00 0.00 18,619,000.00 1,366 3,277 3,145 6,422 Approved by RPAB For endorsement to NPCO
558 PRDP-IB-R009-ZDS-010-000-000-2021 Mindanao Region 9 Zamboanga Del Sur Construction of Slaughter House at Margosatubig Others Square Meter 0.000 3,475,200.00 434,400.00 434,400.00 0.00 4,344,000.00 8,330 19,425 18,448 37,873 Approved by RPAB For endorsement to NPCO
559 PRDP-IB-R009-ZDN-019-SIN-001-2021 Mindanao Region 9 Zamboanga Del Norte 2nd Sindangan Construction of Brgy Benigno Aquino Jr. Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 0.000 5,868,000.00 733,500.00 733,500.00 0.00 7,335,000.00 1,707 - - - Approved by RPAB For endorsement to NPCO
560 PRDP-IB-R009-ZDN-018-PRE-002-2021 Mindanao Region 9 Zamboanga Del Norte 2nd Pres. Manuel A. Roxas Construction of Brgy Sibatong-Moliton-Capase Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 0.000 7,987,200.00 998,400.00 998,400.00 0.00 9,984,000.00 585 1,354 1,377 2,731 Approved by RPAB For endorsement to NPCO
561 PRDP-IB-R009-ZDN-017-PRE-001-2021 Mindanao Region 9 Zamboanga Del Norte 2nd Pres. Manuel A. Roxas Construction of Brgy Gubat-Lipakan Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 0.000 11,427,200.00 1,428,400.00 1,428,400.00 0.00 14,284,000.00 450 1,180 1,865 3,045 Approved by RPAB For endorsement to NPCO
562 PRDP-IB-R009-ZDN-014-LAL-002-2021 Mindanao Region 9 Zamboanga Del Norte 1st La Libertad Construction of Brgy New Argao-Singaran Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 0.000 4,990,400.00 623,800.00 623,800.00 0.00 6,238,000.00 272 - - - Approved by RPAB For endorsement to NPCO
563 PRDP-IB-R009-ZDN-013-LAL-001-2021 Mindanao Region 9 Zamboanga Del Norte 1st La Libertad Construction of Brgy La Victoria-Sta Catalina Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 0.000 6,098,400.00 762,300.00 762,300.00 0.00 7,623,000.00 156 - - - Approved by RPAB For endorsement to NPCO
564 PRDP-IB-R009-ZDN-021-SIO-001-2023 Mindanao Region 9 Zamboanga Del Norte 3rd Siocon Rehab./Concreting of Pisawak-Bulakan-New Libutan-Makiang-D. Riconalla -Tabayo FMR Farm to Market Road (FMR) Kilometer 14.100 276,664,532.61 34,583,066.58 34,583,066.58 0.00 345,830,665.77 - - - - Under Validation No validation date
565 PRDP-IB-R009-ZAS-020-OLU-003-2021 Mindanao Region 9 Zamboanga Sibugay 1st Olutanga Construction of Brgy Kahayagan- Sta. Maria Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 462.000 12,497,433.08 2,499,486.62 2,499,486.62 7,498,459.85 24,994,866.17 462 1,204 1,262 2,466 Completed (100%) 100.00% physical progress as of Jul. 15, 2024 » VIEW S-CURVE RUDHIL CONSTRUCTION AND ENTERPRISES INC.
566 PRDP-IB-R009-ZDN-011-GOD-001-2021 Mindanao Region 9 Zamboanga Del Norte 3rd Godod Construction/Improvement of Lomogom- Poblacion-Mauswagon-Baluno Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 1050.000 51,829,438.70 10,365,887.74 10,365,887.74 31,097,663.22 103,658,877.40 1,050 2,504 2,221 4,725 Fifty percent and above progress 84.33% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Joan Construction
567 PRDP-IB-R009-ZDN-016-SIA-002-2021 Mindanao Region 9 Zamboanga Del Norte 2nd Siayan Construction of Domogok-Paranglumba-Balok-Poblacion Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 1640.000 24,465,427.52 4,893,085.50 4,893,085.50 14,679,256.51 48,930,855.03 1,640 4,028 3,828 7,856 Completed (100%) 100.00% physical progress as of Nov. 15, 2024 » VIEW S-CURVE DL ENTERPRISES
568 PRDP-IB-R009-ZAS-019-OLU-002-2021 Mindanao Region 9 Zamboanga Sibugay 1st Olutanga Construction of Brgy San Jose-Calais Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 696.000 18,436,808.99 3,687,361.80 3,687,361.80 11,062,085.39 36,873,617.98 696 1,712 1,788 3,500 Completed (100%) 100.00% physical progress as of Aug. 15, 2024 » VIEW S-CURVE RUDHIL CONSTRUCTION AND ENTERPRISES INC.
569 PRDP-IB-R009-ZDS-007-000-000-2021 Mindanao Region 9 Zamboanga Del Sur 1st Josefina Construction of Josefina Gravity Type Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 1874.000 47,756,797.76 9,551,359.55 9,551,359.55 28,654,078.66 95,513,595.52 1,874 4,789 4,581 9,370 Fifty percent and above progress 84.59% physical progress as of Nov. 30, 2024 » VIEW S-CURVE Joan Construction
570 PRDP-IB-R009-ZDN-012-MUT-001-2021 Mindanao Region 9 Zamboanga Del Norte 1st Mutia Construction/Improvement of Brgy Alvenda-Buenasuerte-Tinglan-San Miguel-Totongan Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 992.000 23,974,991.02 4,794,998.20 4,794,998.20 14,384,994.61 47,949,982.03 992 2,030 1,876 3,906 Completed (100%) 100.00% physical progress as of Sep. 15, 2024 » VIEW S-CURVE Joan Construction
571 PRDP-IB-R009-ZDN-015-SIB-002-2021 Mindanao Region 9 Zamboanga Del Norte 3rd Sibuco Construction of Brgy Nala-Pasilnahut-Poblacion-Jatian Level II PWS Potable Water Supply (PWS) Level 2 Number of Households 336.000 22,501,734.10 4,500,346.82 4,500,346.82 13,501,040.46 45,003,468.20 336 589 884 1,473 Fifty percent and above progress 98.09% physical progress as of Nov. 15, 2024 » VIEW S-CURVE JOAN CONSTRUCTION
572 PRDP-IB-R009-ZAS-021-MAB-002-2022 Mindanao Region 9 Zamboanga Sibugay 1st Mabuhay Construction of Mabuhay Potable Water System(PWS)- Level II Potable Water Supply (PWS) Level 2 Number of Households 654.000 23,441,826.80 4,688,365.36 4,688,365.36 14,065,096.08 46,883,653.60 654 1,538 1,732 3,270 Fifty percent and above progress 95.03% physical progress as of Nov. 15, 2024 » VIEW S-CURVE Long Island Builders and Construction
573 PRDP-IB-R010-MOR-001-MAG-001-2013 Mindanao Region 10 Misamis Oriental 1st Magsaysay Construction of Magsaysay PWS Level II Potable Water Supply (PWS) Level 2 Number of Households 390.000 5,028,732.80 628,591.60 628,591.60 0.00 6,285,916.00 390 1,002 887 1,889 Completed (100%) 100.00% physical progress as of May. 15, 2018 » VIEW S-CURVE RM Mondares Construction
574 PRDP-IB-R010-BUK-010-DAM-001-2014 Mindanao Region 10 Bukidnon 3rd Damulog Rehabilitation/Concreting of Sitio Sinayaran-Pocopoco to Tangkulan FMR Farm to Market Road (FMR) Kilometer 13.940 150,729,496.49 18,841,187.06 18,841,187.06 0.00 188,411,870.61 1,247 3,041 2,890 5,931 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE M. Montesclaros Enterprises
575 PRDP-IB-R010-MOC-006-CAL-001-2013 Mindanao Region 10 Misamis Occidental 1st Calamba Construction/Concreting of Dapacan Bajo-Bunawan- D’Ban FMR w/ Spillway FMR with Bridge Kilometer 3.300 31,751,897.79 3,968,987.22 3,968,987.22 0.00 39,689,872.23 1,283 3,243 3,167 6,410 Completed (100%) 100.00% physical progress as of Apr. 15, 2017 » VIEW S-CURVE RITCHIE - NATHALIE BUILDERS
576 PRDP-IB-R010-BUK-014-MAN-003-2015 Mindanao Region 10 Bukidnon 1st Manolo Fortich Rehabilitation and Concreting of Sitio Viga - Mambatangan FMR Farm to Market Road (FMR) Kilometer 4.640 35,390,499.58 4,423,812.45 4,423,812.45 0.00 44,238,124.48 704 1,656 1,592 3,248 Completed (100%) 100.00% physical progress as of Jun. 18, 2021 » VIEW S-CURVE PURE GOLD CONSTRUCTION & DEVELOPMENT CORPORATION
577 PRDP-IB-R010-BUK-013-VAL-001-2015 Mindanao Region 10 Bukidnon 4th Valencia City Concreting of Bulacao-Concepcion Laligan Junction FMR Farm to Market Road (FMR) Kilometer 8.100 92,379,026.00 11,547,378.25 11,547,378.25 0.00 115,473,782.50 977 2,425 2,133 4,558 Completed (100%) 100.00% physical progress as of Oct. 15, 2020 » VIEW S-CURVE M. MONTESCLAROS ENTERPRISES, INC.
578 PRDP-IB-R010-MOR-005-SAL-001-2013 Mindanao Region 10 Misamis Oriental 1st Salay Concreting of Mimbule Farm to Market Road Farm to Market Road (FMR) Kilometer 1.800 14,919,609.60 1,864,951.20 1,864,951.20 0.00 18,649,512.00 283 692 725 1,417 Completed (100%) 100.00% physical progress as of Mar. 04, 2016 » VIEW S-CURVE Charlz Construction
579 PRDP-IB-R010-MOC-015-CLA-002-2013 Mindanao Region 10 Misamis Occidental 2nd Clarin Rehabilitation and Concreting of Guba-Bernad/Guba-Bitoon Farm to Market Road with Bridge FMR with Bridge Kilometer 4.240 79,736,282.70 9,967,035.34 9,967,035.34 0.00 99,670,353.38 941 2,390 2,187 4,577 Completed (100%) 100.00% physical progress as of Jun. 15, 2020 » VIEW S-CURVE FFJJ Construction/JDCO Phil. Builders, Inc. (JV)
580 PRDP-IB-R010-MOR-010-INI-003-2013 Mindanao Region 10 Misamis Oriental 2nd Initao Upgrading/Concreting of Canilawan-Cogon Farm to Market Road Farm to Market Road (FMR) Kilometer 3.080 21,099,625.60 2,637,453.20 2,637,453.20 0.00 26,374,532.00 906 2,325 2,318 4,643 Completed (100%) 100.00% physical progress as of Apr. 15, 2016 » VIEW S-CURVE RG & K Construction and Gen. Mdse
581 PRDP-IB-R010-MOR-009-INI-002-2013 Mindanao Region 10 Misamis Oriental 2nd Initao Upgrading/Concreting of Gimampang-Aluna-Casilihon FMR Farm to Market Road (FMR) Kilometer 3.020 19,872,197.60 2,484,024.70 2,484,024.70 0.00 24,840,247.00 783 1,901 1,896 3,797 Completed (100%) 100.00% physical progress as of Jul. 01, 2016 » VIEW S-CURVE RG & K Construction and Gen. Mdse
582 PRDP-IB-R010-MOR-008-INI-001-2013 Mindanao Region 10 Misamis Oriental 2nd Initao Upgrading/Concreting of Jampason- Dagongon FMR Farm to Market Road (FMR) Kilometer 2.960 19,872,197.60 2,484,024.70 2,484,024.70 0.00 24,840,247.00 730 2,135 2,131 4,266 Completed (100%) 100.00% physical progress as of Jun. 15, 2019 » VIEW S-CURVE RG & K Construction and Gen. Mdse
583 PRDP-IB-R010-LDN-004-LAL-003-2013 Mindanao Region 10 Lanao Del Norte 2nd Lala Rehabilitation/Concreting of Pinuyak-Simpak -Maranding FMR Farm to Market Road (FMR) Kilometer 4.100 33,132,885.10 4,141,610.64 4,141,610.64 0.00 41,416,106.38 4,104 9,501 10,139 19,640 Completed (100%) 100.00% physical progress as of Aug. 15, 2016 » VIEW S-CURVE Lanao Builbers
584 PRDP-IB-R010-MOC-009-LOP-001-2015 Mindanao Region 10 Misamis Occidental 1st Lopez Jaena Rehabilitation and Concreting of Brgy Dampalan- Brgy Luzaran Farm to Market Road Farm to Market Road (FMR) Kilometer 2.600 18,974,830.52 2,371,853.82 2,371,853.82 0.00 23,718,538.16 596 1,807 1,062 2,869 Completed (100%) 100.00% physical progress as of Feb. 15, 2018 » VIEW S-CURVE RN Builders and General Merchandise
585 PRDP-IB-R010-MOC-003-TUD-002-2015 Mindanao Region 10 Misamis Occidental 2nd Tudela Rehabilitation/Concreting of Maikay-Cahayag-Buenavista Farm to Market Road Farm to Market Road (FMR) Kilometer 13.340 102,991,933.36 12,873,991.67 12,873,991.67 0.00 128,739,916.70 985 2,526 2,414 4,940 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE Grace Construction Corporation and RDT Construction and Gen. Merchandise
586 PRDP-IB-R010-BUK-003-IMP-001-2013 Mindanao Region 10 Bukidnon 2nd Impasug-ong Concreting/Improvement of 5.040 km Kibenton-Intavas Farm to Market Road Farm to Market Road (FMR) Kilometer 5.040 44,319,494.54 5,539,936.82 5,539,936.82 0.00 55,399,368.18 1,658 4,186 3,721 7,907 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE J.T. Gamolo Construction
587 PRDP-IB-R010-BUK-006-MAI-002-2013 Mindanao Region 10 Bukidnon 1st Malitbog Rehabilitation/Concreting of Junction Tomigbong - Larapan FMR Phase I Farm to Market Road (FMR) Kilometer 1.700 17,421,723.75 2,177,715.47 2,177,715.47 0.00 21,777,154.69 1,761 5,359 4,716 10,075 Completed (100%) 100.00% physical progress as of Aug. 31, 2019 » VIEW S-CURVE _______________________
588 PRDP-IB-R010-MOR-003-KIN-002-2013 Mindanao Region 10 Misamis Oriental 1st Kinoguitan Upgrading of Panabol-Buko Farm to Market Road Farm to Market Road (FMR) Kilometer 1.340 11,533,820.00 1,441,727.50 1,441,727.50 0.00 14,417,275.00 709 1,773 1,771 3,544 Completed (100%) 100.00% physical progress as of Jul. 15, 2017 » VIEW S-CURVE WDM CONSTRUCTION & SUPPLIES
589 PRDP-IB-R010-MOR-002-KIN-001-2013 Mindanao Region 10 Misamis Oriental 1st Kinoguitan Upgrading of Calubo-Poblacion Farm to Market Road Farm to Market Road (FMR) Kilometer 1.720 14,887,816.80 1,860,977.10 1,860,977.10 0.00 18,609,771.00 656 1,674 1,608 3,282 Completed (100%) 100.00% physical progress as of Aug. 17, 2017 » VIEW S-CURVE WDM CONSTRUCTION & SUPPLIES
590 PRDP-IB-R010-BUK-002-MAL-003-2015 Mindanao Region 10 Bukidnon 1st Malitbog Rehabilitation/Concreting of Junction Tomigbong-Larapan FMR Phase II Farm to Market Road (FMR) Kilometer 3.080 27,904,175.20 3,488,021.90 3,488,021.90 0.00 34,880,219.00 1,809 4,250 4,068 8,318 Completed (100%) 100.00% physical progress as of Aug. 16, 2019 » VIEW S-CURVE Pyramid Consolidated Builders & General Merchandise/ Cagalawan Enterprises (Joint Venture)
591 PRDP-IB-R010-BUK-007-MAI-005-2014 Mindanao Region 10 Bukidnon 1st Malitbog Rehabilitation/Concreting of Junction San Luis/Siloo-Mabuhay- Bagyangon Farm to Market Road Farm to Market Road (FMR) Kilometer 4.920 42,340,652.00 5,292,581.50 5,292,581.50 0.00 52,925,815.00 1,322 3,119 2,985 6,104 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE Metalite Builders
592 PRDP-IB-R010-BUK-011-MAN-002-2014 Mindanao Region 10 Bukidnon 1st Manolo Fortich Rehabilitation/Concreting of Aurora-Sto. Niño Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.040 24,699,881.60 3,087,485.20 3,087,485.20 0.00 30,874,852.00 689 1,757 1,688 3,445 Completed (100%) 100.00% physical progress as of Aug. 31, 2018 » VIEW S-CURVE FFJJ CONSTRUCTION
593 PRDP-IB-R010-MOC-005-BON-001-2015 Mindanao Region 10 Misamis Occidental 2nd Bonifacio Rehabilitation/Concreting of Mapurog-Migsale Farm to Market Road Farm to Market Road (FMR) Kilometer 4.960 53,623,653.06 6,702,956.63 6,702,956.63 0.00 67,029,566.32 713 1,861 2,061 3,922 Completed (100%) 100.00% physical progress as of Jul. 15, 2018 » VIEW S-CURVE Victoriano C. Lim Construction
594 PRDP-IB-R010-MOC-013-TUD-001-2013 Mindanao Region 10 Misamis Occidental 2nd Tudela Rehabilitation/Concreting of 2.26 Km. Casilak-San Agustin FMR Farm to Market Road (FMR) Kilometer 2.260 18,878,892.82 2,359,861.60 2,359,861.60 0.00 23,598,616.02 180 2,918 2,804 5,722 Completed (100%) 100.00% physical progress as of Jan. 15, 2016 » VIEW S-CURVE MBD General Construction
595 PRDP-IB-R010-BUK-008-MAI-004-2013 Mindanao Region 10 Bukidnon 1st Malitbog Rehabilitation/Concreting of San Migara-Tingag-Tagmaray Farm to Market Road Farm to Market Road (FMR) Kilometer 4.700 42,343,852.01 5,292,981.50 5,292,981.50 0.00 52,929,815.01 1,238 3,967 3,338 7,305 Completed (100%) 100.00% physical progress as of May. 16, 2018 » VIEW S-CURVE Metalite Builders Development Company, Incorporated
596 PRDP-IB-R010-LDN-007-TUB-001-2015 Mindanao Region 10 Lanao Del Norte 1st Tubod Rehabilitation and Concreting of Taguranao-Palao-Dalama Farm to Market Road Farm to Market Road (FMR) Kilometer 6.500 51,818,037.87 6,477,254.73 6,477,254.73 0.00 64,772,547.33 918 1,276 1,663 2,939 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE Grand Builders
597 PRDP-IB-R010-MOC-018-ORO-001-2015 Mindanao Region 10 Misamis Occidental 1st Oroquieta City Concreting of Dolipos Alto - Dullan Norte FMR Farm to Market Road (FMR) Kilometer 4.830 44,345,955.78 5,543,244.47 5,543,244.47 0.00 55,432,444.72 755 1,732 1,665 3,397 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE DL Construction
598 PRDP-IB-R010-MOR-011-GIN-001-2015 Mindanao Region 10 Misamis Oriental 1st Gingoog City Rehabilitation and Concreting of Crossing San Miguel-Kalagonoy Farm to Market Road Farm to Market Road (FMR) Kilometer 5.380 53,513,628.51 6,689,203.56 6,689,203.56 0.00 66,892,035.63 294 779 885 1,664 Completed (100%) 100.00% physical progress as of Jan. 15, 2020 » VIEW S-CURVE Three W Builders/ DL Enterprises (JV)
599 PRDP-IB-R010-MOC-008-CAL-003-2013 Mindanao Region 10 Misamis Occidental 1st Calamba Concreting of Siloy-Upper Dioyo Concepcion Farm to Market Road Farm to Market Road (FMR) Kilometer 6.500 55,422,842.58 6,927,855.32 6,927,855.32 0.00 69,278,553.22 236 655 557 1,212 Completed (100%) 100.00% physical progress as of Aug. 25, 2022 » VIEW S-CURVE Henscha Philippines Inc.
600 PRDP-IB-R010-BUK-009-MAN-001-2013 Mindanao Region 10 Bukidnon 1st Manolo Fortich Rehabilitation/Conceting of Mantibugao - Minsuro Farm to Market Road Farm to Market Road (FMR) Kilometer 8.040 56,850,284.82 7,106,285.60 7,106,285.60 0.00 71,062,856.02 592 1,961 1,811 3,772 Completed (100%) 101.19% physical progress as of Dec. 15, 2021 » VIEW S-CURVE HEXAMINDZ CORPORATION
601 PRDP-IB-R010-BUK-005-MAL-001-2013 Mindanao Region 10 Bukidnon 1st Malitbog Rehabilitation/Concreting of San Luis-Tubod-Omagling Farm to Market Road Farm to Market Road (FMR) Kilometer 2.400 22,122,260.80 2,765,282.60 2,765,282.60 0.00 27,652,826.00 1,504 4,688 3,969 8,657 Completed (100%) 100.00% physical progress as of Mar. 15, 2017 » VIEW S-CURVE Charlz Construction
602 PRDP-IB-R010-MOC-004-PLA-001-2015 Mindanao Region 10 Misamis Occidental 1st Plaridel Rehabilitation and Concreting of Unidos-Mangidkid-Balanlinao FMR Farm to Market Road (FMR) Kilometer 3.110 20,209,830.08 2,526,228.76 2,526,228.76 0.00 25,262,287.60 1,147 2,507 2,301 4,808 Completed (100%) 100.00% physical progress as of Oct. 15, 2017 » VIEW S-CURVE RITCHE-NATHALIE BLDRS. & GEN. MDSE.
603 PRDP-IB-R010-MOC-012-PAN-001-2013 Mindanao Region 10 Misamis Occidental 1st Panaon Construction of 2.095 Kms. Sumasap-Villalin-San Andres-Poblacion-Map-an Farm to Market Road Farm to Market Road (FMR) Kilometer 2.100 27,103,331.32 3,387,916.42 3,387,916.42 0.00 33,879,164.16 989 2,297 2,192 4,489 Completed (100%) 100.00% physical progress as of Apr. 15, 2017 » VIEW S-CURVE Victoriano C. Lim Construction
604 PRDP-IB-R010-LDN-005-000-000-2014 Mindanao Region 10 Lanao Del Norte 1st Tubod Infra Components - Integrated Coconut-Based Enterprise Others Square Meter 300.000 7,063,980.25 882,997.53 882,997.53 0.00 8,829,975.31 750 1,110 948 2,058 Completed (100%) 100.01% physical progress as of Mar. 15, 2021 » VIEW S-CURVE JOMARA KONSTRUCKT CORPORATION
605 PRDP-IB-R010-LDN-001-KAP-001-2013 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction and Rehabilitation of Mahayahay - Buenavista - Tiacongan-Bagong Silang Farm to Market Road Farm to Market Road (FMR) Kilometer 13.180 113,758,345.20 14,219,793.15 14,219,793.15 0.00 142,197,931.50 1,153 2,463 2,605 5,068 Completed (100%) 100.00% physical progress as of Oct. 25, 2019 » VIEW S-CURVE WTG Construction and Development Corporation
606 PRDP-IB-R010-MOR-012-GIN-002-2015 Mindanao Region 10 Misamis Oriental 1st Gingoog City Rehabilitation and Concreting of Upper Malibud to Dinawehan Farm to Market Road Farm to Market Road (FMR) Kilometer 11.130 84,887,091.35 10,610,886.42 10,610,886.42 0.00 106,108,864.19 539 1,328 1,394 2,722 Completed (100%) 100.00% physical progress as of Jun. 15, 2023 » VIEW S-CURVE FFJJ Construction
607 PRDP-IB-R010-BUK-019-MAN-005-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Lingi-on) Others Square Meter 1500.000 2,418,400.00 302,300.00 302,300.00 0.00 3,023,000.00 1,267 3,485 2,851 6,336 Approved by RPAB For Issuance of NOL 1
608 PRDP-IB-R010-BUK-018-MAN-004-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Kalugmanan) Others Square Meter 1500.000 2,780,243.41 347,530.43 347,530.43 0.00 3,475,304.27 50 127 123 250 Completed (100%) 100.00% physical progress as of Feb. 28, 2021 » VIEW S-CURVE PARV ENGINEERING SERVICES
609 PRDP-IB-R010-BUK-028-MAN-010-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Sto. Nino) Others Square Meter 1500.000 2,807,865.34 350,983.17 350,983.17 0.00 3,509,831.68 635 1,714 1,461 3,175 Completed (100%) 100.00% physical progress as of May. 12, 2021 » VIEW S-CURVE MORTAR MASTERS AND CONRETE BUILDERS
610 PRDP-IB-R010-BUK-027-MAN-009-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Minsuro) Others Square Meter 1500.000 2,820,056.84 352,507.11 352,507.11 0.00 3,525,071.06 121 332 273 605 Completed (100%) 100.00% physical progress as of Apr. 15, 2021 » VIEW S-CURVE Y CONSTRUCTION AND SUPPLY
611 PRDP-IB-R010-BUK-022-MAN-008-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Mambatangan) Others Square Meter 1500.000 2,940,243.41 367,530.43 367,530.43 0.00 3,675,304.27 78 199 110 309 Completed (100%) 100.00% physical progress as of Apr. 12, 2021 » VIEW S-CURVE PARV ENGINEERING SERVICES
612 PRDP-IB-R010-MOC-017-000-000-2018 Mindanao Region 10 Misamis Occidental 1st Lopez Jaena Rehabilitation and Concreting of Barangay Molatuhan Alto-Barangay Alegria FMR Farm to Market Road (FMR) Kilometer 7.730 134,793,120.00 16,849,140.00 16,849,140.00 0.00 168,491,400.00 400 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
613 PRDP-IB-R010-BUK-025-PAN-001-2018 Mindanao Region 10 Bukidnon 4th Pangantucan Concreting of Poblacion-Concepcion-New Eden-Portulin Farm to Market Road Farm to Market Road (FMR) Kilometer 12.600 176,112,800.00 22,014,100.00 22,014,100.00 0.00 220,141,000.00 500 7,147 6,779 13,926 Approved by RPAB For Issuance of NOL 1
614 PRDP-IB-R010-MOC-020-000-000-2015 Mindanao Region 10 Misamis Occidental 1st Baliangao Concreting of Bato, Plaridel- Sinian, Baliangao Farm to Market Road Farm to Market Road (FMR) Kilometer 4.660 53,968,938.70 6,746,117.34 6,746,117.34 0.00 67,461,173.38 1,472 5,221 3,008 8,229 Completed (100%) 100.00% physical progress as of Sep. 30, 2022 » VIEW S-CURVE Genetian Builders
615 PRDP-IB-R010-MOC-021-PAN-002-2015 Mindanao Region 10 Misamis Occidental 1st Panaon Rehabilitation and Concreting of Sumasap-Salimpono-Magsaysay-Bangko-San Juan FMR Farm to Market Road (FMR) Kilometer 11.930 115,355,859.20 14,419,482.40 14,419,482.40 0.00 144,194,824.00 1,792 4,413 4,179 8,592 Completed (100%) 100.00% physical progress as of Dec. 06, 2022 » VIEW S-CURVE Mindanao Rock
616 PRDP-IB-R010-MOC-022-000-000-2016 Mindanao Region 10 Misamis Occidental 1st Aloran Concreting of Zamora-Culpan-Balintonga-Sinampongan Farm to Market Road Farm to Market Road (FMR) Kilometer 13.000 137,311,211.20 17,163,901.40 17,163,901.40 0.00 171,639,014.00 1,110 4,867 2,186 7,053 Completed (100%) 100.00% physical progress as of Sep. 30, 2022 » VIEW S-CURVE FFJJ Construction
617 PRDP-IB-R010-MOR-013-VIL-001-2016 Mindanao Region 10 Misamis Oriental 2nd Villanueva Construction of Dayawan-Lokong-Crossing Mambuaya FMR Farm to Market Road (FMR) Kilometer 3.740 56,293,199.39 7,036,649.92 7,036,649.92 0.00 70,366,499.23 1,936 4,978 4,703 9,681 Completed (100%) 100.00% physical progress as of Dec. 05, 2021 » VIEW S-CURVE DL Enterprises
618 PRDP-IB-R010-BUK-020-MAN-006-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Brgy Lunocan Proper) Others Square Meter 1500.000 2,895,149.31 361,893.66 361,893.66 0.00 3,618,936.63 1,837 4,040 3,306 7,346 Approved by RPAB For Issuance of NOL 1
619 PRDP-IB-R010-BUK-023-LAN-001-2017 Mindanao Region 10 Bukidnon 2nd Lantapan Concreting of Road and Drainage at Purok 3 to Purok 5, Kulasihan Lantapan, Bukidnon Farm to Market Road (FMR) Kilometer 6.060 46,917,500.00 9,383,500.00 9,383,500.00 28,150,500.00 93,835,000.00 1,341 3,037 2,748 5,785 Completed (100%) 100.00% physical progress as of Dec. 26, 2023 » VIEW S-CURVE CARTESIAN BUILDERS
620 PRDP-IB-R010-BUK-026-VAL-002-2018 Mindanao Region 10 Bukidnon 4th Valencia City Concreting of Mt. Nebo-Sitio Migtulod FMR Farm to Market Road (FMR) Kilometer 7.730 58,585,462.00 11,717,092.40 11,717,092.40 35,151,277.20 117,170,924.00 980 1,976 2,410 4,386 Completed (100%) 100.00% physical progress as of Aug. 05, 2024 » VIEW S-CURVE RRN Construction
621 PRDP-IB-R010-BUK-021-MAN-007-2016 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) (Sebucawan, Lunocan) Others Square Meter 1500.000 3,778,400.00 472,300.00 472,300.00 0.00 4,723,000.00 131 334 321 655 Completed (100%) 100.00% physical progress as of Dec. 08, 2023 » VIEW S-CURVE NGP CONSTRUCTION
622 PRDP-IB-R010-MOR-014-NAA-001-2018 Mindanao Region 10 Misamis Oriental 2nd Naawan Construction of Mapulog-Tuboran FMR with Arch Bridges FMR with Bridge Kilometer 1.720 42,803,638.63 8,560,727.73 8,560,727.73 25,682,183.18 85,607,277.27 587 1,322 1,134 2,456 Fifty percent and above progress 92.37% physical progress as of Nov. 15, 2024 » VIEW S-CURVE JEJORS Construction
623 PRDP-IB-R010-MOC-014-BON-002-2019 Mindanao Region 10 Misamis Occidental 2nd Bonifacio Concreting of Buracan – Dimalco – Dapagan – Masay FMR Farm to Market Road (FMR) Kilometer 6.710 60,893,500.00 12,178,700.00 12,178,700.00 36,536,100.00 121,787,000.00 2,002 4,019 4,392 8,411 Fifty percent and above progress 68.64% physical progress as of Dec. 15, 2024 » VIEW S-CURVE Pyramid Consolidated Builders and General Merchandise
624 PRDP-IB-R010-LDN-008-LAL-004-2020 Mindanao Region 10 Lanao Del Norte 2nd Lala Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Andil Others Square Meter 1380.000 6,400,000.00 800,000.00 800,000.00 0.00 8,000,000.00 1,700 - - - Approved by RPAB For Issuance of NOL 1
625 PRDP-IB-R010-LDN-009-LAL-005-2020 Mindanao Region 10 Lanao Del Norte 2nd Lala Construction of Warehouse and Multi Purpose Drying Pavement (MPDP) with Cold Storage in Barangay Lala Proper Others Square Meter 1.000 8,000,000.00 1,000,000.00 1,000,000.00 0.00 10,000,000.00 1,018 1,985 1,915 3,900 Approved by RPAB For Issuance of NOL 1
626 PRDP-IB-R010-LDN-013-LAL-007-2020 Mindanao Region 10 Lanao Del Norte 2nd Lala Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Pendulunan Others Square Meter 1.000 7,200,000.00 900,000.00 900,000.00 0.00 9,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
627 PRDP-IB-R010-LDN-014-LAL-008-2020 Mindanao Region 10 Lanao Del Norte 2nd Lala Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Abaga Others Square Meter 1500.000 7,200,000.00 900,000.00 900,000.00 0.00 9,000,000.00 108 1,510 1,462 2,972 Approved by RPAB For Issuance of NOL 1
628 PRDP-IB-R010-LDN-014-TUB-002-2020 Mindanao Region 10 Lanao Del Norte 1st Tubod Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Malingao Others Square Meter 1.000 7,200,000.00 900,000.00 900,000.00 0.00 9,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
629 PRDP-IB-R010-LDN-015-TUB-003-2020 Mindanao Region 10 Lanao Del Norte 1st Tubod Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Dalama Others Square Meter 1.000 7,200,000.00 900,000.00 900,000.00 0.00 9,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
630 PRDP-IB-R010-LDN-018-TUB-004-2021 Mindanao Region 10 Lanao Del Norte 1st Tubod Construction of Warehouse and Solar Dryer in Barangay Sto. Nino Others Square Meter 0.000 7,200,000.00 900,000.00 900,000.00 0.00 9,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
631 PRDP-IB-R010-LDN-019-KAP-006-2021 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction of Kapatagan AA abattoir Others Square Meter 1.000 60,000,000.00 7,500,000.00 7,500,000.00 0.00 75,000,000.00 17,989 30,222 45,332 75,554 Approved by RPAB For Issuance of NOL 1
632 PRDP-IB-R010-BUK-033-MAN-011-2020 Mindanao Region 10 Bukidnon 1st Manolo Fortich Construction of Triple 'A' Slaughterhouse in Barangay Tangkulan Others Square Meter 1.000 264,000,000.00 33,000,000.00 33,000,000.00 0.00 330,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
633 PRDP-IB-R010-MOR-015-000-000-2020 Mindanao Region 10 Misamis Oriental Construction of Double 'A' Slaughterhouse with Cold Storage in Barangay Aromahon Others Square Meter 1.000 71,999,995.98 8,999,999.50 8,999,999.50 0.00 89,999,994.98 337 724 746 1,470 Approved by RPAB For Issuance of NOL 1
634 PRDP-IB-R010-MOR-016-SAL-002-2020 Mindanao Region 10 Misamis Oriental 1st Salay Construction of Double 'A' Slaughterhouse in Barangay Alipuaton Others Square Meter 1.000 48,694,910.22 6,086,863.78 6,086,863.78 0.00 60,868,637.78 21,018 50,498 48,631 99,129 Approved by RPAB For Issuance of NOL 1
635 PRDP-IB-R010-LDN-010-LAL-006-2020 Mindanao Region 10 Lanao Del Norte 2nd Lala Concreting of Mabuhay-San Isidro Upper-Pendulonan-Tenazas-Dao FMR Farm to Market Road (FMR) Kilometer 4.800 64,000,000.00 8,000,000.00 8,000,000.00 0.00 80,000,000.00 - - - - Approved by RPAB For Issuance of NOL 1
636 PRDP-IB-R010-BUK-036-LAN-003-2023 Mindanao Region 10 Bukidnon 2nd Lantapan Concreting of Sitio Cacawon, Kulasihan – Purok 2 Kangay, Capitan Juan – Purok 4 to 5 Katiguman – Purok 6 Pinamanguhan, Capitan Juan – Block 2 Kaatuan Farm to Market Road Farm to Market Road (FMR) Kilometer 9.470 153,544,662.40 19,193,082.80 19,193,082.80 0.00 191,930,828.00 1,312 2,370 2,313 4,683 Under Validation No validation date
637 PRDP-IB-R010-BUK-034-LAN-002-2023 Mindanao Region 10 Bukidnon 2nd Lantapan Concreting of Farm to Market Road with Drainage at Balila Proper to Sitio Gahub to Purok 5, Kaatuan Farm to Market Road (FMR) Kilometer 6.560 106,661,815.04 13,332,726.88 13,332,726.88 0.00 133,327,268.80 1,895 4,786 4,876 9,662 Under Validation No validation date
638 PRDP-IB-R010-BUK-037-KIT-001-2023 Mindanao Region 10 Bukidnon 3rd Kitaotao Concreting of Farm to Market Road Junction National Highway- Sitio Kabalansihan- Sitio Pamalawan-Sitio Balatukan Project Sinuda FMR Farm to Market Road (FMR) Kilometer 16.000 265,440,000.00 33,180,000.00 33,180,000.00 0.00 331,800,000.00 1,750 4,065 3,724 7,789 Under Validation No validation date
639 PRDP-IB-R010-BUK-038-MAN-033-2023 Mindanao Region 10 Bukidnon 1st Manolo Fortich Concreting of Lunocan Proper - Cebucawan - Sitio Kilobot Farm to Market Road Farm to Market Road (FMR) Kilometer 11.060 126,840,000.00 15,855,000.00 15,855,000.00 0.00 158,550,000.00 2,288 4,767 4,001 8,768 Under Validation No validation date
640 PRDP-IB-R010-BUK-038-SAN-002-2023 Mindanao Region 10 Bukidnon 2nd San Fernando Concreting of Sto. Domingo-Palacpacan-Dao FMR Farm to Market Road (FMR) Kilometer 5.760 105,984,000.00 13,248,000.00 13,248,000.00 0.00 132,480,000.00 1,190 2,983 2,765 5,748 Under Validation No validation date
641 PRDP-IB-R010-BUK-039-KAL-001-2023 Mindanao Region 10 Bukidnon 4th Kalilangan Construction of Malinao to Imbariz FMR Farm to Market Road (FMR) Kilometer 6.000 80,963,773.60 10,120,471.70 10,120,471.70 0.00 101,204,717.00 145 360 365 725 Under Validation No validation date
642 PRDP-IB-R010-BUK-041-000-000-2023 Mindanao Region 10 Bukidnon Concreting of Iba-Cabulohan-Paradise Farm to Market Road Farm to Market Road (FMR) Kilometer 10.860 208,512,000.00 26,064,000.00 26,064,000.00 0.00 260,640,000.00 5,806 2,434 2,248 4,682 Under Validation No validation date
643 PRDP-IB-R010-BUK-042-000-000-2023 Mindanao Region 10 Bukidnon Concreting of Capinonan-Mauswagon-Freedom-Dalacutan Farm to Market Road Farm to Market Road (FMR) Kilometer 13.540 259,968,000.00 32,496,000.00 32,496,000.00 0.00 324,960,000.00 - - - - Under Validation No validation date
644 PRDP-IB-R010-BUK-043-MAN-012-2023 Mindanao Region 10 Bukidnon 1st Manolo Fortich Concreting of Lunocan Proper-Cebucawan- Sitio Kilobot Farm to Market Road Farm to Market Road (FMR) Kilometer 11.060 200,000,000.00 25,000,000.00 25,000,000.00 0.00 250,000,000.00 2,288 4,767 4,001 8,768 Under Validation No validation date
645 PRDP-IB-R010-BUK-044-MAN-013-2023 Mindanao Region 10 Bukidnon 1st Manolo Fortich Concreting of Crossing Aurora - Ogaong - Sentro Kibudyong Farm to Market Road Farm to Market Road (FMR) Kilometer 7.490 143,718,336.00 17,964,792.00 17,964,792.00 0.00 179,647,920.00 2,865 5,680 5,373 11,053 Under Validation No validation date
646 PRDP-IB-R010-CAM-001-000-000-2023 Mindanao Region 10 Camiguin Rehabilitation and Improvement of Sitio Cabadiangan to Canaum, Pagatpatan, Barangay Bacnit, Sagay Road Farm to Market Road (FMR) Kilometer 1.640 57,014,317.60 7,126,789.70 7,126,789.70 0.00 71,267,897.00 1,214 2,836 2,818 5,654 Under Validation No validation date
647 PRDP-IB-R010-CAM-002-000-000-2023 Mindanao Region 10 Camiguin Rehabilitation of Barangay San Miguel to Sitio Tacangon, Barangay Poblacion, Mahinog Road Farm to Market Road (FMR) Kilometer 2.040 53,768,000.00 6,721,000.00 6,721,000.00 0.00 67,210,000.00 5,552 2,677 2,875 5,552 Under Validation No validation date
648 PRDP-IB-R010-LDN-020-TUB-005-2023 Mindanao Region 10 Lanao Del Norte 1st Tubod Construction/concreting of Purok 6 to Sitio 27 Farm to Market Road in Barangay Palao, Tubod, Lanao del Norte Farm to Market Road (FMR) Kilometer 5.680 134,295,572.46 16,786,946.56 16,786,946.56 0.00 167,869,465.58 900 - - - Under Validation No validation date
649 PRDP-IB-R010-MOC-023-000-000-2023 Mindanao Region 10 Misamis Occidental Del Pilar- Landing Road (Baliangao) Farm to Market Road (FMR) Kilometer 5.500 129,248,000.00 16,156,000.00 16,156,000.00 0.00 161,560,000.00 1,096 2,284 2,261 4,545 Under Validation No validation date
650 PRDP-IB-R010-MOC-024-000-000-2023 Mindanao Region 10 Misamis Occidental Sinara Alto- Sinara Bajo Road (Jimenez) FMR with Bridge Kilometer 13.110 170,496,800.00 21,312,100.00 21,312,100.00 0.00 213,121,000.00 709 6,350 5,863 12,213 Under Validation No validation date
651 PRDP-IB-R010-MOC-028-000-000-2023 Mindanao Region 10 Misamis Occidental Concreting of Landing - Lusot - Magsaysay - Del Pilar Farm to Market Road Farm to Market Road (FMR) Kilometer 5.500 129,248,000.00 16,156,000.00 16,156,000.00 0.00 161,560,000.00 1,096 2,284 2,261 4,545 Under Validation No validation date
652 PRDP-IB-R010-MOC-027-000-000-2023 Mindanao Region 10 Misamis Occidental Concreting of Libertad Bajo-Libertad Alto - San Isidro Alto - Katipunan Farm to Market Road Farm to Market Road (FMR) Kilometer 13.710 156,070,400.00 19,508,800.00 19,508,800.00 0.00 195,088,000.00 974 2,082 1,807 3,889 Under Validation No validation date
653 PRDP-IB-R010-MOC-030-000-000-2023 Mindanao Region 10 Misamis Occidental Concreting of San Isidro - Malibacsan - Matugas Alto Farm to Market Road Farm to Market Road (FMR) Kilometer 15.950 224,733,600.00 28,091,700.00 28,091,700.00 0.00 280,917,000.00 3,281 6,799 6,887 13,686 Under Validation No validation date
654 PRDP-IB-R010-MOC-026-000-000-2021 Mindanao Region 10 Misamis Occidental Concreting of Panalsalan - Cartagena - Luzaran - Dampalan - Macalibre Alto Farm to Mrket Road Farm to Market Road (FMR) Kilometer 12.320 90,158,400.00 11,269,800.00 11,269,800.00 0.00 112,698,000.00 1,028 1,741 2,477 4,218 Under Validation No validation date
655 PRDP-IB-R010-MOC-033-PAN-003-2023 Mindanao Region 10 Misamis Occidental 1st Panaon Concreting of Mohon - Camanucan - San Juan Farm to Market Road Farm to Market Road (FMR) Kilometer 11.020 200,148,000.00 25,018,500.00 25,018,500.00 0.00 250,185,000.00 2,784 6,220 5,975 12,195 Under Validation No validation date
656 PRDP-IB-R010-MOC-034-ORO-002-2022 Mindanao Region 10 Misamis Occidental 1st Oroquieta City Concreting of Paypayan - Binuangan - Senote-Clarin Settlement Farm to Market Road Farm to Market Road (FMR) Kilometer 9.570 160,000,000.00 20,000,000.00 20,000,000.00 0.00 200,000,000.00 1,591 2,889 2,905 5,794 Under Validation No validation date
657 PRDP-IB-R010-MOC-035-ORO-003-2023 Mindanao Region 10 Misamis Occidental 1st Oroquieta City Concreting of Purok 5 Mobod to Tuyabang Alto to Victoria FMR (OROQUIETA CITY) Farm to Market Road (FMR) Kilometer 11.080 193,600,000.00 24,200,000.00 24,200,000.00 0.00 242,000,000.00 4,367 11,884 2,787 14,671 Under Validation No validation date
658 PRDP-IB-R010-BUK-045-KIB-001-2023 Mindanao Region 10 Bukidnon 3rd Kibawe Concreting of Junction Sayre Highway - Gutapol -New Kidapawan - Miabo Farm to Market Road Farm to Market Road (FMR) Kilometer 7.100 171,341,600.00 21,417,700.00 21,417,700.00 0.00 214,177,000.00 1,184 2,185 2,185 4,370 Under Validation No validation date
659 PRDP-IB-R010-BUK-046-VAL-006-2023 Mindanao Region 10 Bukidnon 4th Valencia City Conc. OF Jct. Brgy. Guinoyuran, Prov'l. Road - Sitio Migtulod, Brgy. Mt. Nebo FMR Farm to Market Road (FMR) Kilometer 7.320 156,304,000.00 19,538,000.00 19,538,000.00 0.00 195,380,000.00 - 2,562 1,006 3,568 Under Validation No validation date
660 PRDP-IB-R010-BUK-048-VAL-008-2023 Mindanao Region 10 Bukidnon 4th Valencia City Conc. Jct. Sitio Sumpong, Brgy. Banlag to Sitio Mariposa, Brgy. Laligan FMR Farm to Market Road (FMR) Kilometer 6.200 177,914,400.56 22,239,300.07 22,239,300.07 0.00 222,393,000.70 - 1,203 1,241 2,444 Under Validation No validation date
661 PRDP-IB-R010-BUK-049-VAL-009-2023 Mindanao Region 10 Bukidnon 4th Valencia City Construction of Banlag Water Supply System Project Potable Water Supply (PWS) Level 2 Number of Households 2666.000 241,240,000.00 30,155,000.00 30,155,000.00 0.00 301,550,000.00 2,666 5,724 4,941 10,665 Under Validation No validation date
662 PRDP-IB-R010-BUK-050-MAN-014-2023 Mindanao Region 10 Bukidnon 1st Manolo Fortich Concreting of Kalugmanan Proper - Sitio Balabakan FMR Farm to Market Road (FMR) Kilometer 7.860 132,950,400.00 16,618,800.00 16,618,800.00 0.00 166,188,000.00 1,054 2,059 2,033 4,092 Under Validation No validation date
663 PRDP-IB-R010-MOC-032-SAP-001-2023 Mindanao Region 10 Misamis Occidental 1st Sapang Dalaga Concreting of Sepac - Salimpuno - Capundag - Ventura Farm to Market Road with Bridge FMR with Bridge Kilometer 9.700 185,762,400.00 23,220,300.00 23,220,300.00 0.00 232,203,000.00 727 1,849 1,786 3,635 Under Validation No validation date
664 PRDP-IB-R010-MOC-031-000-000-2021 Mindanao Region 10 Misamis Occidental Concreting of Sinara Bajo - Sinara Alto - Dinas - Katipunan Farm to Market Road FMR with Bridge Kilometer 13.110 170,496,800.00 21,312,100.00 21,312,100.00 0.00 213,121,000.00 709 6,350 5,863 12,213 Under Validation No validation date
665 PRDP-IB-R010-BUK-032-DON-001-2020 Mindanao Region 10 Bukidnon 3rd Don Carlos Construction of Municipal Double "A" Slaughterhouse in Barangay Pinamaloy Others Square Meter 5000.000 48,000,000.00 6,000,000.00 6,000,000.00 0.00 60,000,000.00 16,097 36,035 33,238 69,273 Approved by RPAB For Issuance of NOL 1
666 PRDP-IB-R010-BUK-035-SAN-001-2023 Mindanao Region 10 Bukidnon 2nd San Fernando Concreting of Mahayag, Namnam - Iglugsad - Kibongkog Farm-to-Market Road Farm to Market Road (FMR) Kilometer 8.620 151,712,000.00 18,964,000.00 18,964,000.00 0.00 189,640,000.00 1,056 2,764 2,252 5,016 With NOL 1 Proponent LGU to proceed with pre-procurement conference
667 PRDP-IB-R010-LDN-016-KAP-004-2021 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Kahayagan Others Square Meter 858.250 7,787,898.64 973,487.33 973,487.33 0.00 9,734,873.30 226 - - - Fifty percent and above progress 64.58% physical progress as of Nov. 15, 2024 » VIEW S-CURVE LEXAND CONSTRUCTION AND DEVELOPMENT
668 PRDP-IB-R010-LDN-012-KAP-003-2020 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Mahayahay Others Square Meter 858.250 7,684,989.91 960,623.74 960,623.74 0.00 9,606,237.39 528 1,132 1,084 2,216 Fifty percent and above progress 86.98% physical progress as of Nov. 15, 2024 » VIEW S-CURVE LEXAND CONSTRUCTION AND DEVELOPMENT
669 PRDP-IB-R010-LDN-017-KAP-005-2021 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Bansarvil Others Square Meter 846.250 7,620,919.35 952,614.92 952,614.92 0.00 9,526,149.19 546 - - - Fifty percent and above progress 71.01% physical progress as of Nov. 15, 2024 » VIEW S-CURVE LEXAND CONSTRUCTION AND DEVELOPMENT
670 PRDP-IB-R010-BUK-029-VAL-003-2018 Mindanao Region 10 Bukidnon 4th Valencia City Concreting of Jct. Brgy. Mabuhay to Brgy. Banlag Proper to Sitio Pantaron FMR Farm to Market Road (FMR) Kilometer 16.270 119,263,785.72 23,852,757.14 23,852,757.14 71,558,271.43 238,527,571.43 6,817 16,562 13,334 29,896 Fifty percent and above progress 94.35% physical progress as of Nov. 15, 2024 » VIEW S-CURVE JEJORS CONSTRUCTION CORPORATION
671 PRDP-IB-R010-BUK-016-VAL-005-2021 Mindanao Region 10 Bukidnon 4th Valencia City Construction of Warehouse with Multi-Purpose Drying Pavement (MPDP) Barangay Banlag Others Square Meter 1500.000 5,448,500.00 1,089,700.00 1,089,700.00 3,269,100.00 10,897,000.00 277 4,378 3,768 8,146 Completed (100%) 100.00% physical progress as of May. 15, 2024 » VIEW S-CURVE MAFIL BUILDERS INC.
672 PRDP-IB-R010-BUK-015-VAL-004-2021 Mindanao Region 10 Bukidnon 4th Valencia City Construction of Warehouse with Multi-purpose Drying Pavement (MPDP) Barangay Lilingayon Others Square Meter 1500.000 5,492,500.00 1,098,500.00 1,098,500.00 3,295,500.00 10,985,000.00 1,986 4,142 3,898 8,040 Completed (100%) 100.00% physical progress as of May. 15, 2024 » VIEW S-CURVE JT GAMOLO CONSTRUCTION, INC.
673 PRDP-IB-R010-LDN-011-KAP-002-2020 Mindanao Region 10 Lanao Del Norte 2nd Kapatagan Construction of Warehouse with Multi Purpose Drying Pavement (MPDP) in Barangay Suso Others Square Meter 0.000 8,027,010.27 1,003,376.28 1,003,376.28 0.00 10,033,762.83 207 431 732 1,163 Fifty percent and above progress 74.46% physical progress as of Nov. 15, 2024 » VIEW S-CURVE LEXAND CONSTRUCTION AND DEVELOPMENT
674 PRDP-IB-R011-CVP-010-000-000-2015 Mindanao Region 11 Compostela Valley 1st Montevista Rehabilitation Junction National Highway Dauman, Montevista - Macopa, Monkayo FMR Farm to Market Road (FMR) Kilometer 3.650 48,249,600.00 6,031,200.00 6,031,200.00 0.00 60,312,000.00 1,273 3,336 3,028 6,364 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
675 PRDP-IB-R011-DOR-004-000-000-2015 Mindanao Region 11 Davao Oriental 2nd Governor Generoso Rehabilitation of So. Buso Buso, Lavigan, Gov. Generoso - So. Panumbayon, Lanca, Mati City FMR Farm to Market Road (FMR) Kilometer 10.030 147,710,627.54 18,463,828.44 18,463,828.44 0.00 184,638,284.42 1,000 - - - Approved by RPAB For endorsement to NPCO
676 PRDP-IB-R011-CVP-004-000-000-2015 Mindanao Region 11 Compostela Valley 1st Maragusan Rehabilitation of Brgy. Poblacion - Brgy. Magcagong FMR Farm to Market Road (FMR) Kilometer 1.540 10,618,146.94 1,327,268.37 1,327,268.37 0.00 13,272,683.68 947 2,402 2,047 4,449 Completed (100%) 100.00% physical progress as of Oct. 14, 2017 » VIEW S-CURVE Tagum Builders Contractors Corporation
677 PRDP-IB-R011-CVP-003-000-000-2015 Mindanao Region 11 Compostela Valley 2nd Laak Rehabilitation of Junction San Miguel - Kidawa FMR with Bridge Component FMR with Bridge Kilometer 2.020 32,497,919.12 4,062,239.89 4,062,239.89 0.00 40,622,398.90 416 1,186 896 2,082 Completed (100%) 100.00% physical progress as of Sep. 15, 2019 » VIEW S-CURVE AB APONESTO CONSTRUCTION PARTS AND SUPPLY / TAGUM BUILDERS CONTRACTORS CORP.
678 PRDP-IB-R011-DDS-002-MAG-001-2015 Mindanao Region 11 Davao Del Sur 1st Magsaysay Concreting of Barayong-Mabini-Bala-Upper Bala FMR Farm to Market Road (FMR) Kilometer 12.110 112,000,000.00 14,000,000.00 14,000,000.00 0.00 140,000,000.00 3,050 6,849 6,267 13,116 Completed (100%) 100.00% physical progress as of May. 15, 2019 » VIEW S-CURVE St. Gerrard Construction / Digos Tesston Construction & Supplies (Joint Venture)
679 PRDP-IB-R011-DDS-001-000-000-2015 Mindanao Region 11 Davao Del Sur 1st Magsaysay Rehabilitation of Poblacion-San Isidro-Tacul FMR Farm to Market Road (FMR) Kilometer 8.730 76,419,990.45 9,552,498.81 9,552,498.81 0.00 95,524,988.07 2,713 7,616 6,556 14,172 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE TKS Builders & Supplies / St. Gerrard Construction (Joint Venture)
680 PRDP-IB-R011-DDN-009-000-000-2015 Mindanao Region 11 Davao Del Norte 1st Kapalong Construction of Civil Works Component for the Enterprise Subproject: Cacao Production and Beans Marketing Others Square Meter 3610.000 4,698,901.44 587,362.68 587,362.68 0.00 5,873,626.80 880 157 51 208 Completed (100%) 100.00% physical progress as of Jul. 30, 2020 » VIEW S-CURVE MICAH CONSTRUCTION AND SUPPLY
681 PRDP-IB-R011-CVP-001-000-000-2015 Mindanao Region 11 Compostela Valley 2nd Nabunturan Rehabilitation of Brgy. Pangutusan, Nabunturan - Brgy. New Alegria, Compostela Farm-to-Market Road Farm to Market Road (FMR) Kilometer 11.740 87,531,263.78 10,941,407.97 10,941,407.97 0.00 109,414,079.72 2,626 6,965 6,177 13,142 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE Alonzo Construction/Rely Construction and Supply (JV)
682 PRDP-IB-R011-DDN-001-000-000-2015 Mindanao Region 11 Davao Del Norte 1st Kapalong Rehabilitation of Capungagan -Boundary San Miguel Farm Market Road Farm to Market Road (FMR) Kilometer 10.600 86,643,071.46 10,830,383.93 10,830,383.93 0.00 108,303,839.32 2,060 4,458 4,942 9,400 Completed (100%) 100.00% physical progress as of Jul. 03, 2020 » VIEW S-CURVE VICENTE T. LAO CONSTRUCTION
683 PRDP-IB-R011-CVP-007-000-000-2015 Mindanao Region 11 Compostela Valley 2nd Pantukan Concreting/Upgrading of Junction National Highway Quirino-Upper Pangasinan FMR Farm to Market Road (FMR) Kilometer 2.540 16,609,507.70 2,076,188.46 2,076,188.46 0.00 20,761,884.62 4,918 12,868 11,723 24,591 Completed (100%) 100.00% physical progress as of Oct. 18, 2019 » VIEW S-CURVE ACQ Solomonic Builders Development Corp.
684 PRDP-IB-R011-CVP-006-000-000-2015 Mindanao Region 11 Compostela Valley 2nd Pantukan Rehabilitation of FMR from Napnapan Proper to Binogsayan Road Farm to Market Road (FMR) Kilometer 1.570 13,291,961.35 1,661,495.17 1,661,495.17 0.00 16,614,951.69 2,472 7,121 5,240 12,361 Completed (100%) 100.00% physical progress as of Sep. 02, 2019 » VIEW S-CURVE ACQ Solomonic Builder's Development Inc.
685 PRDP-IB-R011-DOR-002-000-000-2013 Mindanao Region 11 Davao Oriental 1st Baganga Rehabilitation of Mikit FMR with Bridge FMR with Bridge Kilometer 2.200 42,061,340.01 5,257,667.50 5,257,667.50 0.00 52,576,675.01 272 884 869 1,753 Completed (100%) 100.00% physical progress as of Sep. 17, 2017 » VIEW S-CURVE RELY CONSTRUCTION AND SUPPLY
686 PRDP-IB-R011-DDN-003-000-000-2015 Mindanao Region 11 Davao Del Norte 2nd Santo Tomas Rehabilitation of Esperanza-Poblacion Sto. Tomas FMR Farm to Market Road (FMR) Kilometer 12.630 93,928,341.04 11,741,042.63 11,741,042.63 0.00 117,410,426.30 11,400 5,814 5,586 11,400 Completed (100%) 100.00% physical progress as of Oct. 23, 2020 » VIEW S-CURVE ALZAM ENTERPRISES
687 PRDP-IB-R011-DDN-002-000-000-2013 Mindanao Region 11 Davao Del Norte 1st Asuncion Rehabilitation of Sitio New Visayas- Binancian FMR Farm to Market Road (FMR) Kilometer 7.840 69,200,296.38 8,650,037.05 8,650,037.05 0.00 86,500,370.48 410 1,000 923 1,923 Completed (100%) 100.00% physical progress as of Sep. 30, 2018 » VIEW S-CURVE Davao Rock Mixer Enterprises
688 PRDP-IB-R011-DDN-007-000-000-2015 Mindanao Region 11 Davao Del Norte 2nd Panabo City Construction of Dalisay PWS Potable Water Supply (PWS) Level 2 Number of Households 162.000 3,349,583.69 418,697.96 418,697.96 0.00 4,186,979.61 162 429 381 810 Completed (100%) 100.00% physical progress as of Feb. 29, 2020 » VIEW S-CURVE ANCOR WATER RESOURCES
689 PRDP-IB-R011-DDN-002-000-000-2015 Mindanao Region 11 Davao Del Norte 1st San Isidro Rehabilitation of Sto. Nino - Igangon Farm to Market Road Farm to Market Road (FMR) Kilometer 8.990 59,339,231.42 7,417,403.93 7,417,403.93 0.00 74,174,039.28 1,274 3,049 2,495 5,544 Completed (100%) 100.00% physical progress as of Nov. 30, 2018 » VIEW S-CURVE MONOLITHIC CONST. & CONCRETE PRODUCTS, INC. / R.R. SEISMUNDO CONST. & SUPPLY (JV)
690 PRDP-IB-R011-DDN-001-000-000-2013 Mindanao Region 11 Davao Del Norte 2nd Panabo City Rehabilitation of Little Panay-Katipunan-Kasilak FMR Farm to Market Road (FMR) Kilometer 8.000 49,548,640.66 6,193,580.08 6,193,580.08 0.00 61,935,800.82 1,140 3,182 2,994 6,176 Completed (100%) 100.00% physical progress as of May. 30, 2017 » VIEW S-CURVE Rely Construction and Supply
691 PRDP-IB-R011-DDN-003-000-000-2013 Mindanao Region 11 Davao Del Norte 1st San Isidro Rehabilitation of Poblacion Datu Balong- Purok Mamalian FMR Farm to Market Road (FMR) Kilometer 3.460 31,219,772.03 3,902,471.50 3,902,471.50 0.00 39,024,715.03 366 799 690 1,489 Completed (100%) 100.00% physical progress as of Dec. 30, 2017 » VIEW S-CURVE RELY CONSTRUCTION AND SUPPLY
692 PRDP-IB-R011-CVP-002-000-000-2015 Mindanao Region 11 Compostela Valley 2nd Mawab Rehabilitation of Brgy. Nuevo Iloco, Mawab - Brgy. Panibasan, Maco FMR Farm to Market Road (FMR) Kilometer 5.100 42,506,862.15 5,313,357.77 5,313,357.77 0.00 53,133,577.69 3,398 9,004 7,984 16,988 Completed (100%) 100.00% physical progress as of May. 15, 2017 » VIEW S-CURVE Alonzo Construction/ Davao Rock Mixer (JV)
693 PRDP-IB-R011-DDN-008-000-000-2015 Mindanao Region 11 Davao Del Norte 2nd Panabo City Construction of Kasilak PWS Potable Water Supply (PWS) Level 2 Number of Households 252.000 4,993,198.04 624,149.76 624,149.76 0.00 6,241,497.56 252 643 617 1,260 Completed (100%) 100.00% physical progress as of Feb. 29, 2020 » VIEW S-CURVE ANCOR WATER RESOURCES
694 PRDP-IB-R011-DDN-004-000-000-2015 Mindanao Region 11 Davao Del Norte 1st New Corella Rehabilitation of Poblacion - Limbaan -Suawon - Macgum FMR with Bridge FMR with Bridge Kilometer 15.090 167,361,298.06 20,920,162.26 20,920,162.26 0.00 209,201,622.58 751 5,174 4,410 9,584 Completed (100%) 100.00% physical progress as of Jan. 28, 2022 » VIEW S-CURVE WEE ENG CONSTRUCTION, INC. / DAVAO ROCK MIXER ENTERPRISES (JV)
695 PRDP-IB-R011-DDN-011-000-000-2015 Mindanao Region 11 Davao Del Norte 1st Asuncion Rehabilitation of Sonlon-Camansa FMR Farm to Market Road (FMR) Kilometer 10.230 184,958,968.16 23,119,871.02 23,119,871.02 0.00 231,198,710.20 1,207 2,701 2,494 5,195 Completed (100%) 100.00% physical progress as of Dec. 31, 2022 » VIEW S-CURVE THREE W BUILDERS, INC. / DAVAO ROCK MIXER ENTERPRISES- JV
696 PRDP-IB-R011-DOR-003-000-000-2015 Mindanao Region 11 Davao Oriental 2nd Lupon Rehabilitation of Matavisan FMR Farm to Market Road (FMR) Kilometer 14.360 173,436,996.34 21,679,624.54 21,679,624.54 0.00 216,796,245.42 1,401 3,204 2,955 6,159 Completed (100%) 100.63% physical progress as of Jan. 20, 2020 » VIEW S-CURVE Maverick Builders, Inc.
697 PRDP-IB-R011-CVP-009-000-000-2015 Mindanao Region 11 Compostela Valley 1st Monkayo Rehabilitation of Brgy. Poblacion - Brgy. Naboc FMR Farm to Market Road (FMR) Kilometer 11.470 95,189,773.21 11,898,721.65 11,898,721.65 0.00 118,987,216.51 3,891 10,312 9,145 19,457 Completed (100%) 100.00% physical progress as of Aug. 16, 2021 » VIEW S-CURVE FFJJ
698 PRDP-IB-R011-DDS-007-000-000-2018 Mindanao Region 11 Davao Del Sur 2nd Malalag Rehabilitation of Mabini-Lapu-Lapu, Malalag FMR Farm to Market Road (FMR) Kilometer 3.650 82,790,400.00 10,348,800.00 10,348,800.00 0.00 103,488,000.00 1,700 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
699 PRDP-IB-R011-DDS-008-000-000-2018 Mindanao Region 11 Davao Del Sur 1st Digos City Rehabilitation of Dulangan FMR Farm to Market Road (FMR) Kilometer 5.790 88,588,624.90 11,073,578.11 11,073,578.11 0.00 110,735,781.12 764 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
700 PRDP-IB-R011-DOC-001-000-000-2017 Mindanao Region 11 Davao Occidental Lone Santa Maria Concreting Poblacion-San Isidro-Pongpong-San Antonio-San Juan-Demoloc Road Farm to Market Road (FMR) Kilometer 14.000 206,976,000.00 25,872,000.00 25,872,000.00 0.00 258,720,000.00 2,342 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
701 PRDP-IB-R011-DOC-002-000-000-2017 Mindanao Region 11 Davao Occidental Lone Santa Maria Rehabilitation/Concreting of Poblacion-Cadaatan-Malalag Tubig Road Farm to Market Road (FMR) Kilometer 10.000 120,736,000.00 15,092,000.00 15,092,000.00 0.00 150,920,000.00 1,864 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
702 PRDP-IB-R011-DOR-018-MAT-015-2017 Mindanao Region 11 Davao Oriental 2nd Mati City Rehabilitation/Construction of NHJ Sainz-Central FMR Farm to Market Road (FMR) Kilometer 6.670 101,860,254.46 12,732,531.81 12,732,531.81 0.00 127,325,318.08 700 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
703 PRDP-IB-R011-DOR-017-MAT-014-2017 Mindanao Region 11 Davao Oriental 2nd Mati City Rehabilitation/Construction of Bantal FMR Farm to Market Road (FMR) Kilometer 5.160 84,160,897.12 10,520,112.14 10,520,112.14 0.00 105,201,121.40 800 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
704 PRDP-IB-R011-CVP-014-000-000-2016 Mindanao Region 11 Compostela Valley 1st Monkayo Construction of Five (5) Units Warehouse with Solar Dryer Others Square Meter 5.000 21,405,445.49 2,675,680.69 2,675,680.69 0.00 26,756,806.87 2,385 6,321 5,604 11,925 Completed (100%) 100.00% physical progress as of Mar. 15, 2020 » VIEW S-CURVE ACQ Solomonic Construction Inc.,
705 PRDP-IB-R011-DOR-008-MAT-002-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Sanghay PWS Potable Water Supply (PWS) Level 2 Number of Households 222.000 4,192,389.69 524,048.71 524,048.71 0.00 5,240,487.11 222 577 533 1,110 Completed (100%) 100.00% physical progress as of Jun. 16, 2019 » VIEW S-CURVE Mark Anthony Construction and Supply
706 PRDP-IB-R011-DOR-010-MAT-004-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Libudon PWS Potable Water Supply (PWS) Level 2 Number of Households 90.000 2,401,304.10 300,163.01 300,163.01 0.00 3,001,630.12 90 234 216 450 Completed (100%) 100.00% physical progress as of Mar. 14, 2019 » VIEW S-CURVE Tagum Builders Contractor's Corporation
707 PRDP-IB-R011-DOR-015-MAT-009-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Taguibo PWS Potable Water Supply (PWS) Level 2 Number of Households 168.000 3,964,698.30 495,587.29 495,587.29 0.00 4,955,872.88 168 428 412 840 Completed (100%) 100.00% physical progress as of Feb. 04, 2019 » VIEW S-CURVE Dingo Builders and Supply
708 PRDP-IB-R011-DOR-017-MAT-011-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Tagbinonga PWS Potable Water Supply (PWS) Level 2 Number of Households 192.000 3,292,760.31 411,595.04 411,595.04 0.00 4,115,950.39 192 504 456 960 Completed (100%) 100.00% physical progress as of Jan. 05, 2019 » VIEW S-CURVE Mark Anthony Construction and Supply
709 PRDP-IB-R011-DOR-014-MAT-008-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Lawigan PWS Potable Water Supply (PWS) Level 2 Number of Households 215.000 3,258,903.53 407,362.94 407,362.94 0.00 4,073,629.41 215 586 489 1,075 Completed (100%) 100.00% physical progress as of Oct. 15, 2021 » VIEW S-CURVE JAI Builders and Supply
710 PRDP-IB-R011-DOR-019-MAT-013-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Seven (7) units Green Houses Others Square Meter 1666.000 2,878,527.95 359,815.99 359,815.99 0.00 3,598,159.93 163 393 259 652 Completed (100%) 100.00% physical progress as of Nov. 05, 2020 » VIEW S-CURVE Siliman Avenue Construction and Supply
711 PRDP-IB-R011-DDS-013-000-000-2016 Mindanao Region 11 Davao Del Sur 1st Matanao Construction of Fourteen (14) Units Warehouse with Solar Dryer Others Square Meter 1500.000 34,345,021.44 4,293,127.68 4,293,127.68 0.00 42,931,276.80 4,903 3,372 1,531 4,903 Completed (100%) 100.00% physical progress as of Jul. 15, 2020 » VIEW S-CURVE NGP Construction
712 PRDP-IB-R011-CVP-015-000-000-2017 Mindanao Region 11 Compostela Valley 1st New Bataan Rehabilitation of Cabinuangan-Magangit FMR with Three (3) Units Bridge Retrofitting Works FMR with Bridge Kilometer 10.590 152,656,513.06 19,082,064.13 19,082,064.13 0.00 190,820,641.32 4,200 11,132 9,869 21,001 Completed (100%) 100.00% physical progress as of Jul. 02, 2020 » VIEW S-CURVE Alonzo Construction / Gemma
713 PRDP-IB-R011-DDS-015-000-000-2017 Mindanao Region 11 Davao Del Sur 1st Hagonoy Rehabilitation of San Isidro, Hagonoy - Km 67, Matanao FMR Farm to Market Road (FMR) Kilometer 14.320 138,853,873.92 17,356,734.24 17,356,734.24 0.00 173,567,342.40 2,749 8,575 7,916 16,491 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE Rely Construction & Supply / Alonzo Construction (JV)
714 PRDP-IB-R011-DDN-016-000-000-2016 Mindanao Region 11 Davao Del Norte 1st New Corella Improvement of New Corella Nursery with Organic Input Production and Common Service Facility Others Square Meter 1901.000 7,911,341.11 988,917.64 988,917.64 0.00 9,889,176.39 2,890 7,884 4,832 12,716 Completed (100%) 100.00% physical progress as of Oct. 30, 2020 » VIEW S-CURVE SOUTH IRONROCK CORPORATION
715 PRDP-IB-R011-DDN-015-000-000-2016 Mindanao Region 11 Davao Del Norte 2nd Santo Tomas Improvement of Sto. Tomas Organic Production Center with Common Service Facility Others Square Meter 1901.000 7,609,638.45 951,204.81 951,204.81 0.00 9,512,048.07 1,301 3,407 3,144 6,551 Completed (100%) 100.00% physical progress as of Aug. 14, 2021 » VIEW S-CURVE E.P. MANANTAN CONST. & DEV. CORPORATION
716 PRDP-IB-R011-DOR-007-MAT-001-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Dawan PWS Potable Water Supply (PWS) Level 2 Number of Households 102.000 3,510,408.04 438,801.01 438,801.01 0.00 4,388,010.06 102 250 260 510 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE CJEP BUILDERS & ENGINEERING SERVICES
717 PRDP-IB-R011-DOR-011-MAT-005-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Mamali PWS Potable Water Supply (PWS) Level 2 Number of Households 318.000 4,753,612.14 594,201.52 594,201.52 0.00 5,942,015.18 265 755 570 1,325 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE FAJR Construction Parts and Supply
718 PRDP-IB-R011-DOR-012-MAT-006-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of DSL PWS Potable Water Supply (PWS) Level 2 Number of Households 170.000 7,938,171.97 992,271.50 992,271.50 0.00 9,922,714.97 204 408 612 1,020 Completed (100%) 100.00% physical progress as of Aug. 25, 2020 » VIEW S-CURVE _______________________
719 PRDP-IB-R011-DOR-013-MAT-007-2016 Mindanao Region 11 Davao Oriental 2nd Mati City Construction of Bangunay PWS Potable Water Supply (PWS) Level 2 Number of Households 90.000 4,483,769.62 560,471.20 560,471.20 0.00 5,604,712.02 90 252 198 450 Completed (100%) 100.00% physical progress as of Dec. 15, 2021 » VIEW S-CURVE RC Trocio Builders
720 PRDP-IB-R011-DDS-014-000-000-2017 Mindanao Region 11 Davao Del Sur 2nd Sulop Rehabilitation of Waterfall-Osmena FMR with PSCG Bridge FMR with Bridge Kilometer 14.290 200,231,134.70 25,028,891.84 25,028,891.84 0.00 250,288,918.38 2,260 4,227 3,834 8,061 Completed (100%) 103.06% physical progress as of Feb. 25, 2023 » VIEW S-CURVE Jejor's Construction
721 PRDP-IB-R011-DOC-003-000-000-2017 Mindanao Region 11 Davao Occidental Lone Santa Maria Rehabilitation of San Agustin - Mamacao- Tanglad Road Farm to Market Road (FMR) Kilometer 5.860 87,468,250.89 10,933,531.36 10,933,531.36 0.00 109,335,313.61 1,337 3,513 3,272 6,785 Completed (100%) 100.00% physical progress as of Sep. 15, 2023 » VIEW S-CURVE Alpha & Omega General Contractor
722 PRDP-IB-R011-DDS-016-000-000-2018 Mindanao Region 11 Davao Del Sur 2nd Malalag Rehabilitation of Ibo-Pitu, Malalag FMR Farm to Market Road (FMR) Kilometer 5.820 50,590,392.81 10,118,078.56 10,118,078.56 30,354,235.69 101,180,785.62 2,766 5,734 5,306 11,040 Completed (100%) 100.00% physical progress as of May. 30, 2024 » VIEW S-CURVE Kodus Peers Construction Corporation
723 PRDP-IB-R011-DDN-015-000-000-2018 Mindanao Region 11 Davao Del Norte 2nd Santo Tomas Rehabilitation of New Visayas-Tulalian FMR with Bridge FMR with Bridge Kilometer 7.870 93,600,487.23 18,720,097.45 18,720,097.45 56,160,292.34 187,200,974.47 4,902 11,284 10,400 21,684 Completed (100%) 100.00% physical progress as of Aug. 31, 2024 » VIEW S-CURVE Maer Summit Konstrukt, Co.
724 PRDP-IB-R011-DDS-017-MAG-003-2019 Mindanao Region 11 Davao Del Sur 1st Magsaysay Concreting of Crossing Blocon, Dalumay-Glamang FMR Farm to Market Road (FMR) Kilometer 9.470 88,622,991.30 17,724,598.26 17,724,598.26 53,173,794.78 177,245,982.60 1,665 3,460 3,198 6,658 Fifty percent and above progress 88.33% physical progress as of Nov. 15, 2024 » VIEW S-CURVE TKS BUILDERS and Supply
725 PRDP-IB-R011-CVP-013-000-000-2023 Mindanao Region 11 Compostela Valley Rehabilitation of Junction National Highway Sitio Sawing to Sitio Tagaytay, Brgy. Mipangi, Nabunturan FMR Farm to Market Road (FMR) Kilometer 0.000 106,070,400.00 13,258,800.00 13,258,800.00 0.00 132,588,000.00 - - - - Under Validation No validation date
726 PRDP-IB-R011-CVP-014-000-000-2023 Mindanao Region 11 Compostela Valley Concreting of Brgy. Libaylibay - Sitio Singanan - Panangan FMR Farm to Market Road (FMR) Kilometer 0.000 153,762,400.00 19,220,300.00 19,220,300.00 0.00 192,203,000.00 - - - - Under Validation No validation date
727 PRDP-IB-R011-DDS-010-DIG-001-2023 Mindanao Region 11 Davao Del Sur 1st Digos City Rehabilitation of Dulangan FMR with Bridge FMR with Bridge Kilometer 0.000 165,004,000.00 20,625,500.00 20,625,500.00 0.00 206,255,000.00 - - - - Under Validation No validation date
728 PRDP-IB-R011-DDS-011-BAN-010-2023 Mindanao Region 11 Davao Del Sur 1st Bansalan Rehabilitation of Linawan- Alegre FMR FMR with Bridge Kilometer 0.000 219,801,600.00 27,475,200.00 27,475,200.00 0.00 274,752,000.00 - - - - Under Validation No validation date
729 PRDP-IB-R011-DOR-016-CAT-004-2023 Mindanao Region 11 Davao Oriental 1st Cateel Rehabilitation/Improvement of FMR from NHJ-Proper Mainit-Purok Banga, Mainit, Cateel – Prk. Buko-buko sa Anay E/S with Bridge Component Brgy. Cabasagan, Boston FMR with Bridge Kilometer 0.000 179,734,154.17 22,466,769.27 22,466,769.27 0.00 224,667,692.71 - - - - Under Validation No validation date
730 PRDP-IB-R011-DOR-017-TAR-005-2023 Mindanao Region 11 Davao Oriental 1st Tarragona Rehabilitation/Improvement of Farm to Market Road (Gravel to Concrete) from Purok Durian, Brgy. Mayo-Upper Limot-Cangusan Farm to Market Road (FMR) Kilometer 0.000 211,133,703.74 26,391,712.97 26,391,712.97 0.00 263,917,129.68 - - - - Under Validation No validation date
731 PRDP-IB-R011-DOR-020-MAT-013-2023 Mindanao Region 11 Davao Oriental 2nd Mati City Rehabilitation/Improvement of Purok Ligaran 2, to Purok New Camotes to Purok Paypay Tagbinonga Farm to Market Road (FMR) Kilometer 0.000 233,881,323.12 29,235,165.39 29,235,165.39 0.00 292,351,653.90 - - - - Under Validation No validation date
732 PRDP-IB-R011-DOR-021-MAT-014-2023 Mindanao Region 11 Davao Oriental 2nd Mati City Rehabilitation/Improvement of NHJ Taguibo-Casilac 2-New Malita FMR with Bridge FMR with Bridge Kilometer 0.000 122,654,160.34 15,331,770.04 15,331,770.04 0.00 153,317,700.42 - - - - Under Validation No validation date
733 PRDP-IB-R011-CVP-011-000-000-2023 Mindanao Region 11 Compostela Valley Rehabilitation of New Visayas - Banagbanag Montevista to Magading, Nabunturan Road with Expansion of Existing Bridge FMR with Bridge Kilometer 0.000 147,740,800.00 18,467,600.00 18,467,600.00 0.00 184,676,000.00 - - - - Under Validation No validation date
734 PRDP-IB-R011-CVP-012-000-000-2023 Mindanao Region 11 Compostela Valley Rehabilitation of FMR from Kilagding Recenia - Kibagiou Road, Laak with Bridge Component FMR with Bridge Kilometer 0.000 173,896,000.00 21,737,000.00 21,737,000.00 0.00 217,370,000.00 - - - - Under Validation No validation date
735 PRDP-IB-R011-DDN-015-000-000-2023 Mindanao Region 11 Davao Del Norte Rehabilitation of Sawata-Mamangan-Pinamuno-Datu Balong FMR FMR with Bridge Kilometer 0.000 392,000,000.00 49,000,000.00 49,000,000.00 0.00 490,000,000.00 - - - - Under Validation No validation date
736 PRDP-IB-R011-DDN-016-000-000-2023 Mindanao Region 11 Davao Del Norte Rehabilitation of Daligdigon - Paiton FMR with Bridge FMR with Bridge Kilometer 0.000 221,200,000.00 27,650,000.00 27,650,000.00 0.00 276,500,000.00 - - - - Under Validation No validation date
737 PRDP-IB-R011-DOR-018-TAR-006-2023 Mindanao Region 11 Davao Oriental 1st Tarragona Rehabilitation/Improvement of Farm to Market Road (Gravel to Concrete) from Central-Maganda-Tubaon with Bridge Component FMR with Bridge Kilometer 0.000 196,752,947.46 24,594,118.43 24,594,118.43 0.00 245,941,184.32 - - - - Under Validation No validation date
738 PRDP-IB-R011-DDN-017-000-000-2023 Mindanao Region 11 Davao Del Norte Rehabilitation of KM. 15 Kipalili-New Loon FMR with Bridge FMR with Bridge Kilometer 6.910 169,643,149.82 21,205,393.73 21,205,393.73 0.00 212,053,937.28 1,140 - - - Under Validation No validation date
739 PRDP-IB-R012-SAR-010-000-000-2015 Mindanao Region 12 Sarangani Lone Maitum Improvement/Concreting of Sison-Zion Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.720 69,050,998.51 8,631,374.81 8,631,374.81 0.00 86,313,748.13 675 1,538 1,502 3,040 Completed (100%) 100.00% physical progress as of Mar. 18, 2021 » VIEW S-CURVE Jargon Construction & Supply
740 PRDP-IB-R012-SUK-001-ISU-001-2013 Mindanao Region 12 Sultan Kudarat 1st Isulan Rehabilitation of Purok 2-San Martin Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.820 15,109,750.75 1,888,718.84 1,888,718.84 0.00 18,887,188.43 326 279 264 543 Completed (100%) 100.00% physical progress as of Jun. 30, 2015 » VIEW S-CURVE Blimex Construction and Supply
741 PRDP-IB-R012-SAR-011-000-000-2015 Mindanao Region 12 Sarangani Lone Maitum Improvement/Concreting of Lomutan - Upper Kalaneg Farm-Market Road Farm to Market Road (FMR) Kilometer 3.980 33,068,510.92 4,133,563.87 4,133,563.87 0.00 41,335,638.66 374 874 800 1,674 Completed (100%) 100.00% physical progress as of Aug. 15, 2019 » VIEW S-CURVE AJYSC MARKETING
742 PRDP-IB-R012-SOC-007-TUP-003-2014 Mindanao Region 12 South Cotabato 1st Tupi Concreting of Palian-Tubeng FMR Farm to Market Road (FMR) Kilometer 4.000 35,029,882.66 4,378,735.33 4,378,735.33 0.00 43,787,353.32 1,057 2,536 2,749 5,285 Completed (100%) 100.00% physical progress as of May. 14, 2020 » VIEW S-CURVE BRE Construction
743 PRDP-IB-R012-SOC-010-000-000-2015 Mindanao Region 12 South Cotabato 1st Tupi Infra Component of Enhancement of Production and Marketing of Dried Green Coffee Beans Others Square Meter 3296.500 7,905,629.60 988,203.70 988,203.70 0.00 9,882,037.00 194 123 71 194 Completed (100%) 100.00% physical progress as of Oct. 04, 2021 » VIEW S-CURVE Dedase Construction Services
744 PRDP-IB-R012-SOC-006-BAN-002-2015 Mindanao Region 12 South Cotabato 2nd Banga Concreting of Junction National Highway - Sitio Pedregoza Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.760 81,204,630.18 10,150,578.77 10,150,578.77 0.00 101,505,787.72 4,409 8,922 9,666 18,588 Completed (100%) 100.00% physical progress as of Aug. 13, 2020 » VIEW S-CURVE FFJJ Construction
745 PRDP-IB-R012-SUK-002-ISU-002-2013 Mindanao Region 12 Sultan Kudarat 1st Isulan Rehabilitation of Tayugo-Paladong Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.810 15,580,225.56 1,947,528.20 1,947,528.20 0.00 19,475,281.96 165 405 421 826 Completed (100%) 100.00% physical progress as of Oct. 15, 2015 » VIEW S-CURVE BLIMEX Construction & Supply
746 PRDP-IB-R012-SAR-002-MAI-002-2014 Mindanao Region 12 Sarangani Lone Maitum Improvement of Pangi - Kiambing Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.670 23,125,748.99 2,890,718.62 2,890,718.62 0.00 28,907,186.23 561 1,121 1,070 2,191 Completed (100%) 100.00% physical progress as of May. 15, 2016 » VIEW S-CURVE SQUARE CUBE CONSTRUCTION
747 PRDP-IB-R012-SOC-003-TUP-002-2014 Mindanao Region 12 South Cotabato 1st Tupi Concreting of Cebuano - Linan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.550 45,607,045.58 5,700,880.70 5,700,880.70 0.00 57,008,806.98 1,804 5,412 3,608 9,020 Completed (100%) 100.00% physical progress as of Sep. 30, 2017 » VIEW S-CURVE SARANGANI ROCK MIXER
748 PRDP-IB-R012-SUK-003-ISU-003-2013 Mindanao Region 12 Sultan Kudarat 1st Isulan Rehabilitation of Bual-Talitay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.430 14,273,174.47 1,784,146.81 1,784,146.81 0.00 17,841,468.09 486 694 686 1,380 Completed (100%) 100.00% physical progress as of Nov. 15, 2015 » VIEW S-CURVE BLIMEX Construction & Supply
749 PRDP-IB-R012-SUK-006-LAM-001-2014 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of E. Peralta to Asuncion Farm to Market Road Farm to Market Road (FMR) Kilometer 1.300 10,536,210.23 1,317,026.28 1,317,026.28 0.00 13,170,262.79 82 178 232 410 Completed (100%) 100.00% physical progress as of Jul. 15, 2016 » VIEW S-CURVE Charifer Builders Inc.
750 PRDP-IB-R012-SOC-002-TUP-001-2014 Mindanao Region 12 South Cotabato 1st Tupi Concreting of Crossing Rubber-Lunen Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.000 33,479,710.62 4,184,963.83 4,184,963.83 0.00 41,849,638.28 1,363 3,545 3,270 6,815 Completed (100%) 100.00% physical progress as of Feb. 09, 2016 » VIEW S-CURVE T SQUARE BUILDERS
751 PRDP-IB-R012-SUK-008-LAM-003-2014 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Lambay Sambilan to Balikakao Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.200 9,907,175.46 1,238,396.93 1,238,396.93 0.00 12,383,969.32 247 393 128 521 Completed (100%) 100.00% physical progress as of Jun. 26, 2016 » VIEW S-CURVE C.A. Betalac Constn. And Gen. Mdse
752 PRDP-IB-R012-SOC-004-BAN-001-2013 Mindanao Region 12 South Cotabato 2nd Banga Improvement and Construction of Katipunan-Lariosa Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.700 28,366,481.86 3,545,810.23 3,545,810.23 0.00 35,458,102.32 134 266 251 517 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE C.A. BETALAC CONSTRUCTION & GEN. MERCHANDISE
753 PRDP-IB-R012-SOC-001-TAM-001-2013 Mindanao Region 12 South Cotabato 2nd Tampakan Construction of Lampitak Potable Water Supply Potable Water Supply (PWS) Level 2 Number of Households 253.000 3,437,565.93 429,695.74 429,695.74 0.00 4,296,957.41 253 584 437 1,021 Completed (100%) 100.00% physical progress as of Jun. 15, 2015 » VIEW S-CURVE Hanna Via Design & Construction
754 PRDP-IB-R012-SUK-009-LAM-004-2014 Mindanao Region 12 Sultan Kudarat 1st Lambayong Rehabilitation of L. Aserto to Rodrigo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.800 14,034,396.28 1,754,299.54 1,754,299.54 0.00 17,542,995.36 138 317 371 688 Completed (100%) 100.00% physical progress as of Aug. 15, 2016 » VIEW S-CURVE FFJJ Construction
755 PRDP-IB-R012-SUK-007-LAM-002-2014 Mindanao Region 12 Sultan Kudarat 1st Lambayong Rehabilitation of Maskulado Abellera to ARC 2 Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.500 12,361,585.22 1,545,198.15 1,545,198.15 0.00 15,451,981.52 128 301 347 648 Completed (100%) 100.00% physical progress as of Aug. 15, 2016 » VIEW S-CURVE Cofejok Construction and Supply Corporation
756 PRDP-IB-R012-NCO-002-ANT-001-2014 Mindanao Region 12 North Cotabato 2nd Antipas Rehabilitation/Concreting of Magsaysay-Canaan FMR Farm to Market Road (FMR) Kilometer 4.080 28,610,019.10 3,576,252.39 3,576,252.39 0.00 35,762,523.88 758 1,716 1,569 3,285 Completed (100%) 100.00% physical progress as of Sep. 15, 2018 » VIEW S-CURVE LLABAN CONSTRUCTION
757 PRDP-IB-R012-NCO-014-KIC-001-2015 Mindanao Region 12 North Cotabato 2nd Kidapawan City Concreting of Maligaya Farm to Market Road Farm to Market Road (FMR) Kilometer 2.790 23,572,762.98 2,946,595.37 2,946,595.37 0.00 29,465,953.72 3,703 8,111 8,148 16,259 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE FFJJ Construction
758 PRDP-IB-R012-NCO-003-PRE-001-2014 Mindanao Region 12 North Cotabato 2nd President Roxas Concreting of Poblacion-Mabuhay FMR Farm to Market Road (FMR) Kilometer 2.850 17,863,229.90 2,232,903.74 2,232,903.74 0.00 22,329,037.38 1,016 3,069 2,513 5,582 Completed (100%) 100.00% physical progress as of Dec. 15, 2017 » VIEW S-CURVE Llaban Construction
759 PRDP-IB-R012-SAR-008-000-000-2015 Mindanao Region 12 Sarangani Lone Kiamba Improvement of NHW Jct. Kayupo-Maligang-Sitio Malayo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 4.310 37,964,606.26 4,745,575.78 4,745,575.78 0.00 47,455,757.82 1,354 3,180 2,940 6,120 Completed (100%) 100.00% physical progress as of Nov. 15, 2017 » VIEW S-CURVE JDRC Construction and Supplies
760 PRDP-IB-R012-SAR-014-000-000-2015 Mindanao Region 12 Sarangani Lone Kiamba Improvement of NHW Junction Lomuyon-Tudok FMR Farm to Market Road (FMR) Kilometer 4.060 33,927,850.79 4,240,981.35 4,240,981.35 0.00 42,409,813.49 1,020 1,491 2,892 4,383 Completed (100%) 100.00% physical progress as of Dec. 17, 2018 » VIEW S-CURVE AJYSC MARKETING
761 PRDP-IB-R012-SAR-005-000-000-2015 Mindanao Region 12 Sarangani Lone Malapatan Improvement of NHW Jct. Lun Masla - Kinam - Boundary Don Marcelino(DDS) FMR Farm to Market Road (FMR) Kilometer 5.040 39,460,298.00 4,932,537.25 4,932,537.25 0.00 49,325,372.50 5,469 1,389 12,574 13,963 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE N. Congson Construction/ Three W Builders, Inc.
762 PRDP-IB-R012-SAR-004-000-000-2015 Mindanao Region 12 Sarangani Lone Glan Improvement of NHW Jct. Calabanit - E. Alegado Farm - to - Market Road Farm to Market Road (FMR) Kilometer 4.150 32,018,138.22 4,002,267.28 4,002,267.28 0.00 40,022,672.78 1,615 3,639 3,453 7,092 Completed (100%) 100.00% physical progress as of Aug. 15, 2018 » VIEW S-CURVE Vicente T. Lao Construction
763 PRDP-IB-R012-SAR-007-000-000-2015 Mindanao Region 12 Sarangani Lone Malungon Improvement of Malandag-Datal Batong FMR, Phase 1 Farm to Market Road (FMR) Kilometer 15.840 96,297,390.57 12,037,173.82 12,037,173.82 0.00 120,371,738.21 1,231 3,595 2,158 5,753 Completed (100%) 100.00% physical progress as of Sep. 15, 2020 » VIEW S-CURVE Vicente Lao Construction
764 PRDP-IB-R012-SAR-015-000-000-2015 Mindanao Region 12 Sarangani Lone Kiamba Infra Component of Enhancement of Abaca Production, Processing and Marketing to a High Quality Fiber Others Square Meter 1700.000 10,790,394.66 1,348,799.33 1,348,799.33 0.00 13,487,993.32 377 323 54 377 Completed (100%) 100.00% physical progress as of Apr. 13, 2019 » VIEW S-CURVE KGD Builders, Inc.
765 PRDP-IB-R012-SOC-008-000-000-2014 Mindanao Region 12 South Cotabato 1st Polomolok Infra component of Cassava Granules Production (Construction of All-Weather Drier with Warehouse) Others Square Meter 3.000 3,563,198.92 445,399.87 445,399.87 0.00 4,453,998.66 250 161 89 250 Completed (100%) 100.97% physical progress as of Jun. 15, 2016 » VIEW S-CURVE FH Gopiteo Construction and Supply
766 PRDP-IB-R012-SAR-006-000-000-2015 Mindanao Region 12 Sarangani Lone Maasim Improvement of Mutag Farm - to - Market Road Farm to Market Road (FMR) Kilometer 4.480 34,739,790.46 4,342,473.81 4,342,473.81 0.00 43,424,738.08 2,502 5,709 5,415 11,124 Completed (100%) 100.00% physical progress as of Feb. 15, 2020 » VIEW S-CURVE Legacy Construction
767 PRDP-IB-R012-SAR-003-000-000-2014 Mindanao Region 12 Sarangani Lone Malapatan Infra Component of Sarangani Virgin Coconut Oil Processing Others Square Meter 32.120 7,759,169.76 969,896.22 969,896.22 0.00 9,698,962.20 816 442 374 816 Completed (100%) 100.00% physical progress as of Mar. 20, 2020 » VIEW S-CURVE KGD Builders, Inc.
768 PRDP-IB-R012-NCO-011-000-000-2014 Mindanao Region 12 North Cotabato 1st Pigkawayan Concreting of New Igbaras-Patot FMR Farm to Market Road (FMR) Kilometer 3.490 35,957,179.64 4,494,647.46 4,494,647.46 0.00 44,946,474.56 529 1,386 1,180 2,566 Completed (100%) 100.00% physical progress as of Jul. 15, 2021 » VIEW S-CURVE Jargon Construction & Supply
769 PRDP-IB-R012-NCO-009-ALE-001-2014 Mindanao Region 12 North Cotabato 1st Aleosan Concreting of Dualing-San Mateo-Sta. Cruz FMR Farm to Market Road (FMR) Kilometer 2.480 20,021,778.05 2,502,722.26 2,502,722.26 0.00 25,027,222.57 453 1,136 1,178 2,314 Completed (100%) 100.00% physical progress as of Aug. 15, 2017 » VIEW S-CURVE MarCus Construction
770 PRDP-IB-R012-NCO-016-000-000-2014 Mindanao Region 12 North Cotabato 1st Aleosan Infra Component of Rubber Sheet Processing and Marketing Others Square Meter 720.000 6,172,414.75 771,551.84 771,551.84 0.00 7,715,518.43 400 276 124 400 Completed (100%) 100.00% physical progress as of Apr. 22, 2019 » VIEW S-CURVE Curve-Line Construction
771 PRDP-IB-R012-NCO-012-000-000-2014 Mindanao Region 12 North Cotabato 3rd Carmen Concreting of Malapag-Tinimbacan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 4.500 38,402,683.18 4,800,335.40 4,800,335.40 0.00 48,003,353.98 1,231 3,141 2,993 6,134 Completed (100%) 100.00% physical progress as of Dec. 15, 2020 » VIEW S-CURVE FFJJ Construction
772 PRDP-IB-R012-SUK-005-ISU-005-2014 Mindanao Region 12 Sultan Kudarat 1st Isulan Rehabilitation of Upper Dansuli-Labintao-Purok Malipayon Farm-to-Market Road Farm to Market Road (FMR) Kilometer 5.080 47,967,413.39 5,995,926.67 5,995,926.67 0.00 59,959,266.73 501 396 361 757 Completed (100%) 100.00% physical progress as of Jan. 15, 2019 » VIEW S-CURVE Joint Venture (Charifer Builders, Inc. and E. Paule)
773 PRDP-IB-R012-NCO-010-000-000-2014 Mindanao Region 12 North Cotabato 2nd Kidapawan City Concreting of Kalaisan-Sumbak Farm to Market Road Farm to Market Road (FMR) Kilometer 1.080 9,663,884.22 1,207,985.53 1,207,985.53 0.00 12,079,855.28 1,214 2,805 2,535 5,340 Completed (100%) 100.00% physical progress as of Aug. 15, 2018 » VIEW S-CURVE Borderline Construction and Supply
774 PRDP-IB-R012-NCO-013-000-000-2014 Mindanao Region 12 North Cotabato 3rd Kabacan Concreting of Kabacan-Aringay -Bangilan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.200 15,321,205.17 1,915,150.65 1,915,150.65 0.00 19,151,506.47 333 750 781 1,531 Completed (100%) 100.00% physical progress as of Dec. 06, 2018 » VIEW S-CURVE MARCUS CONSTRUCTION AND SUPPLY
775 PRDP-IB-R012-NCO-015-000-000-2014 Mindanao Region 12 North Cotabato 3rd Tulunan Concreting of La Esperanza - New Panay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.280 9,297,254.31 1,162,156.79 1,162,156.79 0.00 11,621,567.89 1,662 4,484 4,139 8,623 Completed (100%) 100.00% physical progress as of Dec. 15, 2018 » VIEW S-CURVE Robeth General Merchandize Construction & Supply
776 PRDP-IB-R012-SAR-001-MAI-001-2014 Mindanao Region 12 Sarangani Lone Maitum Improvement of Malalag- Mabay Seaside Farm to Market Road Farm to Market Road (FMR) Kilometer 2.260 18,051,288.72 2,256,411.09 2,256,411.09 0.00 22,564,110.90 2,087 4,197 4,004 8,201 Completed (100%) 100.00% physical progress as of Jul. 15, 2017 » VIEW S-CURVE KEILENA RESOURCE AND DEVELOPMENT CORPORATION
777 PRDP-IB-R012-SOC-005-NOR-001-2014 Mindanao Region 12 South Cotabato 2nd Norala Rehabilitation of Purok-Taurus-Central Balabago Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.730 15,151,625.48 1,893,953.19 1,893,953.19 0.00 18,939,531.86 100 256 244 500 Completed (100%) 100.00% physical progress as of Aug. 15, 2016 » VIEW S-CURVE ILBI CONSTRUCTION SUPPLY & SERVICES
778 PRDP-IB-R012-SUK-010-ESP-001-2014 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of Numo-Dukay PWS Level II (Phase 2) Potable Water Supply (PWS) Level 2 Number of Households 1013.000 7,838,081.76 979,760.22 979,760.22 0.00 9,797,602.20 1,013 2,617 2,448 5,065 Completed (100%) 100.00% physical progress as of Aug. 15, 2016 » VIEW S-CURVE KGD BUILDERS
779 PRDP-IB-R012-SOC-009-TAM-002-2015 Mindanao Region 12 South Cotabato 2nd Tampakan Concreting of Lampitak-Albagan Farm to Market Road Farm to Market Road (FMR) Kilometer 5.000 80,086,349.73 10,010,793.72 10,010,793.72 0.00 100,107,937.17 449 1,097 944 2,041 Completed (100%) 100.00% physical progress as of Mar. 04, 2024 » VIEW S-CURVE Better Work Construction
780 PRDP-IB-R012-SUK-016-ESP-006-2016 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Marawir Warehouse with Solar Dryer Others Square Meter 652.000 2,893,217.50 361,652.19 361,652.19 0.00 3,616,521.88 1,064 2,296 2,168 4,464 Completed (100%) 100.00% physical progress as of Nov. 15, 2019 » VIEW S-CURVE FFJJ Construction
781 PRDP-IB-R012-SUK-012-ESP-002-2016 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Barangay Margues Warehouse with Solar Dryer Others Square Meter 652.000 2,590,204.61 323,775.58 323,775.58 0.00 3,237,755.77 854 1,893 1,757 3,650 Completed (100%) 100.00% physical progress as of Jul. 19, 2019 » VIEW S-CURVE ECO Construction and Supply
782 PRDP-IB-R012-SUK-013-ESP-003-2016 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Barangay Legodon Warehouse with Solar Dryer Others Square Meter 652.000 3,074,687.44 384,335.93 384,335.93 0.00 3,843,359.30 120 255 245 500 Completed (100%) 100.00% physical progress as of Dec. 15, 2019 » VIEW S-CURVE Minrock Multi-Builders
783 PRDP-IB-R012-SUK-014-ESP-004-2016 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Purok Maligaya Warehouse with Solar Dryer Others Square Meter 652.000 2,590,204.61 323,775.58 323,775.58 0.00 3,237,755.77 912 1,971 1,679 3,650 Completed (100%) 100.00% physical progress as of Jul. 19, 2019 » VIEW S-CURVE ECO Construction and Supply
784 PRDP-IB-R012-SUK-015-ESP-005-2016 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Bungo-Bungo Warehouse with Solar Dryer Others Square Meter 652.000 3,094,858.09 386,857.26 386,857.26 0.00 3,868,572.61 120 255 245 500 Completed (100%) 100.00% physical progress as of Dec. 15, 2019 » VIEW S-CURVE Minrock Multi-Builders
785 PRDP-IB-R012-SUK-017-ESP-007-2017 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Concreting of Saliao-Daladap-Guiamalia FMR Farm to Market Road (FMR) Kilometer 13.300 127,811,199.99 15,976,400.00 15,976,400.00 0.00 159,763,999.99 4,150 9,001 9,210 18,211 Completed (100%) 100.00% physical progress as of Feb. 08, 2022 » VIEW S-CURVE Alpha & Omega General Contractor and Development Corporation
786 PRDP-IB-R012-SAR-016-000-000-2018 Mindanao Region 12 Sarangani Lone Maasim Concreting of Kanalo-Nomoh Farm-Market Road Farm to Market Road (FMR) Kilometer 4.590 45,268,800.00 5,658,600.00 5,658,600.00 0.00 56,586,000.00 875 2,070 2,007 4,077 Completed (100%) 100.00% physical progress as of Mar. 20, 2021 » VIEW S-CURVE FREDEN Construction
787 PRDP-IB-R012-NCO-017-KID-002-2017 Mindanao Region 12 North Cotabato Kidapawan Concreting of Sumbac-Onica FMR Farm to Market Road (FMR) Kilometer 9.140 115,040,641.26 14,380,080.16 14,380,080.16 0.00 143,800,801.58 1,559 3,331 3,120 6,451 Completed (100%) 100.00% physical progress as of Nov. 30, 2022 » VIEW S-CURVE JARGON CONSTRUCTION & SUPPLY
788 PRDP-IB-R012-NCO-001-TUL-001-2014 Mindanao Region 12 North Cotabato 3rd Tulunan Rehabilitation of Paraiso-Daig Farm-to-Market Road Farm to Market Road (FMR) Kilometer 8.600 19,946,541.12 2,493,317.64 2,493,317.64 0.00 24,933,176.40 417 824 776 1,600 Less than fifty percent progress 17.26% physical progress as of Apr. 15, 2015 » VIEW S-CURVE Jargon Construction and Supply
789 PRDP-IB-R012-NCO-020-ANT-002-2021 Mindanao Region 12 North Cotabato 2nd Antipas Construction of New Pontevedra-Malangag-Malatab PWS Level II Potable Water Supply (PWS) Level 2 Number of Households 1480.000 55,981,114.33 6,997,639.29 6,997,639.29 0.00 69,976,392.91 1,480 3,922 3,478 7,400 Approved by RPAB For endorsement to NPCO
790 PRDP-IB-R012-NCO-021-KID-003-2022 Mindanao Region 12 North Cotabato 2nd Kidapawan City Concreting of Sibawan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.340 39,870,744.03 4,983,843.00 4,983,843.00 0.00 49,838,430.03 641 1,913 1,291 3,204 Approved by RPAB For endorsement to NPCO
791 PRDP-IB-R012-NCO-022-ANT-003-2022 Mindanao Region 12 North Cotabato 2nd Antipas Concreting of Malangag-Malire Farm-to-Market Road Farm to Market Road (FMR) Kilometer 10.200 147,250,330.95 18,406,291.37 18,406,291.37 0.00 184,062,913.69 4,302 8,614 7,802 16,416 Approved by RPAB For endorsement to NPCO
792 PRDP-IB-R012-SAR-021-000-000-2022 Mindanao Region 12 Sarangani Concreting Alegria-Pait Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.060 142,543,191.86 17,817,898.98 17,817,898.98 0.00 178,178,989.82 - - - - Approved by RPAB For endorsement to NPCO
793 PRDP-IB-R012-SUK-023-LAM-005-2020 Mindanao Region 12 Sultan Kudarat 1st Lambayong Concreting of Bilumin to Kapingkong FMR Farm to Market Road (FMR) Kilometer 7.240 100,325,628.38 12,540,703.55 12,540,703.55 0.00 125,407,035.48 1,336 3,005 3,673 6,678 Approved by RPAB For endorsement to NPCO
794 PRDP-IB-R012-SUK-024-LAM-006-2020 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Non-Halal AA Slaughterhouse Others Square Meter 294.000 27,330,618.09 3,416,327.26 3,416,327.26 0.00 34,163,272.61 17,020 38,944 38,069 77,013 Approved by RPAB For endorsement to NPCO
795 PRDP-IB-R012-SUK-037-ISU-006-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Impao Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 280.000 6,732,772.50 841,596.56 841,596.56 0.00 8,415,965.62 280 333 425 758 Approved by RPAB For endorsement to NPCO
796 PRDP-IB-R012-SUK-038-ISU-007-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Kolambog Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 172.000 5,735,060.42 716,882.55 716,882.55 0.00 7,168,825.52 172 302 265 567 Approved by RPAB For endorsement to NPCO
797 PRDP-IB-R012-SUK-039-ISU-008-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Kudanding Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 233.000 6,035,089.13 754,386.14 754,386.14 0.00 7,543,861.41 233 299 298 597 Approved by RPAB For endorsement to NPCO
798 PRDP-IB-R012-SUK-040-ISU-009-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Laguilayan Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 248.000 6,202,187.90 775,273.49 775,273.49 0.00 7,752,734.88 248 510 552 1,062 Approved by RPAB For endorsement to NPCO
799 PRDP-IB-R012-SUK-041-ISU-010-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Mapantig Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 248.000 5,639,539.48 704,942.44 704,942.44 0.00 7,049,424.36 248 618 616 1,234 Approved by RPAB For endorsement to NPCO
800 PRDP-IB-R012-SUK-042-ISU-011-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of New Egana Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 264.000 6,833,859.35 854,232.42 854,232.42 0.00 8,542,324.19 264 539 475 1,014 Approved by RPAB For endorsement to NPCO
801 PRDP-IB-R012-SUK-043-ISU-012-2021 Mindanao Region 12 Sultan Kudarat 1st Isulan Construction of Tayugo Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 256.000 5,749,843.41 718,730.43 718,730.43 0.00 7,187,304.27 256 621 606 1,227 Approved by RPAB For endorsement to NPCO
802 PRDP-IB-R012-SUK-030-ESP-009-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Brgy. New Panay Warehouse with Solar Dryer Others Square Meter 652.000 3,593,146.46 449,143.31 449,143.31 0.00 4,491,433.08 956 2,062 1,953 4,015 Approved by RPAB For endorsement to NPCO
803 PRDP-IB-R012-SUK-031-ESP-010-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Brgy. Salabaca Warehouse with Solar Dryer Others Square Meter 652.000 3,647,921.74 455,990.22 455,990.22 0.00 4,559,902.18 936 1,997 1,993 3,990 Approved by RPAB For endorsement to NPCO
804 PRDP-IB-R012-NCO-023-KID-004-2023 Mindanao Region 12 North Cotabato 2nd Kidapawan City Concreting of Katipunan-Malinan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 9.250 109,000,000.00 13,625,000.00 13,625,000.00 0.00 136,250,000.00 1,066 2,172 1,906 4,078 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
805 PRDP-IB-R012-SAR-020-000-000-2019 Mindanao Region 12 Sarangani Lone Glan Concreting of NHW Jct. Calabanit-E. Alegado Farm to Market Road Phase 2 Farm to Market Road (FMR) Kilometer 16.810 198,852,980.98 24,856,622.62 24,856,622.62 0.00 248,566,226.22 1,173 2,271 2,011 4,282 Approved by RPAB For Issuance of NOL 1
806 PRDP-IB-R012-SOC-013-SAN-001-2023 Mindanao Region 12 South Cotabato 2nd Santo Niño Concreting of NHW Jct. Crossing Fale-Riverside Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.620 42,681,301.70 5,335,162.71 5,335,162.71 0.00 53,351,627.12 1,772 4,121 4,014 8,135 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
807 PRDP-IB-R012-SOC-014-POL-001-2023 Mindanao Region 12 South Cotabato 1st Polomolok Concreting of Kalyong-Bukay Eel-Guaza-Buluan-Bato-Paradise Farm-to-Market Road Farm to Market Road (FMR) Kilometer 10.430 168,229,746.72 21,028,718.34 21,028,718.34 0.00 210,287,183.40 633 1,432 1,345 2,777 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
808 PRDP-IB-R012-SOC-016-BAN-003-2023 Mindanao Region 12 South Cotabato 2nd Banga Concreting of Rang-ay-Lamba Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.760 121,072,000.71 15,134,000.09 15,134,000.09 0.00 151,340,000.89 1,179 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
809 PRDP-IB-R012-SOC-017-TAM-003-2023 Mindanao Region 12 South Cotabato 2nd Tampakan Concreting of San Isidro-Buto Farm-to-Market Road FMR with Bridge Kilometer 4.360 107,350,182.26 13,418,772.78 13,418,772.78 0.00 134,187,727.82 922 1,918 1,770 3,688 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
810 PRDP-IB-R012-SOC-018-TUP-004-2023 Mindanao Region 12 South Cotabato 1st Tupi Concreting of Polonuling-Simbo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.020 123,353,600.00 15,419,200.00 15,419,200.00 0.00 154,192,000.00 2,287 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
811 PRDP-IB-R012-SOC-015-TBO-001-2023 Mindanao Region 12 South Cotabato 2nd T'boli Concreting of Maan-Datal Tablo Farm-to-Market Road Farm to Market Road (FMR) Kilometer 8.630 119,202,957.70 14,900,369.71 14,900,369.71 0.00 149,003,697.12 7,919 3,861 2,084 5,945 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
812 PRDP-IB-R012-SOC-011-TAN-001-2023 Mindanao Region 12 South Cotabato 1st Tantangan Concreting of NHW Jct. - El Ulit Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.000 56,186,400.00 7,023,300.00 7,023,300.00 0.00 70,233,000.00 1,009 2,202 1,984 4,186 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
813 PRDP-IB-R012-SUK-045-BAG-001-2023 Mindanao Region 12 Sultan Kudarat 2nd Bagumbayan Concreting of Sitio Kipuso-Sitio Janiuay Farm-to-Market Road Farm to Market Road (FMR) Kilometer 6.300 130,821,088.68 16,352,636.09 16,352,636.09 0.00 163,526,360.86 296 588 470 1,058 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
814 PRDP-IB-R012-SOC-012-SUR-001-2023 Mindanao Region 12 South Cotabato 2nd Surallah Concreting of Sitio Lanas-Datal Banate-Buyos-Siop Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.720 161,170,603.80 20,146,325.48 20,146,325.48 0.00 201,463,254.76 391 844 738 1,582 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
815 PRDP-IB-R012-SUK-046-SEN-001-2023 Mindanao Region 12 Sultan Kudarat 2nd Sen. Ninoy Aquino Concreting of NHJ Lagubang-Banali-Buklod-Tacupis-Basag Farm-to-Market Road Farm to Market Road (FMR) Kilometer 18.500 265,259,209.50 33,157,401.19 33,157,401.19 0.00 331,574,011.88 1,935 4,979 4,696 9,675 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
816 PRDP-IB-R012-NCO-024-PRE-002-2023 Mindanao Region 12 North Cotabato 2nd President Roxas Concreting of Greenhill-Camasi Farm-to-Market Road Farm to Market Road (FMR) Kilometer 7.330 112,064,000.00 14,008,000.00 14,008,000.00 0.00 140,080,000.00 1,200 3,115 2,887 6,002 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
817 PRDP-IB-R012-SUK-044-ESP-016-2022 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Concreting of Jct. Margues-Numo FMR Farm to Market Road (FMR) Kilometer 7.500 143,660,000.00 17,957,500.00 17,957,500.00 0.00 179,575,000.00 2,573 5,347 6,054 11,401 Approved by RPAB For endorsement to NPCO
818 PRDP-IB-R012-SUK-032-ESP-011-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Embaley, Barangay Salumping Warehouse with Solar Dryer Others Square Meter 652.000 2,845,963.52 569,192.70 569,192.70 1,707,578.11 5,691,927.03 1,237 3,199 1,997 5,196 Completed (100%) 100.00% physical progress as of Nov. 03, 2023 » VIEW S-CURVE FPJ Construction and Supply
819 PRDP-IB-R012-SUK-033-ESP-012-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Kebeng, Barangay Salumping Warehouse with Solar Dryer Others Square Meter 652.000 2,795,991.18 559,198.24 559,198.24 1,677,594.71 5,591,982.37 1,237 3,199 1,997 5,196 Completed (100%) 100.00% physical progress as of Nov. 03, 2023 » VIEW S-CURVE FPJ Construction and Supply
820 PRDP-IB-R012-SUK-025-LAM-007-2021 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Warehouse with Solar Dryer, Brgy. Bilumin, Lambayong Others Square Meter 652.000 3,425,702.23 428,212.78 428,212.78 0.00 4,282,127.79 580 735 1,716 2,451 Completed (100%) 100.00% physical progress as of May. 30, 2024 » VIEW S-CURVE Dreambolt Builders Corporation
821 PRDP-IB-R012-SUK-036-ESP-015-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Mekedefang, Barangay Legodon Warehouse with Solar Dryer Others Square Meter 652.000 2,759,980.38 551,996.08 551,996.08 1,655,988.23 5,519,960.77 772 1,710 1,534 3,244 Completed (100%) 100.00% physical progress as of May. 30, 2024 » VIEW S-CURVE FPJ Construction and Supply
822 PRDP-IB-R012-SUK-035-ESP-014-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Kamansa, Barangay Legodon Warehouse with Solar Dyer Others Square Meter 652.000 2,790,982.48 558,196.50 558,196.50 1,674,589.49 5,581,964.97 772 1,710 1,534 3,244 Completed (100%) 100.00% physical progress as of Apr. 25, 2024 » VIEW S-CURVE FPJ Construction and Supply
823 PRDP-IB-R012-SUK-034-ESP-013-2021 Mindanao Region 12 Sultan Kudarat 2nd Esperanza Construction of One (1) Unit Sitio Dapulan, Barangay Legodon Warehouse with Solar Dryer Others Square Meter 652.000 2,784,993.95 556,998.79 556,998.79 1,670,996.37 5,569,987.90 772 1,710 1,534 3,244 Completed (100%) 100.00% physical progress as of Apr. 01, 2024 » VIEW S-CURVE FPJ Construction and Supply
824 PRDP-IB-R012-SUK-028-LAM-010-2021 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Warehouse with Solar Dryer, Brgy. Pimbalayan, Lambayong Others Square Meter 652.000 2,555,000.00 511,000.00 511,000.00 1,533,000.00 5,110,000.00 518 1,375 3,339 4,714 Completed (100%) 99.99% physical progress as of Jun. 30, 2024 » VIEW S-CURVE JRT TELECOM ENTERPRISE, INC.
825 PRDP-IB-R012-SUK-029-LAM-011-2021 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Warehouse with Solar Dryer, Baumol, Brgy. Pidtiguian, Lambayong Others Square Meter 652.000 2,552,500.00 510,500.00 510,500.00 1,531,500.00 5,105,000.00 755 1,182 2,759 3,941 Completed (100%) 100.00% physical progress as of Jun. 30, 2024 » VIEW S-CURVE CRISNARD CONSTRUCTION AND SUPPLY
826 PRDP-IB-R012-SUK-026-LAM-008-2021 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Warehouse with Solar Dryer, Brgy. Lagao, Lambayong Others Square Meter 652.000 3,980,800.00 497,600.00 497,600.00 0.00 4,976,000.00 455 600 1,403 2,003 Completed (100%) 100.00% physical progress as of May. 30, 2024 » VIEW S-CURVE JRT TELECOM ENTERPRISE, INC.
827 PRDP-IB-R012-SUK-027-LAM-009-2021 Mindanao Region 12 Sultan Kudarat 1st Lambayong Construction of Warehouse with Solar Dryer, Brgy. Tambak, Lambayong Others Square Meter 652.000 3,984,800.00 498,100.00 498,100.00 0.00 4,981,000.00 550 785 1,834 2,619 Completed (100%) 100.00% physical progress as of May. 30, 2024 » VIEW S-CURVE JRT TELECOM ENTERPRISE, INC.
828 PRDP-IB-R013-ADN-002-KIT-002-2013 Mindanao Region 13 Agusan Del Norte 2nd Kitcharao Concreting of Gamoton - Lake Mainit Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.000 7,027,535.65 878,441.96 878,441.96 0.00 8,784,419.57 573 898 919 1,817 Completed (100%) 100.00% physical progress as of Jan. 15, 2017 » VIEW S-CURVE Algamon Construction
829 PRDP-IB-R013-SDN-003-GIG-001-2013 Mindanao Region 13 Surigao Del Norte 2nd Gigaquit Improvement/Concreting of San Isidro Centro-Balesaya FMR Farm to Market Road (FMR) Kilometer 1.450 10,864,337.26 1,358,042.16 1,358,042.16 0.00 13,580,421.58 1,235 3,139 3,267 6,406 Completed (100%) 100.00% physical progress as of Sep. 15, 2017 » VIEW S-CURVE Socor Construction Corporation
830 PRDP-IB-R013-SDN-002-SUR-001-2013 Mindanao Region 13 Surigao Del Norte 2nd Surigao City Construction / Concreting of Guiso Farm-to-Market Road Farm to Market Road (FMR) Kilometer 1.270 14,679,096.22 1,834,887.03 1,834,887.03 0.00 18,348,870.28 437 1,135 1,182 2,317 Completed (100%) 100.00% physical progress as of Apr. 15, 2019 » VIEW S-CURVE Charlz Construction
831 PRDP-IB-R013-ADN-002-KIT-001-2013 Mindanao Region 13 Agusan Del Norte 2nd Kitcharao Construction/Concreting Sangay - Mahayahay Farm to Market Road Farm to Market Road (FMR) Kilometer 1.560 12,349,720.77 1,543,715.10 1,543,715.10 0.00 15,437,150.97 639 1,888 1,600 3,488 Completed (100%) 100.00% physical progress as of Apr. 15, 2018 » VIEW S-CURVE Two Aces Construction
832 PRDP-IB-R013-ADS-002-TAL-001-2013 Mindanao Region 13 Agusan Del Sur 1st Talacogon Construction of Batucan-Malihao-Del Monte Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.480 23,440,088.40 2,930,011.05 2,930,011.05 0.00 29,300,110.50 1,574 4,772 4,292 9,064 Completed (100%) 100.00% physical progress as of Jun. 15, 2017 » VIEW S-CURVE Thearis Builders & Supply
833 PRDP-IB-R013-ADN-003-000-000-2014 Mindanao Region 13 Agusan Del Norte 2nd Santiago Construction of Abaca Fiber Warehouse with Drying Area (Infra component of Integrated Abaca Enhancement Enterprise) Others Square Meter 900.000 11,995,940.67 1,499,492.58 1,499,492.58 0.00 14,994,925.83 31 68 81 149 Completed (100%) 100.00% physical progress as of Dec. 15, 2017 » VIEW S-CURVE Reyrose Construction and Supply
834 PRDP-IB-R013-SDS-007-000-000-2015 Mindanao Region 13 Surigao Del Sur 1st Cortes Concreting of Poblacion-Manlico-Uba FMR Farm to Market Road (FMR) Kilometer 14.160 150,145,713.62 18,768,214.20 18,768,214.20 0.00 187,682,142.02 1,172 2,750 2,596 5,346 Completed (100%) 100.00% physical progress as of Dec. 16, 2020 » VIEW S-CURVE R.D. Interior Junior Construction/Bislig Venture Construction & Development, Inc. (Joint Venture)
835 PRDP-IB-R013-ADS-008-000-000-2015 Mindanao Region 13 Agusan Del Sur 1st Esperanza Concreting of Mahapag-Dona Maxima FMR Farm to Market Road (FMR) Kilometer 9.320 102,710,251.28 12,838,781.41 12,838,781.41 0.00 128,387,814.10 2,473 1,460 1,377 2,837 Completed (100%) 100.00% physical progress as of Nov. 08, 2021 » VIEW S-CURVE ARQ Builders
836 PRDP-IB-R013-ADN-004-NAS-001-2013 Mindanao Region 13 Agusan Del Norte 2nd Nasipit Rehabilitation of Culit CIS Communal Irrigation System (CIS) Hectare 100.000 29,750,463.40 3,718,807.93 3,718,807.93 0.00 37,188,079.26 140 137 31 168 Completed (100%) 100.00% physical progress as of Jan. 17, 2019 » VIEW S-CURVE ROIM Builders & Construction & Supply/Giovanni Construction (Joint Venture (JV))
837 PRDP-IB-R013-DII-002-000-000-2015 Mindanao Region 13 Dinagat Islands Lone Cagdianao Concreting of R. Ecleo - Upper Laguna Farm to Market Road Farm to Market Road (FMR) Kilometer 3.620 87,576,386.70 10,947,048.34 10,947,048.34 0.00 109,470,483.38 794 1,978 1,969 3,947 Completed (100%) 100.00% physical progress as of Oct. 15, 2020 » VIEW S-CURVE Puregold Construction and Development Corporation
838 PRDP-IB-R013-SDN-006-PLA-001-2014 Mindanao Region 13 Surigao Del Norte 2nd Placer Rehabilitation/Construction/Concreting of Bad-as Tres De Mayo - Amoslog Farm to Market Road Farm to Market Road (FMR) Kilometer 4.860 65,258,400.00 8,157,300.00 8,157,300.00 0.00 81,573,000.00 708 2,313 1,683 3,996 Completed (100%) 100.00% physical progress as of Dec. 29, 2020 » VIEW S-CURVE Socor Construction Corporation
839 PRDP-IB-R013-ADS-003-TRE-001-2014 Mindanao Region 13 Agusan Del Sur 2nd Trento Construction/Concreting of Sitio Gasa to Algon FMR Farm to Market Road (FMR) Kilometer 2.780 16,880,846.57 2,110,105.82 2,110,105.82 0.00 21,101,058.21 355 759 649 1,408 Completed (100%) 100.00% physical progress as of Jan. 17, 2019 » VIEW S-CURVE Davao Rock Mixer
840 PRDP-IB-R013-ADS-002-VER-001-2013 Mindanao Region 13 Agusan Del Sur 2nd Veruela Const/Concreting of NRJ Anilao - Mahayahay Farm to Market Road Farm to Market Road (FMR) Kilometer 3.000 22,548,996.14 2,818,624.52 2,818,624.52 0.00 28,186,245.18 230 427 383 810 Completed (100%) 100.00% physical progress as of Apr. 20, 2018 » VIEW S-CURVE ROIM Builders and Construction Supply
841 PRDP-IB-R013-ADS-002-ESP-003-2013 Mindanao Region 13 Agusan Del Sur 1st Esperanza Concreting of Lumbia- Mabao Farm to Market Road Farm to Market Road (FMR) Kilometer 2.920 27,512,866.46 3,439,108.31 3,439,108.31 0.00 34,391,083.08 885 1,576 1,460 3,036 Completed (100%) 100.00% physical progress as of Sep. 01, 2018 » VIEW S-CURVE AQR Builders
842 PRDP-IB-R013-ADS-002-ESP-002-2013 Mindanao Region 13 Agusan Del Sur 1st Esperanza Concreting of Tag-anahaw to San Isidro Farm to Market Road Farm to Market Road (FMR) Kilometer 1.400 11,096,858.90 1,387,107.36 1,387,107.36 0.00 13,871,073.62 504 376 352 728 Completed (100%) 100.00% physical progress as of Jul. 15, 2017 » VIEW S-CURVE L.C Ting Construction
843 PRDP-IB-R013-SDN-004-SIS-001-2013 Mindanao Region 13 Surigao Del Norte 2nd Sison Rehabilitation/Construction of Gacepan-Mayag Farm to Market Road Farm to Market Road (FMR) Kilometer 1.820 16,501,672.06 2,062,709.01 2,062,709.01 0.00 20,627,090.08 274 719 621 1,340 Less than fifty percent progress 9.78% physical progress as of Apr. 15, 2018 » VIEW S-CURVE Charlz Construction
844 PRDP-IB-R013-SDN-008-000-000-2015 Mindanao Region 13 Surigao Del Norte 2nd Malimono Concreting/Rehabilitation of Jubgan-Binocaran FMR Farm to Market Road (FMR) Kilometer 6.500 35,285,834.10 4,410,729.26 4,410,729.26 0.00 44,107,292.62 4,524 1,973 1,921 3,894 Completed (100%) 100.00% physical progress as of Oct. 02, 2018 » VIEW S-CURVE Socor Construction Corporation
845 PRDP-IB-R013-SDN-007-000-000-2015 Mindanao Region 13 Surigao Del Norte 2nd Mainit Rehabilitation/Concreting of Magsaysay-Bobonaon Spur Sta. Cruz-Paco FMR (2 Packages) Farm to Market Road (FMR) Kilometer 18.400 174,319,972.65 21,789,996.58 21,789,996.58 0.00 217,899,965.81 1,994 4,761 4,610 9,371 Completed (100%) 99.99% physical progress as of Jul. 15, 2019 » VIEW S-CURVE Socor Construction Corporation
846 PRDP-IB-R013-ADS-007-000-000-2015 Mindanao Region 13 Agusan Del Sur 1st Bayugan City Concreting of Bucac - Marcelina - Mahapag - San Vicente FMR Farm to Market Road (FMR) Kilometer 32.340 322,187,530.91 40,273,441.36 40,273,441.36 0.00 402,734,413.63 3,706 9,249 8,507 17,756 Completed (100%) 103.99% physical progress as of Sep. 22, 2022 » VIEW S-CURVE ARQ Builders
847 PRDP-IB-R013-ADN-005-000-000-2014 Mindanao Region 13 Agusan Del Norte 2nd Cabadbaran City Concreting of Bay-ang-Mahaba FMR with Bridge FMR with Bridge Kilometer 8.450 122,178,251.98 15,272,281.50 15,272,281.50 0.00 152,722,814.98 751 1,840 1,659 3,499 Completed (100%) 100.00% physical progress as of Dec. 09, 2021 » VIEW S-CURVE ARQ Builders
848 PRDP-IB-R013-SDS-006-COR-002-2016 Mindanao Region 13 Surigao Del Sur 1st Cortes Construction of Five (5) Units All-Weather Dryer Others Square Meter 600.000 3,211,980.23 401,497.53 401,497.53 0.00 4,014,975.29 2,476 6,083 5,884 11,967 Completed (100%) 100.00% physical progress as of May. 15, 2019 » VIEW S-CURVE CHRISTIAN LEY CONSTRUCTION
849 PRDP-IB-R013-ADS-010-ROS-001-2016 Mindanao Region 13 Agusan Del Sur 2nd Rosario Construction of 4.76 kms. Main Canal with Structures of Limbatangan CIS Communal Irrigation System (CIS) Hectare 300.000 43,777,559.57 5,472,194.95 5,472,194.95 0.00 54,721,949.47 1,623 4,178 4,048 8,226 Completed (100%) 100.00% physical progress as of Jun. 15, 2021 » VIEW S-CURVE Giovanni Construction
850 PRDP-IB-R013-ADS-012-SAL-001-2016 Mindanao Region 13 Agusan Del Sur 1st San Luis Construction of 2.711 km. Main Canal & Lateral and Structures of Laminga Communal Irrigation System Communal Irrigation System (CIS) Hectare 111.000 16,881,889.65 2,110,236.21 2,110,236.21 0.00 21,102,362.07 703 1,799 1,634 3,433 Completed (100%) 100.00% physical progress as of Apr. 01, 2021 » VIEW S-CURVE ARQ Builders
851 PRDP-IB-R013-ADS-009-000-000-2015 Mindanao Region 13 Agusan Del Sur 1st Bayugan City Infra Component of Quality Raw Rubber Production, Processing and Marketing Others Square Meter 1211.930 6,630,326.74 828,790.84 828,790.84 0.00 8,287,908.42 145 99 46 145 Completed (100%) 99.98% physical progress as of Dec. 14, 2020 » VIEW S-CURVE
852 PRDP-IB-R013-ADN-007-BUT-002-2015 Mindanao Region 13 Agusan Del Norte 1st Butuan City Concreting of Lauan - Tud-ol Farm to Market Road Farm to Market Road (FMR) Kilometer 9.820 127,146,406.35 15,893,300.79 15,893,300.79 0.00 158,933,007.93 511 1,351 1,099 2,450 Completed (100%) 100.00% physical progress as of Sep. 27, 2022 » VIEW S-CURVE Badsbro Construction and General Merchandise
853 PRDP-IB-R013-SDS-008-COR-001-2016 Mindanao Region 13 Surigao Del Sur 1st Cortes Construction of Six (6) Units Watch Tower Others Square Meter 300.000 13,237,406.63 1,654,675.83 1,654,675.83 0.00 16,546,758.29 3,377 5,202 4,978 10,180 Completed (100%) 100.00% physical progress as of Dec. 30, 2022 » VIEW S-CURVE Triple Eight Engineering and Supply
854 PRDP-IB-R013-SDS-005-TAO-005-2018 Mindanao Region 13 Surigao Del Sur 1st Tago Concreting of Kinabigtasan-Lindoy FMR with One (1) Unit Concrete Bridge FMR with Bridge Kilometer 10.150 147,797,343.94 18,474,667.99 18,474,667.99 0.00 184,746,679.92 1,837 4,748 4,393 9,141 Approved by RPAB For endorsement to NPCO
855 PRDP-IB-R013-SDN-009-000-000-2018 Mindanao Region 13 Surigao Del Norte Concreting/Rehabilitation of Sison - Tagbayani - Mayag FMR with Bridge Component FMR with Bridge Kilometer 5.190 155,696,000.00 19,462,000.00 19,462,000.00 0.00 194,620,000.00 680 1,555 1,390 2,945 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
856 PRDP-IB-R013-ADN-008-000-000-2018 Mindanao Region 13 Agusan Del Norte 2nd Nasipit Improvement of Aclan to Junction Hinandayan Farm-to-Market Road with Bridge FMR with Bridge Kilometer 5.610 224,000,000.00 28,000,000.00 28,000,000.00 0.00 280,000,000.00 1,692 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
857 PRDP-IB-R013-SDN-011-000-000-2018 Mindanao Region 13 Surigao Del Norte 2nd Sison Concreting/Rehabilitation of Cantugas - Gacepan FMR with Bridge Component FMR with Bridge Kilometer 3.490 115,104,000.00 14,388,000.00 14,388,000.00 0.00 143,880,000.00 616 1,306 1,242 2,548 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
858 PRDP-IB-R013-SDS-004-SAN-004-2018 Mindanao Region 13 Surigao Del Sur 1st San Agustin Construction/Concreting of Buhisan-Manumnum FMR Farm to Market Road (FMR) Kilometer 3.940 42,761,101.32 8,552,220.26 8,552,220.26 25,656,660.79 85,522,202.63 624 1,644 1,582 3,226 Fifty percent and above progress 87.06% physical progress as of Nov. 30, 2024 » VIEW S-CURVE HI-TRI Development Corporation
859 PRDP-IB-R013-ADS-012-000-000-2018 Mindanao Region 13 Agusan Del Sur 1st Bayugan City Concreting of Bucac-Marcelina FMR Farm to Market Road (FMR) Kilometer 4.750 29,578,796.48 5,915,759.30 5,915,759.30 17,747,277.89 59,157,592.97 2,016 4,791 4,555 9,346 Fifty percent and above progress 92.66% physical progress as of Nov. 30, 2024 » VIEW S-CURVE KHAN KON CHI Construction and Dev't Corporation
860 PRDP-IB-R013-SDN-010-PLA-002-2021 Mindanao Region 13 Surigao Del Norte 2nd Placer Establishment of 30 Tons Ice Plant and Ice Storage Facility Others Square Meter 396.000 46,755,670.54 5,844,458.82 5,844,458.82 0.00 58,444,588.18 5,419 13,942 13,152 27,094 Approved by RPAB For endorsement to NPCO
861 PRDP-IB-R013-SDS-006-CAN-001-2021 Mindanao Region 13 Surigao Del Sur 1st Cantilan Construction of three (3) units Watch Towers Others Square Meter 520.560 13,864,024.83 1,733,003.10 1,733,003.10 0.00 17,330,031.03 3,214 15,106 16,386 31,492 Approved by RPAB For endorsement to NPCO
862 PRDP-IB-R013-SDS-008-SAM-001-2023 Mindanao Region 13 Surigao Del Sur 1st San Miguel Construction of San Miguel Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 8020.000 144,708,800.00 18,088,600.00 18,088,600.00 0.00 180,886,000.00 8,020 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
863 PRDP-IB-R013-SDS-007-CAN-002-2021 Mindanao Region 13 Surigao Del Sur 1st Cantilan Improvement of Cabangahan Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 134.000 7,321,969.14 915,246.14 915,246.14 0.00 9,152,461.42 134 542 471 1,013 Approved by RPAB For endorsement to NPCO
864 PRDP-IB-R013-ADS-013-000-000-2023 Mindanao Region 13 Agusan Del Sur Concreting of Villapaz - Magaud FMR Farm to Market Road (FMR) Kilometer 12.700 260,074,194.98 32,509,274.37 32,509,274.37 0.00 325,092,743.72 2,016 4,791 4,555 9,346 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
865 PRDP-IB-R013-ADS-014-ROS-002-2023 Mindanao Region 13 Agusan Del Sur 2nd Rosario Concreting of Purok 6, Cabantao - Gawahon - Redline, Maligaya FMR Farm to Market Road (FMR) Kilometer 6.650 194,716,000.00 24,339,500.00 24,339,500.00 0.00 243,395,000.00 - - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
866 PRDP-IB-R013-ADS-015-000-000-2023 Mindanao Region 13 Agusan Del Sur Concreting of San Agustin - Bentahon FMR Farm to Market Road (FMR) Kilometer 9.180 151,120,073.18 18,890,009.15 18,890,009.15 0.00 188,900,091.48 1,682 1,719 1,659 3,378 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
867 PRDP-IB-R013-SDN-011-SUR-002-2023 Mindanao Region 13 Surigao Del Norte 2nd Surigao City Construction of NRJ Trinidad - Mabini FMR including Bridges FMR with Bridge Kilometer 6.520 321,677,600.00 40,209,700.00 40,209,700.00 0.00 402,097,000.00 - 1,702 2,553 4,255 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
868 PRDP-IB-R013-SDN-011-000-000-2021 Mindanao Region 13 Surigao Del Norte Concreting of San Isidro - Sico-sico FMR Farm to Market Road (FMR) Kilometer 5.840 128,968,800.00 16,121,100.00 16,121,100.00 0.00 161,211,000.00 2,819 4,860 5,202 10,062 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
869 PRDP-IB-R013-ADN-008-000-000-2023 Mindanao Region 13 Agusan Del Norte Construction/Improvement of Pirada - Payas Farm-to-Market Road with Bridge FMR with Bridge Kilometer 3.070 190,441,600.00 23,805,200.00 23,805,200.00 0.00 238,052,000.00 896 1,618 1,429 3,047 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
870 PRDP-IB-R013-ADN-009-000-000-2023 Mindanao Region 13 Agusan Del Norte Construction/Improvement of San Isidro - Baraas Farm-to-Market Road with Bridge FMR with Bridge Kilometer 4.870 272,182,621.79 34,022,827.72 34,022,827.72 0.00 340,228,277.23 414 1,020 1,117 2,137 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
871 PRDP-IB-R013-ADN-010-000-000-2023 Mindanao Region 13 Agusan Del Norte Construction/Improvement of Mahayahay - Zion Libertad Farm-to-Market Road with Bridge FMR with Bridge Kilometer 4.460 226,866,400.00 28,358,300.00 28,358,300.00 0.00 283,583,000.00 305 534 530 1,064 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
872 PRDP-IB-R013-ADN-011-BUT-002-2023 Mindanao Region 13 Agusan Del Norte 1st Butuan City Concreting of Bugsukan - De Oro - Camayahan FMR with Bridge FMR with Bridge Kilometer 8.660 453,378,400.00 56,672,300.00 56,672,300.00 0.00 566,723,000.00 1,037 2,084 2,548 4,632 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
873 PRDP-IB-R013-ADS-013-SAN-001-2023 Mindanao Region 13 Agusan Del Sur 2nd San Francisco Construction of Lucac Potable Water System Level II Potable Water Supply (PWS) Level 2 Number of Households 1495.000 103,780,848.21 12,972,606.03 12,972,606.03 0.00 129,726,060.27 1,495 3,137 2,843 5,980 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
874 PRDP-IB-R013-DII-002-000-000-2023 Mindanao Region 13 Dinagat Islands Concreting of Sering - Plaridel FMR Farm to Market Road (FMR) Kilometer 9.480 266,118,400.00 33,264,800.00 33,264,800.00 0.00 332,648,000.00 3,659 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
875 PRDP-IB-RARM-MAG-007-000-000-2015 Mindanao ARMM Maguindanao 1st Datu Odin Sinsuat Concreting of Old Market-Sitio Silingan FMR Farm to Market Road (FMR) Kilometer 2.700 24,156,294.07 3,019,536.76 3,019,536.76 0.00 30,195,367.59 482 2,023 867 2,890 Approved by RPAB For endorsement to NPCO
876 PRDP-IB-RARM-MAG-012-AMP-001-2015 Mindanao ARMM Maguindanao 2nd Ampatuan Concreting of Salman - Talpok FMR Farm to Market Road (FMR) Kilometer 3.000 44,274,785.06 5,534,348.13 5,534,348.13 0.00 55,343,481.32 142 550 250 800 Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
877 PRDP-IB-RARM-MAG-008-000-000-2015 Mindanao ARMM Maguindanao 2nd Sultan Sa Barongis Concreting of Barurao-Kulambog FMR Farm to Market Road (FMR) Kilometer 5.560 40,226,934.78 5,028,366.85 5,028,366.85 0.00 50,283,668.48 381 1,256 1,028 2,284 Approved by RPAB For endorsement to NPCO
878 PRDP-IB-RARM-MAG-002-PAR-002-2014 Mindanao ARMM Maguindanao 1st Parang Rehabilitation/Concreting of Barangay Manion Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.000 23,627,799.63 2,953,474.95 2,953,474.95 0.00 29,534,749.53 301 1,210 596 1,806 Completed (100%) 100.00% physical progress as of Sep. 13, 2017 » VIEW S-CURVE FFJJ CONSTRUCTION
879 PRDP-IB-RARM-MAG-001-PAR-001-2014 Mindanao ARMM Maguindanao 1st Parang Rehabilitation/Concreting of Barangay Making-Kalutan Farm-to-Market Road Farm to Market Road (FMR) Kilometer 2.550 20,297,763.60 2,537,220.45 2,537,220.45 0.00 25,372,204.50 662 2,674 1,306 3,980 Completed (100%) 100.00% physical progress as of Jun. 30, 2018 » VIEW S-CURVE FORSTSTONE ENTERPRISES CONSTRUCTON
880 PRDP-IB-RARM-TAW-004-TAN-001-2015 Mindanao ARMM Tawi-tawi Lone Tandubas Concreting of Kepeng-Ungus Matata Farm to Market Road Farm to Market Road (FMR) Kilometer 3.600 26,471,955.71 3,308,994.46 3,308,994.46 0.00 33,089,944.63 610 2,592 1,725 4,317 Completed (100%) 100.00% physical progress as of Apr. 18, 2019 » VIEW S-CURVE Dawing Construction
881 PRDP-IB-RARM-TAW-003-SIM-001-2015 Mindanao ARMM Tawi-tawi Lone Simunul Concreting of Panglima Mastul Farm to Market Road Farm to Market Road (FMR) Kilometer 4.000 33,945,621.63 4,243,202.70 4,243,202.70 0.00 42,432,027.03 720 3,342 1,616 4,958 Completed (100%) 100.00% physical progress as of Sep. 13, 2022 » VIEW S-CURVE JAMARI CONSTRUCTION
882 PRDP-IB-RARM-LDS-001-BAI-001-2013 Mindanao ARMM Lanao Del Sur 2nd Balindong Construction/Rehabilitation of Bubong Cadapaan-Barit Farm-to-Market Road Farm to Market Road (FMR) Kilometer 3.060 28,780,105.10 3,597,513.14 3,597,513.14 0.00 35,975,131.38 307 614 921 1,535 Completed (100%) 100.00% physical progress as of Feb. 28, 2016 » VIEW S-CURVE PIBS TRADING AND CONSTRUCTION
883 PRDP-IB-RARM-TAW-006-SAP-001-2015 Mindanao ARMM Tawi-tawi Lone Sapa-sapa Concreting of Lookan Latuan-Palate Farm to Market Road Farm to Market Road (FMR) Kilometer 3.900 36,619,610.42 4,577,451.30 4,577,451.30 0.00 45,774,513.02 276 2,240 1,700 3,940 Less than fifty percent progress 36.96% physical progress as of Nov. 28, 2021 » VIEW S-CURVE JAMARI CONSTRUCTION
884 PRDP-IB-RARM-MAG-016-AMP-003-2016 Mindanao ARMM Maguindanao 2nd Ampatuan Concreting of Kauran -Sitio Rizal FMR Farm to Market Road (FMR) Kilometer 3.000 24,238,800.64 3,029,850.08 3,029,850.08 0.00 30,298,500.80 834 2,251 2,753 5,004 Approved by RPAB For endorsement to NPCO
885 PRDP-IB-RARM-SUL-002-LUG-002-2018 Mindanao ARMM Sulu 2nd Lugus Construction of Parian Kayawan Warehouse with Solar Drier Others Square Meter 636.000 4,312,000.00 539,000.00 539,000.00 0.00 5,390,000.00 221 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
886 PRDP-IB-RARM-TAW-013-SAP-013-2018 Mindanao ARMM Tawi-tawi Lone Sapa-sapa Construction of Pamasan PWS Level II Potable Water Supply (PWS) Level 2 Number of Households 336.000 7,158,765.14 894,845.64 894,845.64 0.00 8,948,456.42 285 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
887 PRDP-IB-RARM-TAW-014-SAP-014-2018 Mindanao ARMM Tawi-tawi Lone Sapa-sapa Construction of Sikubong Potable Water Supply Level II Potable Water Supply (PWS) Level 2 Number of Households 269.000 5,891,200.00 736,400.00 736,400.00 0.00 7,364,000.00 269 - - - Under FS / DED Preparation Proponent LGU preparing / drafting the Subproject Feasibility Study (FS)
888 PRDP-IB-RARM-TAW-016-SAP-003-2016 Mindanao ARMM Tawi-tawi Lone Sapa-sapa Concreting of Baldatal Farm to Market Road Farm to Market Road (FMR) Kilometer 3.000 28,433,960.00 3,554,245.00 3,554,245.00 0.00 35,542,450.00 167 650 350 1,000 Approved by RPAB For endorsement to NPCO
889 PRDP-IB-RARM-TAW-008-TAN-002-2016 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Ballak Warehouse with Solar Dryer Others Square Meter 636.000 3,965,503.42 495,687.93 495,687.93 0.00 4,956,879.28 90 272 252 524 Completed (100%) 100.00% physical progress as of Feb. 01, 2019 » VIEW S-CURVE Dawing Construction
890 PRDP-IB-RARM-TAW-009-TAN-003-2016 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Silantup Warehouse with Solar Dryer Others Square Meter 636.000 3,965,503.42 495,687.93 495,687.93 0.00 4,956,879.28 366 1,241 1,192 2,433 Completed (100%) 100.00% physical progress as of Feb. 01, 2019 » VIEW S-CURVE Dawing Construction
891 PRDP-IB-RARM-TAW-010-TAN-004-2016 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Tapian Sokah Fish Landing Others Square Meter 300.000 4,796,509.36 599,563.67 599,563.67 0.00 5,995,636.70 258 472 453 925 Completed (100%) 100.00% physical progress as of Apr. 01, 2019 » VIEW S-CURVE DAWING CONSTRUCTION
892 PRDP-IB-RARM-TAW-011-TAN-005-2016 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Tapian Warehouse with Solar Dryer Others Square Meter 636.000 3,965,503.42 495,687.93 495,687.93 0.00 4,956,879.28 425 597 690 1,287 Completed (100%) 100.00% physical progress as of Feb. 01, 2019 » VIEW S-CURVE Dawing Construction
893 PRDP-IB-RARM-LDS-002-PIA-001-2017 Mindanao ARMM Lanao Del Sur 1st Piagapo Concreting of Barangay Pantar Farm to Market Road (FMR) Kilometer 3.800 25,073,791.11 5,014,758.22 5,014,758.22 15,044,274.67 50,147,582.22 120 - - - Approved by RPAB For endorsement to NPCO
894 PRDP-IB-RARM-LDS-003-GAN-001-2017 Mindanao ARMM Lanao Del Sur 2nd Ganassi Construction of Campong Sabala to Sogod Madaya, Gannassi, Lanao Del Sur Farm to Market Road (FMR) Kilometer 2.100 13,496,570.96 2,699,314.19 2,699,314.19 8,097,942.58 26,993,141.92 486 - - - Approved by RPAB For endorsement to NPCO
895 PRDP-IB-RARM-SUL-001-LUG-001-2017 Mindanao ARMM Sulu 2nd Lugus Concreting of Barangay Parian Kayawan- Pait-Rugasan-Kutah Parang - Mantan Farm to Market Road Farm to Market Road (FMR) Kilometer 8.360 111,117,510.88 13,889,688.86 13,889,688.86 0.00 138,896,888.60 2,733 9,349 7,052 16,401 Completed (100%) 100.00% physical progress as of Nov. 17, 2022 » VIEW S-CURVE 2M CONSTRUCTION
896 PRDP-IB-RARM-MAG-017-TAL-001-2017 Mindanao ARMM Maguindanao 2nd Talayan Concreting of Tamar -Fukol Farm to Market Road with Bridge FMR with Bridge Kilometer 9.500 146,298,667.19 18,287,333.40 18,287,333.40 0.00 182,873,333.99 781 1,688 1,557 3,245 Completed (100%) 100.00% physical progress as of Oct. 31, 2023 » VIEW S-CURVE FFJJ CONSTRUCTION
897 PRDP-IB-RARM-TAW-013-SOU-003-2016 Mindanao ARMM Tawi-tawi Lone South Ubian Construction of Tampakan Dampong Warehouse with Solar Drier Others Square Meter 652.000 2,977,471.31 595,494.26 595,494.26 1,786,482.79 5,954,942.62 197 394 591 985 Completed (100%) 100.00% physical progress as of Dec. 31, 2023 » VIEW S-CURVE Tashmer
898 PRDP-IB-RARM-TAW-015-TAN-007-2016 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Sallangan Potable Water Supply Level II Potable Water Supply (PWS) Level 2 Number of Households 336.000 7,466,207.78 1,493,241.56 1,493,241.56 4,479,724.67 14,932,415.57 701 1,402 2,102 3,504 Completed (100%) 100.00% physical progress as of Oct. 31, 2023 » VIEW S-CURVE TASHMEER CONSTRUCTION
899 PRDP-IB-RARM-BAS-003-LAM-001-2017 Mindanao ARMM Basilan Lone Lamitan City Concreting of Barangay Lo-ok -Barangay Arco Farm to Market Road Farm to Market Road (FMR) Kilometer 2.160 24,984,826.87 4,996,965.37 4,996,965.37 14,990,896.12 49,969,653.73 1,231 2,628 2,609 5,237 Fifty percent and above progress 96.19% physical progress as of Nov. 30, 2024 » VIEW S-CURVE RCDG
900 PRDP-IB-RARM-LDS-006-KAP-001-2021 Mindanao ARMM Lanao Del Sur 1st Kapai Concreting of Brgy. Dimagalin-Babayog-Gadongan-Pantao FMR Farm to Market Road (FMR) Kilometer 5.400 44,435,625.16 8,887,125.03 8,887,125.03 26,661,375.10 88,871,250.32 635 1,705 1,478 3,183 Approved by RPAB For endorsement to NPCO
901 PRDP-IB-RARM-SUL-005-SIA-001-2023 Mindanao ARMM Sulu 2nd Siasi Concreting of Barangay Sipanding -Barangay Tubig Kutah FMR Farm to Market Road (FMR) Kilometer 0.000 162,189,512.78 20,273,689.10 20,273,689.10 0.00 202,736,890.98 - - - - Under Validation No validation date
902 PRDP-IB-RARM-TAW-022-SIM-002-2023 Mindanao ARMM Tawi-tawi Lone Simunul Concreting of Barangay Tonggusong -Barangay Tampakan FMR Farm to Market Road (FMR) Kilometer 0.000 39,992,554.76 4,999,069.35 4,999,069.35 0.00 49,990,693.46 - - - - Under Validation No validation date
903 PRDP-IB-RARM-TAW-023-SIM-003-2023 Mindanao ARMM Tawi-tawi Lone Simunul Construction of Sitio Tahing-Tahing Fishlanding with Concrete Footbridge Others Square Meter 0.000 17,674,400.00 2,209,300.00 2,209,300.00 0.00 22,093,000.00 - - - - Under Validation No validation date
904 PRDP-IB-RARM-TAW-025-TAN-013-2023 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of 2 units watch tower at Barangay Tapian and Tongbangkao Others Square Meter 0.000 11,999,648.00 1,499,956.00 1,499,956.00 0.00 14,999,560.00 - - - - Under Validation No validation date
905 PRDP-IB-RARM-TAW-026-TAN-014-2023 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Kepeng Trading Post Others Square Meter 0.000 11,930,637.60 1,491,329.70 1,491,329.70 0.00 14,913,297.00 - - - - Under Validation No validation date
906 PRDP-IB-RARM-TAW-027-TAN-015-2023 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Tongbangkaw Trading Post Others Square Meter 0.000 11,930,637.60 1,491,329.70 1,491,329.70 0.00 14,913,297.00 - - - - Under Validation No validation date
907 PRDP-IB-RARM-LDS-014-TAG-001-2023 Mindanao ARMM Lanao Del Sur 1st Tagoloan Ii Concreting of Tagoloan Irrigation System Communal Irrigation System (CIS) Hectare 0.000 8,776,000.00 1,097,000.00 1,097,000.00 0.00 10,970,000.00 - - - - Under Validation No validation date
908 PRDP-IB-RARM-LDS-013-PUA-001-2023 Mindanao ARMM Lanao Del Sur 2nd Pualas Concreting of Barangay Dapao -Barangay Bantayan FMR Farm to Market Road (FMR) Kilometer 0.000 51,463,042.42 6,432,880.30 6,432,880.30 0.00 64,328,803.02 - - - - Under Validation No validation date
909 PRDP-IB-RARM-SUL-003-OMA-001-2023 Mindanao ARMM Sulu Omar Concreting of Barangay Capual FMR Farm to Market Road (FMR) Kilometer 0.000 118,578,964.67 14,822,370.58 14,822,370.58 0.00 148,223,705.83 - - - - Under Validation No validation date
910 PRDP-IB-RARM-LDS-007-TAG-001-2021 Mindanao ARMM Lanao Del Sur 1st Tagoloan Ii Construction of Tagoloan Irrigation System Communal Irrigation System (CIS) Hectare 50.000 5,485,000.00 1,097,000.00 1,097,000.00 3,291,000.00 10,970,000.00 - - - - Approved by RPAB For endorsement to NPCO
911 PRDP-IB-RARM-LDS-011-LUY-004-2021 Mindanao ARMM Lanao Del Sur 2nd Lumbayanague Construction of Brgy. Poctan Warehouse with Solar Dryer Others Square Meter 652.000 2,808,805.32 561,761.06 561,761.06 1,685,283.19 5,617,610.63 - - - - Approved by RPAB For endorsement to NPCO
912 PRDP-IB-RARM-SUL-004-OMA-002-2023 Mindanao ARMM Sulu Omar Concreting of Barangay Niangkaan FMR Farm to Market Road (FMR) Kilometer 0.000 126,133,246.19 15,766,655.77 15,766,655.77 0.00 157,666,557.73 - - - - Under Validation No validation date
913 PRDP-IB-RARM-TAW-018-TAN-009-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Kepeng Fish Landing with Concrete Footbridge Others Square Meter 650.000 7,419,274.98 1,483,855.00 1,483,855.00 4,451,564.99 14,838,549.97 314 628 941 1,569 Completed (100%) 100.00% physical progress as of Feb. 06, 2024 » VIEW S-CURVE ZET CONSTRUCTION
914 PRDP-IB-RARM-TAW-017-TAN-008-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Kepeng Warehouse with Solar Dryer Others Square Meter 636.000 2,988,662.00 597,732.40 597,732.40 1,793,197.20 5,977,324.00 392 628 941 1,569 Completed (100%) 100.00% physical progress as of Oct. 31, 2023 » VIEW S-CURVE Alms Construction
915 PRDP-IB-RARM-TAW-019-TAN-010-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Tongbangkaw Fish Landing Others Square Meter 300.000 2,981,921.99 596,384.40 596,384.40 1,789,153.19 5,963,843.98 375 750 1,124 1,874 Completed (100%) 100.00% physical progress as of Feb. 07, 2024 » VIEW S-CURVE ALMS CONSTRUCTION
916 PRDP-IB-RARM-TAW-020-TAN-011-2021 Mindanao ARMM Tawi-tawi Lone Tandubas Construction of Tapian Sokah Concrete Footbridge Others Square Meter 450.000 5,965,378.20 1,193,075.64 1,193,075.64 3,579,226.92 11,930,756.40 300 600 799 1,399 Completed (100%) 100.00% physical progress as of Feb. 06, 2024 » VIEW S-CURVE TASHMEER CONSTRUCTION
917 PRDP-IB-RARM-TAW-021-SOU-004-2021 Mindanao ARMM Tawi-tawi Lone South Ubian Construction of Dampong Fish Landing Others Square Meter 300.000 2,972,073.17 594,414.63 594,414.63 1,783,243.90 5,944,146.33 275 627 748 1,375 Completed (100%) 100.00% physical progress as of Feb. 07, 2024 » VIEW S-CURVE ALMS CONSTRUCTION
918 PRDP-IB-RARM-LDS-010-LUY-003-2021 Mindanao ARMM Lanao Del Sur 2nd Lumbayanague Construction of Brgy. Wago Warehouse with Solar Dryer Others Square Meter 652.000 2,808,435.19 561,687.04 561,687.04 1,685,061.11 5,616,870.38 169 406 441 847 Completed (100%) 100.00% physical progress as of Oct. 13, 2024 » VIEW S-CURVE PREHTI
919 PRDP-IB-RARM-BAS-004-LAM-002-2020 Mindanao ARMM Basilan Lone Lamitan City Concreting of Barangay Bohe Yakan to Sitio Tabo-Tabo, Barangay Bulingan Farm to Market Road Farm to Market Road (FMR) Kilometer 2.600 24,963,999.96 4,992,799.99 4,992,799.99 14,978,399.98 49,927,999.92 538 975 968 1,943 Fifty percent and above progress 96.87% physical progress as of Nov. 30, 2024 » VIEW S-CURVE RCDG
920 PRDP-IB-RARM-LDS-004-LUM-001-2021 Mindanao ARMM Lanao Del Sur 1st Lumba-bayabao Concreting of Brgy Barit-Brgy Carandangan FMR Farm to Market Road (FMR) Kilometer 3.030 24,623,000.04 4,924,600.01 4,924,600.01 14,773,800.02 49,246,000.08 240 633 686 1,319 Fifty percent and above progress 68.09% physical progress as of Nov. 29, 2024 » VIEW S-CURVE CDH
921 PRDP-IB-RARM-LDS-008-LUY-001-2021 Mindanao ARMM Lanao Del Sur 2nd Lumbayanague Construction of Brgy Bualan Warehouse with Solar Dryer Others Square Meter 652.000 2,808,435.19 561,687.04 561,687.04 1,685,061.11 5,616,870.38 140 363 350 713 Completed (100%) 100.00% physical progress as of Oct. 13, 2024 » VIEW S-CURVE PREHTI
922 PRDP-IB-RARM-LDS-009-LUY-002-2021 Mindanao ARMM Lanao Del Sur 2nd Lumbayanague Construction of Brgy. Miniros Warehouse with Solar Dryer Others Square Meter 652.000 2,808,435.19 561,687.04 561,687.04 1,685,061.11 5,616,870.38 220 442 658 1,100 Fifty percent and above progress 99.81% physical progress as of Oct. 13, 2024 » VIEW S-CURVE PREHTI
923 PRDP-IB-RARM-LDS-012-LUY-005-2021 Mindanao ARMM Lanao Del Sur 2nd Lumbayanague Construction of Barangay Kabasaran Trading Post Others Square Meter 640.000 6,373,149.77 1,274,629.95 1,274,629.95 3,823,889.86 12,746,299.53 210 525 787 1,312 Completed (100%) 100.00% physical progress as of Nov. 30, 2024 » VIEW S-CURVE PREHTI
924 PRDP-IB-RARM-MAG-019-000-000-2021 Mindanao ARMM Maguindanao Concreting of Brgy. Pandan FMR Farm to Market Road (FMR) Kilometer 6.240 50,651,929.47 10,130,385.89 10,130,385.89 30,391,157.68 101,303,858.93 929 2,277 2,370 4,647 Fifty percent and above progress 90.18% physical progress as of Nov. 21, 2024 » VIEW S-CURVE NIRVANA CONSTRUCTION & SUPPLIES/GABRIELLAS ENTERPRISES
925 PRDP-IB-RARM-MAG-018-000-000-2021 Mindanao ARMM Maguindanao Concreting of Brgy. Rempes- Brgy.Darugao Farm to Market Road Farm to Market Road (FMR) Kilometer 10.000 75,429,894.39 15,085,978.88 15,085,978.88 45,257,936.63 150,859,788.78 1,694 4,292 4,009 8,301 Fifty percent and above progress 62.56% physical progress as of Nov. 17, 2024 » VIEW S-CURVE Item Description